This is an Asbestos Inspection Report for Building #1826 at MCB Camp Lejeune, dated December 16, 2025. The inspection determined that no asbestos-containing materials (ACM) were identified during the initial asbestos inspection, resulting in a hazard ranking of 0/BLUE with no further action required. The building, constructed in 1952 and occupied for general storage (GEN STG A/G/ORG), contained no friable or non-friable ACM records in the database at the time of the report.

The inspection documented ten samples collected on May 19, 2006, from various building locations including concrete expansion joint material, vinyl base and adhesive, drywall and joint material, interior and exterior caulking, gypsum board ceiling, and miscellaneous sealants. All samples tested negative for asbestos content (0% chrysotile, 0% amosite, 0% other asbestos types). The report specifies that ACM presents a health hazard only when asbestos fibers are airborne and inhaled, and directs building occupants to avoid disturbing materials. Maintenance and inspection protocols are outlined, including prohibition on sanding, grinding, or abrading materials, and requirements to report any damage or changes in material condition to the Camp Lejeune Asbestos Program Manager at (910) 451-5837.

View the file

Other files

File Type Posted
RFP PDF.pdf PDF
N4008525B0015 Specs.pdf PDF
N4008525B0015 Dwgs Signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # 1826

MCB CAMP LEJEUNE

Tuesday, December 16, 2025

Print Date

Tuesday, December 16, 2025 Page 1 of 4Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

GEN STG A/G/ORG

HAZARD RANKING 0/BLUE; NO ACM IDENTIFIED [ AH MAY06 ]

NO ASBESTOS WAS IDENTIFIED DURING THE INITIAL ASBESOS INSPECTION. NO FURTHER ACTION REQUIRED

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

No non friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

DRYWALL AND JOINT MATERIAL ENTRANCE 5/19/2006

EXTERIOR CAULKING, WINDOW 5/19/2006

MISCELLANEOUS SEALANT OUTSIDE OF BUILDING 5/19/2006

EXTERIOR CAULKING, WINDOW 5/19/2006

4" VINYL BASE AND ADHESIVE ENTRANCE 5/19/2006

CONCRETE EXPANSION JOINT MATERIAL OFFICE 5/19/2006

4" VINYL BASE AND ADHESIVE OFFICE 5/19/2006

INTERIOR CAULKING, WINDOW 5/19/2006

GYPSUM BOARD CEILING (WITH

ASSOCIATED JOINT COMPOUND)

OFFICE 5/19/2006

JOINT MATERIAL ENTRANCE 5/19/2006

Tuesday, December 16, 2025 Page 2 of 4Print Date:

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

Tuesday, December 16, 2025 Page 3 of 4Print Date:

SAMPLES COLLECTED

Sample Sample

Date

HA Sample Location Chr

Amo

Oth

Description

1826-01-01 5/19/200601 CENTER OF OFFICE 0 0 0CONCRETE EXPANSION

JOINT MATERIAL

1826-02-01 5/19/200602 NORTH DOORWAY 0 0 04" VINYL BASE AND

ADHESIVE

BROWN

1826-03-01 5/19/200603 NORTH DOORWAY 0 0 0DRYWALL AND JOINT

MATERIAL

WALL

1826-03-02 5/19/200603 NORTH CORNER OFFICE 0 0 0DRYWALL AND JOINT

MATERIAL

WALL

1826-04-01 5/19/200604 NORTH DOORWAY 0 0 0JOINT MATERIAL WALL , WHITE

1826-05-01 5/19/200605 NORTH CORNER OFFICE 0 0 04" VINYL BASE AND

ADHESIVE

GRAY

1826-06-01 5/19/200606 NORTH CORNER WALL 0 0 0INTERIOR CAULKING, GRAY @ WINDOW

1826-07-01 5/19/200607 NORTH CORNER OFFICE 0 0 0GYPSUM BOARD

CEILING (WITH

ASSOCIATED JOINT

COMPOUND)

1826-08-01 5/19/200608 NORTH WINDOW 0 0 0EXTERIOR CAULKING, WHITE , @ AC UNIT

BELOW WINDOW

1826-09-01 5/19/200609 NORTH DRAIN TUBE 0 0 0MISCELLANEOUS

SEALANT

EXTERIOR, WHITE @

PVC DRAIN TUBE

1826-10-01 5/19/200610 EAST WINDOW 0 0 0EXTERIOR CAULKING, WHITE, @ 6"X6" POWER

VENT/ FAN

Tuesday, December 16, 2025 Page 4 of 4Print Date: