This is a Statement of Work (SOW) for C5ISR Acquisition, Engineering and Integration (CAEI) Production services to be performed by a single production contractor supporting Naval Information Warfare Center (NIWC) Atlantic. The contract covers concurrent production of approximately 50-65 integrated Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems across multiple platforms including submarines (Los Angeles, Virginia, Seawolf, Ohio classes), surface ships (AEGIS destroyers, CVN carriers, LPD amphibious vessels), and shore-based systems. The contractor shall provide equipment and material procurement, production management, production execution, and production engineering. Work locations include NIWC Atlantic in Charleston, South Carolina; contractor facilities within a 50-mile radius of NIWC Atlantic; and other CONUS and OCONUS locations as defined at the order level. Material comprises approximately 65% of order costs and includes electronics, brackets, cables, and consumables (all commercial items per FAR 2.101), while labor comprises approximately 35% and includes production management, engineering, and execution support. Historically, production contractors have averaged approximately 250 Full-Time Equivalents (FTEs) performing concurrently.
The contractor must establish and maintain a minimum 300,000 square feet of environmentally controlled, access-controlled production floor space with shipping/receiving capability and ability to add classification requirements. A TOP SECRET facility clearance with Sensitive Compartmented Information (SCI) access is required at NIWC Atlantic Charleston and NAVWAR San Diego, with additional locations defined at order level. Performance requirements include systems engineering support, design engineering, site surveys, design validation and verification, production integration, testing facilities, and configuration management. The contractor shall comply with extensive security requirements including personnel clearances, mandatory training (Active Shooter, OPSEC, Anti-Terrorism, cybersecurity, PII awareness), contractor check-in/check-out procedures, information assurance training certifications, and NIST 800-171 compliance for handling controlled unclassified information. Contract administration requires monthly Contract Status Reports, Task/Delivery Order Status Reports, weekly status reports, eCRAFT cost reporting, and closeout documentation. Quality requirements include ISO 9001 compliance, First Article Inspection plans, and Government-approved quality management systems per NAVSEA specifications for shipboard/submarine work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 77-0002 DRAFT SECTION M.pdf | ||
| 77-0002 DRAFT SECTION L.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C – DESCRIPTION/SPECS/WORK STATEMENT
SPECIFICATIONS/STATEMENT OF WORK/PERFORMANCE WORK STATEMENT
Work under this contract will be performed in accordance with the following description/ specifications/statement of work (SOW) which herein will be referred to as Statement of Work:
SHORT TITLE: C5ISR Acquisition, Engineering and Integration (CAEI) Production
1.0 PURPOSE
1.1 SCOPE
As required by each Delivery Order (DO) or Task Order (TO), the contractor shall be required to produce and deliver integrated Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems, networks, and support equipment in support of multiple large acquisition programs on various platforms. At any given time during the life of the contract, the contractor shall be responsible for the concurrent production of between approximately 50 and 65 integrated C5ISR systems; each in different production phases and of varying complexities. Systems will span the entire C5ISR spectrum with installations on shipboard, land-based, and field-based systems. The number of Full Time Equivalents (FTEs) required to perform this effort varies proportionally with Warfighter demand and active orders issued under this contract; however historically, production contractors have averaged approximately 250 FTEs performing at any given time. Examples of engineered systems that shall be procured under this action include, but are not limited to the following:
Multi-Rack Subsurface Communications Systems in support of the Common Submarine Radio Room (CSRR) program on multiple platforms; including Los Angeles (SSN), Virginia (SSN), Seawolf (SSN), and Ohio (SSBN, SSGN) class submarines;
Single/Multi-Rack Network systems in support of the Consolidated Afloat Networks and Enterprise Services (CANES) program on multiple subsurface and surface platforms;
Multi-Rack Weapons Control Systems in support of the Common Electronic Module (CEM) program on multiple platforms; including AEGIS Arleigh Burke class destroyers (DDG), CVN (Carrier Vessel Nuclear) aircraft carriers, and Landing/Platform Dock (LPD) amphibious warfare ships;
Single Rack Command/Control Systems in support of the Global Command and Control System – Maritime (GCCS-M) program on multiple subsurface and surface platforms;
Subsurface Communication Test Beds (a mockup of shipboard communication space; to include shipboard power, cooling, and hull frames) that allow Pre-Installation and Test Checkout (PITCO) to be performed in the production environment prior to delivery;
Field Deployable Communication Systems supporting the Special Operations Deployable Node (SDN) program and various other platforms;
Single Rack Air Traffic Control (ATC) Visual Information Display System (VIDS) in support of multiple shore based platforms;
Production requirements shall include the following:
Equipment and Material Procurement (SOW Para 3.1) Production Management (SOW Para 3.2) Production Execution (SOW Para 3.3) Production Engineering (SOW Para 3.4)
The material and equipment necessary to complete the production and delivery of the required systems varies greatly from order to order, but typically consists of 65% of the total order cost. Material generally includes electronics, metal brackets, cable components, transit cases, racks, packaging materials, and miscellaneous consumables. All material will be commercial items as defined by FAR 2.101; including Commercial-Off-the-Shelf (COTS) items and commercial items with modifications of a type customarily available in the commercial marketplace. Labor typically consists of 35% of the total order cost and will include production management support, production engineering support and production execution. For work completed off-site, the Contractor will generally be required to provide all tools and equipment necessary for production. For work completed on Government-site, all tools and equipment necessary for production will typically be provided by the Government. The Government will identify any tools and equipment to be provided at the order level.
NOTE: Website and e-mail addresses referenced within the SOW and Contract Data Requirements List (CDRL) forms are subject to change. For any website and e-mail address not working during time of performance, the contractor shall contact the Contracting Officer’s Representative (COR) or Contracting Officer for latest website and e-mail address.
An incorrect website or e-mail address does not alleviate a contractor from required reporting or access requirements.
1.2 BACKGROUND
The NIWC Atlantic Corporate Production operation known as the CAEI Service Center is modeled around a strategic partnership between a Government technical team and a single production contractor. With access to Government resources (space, people, tools, equipment, and infrastructure), the production contractor is responsible for procuring, fabricating, assembling, integrating, testing, inspecting and delivering a highly diverse range of systems that include various complex designs provided by Navy program offices in the form of technical data packages. Systems vary in complexity, but generally include the integration of engineered cable assemblies, mounting kit assemblies, hardware, and software/security applications necessary to provide the Warfighter with the capability to communicate, maintain situational awareness, and achieve information dominance.
The CAEI IPT implements a system of processes and metrics (the CAEI Management System) to define, procure, fabricate, assemble, integrate, test, inspect, and deliver fully integrated solutions. The CAEI Management System helps eliminate duplication of efforts throughout the Command and promotes a quality product line through achievement of standard, predictable, repeatable processes, reduced variation, and a culture driving focus on customers and continual improvement that all team members are expected to support.
2.0 PLACE(S) OF PERFORMANCE
The contractor shall provide support at the following location:
a. NIWC Atlantic, Charleston, South Carolina
b. Contractor Facility, Charleston, South Carolina
c. Other locations, both CONUS and OCONUS as defined at the order level.
2.1 GOVERNMENT FACILITIES
The Government will provide multiple facilities (i.e., office space, computer hardware/software, or lab space) to contractor personnel that would otherwise adversely affect the work performance if they were not available on-site.
Labor categories and Government location of those personnel with supplied Government facilities will be identified at the order level. Contractor personnel assigned space within Government facilities shall provide support in accordance with the following requirements.
2.1.1 Access to Government facilities
NIWC Atlantic and other Government installations have restricted access. Contractors are limited to access during certain days and times as specified in the workweek requirements of this SOW. If access to the assigned Government facility is restricted due to safety/security exercise, an Executive Order, or an administrative leave determination applying to the local activity (e.g., inclement weather), the contractor, in agreement with the COR, shall make alternative work arrangements. The contractor shall adjust work schedule or work at an alternate location. If alternate work arrangements cannot be accommodated, the contractor shall notify the COR of the inability to access the assigned facility prior to charging their time to the contract as direct cost provided such charges are consistent with the contractor’s accounting practices.
2.1.2 Training Requirements and Exercise Support
Contractor personnel working full-time or partially at a Government facility shall complete all applicable training requirements as specified under Mandatory Training, SOW Para 8.0. Contractor personnel may also be required to participate in safety, security (e.g., Anti-Terrorism Force Protection (AT/FP)), and operational training exercises (possibly two per year). Applicable contractor personnel shall support and participate in the training exercise which may include role-playing and reacting to exercise injects based on the situation or exercise objectives.
2.1.3 Emergency Management at Government Installations
During emergency situations including health (e.g., COVID-19 pandemic) and weather related circumstances, contractor personnel with scheduled access to a Government installation shall coordinate with the COR prior to reporting to their Government worksite. Access will be in accordance with the latest Government installation requirements and restrictions. The contractor shall identify with the COR if certain personnel are designated mission essential and determine the work expectations during the emergency period of performance. Depending on the type of support, working from an alternative worksite may or may not be allowed.
2.2 CONTRACTOR FACILITIES
The contractor shall have a facility (i.e., office space, laboratory space, staging and storage areas, with or without classified storage) in order to accomplish order objectives. Depending on the type of support required at the order level, contractor shall be required to possess or establish facilities at specific locations. While requirements may vary, the minimum facility requirements to support the orders issued under this contract are as follows:
(a) 300,000 square feet of production floor space, which could be satisfied with multiple locations
(b) Environmentally controlled
(c) Access controlled and physically controlled
(d) Shipping and receiving capability
(e) Ability to add additional classification requirements to the facility at the order level
Specific necessary contractor facilities requirements will be identified at the order level.
A significant portion of work issued under this contract requires close liaison with the Government. The contractor shall establish a local facility within a fifty (50)-mile radius of NIWC Atlantic near Charleston, South Carolina. The contractor shall be capable of quickly interfacing with the labs located at NIWC Atlantic. The contractor’s facility is not necessarily for the exclusive use of this contract and can be utilized on a shared basis. The contractor shall meet all facility location and size requirements within 30 days after contract award. The contractor’s facility shall include physical security to protect Government property as identified in SOW Para 10.0. The contractor shall ensure facility configuration includes space for offices, conference rooms, lab work, and a staging area for materials and equipment.
2.3 ALTERNATE WORK LOCATIONS
Due to the type tasking, support from an alternative worksite is not allowed by contractor personnel. If an alternate work location is necessary to support OCONUS C5ISR production, requirements will be identified at the order level.
2.4 SPECIFIC LOCATIONS
This contract requires a Top Secret facility clearance with access to Sensitive Compartmented Information (SCI). The contractor shall provide support and resources that meet all security requirements for special access at the following locations:
a. NIWC Atlantic, Charleston, South Carolina
b. NAVWAR, San Diego, California
c. Additional Locations defined at the order level
3.0 PERFORMANCE REQUIREMENTS
The following paragraphs list the requirements for the contract. The contractor shall provide the necessary resources and knowledge to support these requirements. Specific requirements will be dependent on the basic contract and the written orders placed under this basic contract. The Contractor shall centrally-manage key functional areas of the contract including production, quality, and logistics.
In compliance with SPAWARINST 4720.1B – SPAWAR Modernization and Installation Policy, all contract installation work performed aboard Navy ships and Navy shore sites is under Installation Management Office (IMO) supervision; otherwise, a formal exemption request has been approved. In accordance with the Fleet Readiness Directorate Standard Operating Procedure (FRD SOP), NAVWARSYSCOM letter Ser FRD/235 dated 24 Apr 12, the contractor shall ensure proper notification and status updates of installation work performed outside of NIWC Atlantic respective Areas of Responsibilities (AORs) are provided to the NAVWAR Officer in Charge (OIC) or applicable Geographic Lead.
3.1 EQUIPMENT AND MATERIAL PROCUREMENT
Equipment descriptions will be made in terms of specifications, brand name or equal, or brand name only requirements.
As required by each order, the contractor shall be responsible for the research, procurement, fabrication, integration, and delivery of equipment and material; including the following:
3.1.1 Reserved
3.1.2 The Contractor shall review Technical Data Packages (TDPs), Ship Schedules, and the Government Furnished Material (GFM) data provided for the integrated systems and determine any additional rack and system components to be procured.
3.1.3 The Contractor shall consolidate system procurement requirements whenever appropriate to achieve bulk quantity discounts.
3.1.4 The Contractor shall procure hardware, software, spares, and documentation items, as required by the order.
3.1.5 Equipment/Material Research
The contractor shall research specified equipment and/or material within the parameters outlined in the order.
3.1.6 Equipment/Material Procurement
Pursuant to SPAWARINST 4440.12, the contractor shall procure items listed under the Contractor Acquired Property (CAP) paragraph of delivery order SOW’ within 30 days of award of the order. Any material line items with requirements changes shall be procured within 30 days of the change. The contractor shall ensure acquisition selection factors include price, availability, reliability, and supportability within current supply system. The contractor shall keep source selection records and make it available for government review as needed (CDRL A001). The contractor shall provide all support data and cost estimates necessary to justify a fair and reasonable price per item procured. The contractor shall have an adequate accounting system to track all items and the delivery status per order and per item.
After receipt, the contractor shall have an adequate property management system to track the item location per order per item. Unless otherwise noted, all items procured by the contractor shall be utilized or staged at the contractor’s facility, transported by the contractor to the installation, integrated or consumed in a system, or returned to the Government at the completion of the order. The contractor shall be responsible for generating inventory tracking report(s) (CDRL A002) for the basic contract and/or each order summary report. Deliverable documentation shall vary and be specified in each order, if applicable.
(a) Product Validation –
The contractor shall certify that it purchases supplies from authorized resellers and/or distributers. Unless otherwise specified, the contractor shall warrant that the products are new, in their original box. The contractor shall obtain all manufacturer products submitted in order offers from authentic manufacturers or through legal distribution channels only, in accordance with all applicable laws and policies at the time of purchase. The contractor shall provide the Government with a copy of the End User license agreement, and shall warrant that all manufacturer software is licensed originally to Government as the original licensee authorized to use the manufacturer software (CDRL A003).
The contractor shall track the licensing information and have it available for Government review as needed.
(b) Cybersecurity/Computer Security Requirements
The contractor shall ensure that all products recommended and/or procured that impact cybersecurity or Information Assurance (IA) shall be selected from the NIAP Validated Products List. The contractor shall ensure the products chosen are based on the appropriate Evaluated Assurance Level (EAL) for the network involved, and utilized in accordance with latest Defense Information Systems Agency (DISA) policy at time of order. The contractor shall store all product information and have it available for Government review as needed (CDRL A004).
(c) Item Unique Identification (IUID)
In accordance with DFARS clause 252.211-7003/7007 and SECNAVINST 4440.34, the contractor shall ensure that an item manufactured, integrated, or purchased with a unit cost equal to or exceeding $5,000 (or less if item is serially managed or if Government specifies items on individual orders) is labeled with an item unique identification number or Unique Item Identifier (UII). At time of delivery of the item to the Government, the contractor shall clearly mark and identify each applicable item based on the criteria provided in DoD MIL-STD-130N for those items not already marked. The contractor shall specify the construct, syntax, marking methodology, and quality methodology chosen to mark the required parts and any corresponding technical justification. All IUID information shall be recorded and shall be subject to Government review as needed (CDRL A005). The contractor shall track IUID items and maintain information being recorded.
(d) After CAP is delivered to the government, the contractor shall enter all items with Unique Item Identifier (UII) in the IUID Registry. The contractor shall register and validate each IUID in the IUID Registry. The contractor shall submit IUID data via Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) (formerly Wide Area Workflow (WAWF)) as part of the Material Inspection and Receiving Report (CDRL A002).
(e) Contractor shall be responsible maintaining and updating information in the IUID Registry. Contractor shall update custody status when items are designated as government furnished material, returned to government position, change physical location, or has been consumed, destroyed, scrapped, lost or abandoned during contract/order performance.
3.1.7 Property/Inventory Tracking
In accordance with FAR clause 52.245-1, the contractor shall create and maintain internal records of all government property accountable to the contract/order, including Government-furnished and Contractor-acquired property. The contractor shall record each item delivered and/or ordered in a Material Inspection and Receiving Report/Inventory Tracking Report (CDRL A002) as specified in DFARS clause 252.211-7003. At a minimum, the report shall track the following information: item description, order date, serial number, model number, lot number, delivery location, and the manufacturer warranty period and expiration date, if applicable. The contractor shall have inventory report information available for Government review as needed, and the contractor shall ensure the report information has the ability to be sorted and manipulated by any of the input fields. Separate from the Government tracking system, the information in the contractor’s records is a backup to the Government records; therefore, the Government shall own all data rights to the collected information.
3.1.8 Warranty Tracking of Serialized Item
As specified in DFARS clause 252.246-7006 and Instructions for Electronic Submission of Warranty Tracking and Administration Information for Serialized Items (see CDRL A006 Attachment 1), the contractor shall follow the requirements for any serialized item manufactured or acquired that come with a warranty:
3.1.8.1 For government specified warranty terms, the government will complete certain fields on the Warranty Tracking Information (WTI) form and Warranty Source of Repair Instructions (WSRI) form and electronically forwarded them to contractor. The contractor shall complete the remaining sections of the WTI and WSRI and forward the forms (CDRL A006) to the Contracting Officer and COR at time of delivery of the warranted serialized item(s).
3.1.8.2 For contractor/vendor specified warranty terms, the contractor shall complete all data elements for both the WTI and WSRI and shall forward the forms (CDRL A006) electronically to the tech code. The WTI shall be returned to the Contracting Officer and COR at contract/order award. The WSRI shall be returned to the Contracting Officer and COR at contract/order award or at time of delivery of the warranted serialized item(s).
3.1.8.3 For receipt and acceptance of items, the contractor shall comply with the following requirements:
(a) If the WTI and WSRI are submitted manually (as a PDF file), the contractor shall forward documents to COR for review. The contractor shall forward approved documents to Government personnel responsible for posting the forms to Electronic Data Access (EDA).
(b) If utilizing the Invoicing, Receipt, Acceptance, & Property Transfer (iRAPT), the contractor shall ensure that the required warranty data is electronically submitted using the Contract Data Requirements List (CDRL) exhibit line item number (ELIN) functionality for the iRAPT Materiel Inspection and Receiving Report or iRAPT Reparable Receiving Report, as applicable.
3.1.9 Warranty Management
The contractor shall serve as the warranty manager by tracking the applicable Government acceptance dates/receipt dates against the serial number of equipment or the lowest replaceable unit (LRU) of a system. As warranty manager, the contractor shall, unless otherwise directed, submit warranty data on Warranty Tracking Information (WTI) form and Warranty Source of Repair Instructions (WSRI) as specified on the Warranty Tracking and Administration for Serialized Items (CDRL A006). The contractor shall upload data to the Wide Area WorkFlow (WAWF) Materiel Inspection and Receiving Report (or WAWF Reparable Receiving Report, if appropriate).
3.1.9.1 The contractor shall internally track items by order (if applicable), serial numbers, and the information shall be updated monthly to identify the time left on the original warranty. The contractor shall provide the Government a copy of the warranty information in an inventory tracking report (CDRL A002).
3.1.9.2 When an item has failed, the contractor shall determine if the item is still under warranty. If the item is under warranty, the contractor shall obtain a Return for Maintenance Authorization (RMA) number and instructions on how to get the product repaired or replaced from the manufacturer or authorized distributor. A Warranty and Non- Warranty Failure Status Repair Report (CDRL A006) shall be submitted to the COR on all warranty and non- warranty actions taken during the preceding quarter and collected cumulatively. Quarters will be based on the fiscal year beginning in the month of October.
3.1.9.3 Maintenance
This type of work entails, at a minimum, the following: maintenance, overhaul, troubleshooting, and repair or a system and/or equipment. Contractor personnel shall be highly experienced in electronic systems and familiar with the particular system, unless otherwise stated in the order.
3.2 PRODUCTION MANAGEMENT
The contractor shall manage all C5ISR production requirements and develop and deliver a project management plan (CDRL A007) in accordance with:
The CAEI Management System o CAEI Management Plan o CAEI Quality Manual o CAEI Project Management Plan Template o CAEI processes
The Project Management Body of Knowledge (PMBOK) The requirements specified in each order’s SOW System design documentation including the Technical
Data Package.
3.2.1 Business Operations
During the performance of production requirements, the contractor shall fulfill business operations responsibilities including the following:
3.2.1.1 Serve as technical and programmatic liaison to the Government by attending program-related meetings;
including, but not limited to, progress reviews, design reviews, and Configuration Control Boards (CCBs).
3.2.1.2 Track modifications; generate plans and reports; and respond to requests for technical information on systems.
3.2.2 Financial Management
3.2.2.1 During the performance of production requirements, the Contractor shall provide financial documentation required to support production management decisions; including, but not limited to, funding status, cost estimate support for new production/project efforts, and cost impact of changes in ship/project/production and delivery schedules (CDRL A007).
3.2.2.2 The Contractor shall provide and submit a Cost and Schedule Milestone Plan for each production effort
(CDRL A008).
3.2.2.3 The Contractor shall provide a Contract Funds Status Report (CDRL A016).
3.2.3 Scheduling
During the performance of production requirements, the Contractor shall generate integrated schedules aligned with NAVWAR’s Global WBS (CDRL A007) for both the overall program and the individual systems.
3.2.4 Risk Management
During the performance of production requirements, the contractor shall fulfill risk management responsibilities, including the following:
3.2.5 The Contractor shall manage and report risks and mitigations in accordance with the CAEI management system (CDRL A007).
3.2.6 CAEI Data Repository
The CAEI Data Repository shall be the central repository for all programmatic information, documentation and data as specified in the CAEI Management System.
3.3 PRODUCTION EXECUTION
The contractor shall assign a single technical production manager who shall be responsible for the execution of the following requirements:
3.3.1 Asset Management
3.3.1.1 The Contractor shall receive, unpack, and inspect all material and equipment; look for and report to management any evidence of tampering with the package or contents; perform shipping document-to-item comparisons; conduct burn-in tests and verification on received material as required; track integration/production of material and equipment to the serial number for the lowest (line) replaceable unit (LRU); track integration/production of material and equipment by part number and program sponsor.
3.3.1.2 The Contractor shall store, track, update locations, update consumption and report on equipment and material inventories in the integration/production inventory database, CMPro. This database shall provide a basis to manage and inventory parts and to identify alternate sources and track hardware component failures.
3.3.1.3 The Contractor shall generate periodic and adhoc reports to support asset management functions (CDRL A002). Such reports shall include master site inventories, inventory utilization data reports, consumable parts bond room/inventory parts usage reports, material discrepancy reports, status of items on order, and notice of part or model number changes.
3.3.1.4 The Contractor shall protect the physical security of production assets at all times.
3.3.2 Packaging, Handling, Shipping, & Transportation
3.3.2.1 The Contractor shall support warehousing, staging and general PHS&T requirements for ship/production/integration and test systems as specified at the order level; perform packing and shipping in accordance with all military and commercial packaging and hazardous material requirements; determine and suggest optimal packaging for produced systems; expedite shipping for emergency responses; and prepare shipping requests, transfer documentation, and other correspondence associated with the internal tracking of system components and related hardware.
3.3.3 Pre-Production
3.3.3.1 The Contractor shall perform pre-production activities to include, but not limited to, item hardening, cable fabrication and the preparation of terminated cable kits.
3.3.4 Fabrication - The Contractor shall fabricate parts, brackets, cables and enclosures necessary for supporting components in place for proper operation and necessary for the system to perform its mission.
3.3.5 Assembly and Integration
3.3.5.1 The Contractor shall assemble, kit, fabricate, and integrate piece parts, components, and assemblies to deliver products to include, but not limited to, prototypes, fully integrated enclosures, installation kits, mobile cases, ashore racks, and afloat racks.
3.3.5.2 The Contractor shall conduct a Physical Configuration Audit/Function Configuration Audit (PCA/FCA) at the appropriate place in the production process.
3.3.6 Software Loading and Duplication
3.3.6.1 The Contractor shall load and test the system software upon completion of hardware integration.
3.3.6.2 The Contractor shall reproduce UNCLASS and GENSER media for backup and installation. At a minimum, this work shall require an Information Assurance Technology (IAT) Level I certification. In accordance with DFARS 252.239-7001, the contractor shall meet all information assurance training and certification requirements prior to accessing DoD information systems.
3.3.7 Refurbishment Support
The contractor shall upgrade existing platforms. This work shall include depopulating equipment, determining usability of equipment, and refurbishing equipment for integration into the new variant of the system.
3.3.7.1 The Contractor shall receive retrograde systems and determine suitability of the material for refurbishment and reuse, Defense Reutilization Material Office (DRMO) processing, or other disposition method.
3.3.7.2 The Contractor shall disassemble each system, test disassembled components for usability, and provide a recommendation as to the best use or disposition of the material.
3.3.8 Troubleshooting and Repair
3.3.8.1 The Contractor shall troubleshoot and repair faulty assemblies and perform interim support of delivered systems as required.
3.3.9 Documentation and Configuration Data
3.3.9.1 COTS Manuals
3.3.9.1.1 The Contractor shall ensure all COTS manuals supplied with off-the-shelf hardware and software items along with any supplemental information required to operate and maintain the system are present and complete and shall assess the adequacy of the COTS manuals and supplements for the operation and maintenance of the systems under processing ensuring that they conform to the minimal technical content requirements of MIL- HDBK-1221. The Contractor shall immediately notify the Government in writing of any inadequacies identified in the course of COTS manuals evaluations, and recommend alternative solutions (CDRL A007).
3.3.9.2 Configuration Management (CM) Program
3.3.9.2.1 The Contractor shall provide CM support for all systems software and hardware components.
3.3.9.2.2 The Contractor shall identify all hardware and software components. The contractor shall assist in the planning and development of the Item Unique Identification (IUID) Implementation Plan if required by the individual / aggregate C5ISR systems.
3.3.9.2.3 The Contractor shall affix a unique serial number to all major hardware components that do not already contain either a serial number or a unique manufacturer serial number. These serial numbers shall be available for tracking all components in the NIWC Atlantic facilities, at other naval activities, and in deployed systems. These serial numbers shall be available for use in tracking parts for warranty repairs in accordance with the CM section of the project management plan.
3.3.9.2.4 The tracking process shall ensure that all components are accounted for and that responsibility for parts is maintained at all times.
3.3.9.3 CM Database
3.3.9.3.1 The Contractor shall populate existing Government CM database(s) of all hardware and software components to establish the standard production baselines as required. In accordance with DFARS 252.239-7001, the contractor shall meet all information assurance training and certification requirements prior to accessing DoD information systems.
3.3.9.3.2 The Contractor shall update the database(s) as new or modified software and hardware components are incorporated into the system; maintain CM data and documents by system, hull type, location, functional area, work breakdown area, originator, in and in/out dates, location and additional information to effectively identify the subject material; prepare as-delivered configuration lists of the shipped systems to support ISEA and ILS efforts (CDRL A007); establish and maintain a central library of all available logistical, hardware and configuration related documents, including, but not limited to, drawings; formulate matrices of results, recommendations and solutions pertinent to maintaining a high quality level of warranty (CDRL A007); and provide support to the Government CCB by attending meetings and providing technical input as required (CDRL A007).
3.3.10 Test and Checkout
3.3.10.1 The Contractor shall inspect Government Furnished Equipment (GFE) and Contractor purchased equipment prior to assembly and prepare an Equipment Inspection and Testing Reports (CDRL A009).
3.3.10.2 The Contractor shall conduct burn-in test prior to assembly in accordance with individual quality plans to be defined at the order level.
3.3.10.3 Additional receipt/inspection requirements will be defined at the order level.
3.3.10.4 Failure Analysis
3.3.10.4.1 The Contractor shall perform failure analysis at the component, sub-assembly and assembly levels.
3.3.10.4.2 The Contractor shall provide Failure Modes, Effects, and Criticality Analysis Reports (CDRL A009).
3.3.10.4.3 The Contractor shall provide Failure Analysis Summary Lists (CDRL A009).
3.3.10.4.4 The Contractor shall analyze and recommend appropriate levels of testing depending upon system maturity, number of production units, original equipment manufacturer (OEM) factory testing, and installation testing.
3.3.10.5 Integration/Assembly Testing
3.3.10.5.1 The Contractor shall support the metal/mechanical fabrication quality assurance as an in-process step of production, the wire fabrication quality assurance as an in-process step of production, and the component fabrication quality assurance as an in-process step of production.
3.3.10.6 Pre-Installation Test and Check Out (PITCO) & Acceptance Testing
3.3.10.6.1 The Contractor shall support testing and check out of vendor provided or internally developed racks, first articles, field change kits, enclosures, cases and other systems as they apply to the ship/project; prepare Production/Integration Test Plans (CDRL A007), test procedures to perform subassembly, assembly and system level testing (CDRL A007), test reports (CDRL A009).
3.3.10.6.2 The Contractor shall support testing through loading the Operation software. In accordance with DFARS 252.239-7001, the contractor shall meet all information assurance training and certification requirements prior to accessing DoD information systems.
3.3.10.6.3 Under Government supervision, the Contractor shall support testing through loading the Application software. In accordance with DFARS 252.239-7001, the contractor shall meet all information assurance training and certification requirements prior to accessing DoD information systems.
3.3.10.6.4 The Contractor shall support System tests to verify the components function together and support System-to-System tests to verify that NIWC Atlantic’s C5ISR products work together.
3.3.10.7 Environmental Test
3.3.10.7.1 The Contractor shall support shock hardening and Electromagnetic Interference (EMI) testing.
3.3.10.7.2 The Contractor shall support environmental tests at the Government-designated facility.
3.3.11 Documentation
3.3.11.1 The Contractor shall assess Government Furnished Information (GFI) to include, but not limited to, work instructions, build-to-print drawings, production activity procedures, wiring schematics, cable run sheets, parts lists, fabrication drawings, assembly drawings, elevation drawings, outline and mounting drawings, interface control drawings (ICDs), and software load procedures.
3.3.11.2 The Contractor shall ensure the technical information is complete and adequate to produce the kit, rack, enclosure, case, system or component specified.
3.3.11.3 In cases where the customer’s TDP/SDPs are incomplete, the Contractor shall prepare the work instructions and documentation necessary to complete a full, production/integration/delivery ready data package in accordance with CAEI’s document control process (CDRL A007).
3.3.11.4 The Contractor shall assess the impacts of Engineering Change Proposals (ECPs) developed by the design agent on delivery schedules, integration and production systems and advise the Government in writing of changes required in product, schedule, quantity and funding (CDRL A007).
3.3.12 Manufacturing Engineering
3.3.12.1 The Contractor shall perform improvement studies designed to include, but not limited to, identifying process problem areas in the evolving system build-up and integration workloads within the production/integration/test facilities. The improvement studies will identify, analyze and report on methods to achieve cost and quality improvements, maintain and increase throughput, and improve the overall performance of the production operation.
The Contractor shall develop and submit to the Government continuous improvement plan and a monthly continuous improvement status (CDRL A010).
3.3.12.2 The Contractor shall analyze technical data packages (TDP) to identify producibility issues and provide recommended design changes through redline submissions (CDRL A011).
3.4 Production Engineering
3.4.1 The Contractor shall provide Systems Engineering to include design support, human system integration, integration engineering, and configuration management for new construction ships, afloat and ashore platforms and acquisition programs as defined at the order level.
3.4.1.1 Design Engineering Support – Using GFI to be provided at the order level (e.g., ICDs, architecture views, ship specifications); the Contractor shall perform engineering analyses and evaluations to generate an optimal and achievable platform system configuration baseline.
3.4.1.2 The Contractor shall support the design of full-scale, Individual Platform TIFs for C5ISRequipment.
Individual Platform TIFs are defined as “mock-ups” of the platform specific shipboard environment and are components of the overall TIF.
3.4.1.3 The Contractor shall ensure interoperability of interfaces between internal and external systems. These interfaces shall be provided in the Delivery Order.
3.4.1.4 The Contractor shall use “design-budget” and “TURNKEY” methodologies respective to the ship/program acquisition program as defined at the order level.
3.4.1.5 The Contractor shall validate the shipbuilders design to support the integration of the C5ISR suite.
3.4.1.6 The Contractor shall make recommendations for design changes to implement solutions, technical improvements, and dated system upgrades as well as develop or review design change proposal documentation and feasibility validations.
3.4.1.7 The Contractor shall develop and provide a bill of materials with technical specifications for the procurement to support C5ISR integration. GFI to support this material list will be provided at the order level.
3.4.2 Human System Integration – The Contractor shall apply Human System Integration principles to all system engineering tasks.
3.4.3 Integration Engineering – The Contractor shall develop/review Engineering Change Proposals (ECPs), implement approved Engineering Change Orders (ECOs) and prepare work instructions.
3.4.3.1 The Contractor shall provide redline submissions to recommend design changes for identified deficiencies
(CDRL A011).
3.4.3.2 The Contractor shall develop change documentation to effect design changes that impact the C5ISR products.
3.4.3.3 The Contractor shall develop work instructions that clearly describe the skills, material, and step-by-step processes required to accomplish specific tasks that enable adherence to design requirements and applicable standards.
3.4.4 Platform/Program C5ISR Testing – The Contractor shall develop a Test Plan based on GFI provided with C5ISR systems in accordance with the Total Ship Test Plan per DoD-STD-2106 or any other required standard as tasked. Complete and defined tasking will be provided at the order level The Contractor shall prepare, revise, and validate test procedures suitable for TIF and Shipboard testing. These procedures shall identify test equipment required to execute TIF and Shipboard testing. A pool of test equipment will be furnished by the Government and managed by the Contractor to assure timely calibration and usage scheduling. The Contractor shall accommodate any shortfalls in test equipment. In accordance with the Government approved test plan, the Contractor shall complete all stages of testing in the TIF to ensure proper operation, compatibility with existing subsystems and equipment, and suitability for integration into the specified Platform. The Contractor shall provide support for shipboard test and trials evolutions.
3.4.5 Production/Integration – The Contractor shall fully maintain detailed testing and integration facility (TIF) schedules to complete integration and testing, integrate C5ISR systems at the TIF, maintain the systems during testing, and prepare systems for delivery and shipboard integration/testing using approved GFI.
3.4.6 The Contractor shall construct a TIF, based upon approved drawings to be defined at the order level.
3.4.7 The Contractor shall prepare and integrate equipment in the TIF. The Contractor shall also fabricate/build equipment, cabling, ancillary hardware, interface units, test fixtures and any other items not available from other sources or provided by the Government.
3.5 Systems Engineering
3.5.1 Systems Engineering Support
3.5.1.1 The contractor shall provide systems engineering support to include systems engineering management, design, and specifications management. These services will be in support of the systems being produced or manufactured, as defined at the order level.
3.5.2 Verification Methods for Requirements
3.5.2.1 The contractor shall assign verification methods to each allocated requirement, including Analysis, Inspection, Similarity, Demonstration, and Test. The specific requirements will be defined at the order level.
3.5.3 Functional Interface Diagram (FID)
3.5.3.1 The Contractor shall create and/or modify a FID derived from the platform’s Department of Defense Architecture Framework (DoDAF) Internal System View (SV)-1. The FID shall show the systems comprising the C4I SoS and the interfaces connecting them, and shall be organized in accordance with SYSCOMTA-STD-010-FID-V10.
3.5.3.2 Create Functional Interface Diagrams (FIDs) in accordance with the NIWC Configuration/Validation (CONVAL) Teams and existing PEO-C4I guidance.
3.5.3.3 Integrate FIDs with other Configuration Management (CM) products, including Weapon System Interface Diagrams (WSIDs), and other similar integration design products.
3.5.4 Specialty Engineering
3.5.4.1 The contractor shall perform specialty engineering studies to include: Reliability, Maintainability, and Availability assessments, Environmental Electromagnetic Effects assessments, modeling and simulation testing, engineering design recommendations, feasibility studies, white papers, and systems safety and hazards assessments.
3.6 DESIGN ENGINEERING
3.6.1 Design Engineering Support
3.6.1.1 Using site survey data and Government Furnished Information (GFI), (e.g., Installation Requirements Drawings (IRDs), Installation Control Drawings (ICDs), architecture views, ship specifications, FIDs) the Contractor shall provide engineering and technical support services in the area of C4ISR Platform design to include performing engineering analyses and evaluations to generate an optimal and achievable platform system configuration baseline in accordance with COMSPAWAR M-4720-5A 508.
3.6.1.2 The contractor shall translate the requirements identified, defined, decomposed, and allocated by the systems engineering process into documents and drawings that provide technical direction and specifications to procure, fabricate, assemble, integrate, and install the C4I SoS on the designated platform in accordance with COMSPAWAR M-9810.1.
3.6.1.3 The contractor shall develop ONE-Net Installation Drawings in accordance with COMSPAWAR M-4720.1 SPAWAR Shore Installation Process Handbook (SIPH), v4.0, of 12 Nov 2014 (appendix Q).
3.6.1.4 The contractor shall develop Engineering Change Requests (ECR) as part of engineering analysis and evaluations.
3.6.2 The contractor shall develop Ship Installation Drawings (SID) in accordance with NAVSEA 9090-600.
3.6.2.1 Prepare Functional Interface Diagrams (FIDs) in accordance with the NIWC CONVAL Teams and existing PEO-C4I guidance.
3.6.2.2 Integrate FIDs with other CM products, including WSIDs, and other similar integration design products.
3.6.2.3 Prepare full scaled AutoCAD space arrangements in C4I Design Baseline (CDB) format, including faceplate detail, patch and power panel labeling, ventilation ducting, and cableway detail.
3.6.2.4 Integrate/install new C4I systems into an existing CDB arrangement.
3.6.3 Design Decision Matrix
3.6.3.1 The contractor shall deliver a design decision matrix to support integration efforts, including relevant source data, and shall be maintained throughout the scope of this SOW (CDRL A002). The design decision matrix shall include a listing of design decisions, the date on which they were made, and the identity of the individual entering the data.
3.6.3.2 The design decision matrix shall be used to maintain Space, Weight, and Power (SWaP)/Heating, Ventilation, and Air Conditioning (HVAC) data, and these data shall be maintained and organized at the compartment, envelope, cabinet, and equipment levels of indenture. Values for the following design budget parameters shall be maintained: weight, center of gravity, dimensions (including sway space), heat to air, heat to water (if applicable), air flow rate, temperature rise, whether a direct ventilation return is required, the number of electrical leads per cabinet/equipment, the type of power per cabinet/equipment, the load per phase, the in-rush load, the power panel characteristics and loads, fusible link values, and breaker sizes. The SWaP/HVAC data shall also include design budget and actual values of data provided for inter-compartment cables and cableways.
3.6.3.3 The design decision matrix shall be flexible and expandable to incorporate needed additional design parameters. The design decision matrix shall provide a summary report of margins available in both absolute values and percentages for each contractual design budget value. The design decision matrix shall be used to compare against values established by the shipbuilder and to identify potential issues.
3.6.4 Design Inputs
3.6.4.1 The contractor shall populate the design decision matrix with parametric data obtained from ICDs or IRDs, contract specifications, and other technical data sources for the systems and equipment comprising the C4I SoS and any additional required non-C4I systems and any new capabilities and equipment necessitated by additional requirements. Data populated in the design decision matrix shall be based upon source documentation that has been formally authorized for use as design inputs. As a result of immature design inputs prior to preliminary ICDs/IRDs being issued, the contractor shall work directly with the technical design agents for those systems to ensure that the preliminary design data available are accurate, consistent, and reasonable and that the system’s design will be compatible with planned integration approaches on a given ship/shore program.
3.6.4.2 The contractor shall review and provide reports documenting comments and recommendations on ICDs/IRDs and other documents used as design inputs (CDRL A002).
3.6.4.3 The contractor shall annotate and redline ICDs/IRDs and other documents used for design inputs to correct discrepancies and provide clarifications before issuing them for design use (CDRL A004).
3.6.5 C4I SoS Ship/Shore Installation Drawings (SIDs)
3.6.5.1 The contractor shall define, develop, review, update, and deliver revised SIDs necessary execute space modifications to shipboard spaces and in the effective installation of the C4I SoS and subsystems into a platform in accordance with COMSPAWAR M-4720.1 (CDRL A004).
3.6.6 Arrangement Design
3.6.6.1 The contractor shall develop, review, update, and deliver arrangement drawings that depict the relevant aspects of arrangement design required for space modification and system installation. These deliverables shall include: arrangement drawings of key C4I spaces depicting arrangement of space envelopes; fully integrated Government Furnished Equipment (GFE); Contractor Furnished Equipment (CFE); Outfitting and Furnishing (O&F) items; and the incorporation of cableway reservations, ventilation ducting, and other key structural obstructions (CDRL A004). These products shall consider information from official drawings such as general arrangement, compartment and access, and scantling drawings and data obtained during site surveys.
3.6.7 Foundation Design
3.6.7.1 The contractor shall develop, review, update, and deliver foundation drawings that can be used to fabricate or modify existing foundations. (CDRL A004).
3.6.7.2 The drawings shall identify the physical outline, weight, center of gravity, mounting interfaces, flatness requirements, and material characteristics of each individually mountable item and comply with MIL-D-23140D:
Drawings, Installation Control, for Electronic Equipment, or the relevant IRDs/ ICDs, less any detail not required to specify the O&M configuration.
3.6.8 Cableway Design
3.6.8.1 The contractor shall develop, review, update, and deliver drawings that specify requirements for cableways through which cabling associated with C4I SoS or other required systems equipment must be pulled and installed.
These requirements shall be specified for both local and main cableways and shall indicate the routing plan for systems’ cabling into and out of the cableways (CDRL A004).
3.6.8.2 Cableway design shall comply with the requirements of Section 304 of the respective shipbuilding specifications, or equivalent ABS NVR.