240209_JMU Steam Line MH30-31_Construction Drawings.pdf
PDF 13 MB Posted
- Solicitation number
- 60200
- Issued by
- Harrisonburg City, Virginia
About this file
The document provided contains the construction drawings for the IFB 23-449314-001 MH-30 to MH-31 Piping Replacement project in Harrisonburg, Virginia. This project involves the demolition and replacement of approximately 647 LF of 10a HP steam and 4a condensate return direct buried piping, modifications to piping and valves in steam vaults, site demolition and restoration, and other related work as specified in the Contract Documents.
The project is being solicited by the City of Harrisonburg, Virginia. No additional details are provided regarding the response dates, due dates, site visits, bidder's meetings, award dates, or contract term and renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOTICE OF IFB 23-449314-001.pdf | ||
| 240209_JMU Steam Line MH30-31_Project Manual_CD.pdf | ||
| Intent to Award to Riddleberger Brothers, Inc. | — | |
| parkingmap.pdf | ||
| Bid Form.doc | DOC document | |
| Award to Riddleberger Bros. | — | |
| dgs-30-272_pre-bid_question_form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
/0
9/
CONCRETE SIDEWALK
UG
E UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
12" D.I.P.
6" D
IP
UGE
UGE
UGE
UGE
UGE
12" RCP
UGE
UG
E
INVERT IN:1306.66'
12" D.I.P. SS
54" RCP SD
INV. OUT 12" RCP: 1305.06'
SD MH TOP: 1309.90'
54" RCP
UGE
UGE
UGE
UGE
5' X 5'
BOX CULVERT
UGE
È
5' X 5'
BOX CULVERT
È
È
TWIN 5' X 5' BOX CULVERTS
È
È
INVERT IN: 1308.0'
PROP UGE
54" RCP SD
54" RCP SD
L.
A.
BLUESTONE DRIVE
ZS3
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
MH
GH4
GH3
GH2
GH1
ZS3
GH1
GH1
GH1
GH1
GH1
GH3
GH3
GH3
GH3
GH3
GH3
GH3
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
APC
APC
J
MH
J
E
E
ZS13
LC
LC
J
UGE
UGE
UGE
UG
E
LC
SH1
F LOT
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
MM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
MM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
MM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMCOMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGEUGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UGE
1312 1313 1314
LANDSCAPE AREA
LANDSCAPE AREA
LANDSCAPE AREA
STEAM
6" CHWS
6" CHWR
GRASS
CONCRETE
CO
NC
RE
TE
SI
DE
WAL
K
CONCRETE SIDEW
ALK
STEPS
STEPS
DOUBLE SWING GATE
AIR COOLED CHILLER
EMERGENCY
GENERATOR
FENCE
CURB
" R
CP 15" RCP
" R
CP
12" RCP
2B
2C
2A
5A
5B
15" RCP
18" RCP
18" RCP
12" HDPE
12" HDPE
15" DOME GRATE
15" BASIN - SOLID TOP
DI-3B
DI-3B
DI-1
DI-3B
DI-3B
DI-3B
DI-3B
DI-3B
FLUSH CURB &
DETECTABLE WARNING
FL
OWERBED
GODWIN HALL
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
JA
M
ES
M
AD
IS
O N
U N
IV
ER
SI
TY
ST
EA
M A
N D
C O
N D
EN
SA
TE
R
EP
LA
C
EM
EN
T
M H
-3
TO
M
H -3
1B
JM
U P
R O
JE
C
T N
O . 2
3-
-0
2/9/2024
230214.00
H
AR
R
IS
O N
BU
R
G , V
IR
G
IN
IA
M R
K D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
/2
6/
:3
AM
X:
\2
3\
J
M U
S C
L in eR ep l M H
-3
1\
D ra w in gs
\7
C iv il\ Sh ee ts
\2
4A
_C
D
1.
dw g
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
ISSUED FOR
CONSTRUCTIO
N
REMOVE CURB AND GUTTER
SEE NOTE 1
DEMOLITION NOTES:
1. SAWCUT AND REMOVE CURB AND GUTTER TO NEAREST JOINT
2. SAWCUT AND REMOVE CONCRETE SIDEWALK/SWALE TO NEAREST JOINT. DEMOLITION
EXTENTS ARE APPROXIMATE ONLY. CONTRACTOR IS TO VERIFY JOINT LOCATIONS
PRIOR TO DEMOLITION.
3. SAWCUT AND REMOVE ASPHALT PAVEMENT TO THE FULL DEPTH PAVEMENT AND
REMOVE AGGREGATE SUBBASE. PRESERVE 12" WIDE BENCHES ON EITHER SIDE OF
UTILITY TRENCH PER DETAIL A, SHEET C-501.
4. REFER TO MECHANICAL SHEETS MSD101 AND MSD102 FOR MECHANICAL DEMOLITION
5. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF UNDERGROUND UTILITIES PRIOR
TO EXCAVATION.
REMOVE CURB AND GUTTER
SEE NOTE 1
REMOVE CONCRETE SIDEWALK RAMP
WITH DETECTABLE WARNING SURFACE
SEE NOTE 2
REMOVE CURB AND GUTTER
SEE NOTE 1
REMOVE CURB AND GUTTER
SEE NOTE 1
REMOVE CURB AND GUTTER
SEE NOTE 1
REMOVE CURB AND GUTTER
SEE NOTE 1
REMOVE CONCRETE SWALE
SEE NOTE 2REMOVE FLUSH CURB WITH
DETECTABLE WARNING
SEE NOTE 1
DEMOLISH CURB
SEE NOTE 1
PROTECT CURB AND GUTTER
SAWCUT AND REMOVE ASPHALT PAVEMENT
SEE NOTE 3
SAWCUT AND REMOVE ASPHALT PAVEMENT
SEE NOTE 3
SAWCUT AND REMOVE ASPHALT PAVEMENT
SEE NOTE 3
SAWCUT AND REMOVE ASPHALT PAVEMENT
SEE NOTE 3
DEMOLISH CONCRETE
SIDE WALK
SEE NOTE 2
0 10' 20' 40'
SCALE: 1" = 20'
IF THIS DRAWING IS REDUCED,
GRAPHIC SCALE MUST BE USED.
SAWCUT AND REMOVE
ASPHALT SIDEWALK
MH-30
MH-31A
REMOVE AND STORE LIGHT POLES
DEMOLISH BASES
DO NOT DISTURB BIORETENTION AREA
REMOVE AND STORE DOUBLE
SWING GATES, GATE POST,
AND GATE POST SUPPORT
REMOVE AND STORE METAL FENCE
REMOVE CONCRETE SIDEWALK
SEE NOTE 2
LIMITS OF DISTURBANCE
LEGEND
LIMITS OF DISTURBANCE
UTILITY DEMOLITION
CONCRETE PAVEMENT DEMOLITION
ASPHALT PAVEMENT DEMOLITION
REMOVE ASPHALT PAVEMENT
SAWCUT AND REMOVE ASPHALT PAVEMENT
SEE NOTE 3
MH-31
MH-31B
TREES REMOVED BY JMU
REMOVE EX 3" CONDENSATE LINE
PROTECT EX 6" STEAM LINE
REMOVE EX 10" STEAM LINE
REMOVE EX 4" CONDENSATE LINE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
FAH
WRM
FAH
CD101
EXISTING CONDITIONS AND
DEMOLITION
REMOVE
FLOWERBED
DEMOLISH CONCRETE SIDE WALK
SEE NOTE 2
MULCH
EQUIPMENT AND PAD
DEMOLISH PAD AND COORDINATE
EQUIPMENT STORAGE WITH JMU
REMOVE AND STORE LIGHT POLE
DEMOLISH BASE
CONCRETE SIDEWALK
UG
E UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
12" D.I.P.
6" D
IP
UGE
UGE
UGE
UGE
UGE
12" RCP
UGE
UG
E
INVERT IN:1306.66'
12" D.I.P. SS
54" RCP SD
INV. OUT 12" RCP: 1305.06'
SD MH TOP: 1309.90'
54" RCP
UGE
UGE
UGE
UGE
5' X 5'
BOX CULVERT
UGE
È
5' X 5'
BOX CULVERT
È
È
TWIN 5' X 5' BOX CULVERTS
È
È
INVERT IN: 1308.0'
PROP UGE
54" RCP SD
54" RCP SD
L.
A.
BLUESTONE DRIVE
ZS3
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
MH
GH4
GH3
GH2
GH1
ZS3
GH1
GH1
GH1
GH1
GH1
GH3
GH3
GH3
GH3
GH3
GH3
GH3
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
APC
APC
J
MH
J
E
E
ZS13
LC
LC
J
UGE
UGE
UGE
UG
E
LC
SH1
F LOT
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
MM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
MM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
MM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMMCOMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
GH1
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGEUGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UGE
1312 1313 1314
LANDSCAPE AREA
LANDSCAPE AREA
LANDSCAPE AREA
STEAM
6" CHWS
6" CHWR
GRASS
CONCRETE
CO
NC
RE
TE
SI
DE
WAL
K
CONCRETE SIDEW
ALK
STEPS
STEPS
DOUBLE SWING GATE
AIR COOLED CHILLER
EMERGENCY
GENERATOR
FENCE
CURB
" R
CP 15" RCP
" R
CP
12" RCP
2B
2C
2A
5A
5B
15" RCP
18" RCP
18" RCP
12" HDPE
12" HDPE
15" DOME GRATE
15" BASIN - SOLID TOP
DI-3B
DI-3B
DI-1
DI-3B
DI-3B
DI-3B
DI-3B
DI-3B
FLUSH CURB &
DETECTABLE WARNING
FL
OWERBED
GODWIN HALL
SAF
SAF
SA
F
SAF
SA
F
SA
F
SA
F
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
x x
TP
TP
TP
TP
TP
TP
X
X
X
X
IP
SF
SF
SF
IP
IP
IP
IP
IP
SAF
SAF
SAF
SAF
SO
SO
SO
TS MU
TS
MU
SO
TS
MU
TS
MU
TP
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
JA
M
ES
M
AD
IS
O N
U N
IV
ER
SI
TY
ST
EA
M A
N D
C O
N D
EN
SA
TE
R
EP
LA
C
EM
EN
T
M H
-3
TO
M
H -3
1B
JM
U P
R O
JE
C
T N
O . 2
3-
-0
2/9/2024
230214.00
H
AR
R
IS
O N
BU
R
G , V
IR
G
IN
IA
M R
K D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
/2
6/
:3
AM
X:
\2
3\
J
M U
S C
L in eR ep l M H
-3
1\
D ra w in gs
\7
C iv il\ Sh ee ts
\2
4A
_C
_1
.d w g
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
ISSUED FOR
CONSTRUCTIO
N
REPLACE CURB AND GUTTER
SEE NOTE 1
GENERAL NOTES:
1. SAWCUT AND REPLACE CURB AND GUTTER TO NEAREST JOINT.
2. SAWCUT AND REPLACE CONCRETE SIDEWALK/SWALE TO NEAREST JOINT. PLAN EXTENTS ARE
APPROXIMATE ONLY.
3. MILL AND RESURFACE ASPHALT PAVING MIN. 12 INCHES, OR AS DIRECTED BY JMU, OFFSET
FROM FULL DEPTH SAWCUT FOR UTILITY TRENCH.
4. REPAINT PARKING LOT STRIPES TO EXISTING CONDITION.
5. COORDINATE PERMANENT LANDSCAPING WITH JMU.
6. PAVEMENT MUST BE SWEPT FOR DIRT AND CONSTRUCTION DEBRIS AT THE END OF EVERY
WORKDAY.
7. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF UNDERGROUND UTILITIES PRIOR TO
EXCAVATION.
REPLACE CURB AND GUTTER
SEE NOTE 1
REPLACE CONCRETE SIDEWALK RAMP
WITH DETECTABLE WARNING SURFACE
SEE NOTE 2
REPLACE CURB AND GUTTER
SEE NOTE 1
REPLACE CURB AND GUTTER
SEE NOTE 1
REPLACE CURB AND GUTTER
SEE NOTE 1
REPLACE CURB AND GUTTER
SEE NOTE 1
REPLACE CONCRETE SWALE
SEE NOTE 2
REPLACE FLUSH CURB WITH
DETECTABLE WARNING
SEE NOTE 1
REPLACE CURB
SEE NOTE 1 AND DETAIL D, SHEET C-501
PROTECT CURB AND GUTTER
REPLACE ASPHALT PAVEMENT
SEE NOTE 3 AND DETAIL A, C-501
REPLACE ASPHALT PAVEMENT
SEE NOTE 3 AND DETAIL A, C-501
REPLACE ASPHALT PAVEMENT
SEE NOTE 3 AND DETAIL A, C-501
REPLACE ASPHALT PAVEMENT
SEE NOTE 3 AND DETAIL A, C-501
REPLACE CONCRETE
SIDE WALK
SEE NOTE 2 AND
DETAIL B, C-501
EROSION AND SEDIMENT CONTROL LEGEND
0 10' 20' 40'
SCALE: 1" = 20'
IF THIS DRAWING IS REDUCED,
GRAPHIC SCALE MUST BE USED.
3.31 TEMPORARY SEEDING TSTS
3.07 STORM DRAIN
INLET PROTECTION IP
3.05 SILT FENCE X XXSF
3.38 TREE PRESERVATION
AND PROTECTION TPTP
3.35 MULCHING MUMU
MH-30
MH-31B
REINSTALL LIGHT POLES
PROVIDE CONCRETE BASE
PER DETAIL E, C-501
DO NOT DISTURB BIORETENTION AREA
REINSTALL DOUBLE SWING
GATES, GATE POST, AND
GATE POST SUPPORT
REINSTALL METAL FENCE
10" STEAM AND 4" CONDENSATE LINES
SEE MECHANICAL
3.33 SODDING SOSO
REPLACE CONCRETE SIDE WALK
SEE NOTE 2 AND DETAIL B, C-501
TEMPORARY SAFETY FENCE
LEGEND
LIMITS OF DISTURBANCE
STEAM PIPE
CONCRETE PAVEMENT
ASPHALT PAVEMENT (STANDARD)
3.01 SAFETY FENCE SAF
REPLACE ASPHALT PAVEMENT
SEE NOTE 3 AND DETAIL A, C-501
REPLACE ASPHALT PAVEMENT
SEE NOTE 3 AND DETAIL A, C-501
INSTALL INSULATION ABOVE MH-31
SEE MECHANICAL
FAH
WRM
FAH
C-101
CIVIL SITE PLAN
MH-31MH-31A
REPLACE CONCRETE SIDE WALK
SEE NOTE 2 AND DETAIL B, C-501
NEW EQUIPMENT PAD. REINSTALLED STORED
EQUIPMENT. COORDINATE WITH JMU
REPLACE MULCH
SAF
EXCAVATE TO ALLOW REPAIRS TO LINK SEALS
JMU TO PERFORM REPAIRS
VERIFY DEPTH AND LOCATION OF
UNDERGROUND COMMUNICATION LINES PRIOR
TO EXCAVATION
REPLACE ASPHALT SIDEWALK
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
JA
M
ES
M
AD
IS
O N
U N
IV
ER
SI
TY
ST
EA
M A
N D
C O
N D
EN
SA
TE
R
EP
LA
C
EM
EN
T
M H
-3
TO
M
H -3
1B
JM
U P
R O
JE
C
T N
O . 2
3-
-0
2/9/2024
230214.00
H
AR
R
IS
O N
BU
R
G , V
IR
G
IN
IA
M R
K D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
/2
6/
:3
AM
X:
\2
3\
J
M U
S C
L in eR ep l M H
-3
1\
D ra w in gs
\7
C iv il\ Sh ee ts
\2
4A
_C
_4
.d w g
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
ISSUED FOR
CONSTRUCTIO
N
FAH
WRM
FAH
C-401
EROSION & SEDIMENT
CONTROL NARRATIVE
I. PROJECT DESCRIPTION
THIS PROJECT INVOLVES THE DEMOLITION AND REPLACEMENT IN THE SAME TRENCH OF THE EXISTING STEAM AND CONDENSATE LINE FROM MH-30 TO MH-31 AND THE DEMOLITION AND REPLACEMENT IN THE SAME TRENCH OF THE EXISTING CONDENSATE LINE BETWEEN MH-31A AND MH-31B. THE PIPING, EXPANSION JOINTS, AND VALVES INSIDE MH-30 AND MH-31 WILL BE RE-INSULATED. THE PROJECT IS ON THE CAMPUS OF JAMES MADISON UNIVERSITY IN HARRISONBURG, VIRGINIA. THE
PROJECT INVOLVES APPROXIMATELY 0.1 ACRES OF LAND DISTURBANCE.
II. EXISTING SITE CONDITIONS
THIS SITE CONSISTS OF A MIX OF ASPHALT, CONCRETE, AND LANDSCAPED AREA. NEW UTILITIES WILL BE INSTALLED BY OPEN
CUT TRENCHING. THE SITE GENERALLY DRAINS TO THE WEST.
III. ADJACENT PROPERTIES
THE PROJECT SITE IS ENTIRELY WITHIN THE JAMES MADISON UNIVERSITY CAMPUS.
IV. OFF-SITE AREAS
UNSUITABLE MATERIAL WILL BE HAULED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION AND SEDIMENT CONTROL PLAN TO THE EROSION AND SEDIMENT CONTROL REGULATOR PERTAINING TO OFF-SITE DISTURBED AREAS (IF ANY SUCH AREAS ARE REQUIRED) SUCH AS STOCKPILES, STAGING
AREAS, AND SPOIL AREAS THAT ARE USED FOR THIS PROJECT.
V. SOILS
ACCORDING TO USDA SCS SOIL MAPPING, THE PROJECT SITE LIES ON THE URBAN SOIL TYPE.
THIS MAP UNIT CONSISTS OF AREAS WHERE MORE THAN 80 PERCENT OF THE SURFACE IS COVERED BY ASPHALT, CONCRETE, BUILDINGS, OR OTHER IMPERVIOUS SURFACES. THESE AREAS ARE PARKING LOTS, SHOPPING CENTERS, BUSINESS CENTERS, INDUSTRIAL PARKS, SCHOOL COMPLEXES, AND AIRPORTS. URBAN LAND DOES NOT RECEIVE ANY RATINGS. FACTOR IS 4.
VI. CRITICAL AREAS
NO CRITICAL AREAS ARE IDENTIFIED AND ADDRESSED BY THIS EROSION AND SEDIMENT CONTROL PLAN. STANDARD CARE WILL
BE TAKEN TO PROVIDE PROTECTIVE MEASURES FOR DISTURBED AREAS.
VII. EROSION AND SEDIMENT CONTROL MEASURES
ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED BY THE CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND JAMES MADISON UNIVERSITY ANNUAL STANDARDS & SPECIFICATIONS FOR ESC & SWM. SYMBOLS, DETAILS, AND DIMENSIONS USED ARE TAKEN FROM THE HANDBOOK, AS WELL AS THE LATEST EDITION OF THE VIRGINIA DEPARTMENT OF
TRANSPORTATION'S ROAD AND BRIDGE STANDARDS.
A. STRUCTURAL PRACTICES
1. SAFETY FENCE (SAF), SPEC. 3.01: A SAFETY FENCE SHALL BE PROVIDED AS SHOWN ON THE PLANS TO PROHIBIT ACCESS
BY THE PUBLIC.
2. SILT FENCE (SF), SPEC. 3.05: SILT FENCE BARRIERS MUST BE PROVIDED WHERE SHOWN AND AS NEEDED TO PREVENT
SEDIMENT FROM LEAVING THE SITE.
3. STORM DRAIN INLET PROTECTION (IP), SPEC. 3.07: STORM DRAIN INLET PROTECTION SHALL BE PROVIDED FOR INLETS AS
SHOWN ON THE PLANS.
B. VEGETATIVE PRACTICES
1. TEMPORARY SEEDING (TS), SPEC. 3.31: TEMPORARY SEEDING SHALL BE PROVIDED ON SITE TO PROVIDE STABILIZATION
UNTIL SITE DEVELOPMENT OCCURS. APPLY SEED BASED ON TEMPORARY SEEDING SCHEDULE SHOWN ON THE PLANS.
2. SODDING (SO), SPEC. 3.33:
3. MULCHING (MU), SPEC. 3.35: ALL PERMANENT AND TEMPORARY SEEDING SHALL BE STRAW MULCHED IMMEDIATELY UPON
COMPLETION OF SEED APPLICATION. STRAW ON STEEP SLOPES SHALL BE ANCHORED UNLESS SEEDING WAS PROVIDED
BY MEANS OF A HYDROSEEDING, IN WHICH CASE, MULCHING IS NOT REQUIRED.
4. TREE PRESERVATION AND PROTECTION (TP), SPEC. 3.38: TREES IDENTIFIED ON THE E&S PLAN SHEET SHALL BE
PROTECTED DURING CONSTRUCTION.
C. MINIMUM STANDARDS
MS-1 STABILIZATION OF DENUDED AREAS:
PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT
DORMANT FOR MORE THAN ONE YEAR.
MS-2 STABILIZATION OF SOIL STOCKPILES:
DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND
SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
MS-3 PERMANENT VEGETATIVE COVER:
A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS
ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
MS-4 TIMING AND STABILIZATION OF SILT TRAPPING MEASURES:
SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE
MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
MS-5 CONCENTRATED RUNOFF DOWN CUT OR FILLED SLOPES:
STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS
IMMEDIATELY AFTER INSTALLATION.
MS-6 SEDIMENT BASINS AND TRAPS:
SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL
DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE
AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER
THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED.
MS-7 CUT AND FILL SLOPES:
CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION.
SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8 CONCENTRATED RUNOFF DOWN CUT OR FILL SLOPES:
CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE
TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
MS-9 WATER SEEPAGE FROM A SLOPE FACE:
WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE
PROVIDED.
MS-10 STORM SEWER INLET PROTECTION:
ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR
OTHERWISE TREATED TO REMOVE SEDIMENT.
MS-11 STABILIZATION OF OUTLETS:
BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS-12 WORK IN LIVE WATERCOURSES:
WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY
NONERODIBLE COVER MATERIALS.
MS-13 CROSSING A LIVE WATERCOURSE:
WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL
SHALL BE PROVIDED.
MS-14 APPLICABLE REGULATIONS:
ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE
WATERCOURSES SHALL BE MET.
MS-15 STABILIZATION OF BED AND BANKS:
THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE
WATERCOURSE IS COMPLETED.
MS-16 UNDERGROUND UTILITIES:
UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN
ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT
FLOWING STREAMS OR OFF-SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER.
F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
MS-17 CONSTRUCTION ACCESS ROUTES:
WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT
LOTS AS WELL AS TO LARGER LAND-DISTURBING ACTIVITIES.
MS-18 TEMPORARY E&S CONTROL MEASURE REMOVAL:
ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER
EROSION AND SEDIMENTATION.
MS-19 ADEQUACY OF RECEIVING CHANNELS:
PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW
RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS:
A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO
AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT
THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED.
B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER:
(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN
THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE
PROJECT IN QUESTION; OR
(2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS.
(B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS;
AND
(C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY
THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM.
C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES
ARE NOT ADEQUATE, THE APPLICANT SHALL:
(1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A
TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR
(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN
THE APPURTENANCES;
(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A
TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF
OUTFALLS INTO A MAN-MADE CHANNEL; OR
(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES
WHICH IS SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION.
D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.
E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE
ULTIMATE DEVELOPMENT CONDITION OF THE SUBJECT PROJECT.
F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN
APPROVAL FROM THE VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR
PERFORMING THE MAINTENANCE.
G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A
STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL.
H. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT
PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A
DETENTION FACILITY.
J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED
IN ALL ENGINEERING CALCULATIONS.
K ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND
OTHER WATERS OF THE STATE.
L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS
PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT.
M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND-DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS.
N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA
STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE
REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION.
D. MAINTENANCE: ALL EROSION AND SEDIMENT CONTROL STRUCTURES AND SYSTEMS SHALL BE MAINTAINED, INSPECTED, AND REPAIRED AS NEEDED TO INSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED AT THE END OF EACH DAY AND AFTER EVERY RAINFALL EVENT.
1. DAMAGE TO EROSION CONTROL MEASURES CAUSED BY CONSTRUCTION TRAFFIC OR OTHER ACTIVITY SHALL BE
REPAIRED BEFORE THE END OF EACH WORKING DAY.
2. MAINTAIN ALL SEEDED AREAS UNTIL A UNIFORM STAND IS ACCEPTED.
3. (SPEC. 3.01) SAFETY FENCE SHALL BE CHECKED REGULARLY FOR DAMAGE. CARE SHALL BE TAKEN TO SECURE ALL
ACCESS POINTS AT THE END OF EACH WORKING DAY.
4. (SPEC. 3.05) SILT FENCE BARRIERS WILL BE CHECKED DAILY FOR UNDERMINING OR DETERIORATION OF THE FABRIC.
SEDIMENT SHALL BE REMOVED WHEN THE LEVEL REACHES HALF WAY TO THE TOP OF THE BARRIER.
5. (SPEC. 3.07) SEDIMENT SHALL BE REMOVED FROM AROUND THE INLET PROTECTION TRAP STRUCTURE AND RESTORED TO
ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. THE TRAP STRUCTURES SHALL BE REMOVED AND THE AREA STABILIZED WHEN THE REMAINING DRAINAGE AREA HAS BEEN
PROPERLY STABILIZED.
6. (SPEC. 3.31 & 3.32) AREAS WHICH FAIL TO ESTABLISH VEGETATIVE COVER ADEQUATE TO PREVENT RILL EROSION WILL BE
RESEEDED AS SOON AS SUCH AREAS ARE IDENTIFIED.
7. (SPEC. 3.33) DURING THE 2 TO 3-WEEK ESTABLISHMENT STAGE, SOD SHALL BE WATERED AS NECESSARY TO MAINTAIN ADEQUATE MOISTURE IN THE ROOT ZONE AND PREVENT DORMANCY OF SOD. NO MORE THAN ONE-THIRD OF THE SHOOT (GRASS LEAF) SHOULD BE REMOVED IN ANY MOWING. GRASS HEIGHT SHOULD BE MAINTAINED BETWEEN 2 AND 3-INCHES
UNLESS OTHERWISE SPECIFIED.
8. (SPEC. 3.35) WHERE EROSION OR WASHOUT IS OBSERVED IN MULCHED AREAS, ADDITIONAL MULCH SHOULD BE APPLIED.
9. (SPEC. 3.38) IF THE SOIL HAS BECOME COMPACTED OVER THE ROOT ZONE OF ANY TREE, THE GROUND SHALL BE
AERATED BY PUNCHING HOLES WITH AN IRON BAR. ANY DAMAGE TO THE CROWN, TRUNK, OR ROOT SYSTEM OF ANY TREE RETAINED ON THE SITE SHALL BE REPAIRED IMMEDIATELY. BROADLEAF TREES THAT HAVE BEEN STRESSED OR
DAMAGED SHALL RECEIVE A HEAVY APPLICATION OF FERTILIZER TO AID THEIR RECOVERY.
VIII. PERMANENT STABILIZATION
ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH SEEDING FOLLOWING GRADING IN ACCORDANCE WITH THE MINIMUM STANDARDS. SEEDING SHALL BE IN ACCORDANCE WITH THE TEMPORARY OR PERMANENT SEEDING SCHEDULES SHOWN ON THIS PLAN. IN ALL SEEDING OPERATIONS, TOPSOIL, SEED, FERTILIZER AND LIME SHALL BE APPLIED PRIOR TO
INSTALLATION OF MULCHING OR EROSION CONTROL BLANKETS AND MATTING.
IX. STORMWATER MANAGEMENT
MANAGEMENT OF STORMWATER RUNOFF DURING CONSTRUCTION WILL COMPLY WITH THE EXISTING VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS 9VAC25-840. THE EROSION AND SEDIMENT CONTROL PLANS INDICATE ALL ACTIVITIES AND
STRATEGIES NECESSARY TO MINIMIZE EROSION AND SEDIMENTATION DURING CONSTRUCTION.
MANAGEMENT OF STORMWATER RUNOFF AFTER CONSTRUCTION WILL COMPLY WITH THE EXISTING VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS 9VAC25-870. THE STORMWATER MANAGEMENT PLANS INDICATE ALL ACTIVITIES
AND STRATEGIES NECESSARY TO COMPLY WITH THE VSMP REGULATIONS AFTER CONSTRUCTION.
X. SOIL STOCKPILES AND BORROW AREAS
FILL MATERIAL SHALL BE OBTAINED FROM AREAS OF EXCAVATION ON SITE. LOCATIONS OF SOIL STOCKPILES SHALL BE DETERMINED BY THE CONTRACTOR WITH THE APPROVAL OF THE OWNER/DEVELOPER. ALL STOCKPILES SHALL BE LOCATED OFFSITE AND PROTECTED WITH SURROUNDING SILT FENCING AND STABILIZED WITH A VEGETATIVE COVER. THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION AND SEDIMENT CONTROL PLAN FOR ALL SOILS INTENTIONALLY TRANSPORTED OFFSITE IF THE TRANSPORTED MATERIAL DISTURBS MORE THAN 10,000 SQUARE FEET IN AREA.
XI. SEQUENCE OF CONSTRUCTION
1. INSTALL EROSION AND SEDIMENT CONTROL PRACTICES AS IS PRACTICABLE.
2. CLEAR THE PLANNED DISTURBED AREA AND REMOVE DEBRIS TO A SUITABLE LOCATION.
3. INSTALL UTILITIES.
4. BRING GRADES TO DESIRED ELEVATION.
5. STABILIZE ALL DISTURBED AREAS WITH PERMANENT VEGETATION.
6. APPLY SURFACE TREATMENT AS DESIGNED.
7. EROSION CONTROL DEVICES SHALL REMAIN IN PLACE UNTIL RELEASED BY THE GOVERNING AGENCY.
8. REMOVE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES.
9. STABILIZE AREAS AFFECTED BY THE REMOVAL OF TEMPORARY E&S MEASURES.
EROSION & SEDIMENT CONTROL NARRATIVE
TS
LIME & FERTILIZER SPECIFICATIONS:
A SOILS TEST IS REQUIRED PRIOR TO FINAL SITE STABILIZATION, TO DETERMINE LIME
AND FERTILIZER APPLICATION RATES FOR THE ESTABLISHMENT OF GRASS ON SITE.
CONTACT VIRGINIA COOPERATIVE EXTENSION OR A GEOTECHNICAL FIRM WITH SOIL
TESTING FACILITIES TO OBTAIN A SOILS REPORT FOR NUTRIENT APPLICATION.
INCORPORATION:
LIME AND FERTILIZER SHALL BE INCORPORATED INT0 THE TOP 4 INCHES OF TOPSOIL BY
DISCING OR OTHER MEANS WHENEVER POSSIBLE. FOR EROSION CONTROL, WHEN
APPLYING LIME AND FERTILIZER WITH A HYDROSEEDER, APPLY TO A ROUGH, LOOSE
SURFACE.
MULCHING:
MULCH WITH STRAW AT A RATE OF 2 TONS/ACRE OR EQUIVALENT.
TEMPORARY SEEDING SCHEDULE
PLANTING SPECIES SPECIES RATE (LBS/ACRE)
SEPT 1 - FEB 15 50/50 MIX OF ANNUAL
RYEGRASS (LOLIUM
MULTI-FLORUM) & 50 - 100
CEREAL (WINTER) RYE
(SECALE CERALE)
FEB 16 - APR 30 ANNUAL RYEGRASS
(LOLIUM MULTI-FLORUM) 60 - 100
MAY 1 - AUG 31 GERMAN MILLET (SETARIA
ITALICA) 50
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
JA
M
ES
M
AD
IS
O N
U N
IV
ER
SI
TY
ST
EA
M A
N D
C O
N D
EN
SA
TE
R
EP
LA
C
EM
EN
T
M H
-3
TO
M
H -3
1B
JM
U P
R O
JE
C
T N
O . 2
3-
-0
2/9/2024
230214.00
H
AR
R
IS
O N
BU
R
G , V
IR
G
IN
IA
M R
K D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
/2
6/
:3
AM
X:
\2
3\
J
M U
S C
L in eR ep l M H
-3
1\
D ra w in gs
\7
C iv il\ Sh ee ts
\2
4A
_C
_4
.d w g
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
ISSUED FOR
CONSTRUCTIO
N
FAH
WRM
FAH
C-402
EROSION & SEDIMENT
CONTROL DETAILS
SHEET FLOW INSTALLATION
(PERSPECTIVE VIEW)
POINTS A SHOULD BE HIGHER THAN POINT B.
CONSTRUCTION OF A SILT FENCE
(WITHOUT WIRE SUPPORT)
1. SET THE STAKES. 2. EXCAVATE A 4" X 4" TRENCH UPSLOPE
ALONG THE LINE OF STAKES.
3. STAPLE FILTER MATERIAL TO
STAKES AND EXTEND IT INTO
THE TRENCH.
4. BACKFILL AND COMPACT THE
EXCAVATED SOIL.
SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, Sherwood & Wyant
4"
4"
FLOW
FLOW
6'
MAX
DRAINAGEWAY INSTALLATION (FRONT ELEVATION)
A A B
FLOW
3" MAX
SILT FENCE
NOT TO SCALE SFPLATE 3.05-2
SPECIFIC APPLICATION
GRAVEL CURB INLET SEDIMENT
FILTER
THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN
FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO
ADJACENT STRUCTURES AND UNPROTECTED AREAS.
* GRAVEL SHALL BE VDOT #3, #357 OR 5 COARSE AGGREGATE.
SOURCE: VA. DSWC
RUNOFF WATER
GRAVEL FILTER*
WIRE MESH
FILTERED WATER
CURB INLET
SEDIMENT
CONCRETE GUTTER
12"
12"
STORM DRAIN INLET PROTECTION
NOT TO SCALE IPPLATE 3.07-6
SOURCE: VA. DSWC
APPEARANCE OF GOOD SOD
INCORRECT
CORRECT
SODDING
LAY SOD IN A STAGGERED
PATTERN. BUTT THE STRIPS
TIGHTLY AGAINST EACH
OTHER. DO NOT LEAVE
SPACES AND DO NOT
OVERLAP. A SHARPENED
MASON'S TROWEL IS A HANDY
TOOL FOR TUCKING DOWN THE
ENDS AND TRIMMING PIECES.
BUTTING - ANGLED ENDS
CAUSED BY THE AUTO-
MATIC SOD CUTTER MUST
BE MATCHED CORRECTLY.
ROLL SOD IMMEDIATELY
TO ACHIEVE FIRM
CONTACT WITH THE SOIL.
WATER TO A DEPTH OF
4" AS NEEDED. WATER
WELL AS SOON AS THE
SOD IS LAID.
MOW WHEN THE SOD IS
ESTABLISHED - IN 2-3
WEEKS. SET THE MOWER
HIGH (2"-3").
SHOOTS OR GRASS BLADES. GRASS
SHOULD BE GREEN AND HEALTHY,
MOWED AT A 2"-3" CUTTING HEIGHT.
THATCH - GRASS CLIPPINGS AND DEAD
LEAVES, UP TO 1/2" THICK.
ROOT ZONE - SOIL AND ROOTS. SHOULD BE
1/2"-3/4" THICK, WITH DENSE ROOT MAT FOR
STRENGTH.
SODDING
NOT TO SCALE SOPLATE 3.33-1
NOTE:
1. MIN 28-DAY CONCRETE COMPRESSIVE STRENGTH SHALL BE 2500 PSI.
2. REFER TO CONSTRUCTION FENCE SPECIFICATIONS IN JMU DESIGN
AND CONSTRUCTION GUIDELINES, SECTION 32.1.4.
3. DOUBLE LOCK GATES WITH CONTRACTOR AND JMU SUPPLIED LOCKS
AND PROVIDE COPIES OF KEYS TO JMU POLICE.
TOP RAIL
LINE POST
CORNER POST
8'-0"
2" MAX
3'-0"
6"
3/8" Ø TRUSS ROD
CONCRETE
BASE MIN DIA 6"
2" MESH 9 GAGE
WIRE CHAIN LINK
10'-0" MAX SPACING
CORNER SECTION
10'-0" SPACING
INTERMEDIATE SECTION
SITE RESTRICTIVE FABRIC
SCREENING
SAFETY FENCE
NOT TO SCALE SAF
SOURCE: VA, DSCW
TREE PRESERVATION AND PROTECTION
NOT TO SCALE TPPLATE 3.38-2
DRIP
LINE
TRIANGULAR BOARD FENCE
CORRECT TRUNK ARMORING
CORRECT METHODS OF TREE FENCING
FENCING AND ARMORING
SNOW
FENCE
BOARD
FENCE CORD
FENCE
PLASTIC
FENCE
NOTE:
1. REFER TO PROJECT MANUAL FOR TREE PROTECTION FENCING
SPECIFICATIONS.
JMU GENERAL EROSION AND SEDIMENT CONTROL NOTES
ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES
SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS 9VAC25-840 EROSION AND
SEDIMENT CONTROL REGULATIONS.
ES-2: THE PLAN APPROVING AUTHORITY (JMU STORMWATER COORDINATOR) MUST BE NOTIFIED AT LEAST ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO COMMENCEMENT OF LAND DISTURBING ACTIVITY AND ONE WEEK PRIOR TO FINAL INSPECTION. THE NAME OF THE CERTIFIED RESPONSIBLE LAND DISTURBER, INCLUDING THEIR CERTIFICATION NUMBER AND CONTACT INFORMATION MUST BE PROVIDED TO THE
PLAN APPROVING AUTHORITY PRIOR TO ACTUAL ENGAGEMENT IN LAND DISTURBING ACTIVITY.
ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PLACED PRIOR TO OR AS A FIRST STEP IN CLEARING.
ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND ACCESS TO THE VIRGINIA EROSION AND
SEDIMENT CONTROL HANDBOOK SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE JMU STORMWATER COORDINATOR FOR REVIEW AND APPROVAL, OR SUBMIT DOCUMENTATION THAT THE OTHER AREA IS CURRENTLY COVERED UNDER A SEPARATE
APPROVED EROSION AND SEDIMENT CONTROL PLAN.
ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.
ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED, AFTER WHICH, UPON APPROVAL OF THE PLAN APPROVING AUTHORITY, THE CONTROLS SHALL BE REMOVED. DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED.
ES-8: DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST ONCE IN EVERY TWO-WEEK PERIOD AND WITHIN 48 HOURS FOLLOWING ANY RUNOFF PRODUCING STORM EVENT. THE OPERATOR SHALL INSPECT IN ACCORDANCE WITH THE CONSTRUCTION GENERAL PERMIT REQUIREMENTS WHEN APPLICABLE. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. CONTRACTOR SHALL SUBMIT EVIDENTIARIES OF INSPECTION REPORTS TO THE OWNER OR WITHIN
THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP).
ES-10: THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL OF SEDIMENT THAT HAS BEEN TRANSPORTED ONTO PAVED OR PUBLIC ROADS. AT A MINIMUM, TRACKING SHALL BE CLEANED BY THE END OF EACH WORK DAY.
ES-11: TEMPORARY/PERMANENT STABILIZATION OPERATIONS SHALL BE INITIATED WITHIN 7 DAYS AFTER REACHING FINAL GRADE OR UPON SUSPENSION OF GRADING OPERATIONS FOR ANTICIPATED DURATION OF GREATER THAN 14
DAYS OR UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIC AREA.
ES-12: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT OF DUST FROM
EXPOSED SOILS.
FINISHED GRADE
TRENCH WIDTH.
SEE MECHANICAL AND NOTE 2
ASPHALT PAVEMENT PATCH FOR STEAM PIPE TRENCH
SCALE: NOT TO SCALE
2" MIN SM-9.5AL ASPHALT SURFACE COURSE
6" LAYER OF #21A STONE
COMPACTED TO >95%
MAXIMUM PROCTOR DENSITY
12" BENCH (EACH SIDE)
SAWCUT JOINTS FULL
DEPTH OF ASPHALT
COURSES.
TACK JOINTS
SELECT BACKFILL IN LIFTS
COMPACTED TO 95%
MAXIMUM PROCTOR DENSITY.
STEAM AND CONDENSATE PIPES.
SEE DETAIL A, M-501
6"
SAND OR FINE
GRAVEL BEDDING
6"
A
NOTES:
1. ALL OPEN PAVEMENT CUTS SHALL COMPLY WITH VDOT "SPECIAL
PROVISIONS FOR PAVEMENT OPEN CUTS" GUIDELINES.
2. TRENCH WIDTH FROM MH-30 TO MH-31 = 54" MIN. TRENCH WIDTH FROM
MH-31 TO MH-31B = 42" MIN.
3. FOR TRENCHING WHERE AN EXISTING PIPE IS TO REMAIN, POSITION
TRENCH SUCH THAT BEDDING AROUND EXISTING PIPE CAN BE
ADEQUATELY RECOMPACTED.
4. REFER TO MECHANICAL DETAILS FOR TRACER WIRE AND WARNING TAPE
LOCATIONS.
FINISHED GRADE
TRENCH WIDTH.
SEE MECHANICAL AND NOTE 2
CONCRETE SIDEWALK PATCH FOR STEAM PIPE TRENCH
SCALE: NOT TO SCALE
6" MIN CONCRETE
6X6 W1.4XW1.4 WWF
6" LAYER OF #21A STONE
COMPACTED TO >95%
MAXIMUM PROCTOR DENSITY
6" BENCH (EACH SIDE)
SAWCUT JOINTS
SELECT BACKFILL IN LIFTS
COMPACTED TO 95%
MAXIMUM PROCTOR DENSITY.
STEAM AND CONDENSATE PIPES.
SEE DETAIL A, M-501
6"
SAND OR FINE
GRAVEL BEDDING
6"
B
NOTES:
1. REFER TO JMU DESIGN AND CONSTRUCTION GUIDELINES SECTION 3.2.7
2. TRENCH WIDTH FROM MH-30 TO MH-31 = 54" MIN. TRENCH WIDTH FROM
MH-31 TO MH-31B = 42" MIN.
3. FOR TRENCHING WHERE AN EXISTING PIPE IS TO REMAIN, POSITION
TRENCH SUCH THAT BEDDING AROUND EXISTING PIPE CAN BE
ADEQUATELY RECOMPACTED.
4. REFER TO MECHANICAL DETAILS FOR TRACER WIRE AND WARNING
TAPE LOCATIONS.
ASPHALT PAVEMENT
2" R
4"
GRADE
1' -1
6"
4000 PSI CONCRETE
1":1'
7"
2'-0"6"
6" VDOT #21B STONE
CG-6 COMBINATION CURB & GUTTER
NOT TO SCALE
6"
6"
6"
12"
6" CONCRETE CURB
SCALE: NOT TO SCALE
1/2" RADIUS
(BACK SIDE)
1" RADIUS
(FRONT SIDE)
CLASS A4
CONCRETE
C
D
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
JA
M
ES
M
AD
IS
O N
U N
IV
ER
SI
TY
ST
EA
M A
N D
C O
N D
EN
SA
TE
R
EP
LA
C
EM
EN
T
M H
-3
TO
M
H -3
1B
JM
U P
R O
JE
C
T N
O . 2
3-
-0
2/9/2024
230214.00
H
AR
R
IS
O N
BU
R
G , V
IR
G
IN
IA
M R
K D
AT
E
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
/2
6/
:3
AM
X:
\2
3\
J
M U
S C
L in eR ep l M H
-3
1\
D ra w in gs
\7
C iv il\ Sh ee ts
\2
4A
_C
_5
.d w g
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
ISSUED FOR
CONSTRUCTIO
N
FAH
WRM
FAH
C-501
CIVIL DETAILS
A4 S-101
A3 S-101 5
2' - 1" 1' - 6"
12' - 0"
12" WIDE CONC KNEE WALL,
SEE SECTION FOR REINF
(4) EXIST ANCHOR BOLTS
EXIST 18" WIDE CONC KNEE WALL
EXIST EXPANSION JOINT
STL BASE PLATE.
CONTRACTOR TO VERIFY
DIMENSIONS IN THE FIELD.
C12X20.7
/2
S T
E A
M P
IP
E
(2) L6X3-1/2X1/2 X 1'-5" LONG
APPROX LOCATION OF NOTCH IN
CONC KNEE WALL, CONTRACTOR TO
VERIFY DIMENSIONS IN THE FIELD
A1 S-101
REPLACE EXIST CONDENSATE PIPE
ATS AND BASE PLATE, SEE MECH.
REMOVE EXIST ANCHOR BOLTS FLUSH
TO TOP OF CONCRETE. SET NEW BASE
PLATE IN 2" NONSHRINK GROUT.
INSTALL (4) 3/4" DIA ASTM F1554
GR. 55 ANCHOR BOLTS. EMBED
6" WITH HILTI HIT-HY 200 V3
M
IN
/4
MIN
1 1/2"
MIN
5 1/2"
A3 S-101
V
IF
M
IN
EXIST EXPANSION JOINT
STL BASE PLATE, GROUT
PAD AND ANCHORS
#4 @8" OC, EA
WAY EA FACE
STEAM PIPE
5/16 9"
V
IF
(2) L6X3-1/2X1/2
X 1'-5" LONG
DRAINPIPE, SEE
A3/S-101
A4 S-101
C12X20.7 W/ (2) 3/4" DIA HILTI
HAS ROD EMBED 8" WITH
HILTI HIT-HY 200V3
#4 DOWELS X 1'-0" LONG @
8" OC EA FACE. (OTHER
VERT AND HORIZ BARS NOT
SHOWN FOR CLARITY, SEE
SECTION A4)
SLOPE TOP
OF INFILL
(4) EXIST ANCHOR
BOLTS
STEAM PIPE,
SEE MECH
A1 S-101
L4X4X1/2 W/ (4) 7/8" DIA HILTI
HAS ROD, EMBED 8" WITH HILTI
HIT-HY 200V3
EMBEDMENT
6" MIN
/2
(3) 2" DIA PVC
DRAINPIPES
A3 S-101
TYP
9"
1 1/2"
/2
5/16
C12X20.7 W/ (2) 3/4" DIA HILTI
HAS ROD EMBED 8" WITH
HILTI HIT-HY 200V3
L4X4X1/2 X 30" LONG W/ (4) 7/8"
DIA HILTI HAS ROD, EMBED 8"
WITH HILTI HIT-HY 200V3
(2) L6X3-1/2X1/2
X 1'-5" LONG
PLAN
NORTH
SCALE: 1/2" = 1'-0"
A6
STRUCTURAL PLAN - STEAM VAULT MH-31
4'2'1'0'
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
N a ti o n w id e D ri v e L y n c h b u rg
V
A
.9
.1 w ile y w ils o n .c o m
E m p lo y e e -O w n e d
/8
/2
:5
:2
A
M
C U s e rs
\m le s n e r\
O n e
D ri v e
W ile y W ils o n
\D o c u m e n ts \2
R
S
C
E N m le s n e r6
H
G B
.r v t
STRUCTURAL NOTES
ABBREVIATIONS, PLANS
AND SECTIONS
J A
M E
S M
A D
IS
O
N U
N
IV
E R
S
IT
Y
S T
E A
M A
N D
C O
N D
E N
S A
T E
R E
P L A
C E
M E
N T
M H
-3 T
O M
H -3
B
J M
U P
R O
J E
C T
N O
-4
-0
SMF
MRL
02/09/2024
230214.00
S-101
MRL
H A
R R
IS
O
N B
U R
G V
IR
G
IN
IA
SCALE: 1/2" = 1'-0"S-101
A4 SECTION
SCALE: 1/2" = 1'-0"S-101
A3 SECTION
IN, " INCH
INCL INCLUDE
INFO INFORMATION
K, KIPS THOUSAND POUNDS
L LENGTH, ANGLE
LB POUND
MECH MECHANICAL
OC ON CENTER
PCF POUNDS PER CUBIC FOOT
PL PLATE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
REINF REINFORCING, REINFORCED
REQ REQUIRED
REV REVISION, REVISED
SECT SECTION
SPEC(S) SPECIFICATION(S)
STL STEEL
STRUCT STRUCTURAL, STRUCTURE
TYP TYPICAL
UFC UNITED FACILITES CRITERIA
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
w/ WITH
WF WIDE FLANGE
x BY, TIMES
& AND
= EQUAL, EQUALS
@ AT
ACI AMERICAN CONCRETE
INSTITUTE
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
APPROX APPROXIMATELY
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
AWS AMERICAN WELDING SOCIETY
C CHANNEL
CIP CAST IN PLACE
CL CENTERLINE
CONC CONCRETE
DET DETAIL
DIA DIAMETER
DWG(S) DRAWINGS
DWL DOWEL
EA EACH
ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERNAL, EXTERIOR
FT, ' FOOT
Fy YIELD STRESS
IBC INTERNATIONAL BUILDING
CODE
ABBREVIATIONS:
SCALE: 3/4" = 1'-0"S-101
A1 SECTION
4'2'1'0' 4'2'1'0' 3'2'1'0'
A. GENERAL
1. STRUCTURAL GENERAL NOTES ARE INTENDED TO HIGHLIGHT OR IN SOME CASES
SUPPLEMENT PROJECT SPECIFICATIONS. REFER TO THE PROJECT SPECIFICATIONS
FOR COMPLETE WORK COVERAGE.
2. THE FOLLOWING ANCHOR LOADS ARE COORDINATED WITH THE MECHANICAL
ENGINEERS’ BASIS OF DESIGN:
STEAM LINE= 30,924 lbf and 1354 ft*lb CONDENSATE LINE = 4,883 lbf and 785 ft*lb
NOTE — CONDENSATE LINE NOT SHOWN ON STRUC DRAWINGS.
3. THE GENERAL CONTRACTOR AND SUB-CONTRACTORS MUST DETERMINE THE
SCOPE OF THE STRUCTURAL WORK FROM THE CONTRACT DOCUMENTS TAKEN AS A
WHOLE. THE STRUCTURAL DRAWINGS MUST NOT BE CONSIDERED SEPARATELY
FOR PURPOSES OF BIDDING THE STRUCTURAL WORK. DUE CONSIDERATION MUST
BE GIVEN TO OTHER STRUCTURAL WORK OR WORK RELATED TO THE STRUCTURE,
INCLUDING NECESSARY COORDINATION DESCRIBED OR IMPLIED BY THE
MECHANICAL DRAWINGS.
4. THE REPRODUCTION OF THE STRUCTURAL CONTRACT DOCUMENTS IN ANY FASHION
AS STRUCTURAL SHOP DRAWING DOCUMENTS IS PROHIBITED.
5. SCALES NOTED IN THE DRAWINGS ARE FOR GENERAL INFORMATION ONLY. NO
DIMENSIONAL INFORMATION MUST BE OBTAINED BY DIRECT SCALING OF THE
DRAWINGS.
6. THE GENERAL CONTRACTOR MUST SUBMIT SHOP DRAWINGS FOR ALL STRUCTURAL
ELEMENTS SHOWN ON THE CONTRACT DOCUMENTS FOR APPROVAL. THE
STRUCTURAL ENGINEER WILL NOT BE RESPONSIBLE FOR THE STRUCTURAL
CERTIFICATION AND DESIGN OF THE PROJECT IF THE GENERAL CONTRACTOR FAILS
TO OBTAIN APPROVAL OF THE SHOP DRAWINGS. SHOP DRAWINGS ARE REVIEWED
AS A CONVENIENCE TO THE GENERAL CONTRACTOR AND ARE NOT A CONTRACT
DOCUMENT. THE GENERAL CONTRACTOR MUST STATE ON THE SHOP DRAWINGS
THAT CONTRACT DOCUMENT REQUIREMENTS HAVE BEEN MET AND THAT ALL
DIMENSIONS, CONDITIONS, AND QUANTITIES HAVE BEEN REVIEWED AND VERIFIED
AS SHOWN AND/OR CORRECTED ON THE SHOP DRAWINGS.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR FITTING NEW WORK WITH
EXISTING CONSTRUCTION. INFORMATION ON THE EXISTING STEAM VAULT SHOWN IN
THESE DRAWINGS WAS BASED UPON THE INFORMATION SUPPLIED TO WILEY
WILSON, INC. THIS INFORMATION IS NOT AS-BUILT DATA AND THE ACTUAL AS-BUILT
CONSTRUCTION MAY DIFFER FROM THAT REPRESENTED IN THE DRAWINGS. THE
CONTRACTOR MUST VERIFY ALL INFORMATION. VARIATIONS FROM THE DIMENSIONS
INDICATED ON THE CONTRACT DOCUMENTS MUST BE BROUGHT TO THE ATTENTION
OF THE ARCHITECT AND/OR THE STRUCTURAL ENGINEER.
8. THE METHODS, PROCEDURES, AND SEQUENCES OF CONSTRUCTION ARE THE
RESPONSIBILITY OF THE CONTRACTOR. SUPPORTING FORMWORK FOR THE
CONCRETE CONSTRUCTION MUST NOT BE REMOVED BEFORE THE CONCRETE HAS
GAINED SUFFICIENT STRENGTH TO SAFELY SUPPORT THE DEAD AND
SUPERIMPOSED LOADS WHICH WOULD BE SUBSEQUENTLY APPLIED. THE
CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO MAINTAIN AND
ENSURE THE INTEGRITY OF THE STRUCTURE AT ALL STAGES OF CONSTRUCTION.
B. CONCRETE
1. ALL CONCRETE WORK MUST BE IN ACCORDANCE WITH ACI 301, ACI 318 AND ACI 302.
2. PROVIDE CONCRETE WITH A MINIMUM COMPRESSIVE STRENGTH (f’c) OF 4,500 PSI AT
28 DAYS. USE NORMAL WEIGHT AGGREGATES CONFORMING TO ASTM C33 AND TYPE
II PORTLAND CEMENT CONFORMING TO ASTM C150. CONCRETE MUST MEET THE
FOLLOWING DURABILITY EXPOSURE CATEGORIES: F2, S0, W1, C1.
3. FLY ASH CONFORMING TO ASTM C618, TYPE C OR F MAY BE USED AS TO REPLACE A
PORTION OF THE PORTLAND CEMENT IN A CONCRETE MIX. THE AMOUNT OF
PORTLAND CEMENT CONTENT MUST NOT BE LESS THAN 50 PERCENT OF THE TOTAL
AMOUNT OF CEMENTITIOUS MATERIAL IN THE MIX.
4. GROUND GRANULATED BLAST-FURNACE SLAG CONFORMING TO ASTM C989, MAY BE
USED AS TO REPLACE A PORTION OF THE PORTLAND CEMENT IN A CONCRETE MIX.
THE AMOUNT OF PORTLAND CEMENT CONTENT MUST NOT BE LESS THAN 50
PERCENT OF THE TOTAL AMOUNT OF CEMENTITIOUS MATERIAL IN THE MIX.
5. CONCRETE REINFORCEMENT BARS MUST CONFORM TO ASTM A615, GRADE 60.
REINFORCEMENT BARS MUST NOT BE TACK WELDED, WELDED, HEATED OR CUT
UNLESS INDICATED ON THE CONTRACT DOCUMENTS OR APPROVED BY THE
STRUCTURAL ENGINEER.
6. PROVIDE WELDED WIRE FABRIC CONFORMING TO ASTM A1064 IN FLAT SHEETS. LAP
FABRIC TWO MESHES AT SPLICES.
7. GROUT UNDER ALL COLUMN BASE PLATES AND BEAM BEARING PLATES WITH NON-
SHRINK, NON-METALLIC GROUT WHICH CONFORMS TO CORPS OF ENGINEERS
SPECIFICATION CRD-C 621-82 OR ASTM C1107.
8. DETAILING OF CONCRETE REINFORCEMENT BARS AND ACCESSORIES MUST
CONFORM TO THE RECOMMENDATIONS OF ACI 315 “DETAILS AND DETAILING OF
CONCRETE REINFORCEMENT” AND ACI SP-66 “DETAILING MANUAL”. PLACING OF
REINFORCING BARS MUST CONFORM TO THE RECOMMENDATIONS OF ACI 315R
“MANUAL OF ENGINEERING AND PLACING DRAWINGS FOR REINFORCED CONCRETE
STRUCTURES” AND CRSI “MANUAL OF STANDARD PRACTICE”.
9. MIX, TRANSPORT, AND PLACE CONCRETE PER THE RECOMMENDATIONS OF ACI 301.
10. PROVIDE CONCRETE COVER PROTECTION OF REINFORCEMENT PER ACI 318
SECTION 20.6.1.3 WITH STANDARD BAR CHAIRS AND SPACERS REQUIRED TO
MAINTAIN MINIMUM CONCRETE PROTECTION.
11. WELDING OF REINFORCEMENT BARS IS NOT PERMITTED.
12. TIE DOWELS IN PLACE BEFORE PLACING CONCRETE. DO NOT STAB OR “WET-SET”
DOWELS.
13. CHAMFER EXPOSED EDGES OF CONCRETE ¾” UNLESS OTHERWISE NOTED.
14. INSTALL AND SECURE EMBEDMENTS SUCH AS ANCHOR BOLTS AND EMBEDMENT
PLATES WITHIN SPECIFIED TOLERANCES BEFORE CONCRETE PLACEMENT.
C. STRUCTURAL STEEL
1. UNLESS NOTED OTHERWISE, STRUCTURAL STEEL MUST CONFORM TO THE
FOLLOWING:
ANCHOR BOLTS ASTM F1554, GRADE 36
WIDE FLANGE SHAPES ASTM A992-01, 50 KSI
ANGLES ASTM A36
CHANNELS ASTM A36
PLATES A36
2. DETAIL, FABRICATE AND ERECT STRUCTURAL STEEL PER THE AISC “SPECIFICATION
FOR STRUCTURAL STEEL BUILDINGS,” THE AISC “CODE OF STANDARD PRACTICE
FOR STEEL BUILDINGS AND BRIDGES” AND THE SAFETY REQUIREMENTS OF THE
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION AND THE LOCAL
JURISDICTION. PROVIDE TEMPORARY SEATS TO FACILITATE SAFE ERECTION.
3. PERFORM WELDING IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY
STANDARD D1.1. PROVIDE ELECTRODES FOR SHOP AND FIELD WELDS IN
ACCORDANCE WITH AWS A5.1 OR AWS A5.5, CLASS E70XX, LOW HYDROGEN. ALL
WELDS MUST USE FILLER METAL WITH A MINIMUM CVN VALUE OF 20 FT-LBS AT -20
DEGREES FAHRENHEIT.
4. ALL SHOP AND FIELD WELDING MUST BE EXECUTED BY WELDERS AND WELDING
OPERATORS WHO HAVE BEEN PREVIOUSLY QUALIFIED BY TEST AS PRESCRIBED IN
AWS D1.1 OF THE AMERICAN WELDING SOCIETY TO PERFORM THE TYPES OF WELDS
REQUIRED ON THE PROJECT.
5. ALL COPES, BLOCKS, CUT-OUTS, AND OTHER CUTTING OF STRUCTURAL MEMBERS
MUST HAVE ALL RE-ENTRANT CORNERS SHAPED, NOTCHED FREE TO A RADIUS OF
AT LEAST ½”.
6. SEE OTHER ENGINEERING DRAWINGS FOR MISCELLANEOUS STEEL NOT SHOWN ON
THE STRUCTURAL DRAWINGS.
7. NO FABRICATION MUST PROCEED PRIOR TO SHOP DRAWING APPROVAL.
8. SPLICING OF STRUCTURAL STEEL MEMBERS WHERE NOT DETAILED ON THE
CONTRACT DOCUMENTS IS PROHIBITED WITHOUT PRIOR APPROVAL OF THE
STRUCTURAL ENGINEER AS TO LOCATION, TYPE OF SPLICE AND CONNECTION TO BE
MADE.
9. THE CONTRACTOR MUST NOTIFY WILEY WILSON, INC. OF ANY MISFABRICATION OF
STRUCTURAL STEEL PRIOR TO ERECTION OF SAME.
10. ONE COAT OF SHOP PAINT MUST BE APPLIED TO ALL STRUCTURAL STEEL WITH THE
EXCEPTION OF AREAS TO BE WELDED.
11. STRUCTURAL STEEL CAST INTO OR IN CONTACT WITH CONCRETE MUST NOT BE
PAINTED.
D. POST INSTALLED ANCHORS
1. POST-INSTALLED ANCHORS MUST ONLY BE USED WHERE SPECIFIED ON THE
CONSTRUCTION DOCUMENTS.
2. THE CONTRACTOR MUST OBTAIN APPROVAL FROM THE ENGINEER-OF-RECORD
PRIOR TO INSTALLING POST-INSTALLED ANCHORS IN PLACE OF MISSING OR
MISPLACED CAST-IN-PLACE ANCHORS.
3. ANCHORAGE TO CONCRETE:
i. MECHANICAL ANCHORS MUST HAVE BEEN TESTED AND QUALIFIED FOR USE IN
ACCORDANCE WITH ACI 355.2 AND ICC-ES AC193 FOR CRACKED AND UNCRACKED
CONCRETE RECOGNITION.
ii.ADHESIVE ANCHORS MUST HAVE BEEN TESTED AND QUALIFIED FOR USE IN
ACCORDANCE WITH ACE 355.4 AND ICC-ES AC 308 FOR CRACKED AND
UNCRACKED CONCRETE RECOGNITION.
4. INSTALL ANCHORS PER THE MANUFACTURER INSTRUCTIONS, AS INCLUDED IN THE
ANCHOR PACKAGING.
5. ANCHOR CAPACITY IS DEPENDANT UPON SPACING BETWEEN ADJACENT ANCHORS
AND PROXIMITY OF ANCHORS TO EDGE OF CONCRETE. INSTALL ANCHORS IN
ACCORDANCE WITH SPACING AND EDGE CLEARANCES INDICATED ON THE
DRAWINGS.
6. EXISTING REINFORCING BARS IN THE CONCRETE STRUCTURE MAY CONFLICT WITH
SPECIFIC ANCHOR LOCATIONS.
This is the start of the file's text. The full file is on GovTribe.