This is Addendum #2 to an Invitation for Bid (IFB #24C314004) issued by the California Highway Patrol for ceiling mounted heater replacement services at the Golden Gate Air Operations Unit. The addendum makes two key changes: it replaces Exhibit A, page 2 of 3 in its entirety, and extends the bid due date from February 10, 2025 at 11:00 AM to February 19, 2025 at 11:00 AM, with bid opening moved to February 19, 2025 at 11:15 AM. The scope of work involves removing and replacing five existing ceiling mounted gas hangar heating units that are no longer effectively heating the space. The contractor must install new commercial grade gas heating units and thermostats, provide staff training, obtain necessary permits, and warranty the work for one year.
The contractor is required to seek any available public utility rebates and pass cost savings on to the California Highway Patrol. The scope includes removal and disposal of existing units according to regulations, installation of new units with all necessary parts and fittings, providing operation manuals, and daily cleanup of the jobsite. The contractor must also provide manufacturer's warranty on all installed equipment. The file does not specify pricing terms, set-asides, or funding sources.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_24C314004.pdf | ||
| IFB_24C314004_ADDENDUM_1.pdf | ||
| 24C314004_SUMMARY_OF_QUESTIONS_AND_ANSWERS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF CALIFORNIA HIGHWAY PATROL
February 5, 2025 Page 1 of 1
ADDENDUM NUMBER 2
TO
INVITATION FOR BID - NUMBER 24C314004
CEILING MOUNTED HEATER REPLACEMENT SERVICES
CALIFORNIA HIGHWAY PATROL
GOLDEN GATE AIR OPERATIONS UNIT
Addendum #2 changes the IFB as follows:
1. IFB, Proposed Agreement:
Exhibit A, page 2 of 3, is replaced in its entirety.
2. IFB, Item B, Time Schedule changes:
Bid Due: February 10, 2025 at 11:00 AM Bid Opening: February 10, 2025 at 11:15 AM
TO READ AS FOLLOWS:
Bid Due: February 19, 2025 at 11:00 AM Bid Opening: February 19, 2025 at 11:15 AM
A COPY OF THIS ADDENDUM, IN ITS ENTIRETY, MUST BE INCLUDED WITH YOUR IFB. FAILURE
TO DO SO MAY RENDER YOUR BID NON-RESPONSIVE.
If you have any questions, contact Tessa Gomez Contract Services Unit at (916) 843-3613.
Department of California Highway Patrol and TBD Upon Award
Agreement #24C314004
EXHIBIT A
(Standard Agreement)
SCOPE OF WORK (Continued)
5. General:
The California Highway Patrol (CHP) is in need of replacing five (5) ceiling mounted gas hangar heater units at its Golden Gate Air Operations Area Unit. The existing five
(5) gas hangar heating units are no longer effectively heating the space and must be replaced. This Agreement is under the jurisdiction of CHP, who will execute the contract documents, coordinate with Contractor as necessary, and conduct inspections to ensure that the work is performed in strict accordance with the specifications. No deviations from the Scope of Work will be permitted without concurrence and prior authorization from the CHP Facilities Coordinator or designee.
A. Remove and dispose of the five (5) existing ceiling mounted gas heating units according to federal, state, and local regulations.
B. Install five (5) like for like new commercial grade Energy Star rated ceiling mounted gas heating units including parts, fittings, and rebuild kits to connect to the existing piping if needed.
C. Replace and install five (5) new like for like commercial grade Energy Star rated thermostats including parts and fittings that connect and are compatible with new heater units.
D. Where applicable, Contractor is to seek any public utility rebates and pass the cost savings on to the California Highway Patrol.
E. Contractor shall start-up and test units to ensure proper operation and to make any adjustments needed.
F. Contractor shall provide on-site training to CHP staff on the operation and functions of the newly installed heating units.
G. Contractor shall provide two copies of Operation and Maintenance Manuals to the CHP on-site contact.
H. Contractor is responsible for obtaining any permits required for the installation of the heating units.
I. Contractor shall remove all debris, including packaging materials from the jobsite on a daily basis.
J. Contractor shall warranty work for a period of one year after installation and provide manufacturer’s warranty on equipment installed.