2407 SD51 EAST MS Phase II 102025_Drawings.pdf
PDF 3 MB Posted
- Attached to
- RFQ/P CMGC for East MS Remodel
- Solicitation number
- 2526/014
- Issued by
- Larimer County, Colorado
About this file
These architectural design documents are for the East Administration Building Remodel - Phase II project located at 850 Gunnison Avenue in Grand Junction, Colorado. The project involves a comprehensive renovation of an existing administrative building, with work spanning two primary buildings (Building A and Building B) across lower and upper levels. The architectural plans detail extensive demolition and new construction, including reconfiguring administrative spaces, classrooms, offices, specialized education areas, and support rooms. The project is designed under the 2021 International Building Code and will maintain a Business Occupancy (Group B) classification with Type II-B construction.
The total renovation area encompasses approximately 23,506 square feet, with the main level covering 16,970 square feet and the upper level covering 6,536 square feet. The building will retain its current two-story configuration and includes specific areas such as administrative offices, SPED (Special Education) specialist spaces, training rooms, vestibules, technical spaces, and various specialized rooms. The design incorporates modern space planning, including equitable room distributions, updated restroom facilities, and strategic room layouts. The project documents are marked "NOT FOR CONSTRUCTION" and were prepared by Chamberlin Architects, located in Grand Junction, Colorado, suggesting these are preliminary or schematic design documents pending final review and approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025-09-08 - East Middle School Street Parking Plan (1).pdf | ||
| CMGC IFB East MS Phase 2 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCALITY MAP
PROJECT LOCATION:
830 GUNNISON AVE
GRAND JUNCTION, CO 81501
VICINITY MAP
LOCALITY MAP
DESIGN TEAM
ARCHITECT:
CHAMBERLIN ARCHITECTS
437 Main Street Grand Junction, CO 81501
(970) 242-6804
MECHANICAL / ELECTRICAL:
BIGHORN CONSULTING ENGINEERS, INC
386 Indian Road Grand Junction, CO 81501
(970) 241-8709
TECHNOLOGY:
SHEN MILSON & WILKE
1801 Wewatta, Floor 11 Denver, CO 80202
(720) 482-0770
OWNER
MESA COUNTY VALLEY
SCHOOL DISTRICT 51
2115 Grand Avenue Grand Junction, CO 81501
(970) 254-5100
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
G001B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
COVER SHEET
PROJECT STATUS: SCHEMATIC
DESIGN
EAST ADMINSTRATION BUILDING REMODEL - PHASE II
DRAWING LIST PHASE II
GENERAL
G001B COVER SHEET
ARCHITECTURAL PHASE II
A001B NOTES, SYMBOLS & ABBREVIATIONS
A002B CODE CHECKLIST & LIFE SAFETY PLAN
A021B LOWER LEVEL DEMO PLAN
A022B UPPER LEVEL DEMO PLAN
A023B BUILDING B DEMO PLANS
A024B REFLECTED CEILING DEMO PLAN
A025B REFLECTED CEILING DEMO PLAN
A026B REFLECTED CEILING DEMO PLANS - BLDG B
A101B LOWER LEVEL FLOOR PLAN PHASE II
A102B UPPER LEVEL FLOOR PLAN PHASE II
A103B BLDG B NEW CONSTRUCTION PLAN
GRAND JUNCTION, CO
NO: ISSUED FOR: DATE:
ABV above ACC accessories AFF above finished floor ALT alternate AL aluminum APC acoustical panel ceiling ARCH architect (ural) ASPH asphalt A/C air conditioning
BCS baby changing station BD board BLDG building BLKG blocking BO bottom of BRG bearing
CBU cementitious backer unit CG corner guard CJ control joint CLG ceiling CLR clear (ance) CMU concrete masonry unit COL column CONC concrete CONT continuous or continue CORR corridor CPET common path of egress travel CPT carpet (ed) CSMT casement CT ceramic tile CTR center CWOG center wall on grid
DBL double DEMO demolish / demolition DF drinking fountain DIM dimension (s) DIR direction DISP dispenser DN down DR door DS downspout DTL detail DWG drawing DWR drawer
E east EA each EC evaporative cooler EG etched glass/glazing
EIFS exterior insul finish sys EJ expansion joint EL elevation ELEC electric (al) EM emergency EWC electric water cooler EWG end wall corner guard EQ equal EXG existing EXH exhaust EXP exposed EXT exterior
FBO furnished by owner FD floor drain FDN foundation FE fire extinguisher FEC fire extinguisher cabinet FEP finished end panel FFE finished floor elevation FIN finish FLG flashing FLR floor (ing) FLUR fluorescent FO face of FRMG framing FRP fiber reinforced plastic FT foot (feet) FTG footing
GA gage, gauge GAL gallon GALV galvanized GB grab bar GC general contractor GL glass, glazing GWB gypsum wallboard GYP gypsum
HAS headed anchor stud HB hose bibb HCP handicap (ed) HDR header HDW hardware HM hollow metal HOR horizontal HSS hollow structural sections HT height HVAC heating /ventilation / air conditioning HWD hardwood
INCL include (d) (ing) INSUL insulate (d) (ing) INT interior INV invert
JST joist JT joint
L length, angle LAM laminate (d) LAV lavatory LB pound LF lineal foot LG laminated glass, glazing LIN linoleum LT light
MA match MAS masonry MATL material MAX maximum MB marker board MECH mechanic (al) MFR manufacture (r) (d) MH manhole MIN minimum MISC miscellaneous MLD molding, moulding MO masonry opening MT mount (ed) (ing) MTL metal
N north N/A not applicable NIC not in contract NOM nominal NTS not to scale NECY necessary
OC on center (s) OD outside diameter OFCI owner furnished, contractor installed OFD overflow drain OFOI owner furnished, owner installed OH overhead OL occupant load OLF occupant load factor
OPG opening OPH opposite hand OPP opposite OSB oriented strand board OTS open to structure
PB particle board PERF perforate (d) PERIM perimeter PLAM plastic laminate PLT plate PNL panel PNT paint (ed) PR pair PROJ projector, projection PSF pounds per square foot PSI pounds per square inch PT pressure treated PTD paper towel dispenser PTN partition PVC polyvinyl chloride PVMT pavement PWD plywood
QT quarry tile
R riser, radius RB rubber base REC recycling RCMD recommend (ed) (ations) RE reference REF refrigerator REIN reinforce (d) (ing) REQ required REV revision (s), revised RD roof drain RFG roofing RH robe hook RM room RO rough opening ROW right of way RR restroom RTU roof top unit RUB rubber
S south SAG susp acoustic grid SB sound batt SC shower curtain rod & hooks SCH schedule SD soap dispenser
SHT sheet SHTG sheathing SIM similar SND sanitary napkin disposal SNV sanitary napkin vendor SPEC specification SPKR speaker SQ square SS solid surface SST stainless steel STD standard STL steel STOR storage STR structural SUSP suspended
T tread TB towel bar TD travel distance TEL telephone T.O. top of TOC top of concrete TOS top of steel TOW top of wall TPD toilet paper dispenser TS tube steel TYP typical T&G tongue and groove
UNO unless noted otherwise
VB vapor barrier VCT vinyl composition tile VERT vertical VIF verify in field VM vending machine VNL vinyl sheet VTR vent through roof
W west, wide, width W/ with WB wood base WC watercloset WD wood WDW window WF wide flange WG wire glass W/O without WP waterproof (ing) WR waste receptacle WRB weather resistive barrier WWM welded wire mesh
REVISION
ELEVATION
COLUMN GRID LOCATION
DOOR NUMBER
WINDOW TYPE
CENTER LINE
LINE OF WALL ABOVE OR HIDDEN LINE
BREAK LINE
MATCH LINE
ROOM NAME
ROOM NUMBER
INTERIOR WALL ELEVATION
REFERENCE DRAWING
REFERENCED SECTION NUMBER
SHEET NUMBER
BASIC WALL TYPE
REFERENCED DETAIL NUMBER
SHEET NUMBER
A101
A
101A
Room
A101
TYP
A101
TYP
ANGLE
DIAMETER
PERPENDICULAR
PLATE
PLUS OR MINUS
FLOOR DRAIN
FIRE EXTINGUISHERFE
FD
100' 0"
TOP OF WALL
AL HM
1.
2.
3.
4.
COMPLY WITH ALL MANUFACTURERS
RECOMMENDATIONS AND INDUSTRY STANDARDS
RELEVANT TO THE WORK HEREIN.
ALL DIMENSIONS ARE FROM FACE OF FINISH UNO.
ALL ALIGNMENTS ARE FACE OF FINISH UNO.
FIELD VERIFY ALL DIMENSIONS AND ROUGH
OPENINGS PRIOR TO FABRICATION AND/OR
INSTALLATION.
1.
2.
3.
NOTES:
PROVIDE GLASS MAT WATER-RESISTANT BACKER BOARD IN LIEU OF GYPSUM WALL BOARD BEHIND ALL WALL TILE.
GYPSUM BOARD SHALL BE MOISTURE-RESISTANT AT THE FOLLOWING LOCATIONS: WALLS AND CEILINGS OF ALL
RESTROOMS AND SHOWERS
WALL TYPE CHANGES OCCUR AT CORNERS OR INTERSECTIONS OF WALLS UNLESS NOTED OTHERWISE.
BATT INSULATION, SB
1A
MTL STUD FRM'G at 16" O.C.
5/8" GYP BD EA SIDE (PROVIDE
GLASS MAT BD @ TILE WALLS)
CONC SLAB
BOTTOM
(SECTION VIEW)
PLAN VIEW
TOP
(SECTION VIEW)
ACOUSTICAL SEALANT FROM
GWB TO B.O. DECK
3 5/8" MTL STUDS (STC 46)
CONT SILL GASKET
MTL STUD SLIP TRACK TO
ACCOMMODATE 1" MOVEMENT MAX
ACOUSTICAL SEALANT
EA SIDE
EXG CONC SLAB
BATT INSULATION, SB
MTL STUD FRM'G at 16" O.C.
5/8" GYP BD ONE SIDE
CONC SLAB
BOTTOM
(SECTION VIEW)
PLAN VIEW
TOP
(SECTION VIEW)
ACOUSTICAL SEALANT FROM
GWB TO B.O. DECK
3 5/8" MTL STUDS
MTL STUD SLIP TRACK TO
ACCOMMODATE 1" MOVEMENT MAX
EXG CONC SLAB
1B 6" MTL STUDS (STC 46)
BOTTOM
(SECTION VIEW)
PLAN VIEW
TOP
(SECTION VIEW)
ACOUSTICAL SEALANT FROM
CMU TO B.O. DECK, EA SIDE
CMU, THICKNESS TO MATCH
EXG ADJACENT
CONC SLAB
EXG CONC SLAB
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A001B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
NOTES, SYMBOLS &
ABBREVIATIONS
PROJECT STATUS: SCHEMATIC
DESIGN
ARCHITECTURAL ABBREVIATIONS SYMBOLS
GENERAL NOTES
0' 6"
1'0' 6"
1' A001B
WALL TYPES PHASE II4
R P N K
PATH
133'-0"
PATH
165'-0"
UP
UP
UP
UP UP
UP
BLDG A
BLDG B
FEC
FEC
FEC
FEC
R P N K
DN
DNDNBLDG A
BLDG B
FEC
OCCUPANT LOAD:
MAIN LEVEL (AREA A):
UPPER LEVEL (AREA A):
TOTAL:
WIDTH OF EXITS (SECTION 1005.3.2):
PROVIDED EXIT WIDTH:
EXIT ACCESS TRAVEL DISTANCE
(TABLE 1017.2):
NUMBER OF EXITS REQUIRED FOR BUILDING (SECTION
1006):
EXITS PROVIDED:
16,994 SF / 150 GROSS = 114 OCCUPANTS
16,830 SF / 150 GROSS = 113 OCCUPANTS
227 OCCUPANTS
227 * 0.2 = 46 INCHES
504 INCHES
300 FT (W/ SPRINKLER SYSTEM)
4 (2 PER FLOOR LEVEL)
CODES IN USE (PER MESA COUNTY BUILDING
DEPARTMENT):
TYPE OF OCCUPANCY (SECTION 305):
2021 INTERNATIONAL BUILDING CODE (IBC)
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL PLUMBING CODE (IPC)
2021 INTERNATIONAL FUEL GAS CODE (IFGC)
2023 NATIONAL ELECTRICAL CODE (NEC)
2021 EXISTING BUILDING CODE (EBC)
2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2021 INTERNATIONAL FIRE CODE (IFC)
BUSINESS OCCUPANCY, GROUP B
N/A N/A
CHAPTER 3: USE AND OCCUPANCY CLASSIFICATION
CHAPTER 6: TYPES OF CONSTRUCTION
TYPE OF CONSTRUCTION (TABLE 601): TYPE II-B
0 HR FOR ALL BUILDING ELEMENTS
CHAPTER 4: SPECIAL DETAILED REQUIREMENTS BASED
ON USE AND OCCUPANCY
CHAPTER 5: GENERAL BUILDING HEIGHTS AND AREAS
ALLOWABLE BUILDING HEIGHT (TABLE 504.3)
PROVIDED BUILDING HEIGHT:
ALLOWABLE NUMBER OF STORIES (TABLE 504.4):
PROVIDED NUMBER OF STORIES:
ALLOWABLE AREA INCREASE
ALLOWABLE FLOOR AREA (TABLE 506.2)
SITE SET BACKS
FRONT YARD:
SIDE YARD:
REAR YARD:
TOTAL PROVIDED AREA:
MAIN LEVEL (AREA A):
UPPER LEVEL (AREA A):
TOTAL:
TOTAL RENOVATION AREA:
MAIN LEVEL (AREA A):
UPPER LEVEL (AREA A):
TOTAL:
AUTOMATIC SPRINKLER SYSTEM (SECTION 903):
FIRE EXTINGUISHER:
75'
24'-6"
4 (OCCUPANCY GROUP B)
69,000 SF PER FLOOR FOR TYPE II-B
> 30 FT TO ASSUMED PROPERTY LINE
> 30 FT TO ASSUMED PROPERTY LINE
> 30 FT TO ASSUMED PROPERTY LINE
16,994 SF
16,830 SF
33,824 SF
6,536 SF
16,970 SF
23,506 SF
PROVIDED (SM)
1 WITHIN 75 FT OF TRAVEL
CHAPTER 7: FIRE AND SMOKE PROTECTION FEATURES
N/A
CHAPTER 8: INTERIOR FINISHES
CHAPTER 9: FIRE PROTECTION SYSTEMS
CHAPTER 10: MEANS OF EGRESS
CHAPTER 29: PLUMBING FIXTURES
MIN. NO OF REQ'D PLUMBING FIXTURES
(TABLE 2902.1):
BUSINESS OCCUPANCY
WATER CLOSETS (1:25 FIRST 50, 1:50 AFTER)
LAVATORIES (1:40 FIRST 80, 1:80 AFTER)
SERVICE SINK:
DRINKING FOUNTAIN:
N/A
AUTOMATIC SPRINKLER SYSTEM REQUIRED
(SECTION 903):
AUTOMATIC SPRINKLER SYSTEM PROVIDED:
REQUIRED PROVIDED
6 27 4 19
1 2
3 5
REQUIRED
CODE COMPLIANT SYSTEM PROVIDED
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A002B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
CODE CHECKLIST &
LIFE SAFETY PLAN
PROJECT STATUS: SCHEMATIC
DESIGN
0' 16'
32'0' 16'
32' A002B
MAIN LEVEL - LIFE SAFETY PLAN1
0' 16'
32'0' 16'
32' A002B
UPPER LEVEL - LIFE SAFETY PLAN2
CODE CHECKLIST
STAGE
KITCHEN 118
CORR 117
BOYS 113
GIRLS 115
ELEC/TELE 133
CORR 131
CORR 143
UP
UP
UP
UP
1687 SF
TRAINING
ROOM
906 SF
MEP
77 SF
MECH
106 SF
MEP
Storage
762 SF
NURSING
273 SF
NURSING
816 SF
CCR
115 SF
NURSING
COORDINATOR
115 SF
AD C&CR
DIR
CAREER &
TECH ED
793 SF
SEBS
754 SF
ART
HERRITAGE
& MUSIC
153 SF
DIRECTOR
OF GT
307 SF
AUDIOLOGY
328 SF
AUDIOLOGY
236 SF
STAFF
BREAK
295 SF
SM CONF
RM
237 SF
OFFICE
CAO
104331 SF
WORKROOM
62 SF
RR
176 SF
AREA
DIRECTOR
709 SF
GT / CLD
85 SF
ELEC /
TELE
157 SF
AREA
DIRECTOR
157 SF
AREA
DIRECTOR
185 SF
VESTIBULE
743 SF
ADMINISTRATIVE
ASSISTANTS
165 SF
MECH /
ELEC
225 SF
MEN
241 SF
WOMEN
105 SF
EXECUTIVE
ASST
90 SF
CFA & AL
126 SF
CLDE
COORDINATOR
62 SF
PRIVACY /
MINI CONF
DEMO FLOOR FOR NEW ELEVATOR
EXISTING WALL TO REMAIN
EXISTING ITEM TO REMAIN
LEGEND
EXISTING ITEM TO BE DEMOLISHED
EXISTING WALL TO BE DEMOLISHED
EXISTING SURFACE TO BE DEMOLISHED
NO WORK IN THIS AREA
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A021B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
LOWER LEVEL
DEMO PLAN
PROJECT STATUS: SCHEMATIC
DESIGN
0' 4'
8'0' 4'
8' A021B
LOWER LEVEL DEMO PLAN - BLDG A - PHASE II1
NO: ISSUED FOR: DATE:
3 ADD#1 8/5/25
4 PR#001 8/25/25
EXISTING WALL TO REMAIN
EXISTING ITEM TO REMAIN
LEGEND
EXISTING ITEM TO BE DEMOLISHED
EXISTING WALL TO BE DEMOLISHED
EXISTING SURFACE TO BE DEMOLISHED
NO WORK IN THIS AREA
R P N K
CLASSROOM 202CLASSROOM 201CLASSROOM 208CLASSROOM 209
CLASSROOM 210
GIRLS 207
LIBRARY 111
OFFICE 212
BOYS 204 CLASSROOM 203
7TH GRAD SPED 214
6TH GRAD SPED 215
CLASSROOM 216
CLASSROOM 219CLASSROOM 220CLASSROOM 222CLASSROOM 223
CLASSROOM 224
GIRLS 225
BOYS 118
MECH
CHASE STOR 227
VESTIBULE 200
VESTIBULE 221
LOBBY 213
JAN 205
DEMO FLOOR FOR NEW ELEVATOR
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A022B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
UPPER LEVEL
DEMO PLAN
PROJECT STATUS: SCHEMATIC
DESIGN
0' 4'
8'0' 4'
8' A022B
UPPER LEVEL DEMO PLAN - BLDG A1
ART ROOM
COMPUTER LAB
KEMS
STUDIO
CORRIDOR
GIRLS RESTROOM
GIRLS SHOWER
COACH
STORAGE
STORAGE
STORAGE
BOY'S LOCKER ROOM
OFFICE
STORAGE
BOY'S COACH
BAND STORAGE
235RESTROOM
EXPULSION
EXPULSION
OFFICE / STORAGE
OFFICE / STORAGE
BOILER
EXISTING WALL TO REMAIN
EXISTING ITEM TO REMAIN
LEGEND
EXISTING ITEM TO BE DEMOLISHED
EXISTING WALL TO BE DEMOLISHED
EXISTING SURFACE TO BE DEMOLISHED
NO WORK IN THIS AREA
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A023B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
BUILDING B DEMO
PLANS
PROJECT STATUS: SCHEMATIC
DESIGN
0' 4'
8'0' 4'
8' A023B
LOWER LEVEL DEMO PLAN - BLDG B1
0' 4'
8'0' 4'
8' A023B
UPPER LEVEL DEMO PLAN - BLDG B2
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A024B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
REFLECTED
CEILING DEMO
PLAN
PROJECT STATUS: SCHEMATIC
DESIGN
0' 4'
8'0' 4'
8' A024B
LOWER LEVEL REFLECTED CEILING DEMO PLAN PHASE II1
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A025B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
REFLECTED
CEILING DEMO
PLAN
PROJECT STATUS: SCHEMATIC
DESIGN
0' 4'
8'0' 4'
8' A025B
UPPER LEVEL REFLECTED CEILING DEMO PLAN PHASE II1
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A026B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
REFLECTED
CEILING DEMO
PLANS - BLDG B
PROJECT STATUS: SCHEMATIC
DESIGN
0' 4'
8'0' 4'
8' A026B
LOWER LEVEL REFLECTED CEILING DEMO PLAN BLDG B PHASE II1
0' 4'
8'0' 4'
8' A026B
UPPER LEVEL REFLECTED CEILING PLAN BLDG B DEMO PLAN PHASE II2
EXECUTIVE ASST &
STUDENT RECORDS
SPECIALIS
infill doors with windows for more useable space re loc ate de mo 'ed mi llw or k a nd si nk presentation wall pr es en tat ion w all presentation wall pr es en tat ion w all
Bulletin board display or acoustic art wall
Bulletin board display or acoustic art wall
Relocated countertop, base cabinets, copy / print storage and mail cubbies
77 SF
MECH
106 SF
MEP
Storage
906 SF
MEP
273 SF
NURSING
762 SF
NURSING
18 SF
JAN
115 SF
NURSING
COORDINATOR
115 SF
AD C&CR
DIR
CAREER &
TECH ED
129816 SF
CCR
793 SF
SEBS
126 SF
CLDE
COORDINATOR
62 SF
PRIVACY /
MINI CONF
754 SF
ART
HERRITAGE
& MUSIC
153 SF
DIRECTOR
OF GT
307 SF
AUDIOLOGY
139 328 SF
AUDIOLOGY
236 SF
STAFF
BREAK
295 SF
SM CONF
RM
176 SF
AREA
DIRECTOR
62 SF
RR
331 SF
WORKROOM
709 SF
GT / CLD
85 SF
ELEC /
TELE
165 SF
MECH /
ELEC
105 SF
EXECUTIVE
ASST
225 SF
MEN
241 SF
WOMEN
45 SF
WOMEN
45 SF
MEN
185 SF
VESTIBULE
743 SF
ADMINISTRATIVE
ASSISTANTS
90 SF
CFA & AL
1687 SF
TRAINING
ROOM
58 SF
STORAGE
119A
49 SF
TEL / ELEC
721 SF
CUR & PL
COLLABORATION
CONFERENCE
ROOM
119B
213 SF
STORAGE
118A190 SF
DIRECTOR
OF MEP
118B
71 SF
PRIVACY /
MINI CONF
58 SF
ELEV
237 SF
OFFICE
CAO
157 SF
AREA
DIRECTOR
157 SF
AREA
DIRECTOR
EQ
7'
- 0
EQ
ART
HERITAGE
ELEMENTARY
ART
SPECIALIST
ART HERITAGE
ELEMENTARY
ART
HERRITAGE
PROGRAM
ASST
MUSIC
COORD
CCR STEAM
COMMINITY
LIASON
CCR STEM
PROGRAMMING
COORD
CCR ADMIN
SUPPOR
SPECIALIST
CCR WORK
BASED
LEARNING
LIAISON
CCR COLLEGE
PREP & IC
COORD
CCR FEDERAL
PROGRAMS
SPECIALIST
1B 1A
1A1A
117 118B 118A
119B
UP
NEW HM WINDOW TO
BORROW NATURAL LIGHT
EXISTING WALL TO REMAIN
NEW WALL
EXISTING ITEM TO REMAIN
NEW ITEM
LEGEND
NO WORK IN THIS AREA
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A101B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
LOWER LEVEL
FLOOR PLAN
PHASE II
PROJECT STATUS: SCHEMATIC
DESIGN
0' 4'
8'0' 4'
8' A101B
LOWER LEVEL FLOOR PLAN - BLDG A PHASE II1
EXISTING WALL TO REMAIN
NEW WALL
EXISTING ITEM TO REMAIN
NEW ITEM
LEGEND
NO WORK IN THIS AREA
R P N K
Co py
/ P rin t / St or ag e
De pa rtm en t C op y / P rin t /
St or ag e
De pa rtm en t C op y / P rin t /
St or ag e
Co py
/ P rin t / St or ag e
Translation / Interpretation
SPED
Translation / Interpretation
ECE
Admin Asst Legal Admin Asst
SPED
Admin Asst
SPED
Secretary
SPED HS
Secretary
SPED MS
Secretary SPED Elem
Secretary
SPED BTK-
ECE
Secretary SPED Elem
Secretary SPED Elem
Secretary
SPED
Coord SPED EM Coord SPED EM Coord SPED HS
Coord SPED MS Coord SPED Coord SWAAC Coord SWAP Career Center
Open / Informal Meeting & Collaboration
Open / Informal Meeting & Collaboration
Break roof access and electrical panels
Teacher Prsch Vision
Team
Teacher SPED Vision
Team Braillist Vision
Team
RBT Behavior RBT Behavior
APES
Teacher
SPED
SPED
Specialist Records
SPED
Specialist Records
SPED
Specialist
SPC, SIT
SPED
Specialist
SPC, SIT
SPED
Specialist
SPC, SIT
SPED
Specialist
SPC, SIT
SPED
Specialist
SPC, SPED
SIS
SPED
Specialist
SPED
Specialist
SPED
Specialist
Phys Therapist
Phys Therapist
Admin Asst
SPED
New window
New window
New window
New windows
Solatubes (typ of 14)
Admin Specialist
Assessment Specialist Data AnalystData AnalystData Analyst ac ou sti c a rt wa ll ac ou sti c a rt wa ll new or modified storefront in existing opening acoustic art wall above seating acoustic art wall above seating ac ou sti c ar t w all
Admin Asst
SPED
APES
Teacher
SPED
APES
Teacher
SPED
APES
Teacher
SPED
SPED Tech SPED Tech
SPED Tech
58 SF
ELEV
1241 SF
SPED
171 SF
SPED DIR
724 SF
SPED
1376 SF
PROFESSIONAL
LEARNING
CURRICULUM
131 SF
COPY /
WORK
300 SF
VESTIBULE
171 SF
INST SPEC
ED DIR
738 SF
SPED
203156 SF
WOMEN
109 SF
ASST DIR
OF ELEM
CUR & PL
211A
173 SF
DIR OF
COLLEGE
AND
CAREER
READINESS
31 SF
RR
156 SF
WOMEN
43 SF
PRIVACY
711 SF
SPED
270 SF
EXEC DIR
OF
TEACHING
AND
LEARNING
171 SF
DIR OF
ASSESSMENT
Instructional Platform Specialist
SPED
Specialist Records
204 SF
DIR SEC
CUR & PL
211B
276 SF
MEETING
ROOM
223A
Professional Learning
Coordinator
Curriculum/ Learning Design Specialist K-5
ELA
Elementary Induction Specialist
Alternative License and
Student Teacher Induction Specialist
Curriculum/ Learning Design
Specialist K-5 Math
Secondary Induction Specialist
Curriculum/ Learning Design Specialist K-12
Science
Curriculum/ Learning Design Specialist 6-12
Math
Curriculum/ Learning Design Specialist 6-12
ELA
Curriculum/ Learning Design Specialist K-12 Social Studies
READ Act Specialist
156 SF
MEN
33 SF
JAN
81 SF
MECH
CHASE
724 SF
AFOP
1241 SF
ASSESSMENT
81 SF
RR
82 SF
RR
733 SF
SEBS
300 SF
VESTIBULE
280 SF
EXEC DIR
SSS
73 SF
LACTATION
209A
75 SF
IDF
202A
75 SF
TBD
219A
171 SF
DIR OF
AOFP
223C
171 SF
DIR OF
SEBS
223B
1242 SF
SPED
Exec Asst Paul
Exec Asst Bernadette
1A
1A
202A
1A
1A
211A
DN
211B
1A
1A
1A
1A
1A
1A
1A
223C
223B
223A
1A
1A
A102B
1A
1A
1A
1A 2
N
1A
1A
1A
1A
EQ
6'
- 5
5'
- 4
3/ 4"
EQ
6'
- 5
4' - 9 1/4" 5' - 10 1/2" +/-
1' - 1"
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A102B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
UPPER LEVEL
FLOOR PLAN
PHASE II
PROJECT STATUS: SCHEMATIC
DESIGN
0' 4'
8'0' 4'
8' A102B
UPPER LEVEL PLAN - BLDG A PHASE II1
0' 2'
4'0' 2'
4' A102B
ENLARGED UPPER RESTROOM PLAN2
STAFF RR
234A
EXPULSION
EXPULSION
OFFICE /
STORAGE
OFFICE
231 STORAGE
STORAGE
STAIR
BOILER
RESTROOM
CONFERENCE
ROOM
RESTROOM
CORRIDOR
DN UP
240241
STAFF
SHOWER
234B
EXPULSION
STORAGE
145A
TECH
TECH
ATHLETIC
STORAGE
RR
RR
CORRIDOR
WOMEN
MEN
ATHLETIC
STORAGE
STORAGE
STORAGE
STAIR
STAIR
AREA OF ALTERNATE
160A 153
CORRIDOR
GYM
160B
1A
1A
2 2
1A1B
1A 1A
1B 1A
1B
JANITOR
161 161
EXISTING WALL TO REMAIN
NEW WALL
EXISTING ITEM TO REMAIN
NEW ITEM
LEGEND
NO WORK IN THIS AREA
SHEET NO:
PROJECT NO:
DATE:
C
C H
AM
BE
R
LI
N A
R C
H
IT
EC
TS
437 Main Street chamber linarchitects.com
Grand Junction, CO 81501 970.242.6804
NOT FOR CONSTRUCTION
EAST ADMINISTRATION
BUILDING REMODEL -
PHASE II
Au to de sk
D oc s:
//2
Ea st
M id dl e
Sc ho ol /2
SD
E
AS
T M
ID
D
LE
S
C H
O O
L.
rv t
/2 0/
:0
6:
P M
A103B 10/20/25
830 GUNNISON AVE
GRAND JUNCTION, COLORADO
BLDG B NEW
CONSTRUCTION
PLAN
PROJECT STATUS: SCHEMATIC
DESIGN
0' 4'
8'0' 4'
8' A103B
UPPER LEVEL FLOOR PLAN - BLDG B PHASE II ALTERNATE2
0' 4'
8'0' 4'
8' A103B
LOWER LEVEL FLOOR PLAN - BLDG B PHASE II1
| G001B - COVER SHEET |
| A001B - NOTES, SYMBOLS & ABBREVIATIONS |
| A002B - CODE CHECKLIST & LIFE SAFETY PLAN |
| A021B - LOWER LEVEL DEMO PLAN |
| A022B - UPPER LEVEL DEMO PLAN |
| A023B - BUILDING B DEMO PLANS |
| A024B - REFLECTED CEILING DEMO PLAN |
| A025B - REFLECTED CEILING DEMO PLAN |
| A026B - REFLECTED CEILING DEMO PLANS - BLDG B |
| A101B - LOWER LEVEL FLOOR PLAN PHASE II |
| A102B - UPPER LEVEL FLOOR PLAN PHASE II |
| A103B - BLDG B NEW CONSTRUCTION PLAN |
File details come from the government source that posted it. Updated .