PROJECT DESCRIPTION
This scope of work is to be accomplished at Bldg.’s 101, 111, RR5, FC360, FC371, 12, and S59B on board Camp Lejeune NC. Contractor will provide and install new HVAC Chiller units at each location.
SPECIAL SCHEDULING
The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity.
SUPERVISION
One person may fill the roles of Superintendent, Quality Control Manager, and
Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.