240110 Saline Area Schools - BP2 - Addendum 001 - 2 of 2.pdf
PDF 3 MB Posted
- Attached to
- RFP Data Cabling & Audio
- Solicitation number
- RFP - SAL - 240000000822
- Issued by
- Washtenaw County, St. Louis City, Michigan
About this file
This document contains details related to a state and local contract opportunity for a Data Cabling & Audio project. The opportunity is being solicited by the Washtenaw County and the City of St. Louis jurisdictions in the state of Michigan. The project involves the provision of products and services related to data cabling and audio equipment. There is no information provided about item quantities, response dates, due dates, site visits, bidder's meetings and conferences, award dates, or the term of the contract including any renewal options.
The document does not contain any details about pricing terms, set asides, incumbents, the current environment, funding requirements and sources, amounts and sources, or any other salient information. Legal language, contract clauses, and other non-essential information are also not included in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information
Detailed, RFIs Grouped by Company and RFI Number
Saline Area Schools 2022 Bond Program Clark Construction CompanyProject # 23-2914
7265 Ann Arbor Street
Saline, MI 48176
Tel: Fax:
Clark Construction Company
RFI #: 0003 Date Created: 1/4/2024
DisciplineSubject Category
MechanicalBP-2 - Saline HS Additions - Mechanical Scope
Clarifications
DaysAmountCost Impact Sched Impact Dwg Impact
Not SureNot SureNot Sure $0.00 0
Cost Impact Comments Sched Impact Comments Dwg Impact Comments
AnswerQuestion Date Required: 1/11/2024 Date Answered: 1/8/2024
Please see below.
1) For the geothermal piping, can the scope cutoff be moved to where the geothermal piping enters the building? Leaving all external piping in the geothermal scope, and internal piping in the mechanical scope? With the geothermal bid category carrying the 3” piping headers into the building, there will be union trade issues because mechanical contractors will have to run that 3” piping. If we can move the cutoff line to where the geothermal piping enters the building, it will clean up both scopes.
2) Is the piping chase demolition and install under the general trades bid pack or the responsibility of the mechanicals?
3) Will there be an allowance added to the general trades bid pack for floor protection? Or will mechanicals be responsible for carrying?
4) Would it be possible to know the value of the temperature controls contract? The mechanical contractors will likely have a large part coordinating the work and some overhead will need to be carried.
1. See revised Bid Category Specific Notes for Bid Category 23A -
HVAC and 23B - Geothermal for clarification of work.
2. Bid category 02 is responsible for demo of existing chase as required for new chilled water piping. Bid category 04 is responsible for infilling masonry as required. Bid category 09C
Hard Tile - is responsible for repairing tile as applicable in restrooms. Bid category 22A is responsible for removing toilet fixtures, salvaging and reinstalling.
3. Floor protection will be covered by 06 - General Trades base bid allowances.
4. Temperature Controls Contract Value - Base Bid $225,000, Alternate 1 - $11,000, Alternate 2 - $33,000, Alternate 3 - $85,000.
Answered By: Clark Construction CompanyAuthored By Matt Wielechowski
Printed on: 1/10/2024 Page 1 of 1
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0004 - BP-2 - Saline HS Additions - Site Logistics and Sequence Clarifications
Subject BP-2 - Saline HS Additions - Site Logistics and Sequence Clarifications
Status Closed by Clark n
Discipline
Civil
LocationPhase
Preconstruction
Created On
1/4/2024
Due Date
1/11/2024
Date Resolved
1/9/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Matt Wielechowski
Clark Construction Company
QUESTION Matt Wielechowski on 1/4/2024 01:25 PM
1. Is this project prevailing wage?
2. Do you have a logistics plan? I looked through all the documents and did not see one.
3. Do you have thoughts on the sequence of installing the retaining wall on the east side of the weightroom? We are supposed to keep the existing water main live for as long as possible, but the new water main is supposed to go in between the retaining wall and existing wall. Will the new retaining wall need to be installed first?
ANSWER Matt Wielechowski on 1/9/2024 09:47 AM
1. This project is NOT prevailing wage.
2. See Addendum 001 for site logistics plan.
ASSIGNMENTS
Matt Wielechowski (Clark Construction Company) Due On 1/11/2024
Page 1 of 1Printed on: 1/10/2024ProjectSight
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0005 - BP-2 - Saline HS Additions - Pre-purchased Equipment Clarifications
Subject BP-2 - Saline HS Additions - Pre-purchased Equipment Clarifications
Status Closed by Clark n
Discipline
Mechanical
LocationPhase
Preconstruction
Created On
1/4/2024
Due Date
1/11/2024
Date Resolved
1/8/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Matt Wielechowski
Clark Construction Company
QUESTION Matt Wielechowski on 1/4/2024 01:50 PM
1. Was sales tax paid by the owner on the Pre-purchased Trane equipment and controls? If not, what is the value, as it will need to be included for the installing contractor as Use Tax.
2. The Trane equipment proposal is missing WSHP-7 and the Inertia Rails and Spring Isolators for the DOAS-1 (per note 13 on the equipment schedule on drawing M6.0 and detail 2 on M3.0). Will these be included in their scope?
3. Will Trane controls handle relocating the existing Unit Heater thermostat in Penthouse 4F (per note on drawing
M4.1)?
ANSWER Matt Wielechowski on 1/8/2024 02:44 PM
1. Sales tax is paid by Owner on the pre-purchased Trane equipment. Do not include Use Tax in proposal of pre-purchased equipment.
2. WSHP-7 is included in the cost though the specific item was not called out – this was confirmed by Trane on
12.5.23. Trane does not provide rails or isolators for the DOAS – that is by MC as is the isolator hangers for the
WSHPs, etc.
3. This will need to be added to Trane’s scope.
ASSIGNMENTS
Matt Wielechowski (Clark Construction Company) Due On 1/11/2024
Karol Bartlam (Kingscott Associates, Inc.) Due On 1/11/2024
Trevor Garland (Kingscott Associates, Inc.) Due On 1/11/2024
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0006 - BP-2 - Saline HS Additions - Housekeeping / Equipment Pads and Demo of Existing Chase for Chilled
Water Piping
Subject BP-2 - Saline HS Additions - Housekeeping / Equipment Pads and Demo of Existing
Chase for Chilled Water Piping
Status Closed by Clark n
Discipline
Mechanical
LocationPhase
Preconstruction
Created On
1/4/2024
Due Date
1/11/2024
Date Resolved
1/8/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Matt Wielechowski
Clark Construction Company
QUESTION Matt Wielechowski on 1/4/2024 01:54 PM
1. Bid Category 03A (Concrete) includes housekeeping/equipment pads; does that include filling of the Inertia bases for the four GSWP pumps and DOAS unit?
2. Who is responsible for "Demolish and patch existing chase as required for new chilled water piping" as noted on drawings MD1.26, MD1.27, MD4.1, M1.26, M1.27, & M4.1?
ANSWER Matt Wielechowski on 1/8/2024 02:46 PM
1. Bid Category 03A is responsible for infilling inertia bases for the DOAS and the GSWP pumps. See revised Bid
Category Specific Notes for 03A.
2. Bid category 02 is responsible for demo of existing chase as required for new chilled water piping. Bid category 04 is responsible for infilling masonry. Bid category 09C Hard Tile - is responsible for repairing tile as applicable in restrooms. Bid category 22A is responsible for removing toilet fixtures, salvaging and reinstalling.
ASSIGNMENTS
Matt Wielechowski (Clark Construction Company) Due On 1/11/2024
Karol Bartlam (Kingscott Associates, Inc.) Due On 1/11/2024
Trevor Garland (Kingscott Associates, Inc.) Due On 1/11/2024
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0007 - BP-2 - Saline HS Additions - Decorative CMU (Ground Face CMU) and Burnished Block (Note #16)
Subject BP-2 - Saline HS Additions - Decorative CMU (Ground Face CMU) and Burnished Block
(Note #16)
Status Closed by Architect n
Discipline
Architectural
LocationPhase
Preconstruction
Created On
1/4/2024
Due Date
1/11/2024
Date Resolved
1/8/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Karol Bartlam
Kingscott Associates, Inc.
QUESTION Matt Wielechowski on 1/4/2024 02:24 PM
The Mason Spec lists Decorative 1. CMU(Ground Face CMU) as a material but no Color, Pattern, or Vendor listed.
Can the architect please provide the necessary information needed. See attached for reference. Please advise
2. Area M Floor Plan A1.12- Corridor 1M03 and Lobby 1M02 have callouts for burnished block to be used- #16
Architectural General Notes on the page. However A9.1-3/6 where these areas are shown have no burnished block on these walls or get covered w/drywall. Should Burnished Block be used in these locations as noted? This is not cost effective to cover them up in 1M03 if yes. Please advise
File
RFI Floor Plan.pdf
Matt Wielechowski
File
DCMU Spec.pdf
Matt Wielechowski
File
INT ELV RFI.pdf
Matt Wielechowski
ANSWER Karol Bartlam on 1/8/2024 08:22 AM (Promoted by Robyn Anes on 1/8/2024 01:30 PM)
Please refer to attached.
File
SAS HS PreBid RFI...
Karol Bartlam
ASSIGNMENTS
Karol Bartlam (Kingscott Associates, Inc.) Due On 1/11/2024
Trevor Garland (Kingscott Associates, Inc.) Due On 1/11/2024
Page 1 of 1Printed on: 1/8/2024ProjectSight https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=9-SRoCRkwu0 https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=cj3WNqwPdMQ https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=u7yh43Xrz_o https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=pwa31OR83y4
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0007 - BP-2 - Saline HS Additions - Decorative CMU (Ground Face CMU) and Burnished Block (Note #16)
Subject BP-2 - Saline HS Additions - Decorative CMU (Ground Face CMU) and Burnished Block
(Note #16)
Status Submitted for Review n
Discipline
Architectural
LocationPhase
Preconstruction
Created On
1/4/2024
Due Date
1/11/2024
Date Resolved
Author
Matt Wielechowski
Clark Construction Company
Resolved By
QUESTION Matt Wielechowski on 1/4/2024 02:24 PM
The Mason Spec lists Decorative 1. CMU(Ground Face CMU) as a material but no Color, Pattern, or Vendor listed.
Can the architect please provide the necessary information needed. See attached for reference. Please advise
2. Area M Floor Plan A1.12- Corridor 1M03 and Lobby 1M02 have callouts for burnished block to be used- #16
Architectural General Notes on the page. However A9.1-3/6 where these areas are shown have no burnished block on these walls or get covered w/drywall. Should Burnished Block be used in these locations as noted? This is not cost effective to cover them up in 1M03 if yes. Please advise
File
RFI Floor Plan.pdf
Matt Wielechowski
File
DCMU Spec.pdf
Matt Wielechowski
File
INT ELV RFI.pdf
Matt Wielechowski
ASSIGNMENTS
Karol Bartlam (Kingscott Associates, Inc.) Due On 1/11/2024
Trevor Garland (Kingscott Associates, Inc.) Due On 1/11/2024
Page 7 of 7Printed on: 1/4/2024ProjectSight
1. Ground Face CMU material will be added to 042000 specification in forthcoming Addendum.
2. Burnished block in Corridor 1M03 is clearly indicated on floor plan & interior elevation (top of elevation) 6/A9.1. At locations where gypsum board is indicated, mason may change to standard cmu if they choose.
Ground face block extents will be modified in Lobby 1M02, one paint color removed and one paint color added on floor plan, color layout plan & interior elevation.
Karol Bartlam / Dana McClellan / Sarah Haselschwardt Kingscott 01/08/2024 https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=9-SRoCRkwu0 https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=cj3WNqwPdMQ https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=u7yh43Xrz_o
2900-09C UNIT MASONRY 042000-6
defects are exposed in the completed Work and will be within 20 ft. vertically and horizontally of a walking surface.
C. Fire-Resistance Ratings: Comply with requirements for fire-resistance-rated assembly designs indicated.
2.2 CONCRETE MASONRY UNITS
A. Shapes: Provide shapes indicated and as follows, with exposed surfaces matching exposed faces of adjacent units unless otherwise indicated.
1. Provide special shapes for lintels, corners, jambs, sashes, movement joints, headers, bonding, and other special conditions.
2. Provide [square-edged] [bullnose] units for outside corners unless otherwise indicated.
B. Integral Water Repellent: Provide units made with integral water repellent for exposed units and where indicated.
1. Integral Water Repellent: Liquid polymeric, integral water-repellent admixture that does not reduce flexural bond strength. Units made with integral water repellent, when tested in accordance with ASTM E514 as a wall assembly made with mortar containing integral water-repellent manufacturer's mortar additive, with test period extended to 24 hours, will show no visible water or leaks on the back of test specimen.
C. CMUs: ASTM C90, normal weight.
1. Unit Compressive Strength: Provide units with minimum average net-area compressive strength of 2500 psi.
2. Size (Width): Manufactured to dimensions 3/8 inch less than nominal dimensions.
3. Exposed Faces: Provide color and texture matching the range represented by Architect's sample.
D. Decorative CMUs: ASTM C90, normal weight.
1. Unit Compressive Strength: Provide units with minimum average net-area compressive strength of 2500 psi.
2. Size (Width): Manufactured to dimensions specified in "CMUs" Paragraph above.
3. Pattern and Texture: Standard pattern, ground-face finish.
4. Colors: As selected by Architect from manufacturer's full range.
5. Special Aggregate: Provide units made with aggregate matching aggregate in Architect's sample.
2.3 BRICK
A. General: Provide shapes indicated and as follows, with exposed surfaces matching finish and color of exposed faces of adjacent units:
1. For ends of sills and caps and for similar applications that would otherwise expose unfinished brick surfaces, provide units without cores or frogs and with exposed surfaces finished.
JamesSnyder Highlight Colors: As selected by Architect from manufacturer's full range.
JamesSnyder Highlight Special Aggregate: Provide units made with aggregate matching aggregate in Architect's sample.
BUILT-IN BENCH RECESSED NOOKS
WITH VINYL SEAT PAD, DECORATIVE
TILE @ BACK WALL & WOOD ACOUSTICAL
PANELS (AWP-2) AT SIDE WALLS &
"CEILING"
RECESSED GLASS TROPHY
CASE 2'-0" DEEP - SLIDING
DOORS INTEGRAL LIGHT
ALIGN W/ ALCOVES &
DOOR BELOW.
LOCKING & KEYED ALIKE
FACEBRICK
W A
LL
C O
V
ER
IN
G
O N G
Y P B
D W
A
LL
PROVIDE DECORATIVE
PROTECTIVE PANEL @ FACE OF
GYP WALLS AROUND
BENCHES, PLAM-5
WALL ABV.
CLG LEVEL
WC-1
2 2
6'-8"
2" WOOD TRIM TO FRAME BENCH
STAINED TO MATCH ACOUSTIC
WOOD WALL PANELS (TYP)
AWP-2 AWP-2
A5.4
6" 6'-4" 6" 6'-8"
BACK WALLBACK WALL
A5.4
A4.6
_______________________ 3
A4.6
2'-4 3/8"
1' -8
RECESSED GLASS TROPHY
CASE 2'-0" DEEP - HINGED
DOORS WITH RECESSED
LIGHTING.
LOCKING & KEYED ALIKE
ROOM SIGN - MODIFIED WIDTH
5" (VERIFY)
DECORATIVE PANEL SEAM - ALIGN
WITH DOOR FRAME
A C C E N T
W A L L C O
V E R
IN
G
ACCENT PAINT
1' -8
WC-1
1 1
WALLCOVERING & PAINT FROM THIS
ELEVATION CONTINUES ON RETURN WALL
TO DOOR SET.
WALL ABV.
CLG LEVEL
A C C E N T
W A L L C O
V E R
IN
G
36"H ARCHITECTURAL ACRYLIC
LETTERS - WHITE / BACKLIT
FURTURA FONT
WALLCOVERING CONTINUES BEHIND
LETTERS.
METAL TRIM AT EXPOSED TILE EDGES (TYP)
4"D LAMINATE
LEDGE (PLAM-6)
TV, SEE TECHNOLOGY
DRAWINGS
WC-1
PAINT ACCENT STRIPE
OPEN TO
TOILET RM.
OPEN TO
TOILET RM.
5'-8"
WP
WALL ABV.
CLG LEVEL
24'-6" 8" 2'-4" 8"
ACCENT PAINT
WP WP WP WP
1 1
8" 8"
4"W RECESSED LED LIGHTS
THAT ALIGN WITH LIGHTS IN
GYP CELIING & PATTERN IN FLOOR
4" TYP
9' -0
5 5
ACCENT PAINT
CONTINUES INTO
ALCOVE
1'-4 1/8"5 1/8" 4" TYP
ACCENT PAINT
CORNER GUARD,
TYP @ BOTH
SIDES OF ALCOVE
8" 8"
10'-1 1/4"
ROOM SIGN (TYP)
1'-4"
10"
1'-7 3/8"6'-6 3/8"
2'-11 3/8"
ALIGN W/ DOOR @ OPP. HALL
ACCENT PAINT
WP WP
GROUND FACE BLOCK
8" 8"
8" 8"
GROUND FACE BLOCK GROUND FACE BLOCKACCENT PAINT
CORNER GUARD TYP @ BOTH SIDES OF ALCOVEROOM SIGN (TYP)
1'-4" 1'-4"1'-4"
PAINT 8"H CMU
UNDER WINDOWS
RB-1
GEOTHERMAL
PIPING BEYOND;
PAINTED
ACCENT COLORS.
SEE MECH DWGS
FOR DETAILS
1. REFER TO COLOR LAYOUT PLANS FOR FINISH MATERIAL SYMBOLS.
INTERIOR ELEVATION GENERAL NOTES
A
B
C
D
EF
G J
H
K
L
M
N
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
N D
C
O P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
E S
A
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
W
IT
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
KEY PLAN
/8
/2
:5 :1
A
M
C
U s e rs
\k b a rt la m
\D o c u m e n ts
\S A
S H ig h S c h o o l A d d it io n A rc h r2 k b a rt la m
.r v t 2900.09C
INTERIOR ELEVATIONS
A9.1
N A nn A rb or
S t
Sa lin e, M
I 4
S a lin e A re a
S ch o o ls
S T E A
M
W E
IG
H T
R O
O M
A D
D
IT
IO
N
1/4" = 1'-0"1
1M02 LOBBY - WEST
1/4" = 1'-0"2
1M02 LOBBY - NORTH
1/4" = 1'-0"3
1M02 LOBBY - EAST
1/4" = 1'-0"5
1M03 CORRIDOR - WEST
1/4" = 1'-0"6
1M03 CORRIDOR - EAST
1/4" = 1'-0"4
1M02 LOBBY-SOUTH
CONSTRUCTION DOCUMENTS 12/08/2023
JamesSnyder Ellipse
JamesSnyder Ellipse
JamesSnyder Ellipse
F159
STAIR
UP
AA
A
4.7
7"
1' -0
A9.2
A3.3
A3.3
1' -4
1' -8
1' -4
7' -0
1' -4
1' -4
1' -4
18'-4" 3'-4" 15'-4" 11'-4" 27'-0" 1'-0" 8" 1'-0"
1'-0" 17'-8" 8" 8'-0" 1'-4" 2'-4" 6'-4"1'-8" 45'-8" 8" 18'-8" 8"
1'-4" 13'-4" 1'-0" 65'-0" 8" 11'-4" 1'-0" 4'-4" 8" 12'-8" 8'-8" 1'-4"
14'-0" 54'-0" 26'-4" 27'-0"
103°
A3.1
A3.1 1
A3.1
A3.15
A9.1
A5.2
A5.2
A5.2
A5.2
A5.2
A5.2
A5.2
A5.2
A5.3
A5.3
A5.3
A5.2
A5.2
A5.2
A5.2
A5.3
A5.3
A9.2
A9.2
A1.43
ROBOTICS WKSHP
1M17
STAIR
1M20
GROUP
1M18
GROUP
1M19
ROBOTICS
1M16
STORAGE
1M15
STORAGE
1M14
FLEX CLASSROOM
1M13
VEST.
1M01
LOBBY
1M02
T.
1M10
T.
1M11
STOR.
1M09
CLASSROOM
1M08
COLLAB.
1M07
GROUP
1M05
GROUP
1M06
CORRIDOR
1M04
CORRIDOR
1M03
A1.43
25'-7"
17'-4 1/2"
17'-4 1/2"
18'-3"
3°
1/
1' -4
1' -4
10'-8"
1'-4"
1' -4
7°
30'-4"
3'-4"
2'-4" 10'-0" 2'-0" 10'-0" 2'-0" 10'-0" 2'-8" 3'-4" 3'-4" 8" 9'-4" 9'-4" 8" 11'-4" 1'-0" 26'-4" 1'-4"
7' -4
1'-4"
33'-4" +/-
167°
8'-4" 33'-4" 12'-4"
2'-0" 25'-8" 1'-8"
1' -0
2'-4" 10'-0" 2'-0" 10'-0" 2'-0" 10'-0" 2'-0" 10'-0"
1'-0"
2'-0" 4'-0" 6'-4" 4'-0"
7' -4
1' -0
1' -4
JC
1M12
A3.3
1'-4"
4'-0" 8"
8" 8'-4"
4'-0" 2'-0" 21'-4"
1M01A
1M13B
1M16F
1M16E1M16D1M16C1M16B
1M15
1M14
1M12
1M09
1M08A
1M08B 1M08C
1M07B
1M07A
1M00
1M04A
1M20
1M16G
1M17E1M17D1M17C1M17B
A3.3
A3.3
A3.3
A3.1
A3.1
A9.1
1 3
A9.2
4 3
A9.3
A3.1
B L -1
J
H
F
E
1' -0
7' -0
7' -0
A9.4
1'-5" 13'-5"
1M17A
1'-4" 6'-4" 2'-4" +/- 6'-4"
1M04F
1M01B
1M01C
1M02A
1M02B
1M02C
1M01D
1M02D
A5.3
OPERABLE GLASS PARTITION
ADD ALTERNATE A1:
1'-4
5"
1'-8" 5'-1" 1'-7"
5"
3"
A5.2
A5.2
A5.2
A5.2
A5.3
A5.3
A5.3
1M13A
1M16A
1M02E
1M03
1M04B
1M04C
1M04D 1M04E
A4.8
A4.8
_______________________ 2
A4.8
A4.8
2'-9"
7'-7"
A5.2
A5.3
B L -2
A4.6
A4.6
A4.6
ARCHITECTURAL PLAN KEYNOTES
1 5/8" GYPSUM BOARD ADHERED & MECHANICALLY FASTENED TO CMU. REFER TO
PARTITION TYPES, WALL SECTIONS AND INTERIOR ELEVATIONS FOR ADDITIONAL
INFORMATION.
PATCH EXISTING WALL CONSTRUCTION DUE TO WALL REMOVAL OR OTHER ASSOCIATED
DEMOLITION. REPLACE MASONRY UNITS WHERE REQUIRED AND MATCH EXISTING
ADJACENT MATERIALS AND FINISHES.
NEW FIRE EXTINGUISHER & EXTINGUISHER CABINET. REFER TO SPECIFICATION SECTIONS
104413 & 104416.
20'-0" STUD & GYPSUM BOARD CHASE. CONCEAL ALL SECTIONAL DOOR OPERATIONS,
INCLUDING CONDUIT AND JUNCTION BOXES, IN CHASE. REFER TO INTERIOR ELEVATIONS
& DETAIL 13/A6.4 FOR ADDITIONAL INFORMATION.
EXTERIOR EXPANSION JOINT AND COVER. REFER TO SPECIFICATION SECTION
079513.13.
PLYWOOD BACKER BOARD. REFER TO INTERIOR ELEVATION FOR ADDITIONAL
INFORMATION
NEW LADDER AND ROOF ACCESS HATCH. REFER TO DETAIL ON .
NOT USED
NEW TOOTHED- IN 8" CMU TO MATCH EXISTING SIZE AND COURSING. INSTALL NEW
CERAMIC WALL TILE TO MATCH EXISTING. PAINT CMU ABOVE CERAMIC WALL TILE TO
MATCH EXISTING. INSTALL SALVAGED TOILET ACCESSORIES TO MATCH EXISTING
LOCATIONS.
INTERIOR EXPANSION JOINT AND COVER. REFER TO SPECIFICATION SECTION 079513.16.
A5.1
1. INDICATES CONSTRUCTION DOCUMENT ROOM NUMBERS.
2. REFER TO EQUIPMENT PLANS FOR CASEWORK, VISUAL DISPLAY BOARDS, LOCKERS,
SHELVING, ETC.
3. REFER TO COLOR LAYOUT PLANS FOR FLOOR FINISH PATTERNS AND COLORS.
4. CONTRACTOR SHALL COORDINATE LOCATIONS OF FLOOR DRAINS, CLEAN OUTS, ETC, WITH
APPROPRIATE TRADES.
5. REFER TO ENLARGED PLANS FOR ADDITIONAL NOTES AND DIMENSIONS.
6. MASONRY CONTRACTOR TO INSTALL LOOSE LINTELS FOR MISCELLANEOUS OPENINGS NOT
INDICATED ON DRAWINGS BUT REQUIRED FOR MECHANICAL, ELECTRICAL, FOOD SERVICE
EQUIPMENT OR OTHER ITEMS THAT PASS THROUGH A WALL. STEEL LINTELS SHALL BE
SUPPLIED BY THE STEEL CONTRACTOR.
7. ALL PARTITION WALLS TO RUN TIGHT TO DECK, U.N.O.
8. REFER TO PARTITION TYPES SHOWN ON REFLECTED CEILING PLANS AND PARTITION TYPE
SHEET .
9. REFER TO SHEET FOR FLOOR PLAN SYMBOLS LEGEND.
10. ALL CMU PARTITION WALLS SHALL BE 8" NOMINAL UNLESS NOTED OTHERWISE.
11. DIMENSIONS SHOWN ARE TO FACE OF CMU WALL.
12. FILL/SEAL ALL PENETRATIONS THROUGH WALLS & VOIDS AT STRUCTURAL MEMBERS.
13. ALL EXPOSED C.M.U. CORNERS SHALL BE BULLNOSE CORNERS. U.N.O.
14. CAULK & SEAL AROUND ALL NEW CABINET HEATER LOUVERS INSTALLED IN EXTERIOR WALLS.
15. NEW OPENINGS IN EXISTING MASONRY WALLS SHALL BE TOOTHED IN TO MATCH EXISTING
COURSING AND MASONRY SIZES, U.N.O.
16. INDICATES BURNISHED BLOCK WALL EXTENTS. REFER TO SPECITION 042000
FOR ADDITION INFORMATION.
XX
ARCHITECTURAL GENERAL NOTES
A2.40
A
B
C
D
EF
G J
H
K
L
M
N
KINGSCOTT ASSOCIATES INC. KALAMAZOO, MICHIGANCC
JOB NO.
SHEET TITLE
SHEET NO.
ISSUANCES DATE
N
P L
E A
S E
R E
C Y
C L
E
T H
E S
E D
R A
W
IN
G S
A N
D T
H E
W O
R K
R E
P R
E S
E N
T E
D T
H E
R E
IN
A
R E
T H
E P
R O
P E
R T
Y O
F A
C
O P
Y R
IG
H
T
K
IN
G
S C
O T
T A
S S
O C
IA
T
S
A
D
M A
Y N
O T
B E
U S
E D
O R
R E
P R
O D
U C
W
IT
H
O U
T P
E R
M
IS
S
IO
N
L A
S T
P R
IN
T
E D ljh
KALAMAZOO | CHELSEA | GRAND RAPIDS | ROYAL OAK
KEY PLAN
/8
/2
:3 :0
A
M
C
U s e rs
\k b a rt la m
\D o c u m e n ts
\S A
S H ig h S c h o o l A d d it io n A rc h r2 k b a rt la m
.r v t 2900.09C
FIRST FLOOR PLAN - UNIT 1M
A1.12
N A nn A rb or
S t
Sa lin e, M
I 4
S a lin e A re a
S ch o o ls
S T E A
M
W E
IG
H T
R O
O M
A D
D
IT
IO
N
1/8" = 1'-0"1
FIRST FLOOR PLAN - UNIT 1M
CONSTRUCTION DOCUMENTS 12/08/2023
JamesSnyder Ellipse
JamesSnyder Ellipse
JamesSnyder Highlight
JamesSnyder Highlight
JamesSnyder Highlight
JamesSnyder Highlight
JamesSnyder Ellipse
JamesSnyder Ellipse
JamesSnyder Line
JamesSnyder Line
JamesSnyder Text Box Is the intent here to lay Burnished Block here and cover them up? This is how the print reads within the notes but would not be cost effective if these walls are to be covered up.
A9.1-6 shows the highlighted areas covered w/drywall. Should we carry Burnished block in these locations? Please advise
JamesSnyder Highlight
JamesSnyder Highlight
JamesSnyder Highlight
JamesSnyder Highlight
JamesSnyder Highlight
1 5/8" GYPSUM BOARD ADHERED & MECHANICALLY FASTENED TO CMU. REFER TO
PARTITION TYPES, WALL SECTIONS AND INTERIOR ELEVATIONS FOR ADDITIONAL
INFORMATION.
JamesSnyder Text Box This area circled and highlighted shows no Burnished block on the interior walls (A9.1-3) but has the walls shaded to indicate otherwise. Which is correct? please advise
JamesSnyder Line
JamesSnyder Highlight
JamesSnyder Highlight
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0008 - BP-2 - Saline HS Additions - Sitework Clarifications
Subject BP-2 - Saline HS Additions - Sitework Clarifications
Status Closed by Clark n
Discipline
Civil
LocationPhase
Preconstruction
Created On
1/5/2024
Due Date
1/12/2024
Date Resolved
1/9/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Matt Wielechowski
Clark Construction Company
QUESTION Matt Wielechowski on 1/5/2024 01:26 PM
1. Who is handling the Gas line relocation ? Usually, the owner handles this due to it being their gas line.
2. Is there a place to stockpile topsoil on site or will it need to be hauled off site.
3. If the topsoil is to be hauled off site who is responsible for bring in new topsoil, would it be in the landscape package?
4. Who is responsible for the temp fencing ?
5. On the scope of work for Earthwork line #20 states “stone surface mat be beneficial on building pad for durability” does this mean you want us to quote to place stone on the building pad and if so, how much?
6. Who is responsible for topsoil and seeding you have it in 2 bid categories.
7. Can you give an allowance number in $ for the repair of base asphalt areas to be repaired prior to placement of top course considering no one is going to know how much repair is going to need to be done.
ANSWER Matt Wielechowski on 1/9/2024 09:57 AM
1. Gas relocation will be handled by the Owner / DTE.
2. Stockpile of topsoil will not be allowed for the STEAM Addition due to site size restraints. All spoils and topsoil must be hauled offsite. Topsoil will be allowed at the Weight Room Addition; however, all Erosion Control measures must be followed per local jurisdiction requirements.
3. New topsoil is to be furnished and installed by Bid Category 32 - Landscaping.
4. Bid Category 31 - Site Demo, Earthwork is responsible for temporary fencing. See logistics plan in Addendum 001 for location and quantity.
5. Delete Note 20 from Bid Category 31. See revised and reissued Bid Category Specific Notes in Addendum 001.
6. Topsoil and seeding is the responsibility of Bid Category 32 - Landscaping. If the site is disturbed outside of the limits shown on the documents and the site logistics plan, it is the responsibility of the trade contractor disturbing the area to restore (topsoil & seed).
7. Delete "Special Considerations" Note 1 from Bid Category 31. See revised and reissued Bid Category Specific
Notes in Addendum 001.
Page 1 of 2Printed on: 1/10/2024ProjectSight
0008 - BP-2 - Saline HS Additions - Sitework Clarifications
ASSIGNMENTS
Matt Wielechowski (Clark Construction Company) Due On 1/12/2024
Page 2 of 2Printed on: 1/10/2024ProjectSight
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0009 - BP-2 - Saline HS Additions - Selective Demo of Concrete
Subject BP-2 - Saline HS Additions - Selective Demo of Concrete
Status Closed by Clark n
Discipline
Architectural
LocationPhase
Preconstruction
Created On
1/5/2024
Due Date
1/12/2024
Date Resolved
1/9/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Matt Wielechowski
Clark Construction Company
QUESTION Matt Wielechowski on 1/5/2024 01:27 PM
Looking through the demo SOW there is note of concrete removal. The only areas I see where concrete might need to be removed is for the underground plumbing, but the underground plumbing pages are for the addition areas.
I just want to clarify exactly what concrete work needs to be included in our scope.
ANSWER Matt Wielechowski on 1/9/2024 09:58 AM
Review all drawings for related scope of work.
ASSIGNMENTS
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0010 - BP-2 - Saline HS Additions - Schedule of work and Polished Concrete Clarifications
Subject BP-2 - Saline HS Additions - Schedule of work and Polished Concrete Clarifications
Status Closed by Clark n
Discipline
All Disciplines
LocationPhase
Preconstruction
Created On
1/5/2024
Due Date
1/12/2024
Date Resolved
1/10/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Matt Wielechowski
Clark Construction Company
QUESTION Matt Wielechowski on 1/5/2024 01:38 PM
1. Polished concrete calls for (Salt & Pepper Grind) on the drawings, the specs call for a class D aggregate exposure, and the alternate for a deep grind polish in certain areas. Can you please clarify what the base polish is? Is it the salt
& pepper, or what is in the specs?
2. Pertaining to the schedule, is the intent to build both additions simultaneously?
3. When will the foundation work fit into the schedule?
4. When will the site concrete work fit into the schedule?
5. At what level will the concrete scope receive the grade for the retaining walls, and to what grade is the concrete scope to backfill the retaining wall?
6. Are the footings in this area thickened slab or actual footing?
ANSWER Matt Wielechowski on 1/10/2024 08:59 AM
1. Salt & Pepper grind is base bid.
2. Start date for STEAM Addition is 3/25/24. Start for Weight Room Addition is 5/6/24. Substantial Completion for both additions remains the same - June 24th, 2025.
3. Foundation work will take place in the spring / summer 2024.
4. Site concrete will be phased. Critical pedestrian sidewalks will need to be in place by end of Summer 2024. The majority of the site concrete will be completed Spring/Summer 2025.
5. Bid Category 31 will demo existing retaining wall and foundations and leave for Bid Category 03B - Foundations to excavate as needed to install footing and retaining walls.
6. Unclear which exact area is in question. Please refer to foundation plans S1.12 and S1.13 for areas marked/tagged for foundations versus areas marked with thickened slab on grade under interior masonry partitions.
ASSIGNMENTS
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0011 - BP-2 - Saline HS Additions - Undercut Allowance
Subject BP-2 - Saline HS Additions - Undercut Allowance
Status Closed by Architect n
Discipline
Civil
LocationPhase
Preconstruction
Created On
1/8/2024
Due Date
1/15/2024
Date Resolved
1/9/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Karol Bartlam
Kingscott Associates, Inc.
QUESTION Matt Wielechowski on 1/8/2024 02:58 PM
Could you please clarify the allowance of 1000 CYDS of undercutting, should this number include filling the undercut back in and if so what are we using to fill the hole ? 21 AA LS ?
ANSWER Karol Bartlam on 1/9/2024 08:58 AM (Promoted by Matt Wielechowski on 1/10/2024 09:10 AM)
Please refer to attached.
File
SAS HS PreBid RFI...
Karol Bartlam
ASSIGNMENTS
Karol Bartlam (Kingscott Associates, Inc.) Due On 1/15/2024
Trevor Garland (Kingscott Associates, Inc.) Due On 1/15/2024 https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=6K3yjG1tbBs
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0011 - BP-2 - Saline HS Additions - Undercut Allowance
Subject BP-2 - Saline HS Additions - Undercut Allowance
Status Submitted for Review n
Discipline
Civil
LocationPhase
Preconstruction
Created On
1/8/2024
Due Date
1/15/2024
Date Resolved
Author
Matt Wielechowski
Clark Construction Company
Resolved By
QUESTION Matt Wielechowski on 1/8/2024 02:58 PM
Could you please clarify the allowance of 1000 CYDS of undercutting, should this number include filling the undercut back in and if so what are we using to fill the hole ? 21 AA LS ?
ASSIGNMENTS
Karol Bartlam (Kingscott Associates, Inc.) Due On 1/15/2024
Trevor Garland (Kingscott Associates, Inc.) Due On 1/15/2024
Page 1 of 1Printed on: 1/8/2024ProjectSight
Nick Brass Text Box FOR BIDDING PURPOSES, ALLOWANCE SHALL INCLUDE DISPOSAL OF POOR SOILS AND IMPORT AND PLACEMENT OF 21AA CRUSHED CONCRETE. UNDERCUT REQUIREMENTS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION BY THE ON-SITE GEOTECHNICAL ENGINEER.
Nick Brass - SDA 01-09-24
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0012 - BP-2 - Saline HS Additions - Mechanical Clarifications
Subject BP-2 - Saline HS Additions - Mechanical Clarifications
Status Closed by Clark n
Discipline
Mechanical
LocationPhase
Preconstruction
Created On
1/9/2024
Due Date
1/16/2024
Date Resolved
1/9/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Matt Wielechowski
Clark Construction Company
QUESTION Matt Wielechowski on 1/9/2024 01:26 PM
1. Bid Category 22A Plumbing – Scope Item #18 – Install Toilet Accessories. Bid Category 06 Carpentry & General
Trades – Scope Item #25 – Furnish & Install Toilet Accessories. Please clarify scope.
2. Drawing M1.26, M1.27, M4.1 – Please confirm that Demo/Patch of chase to access chilled water piping is by other bid categories.
3. Drawing M1.34 & M1.37, HVAC Key Note H16 – Please confirm that painting of Pipe, Hangers, Supports is by Bid
Category 09D Painting.
4. Drawing M1.26 HVAC Key Note H14 – Please confirm that removal/replacement of ceiling tiles is by others.
5. HVAC General Note 12 on ‘M’ Drawings – Paint all visible interior surfaces of Exhaust/Return Grilles, Registers & visible associated ductwork – Please confirm this is by 09D Painting.
6. Drawing M1.13 Note at 2 ½” Gas Piping – Please confirm painting of pipe is by others.
7. Boxed note on M1.12 & M1.32 – Please confirm painting is by 09D Painting.
8. Please provide lead times on pre-purchased mechanical equipment.
9. Please provide the Weights & Shipping splits for ERU-1.
10. Please provide the weight of RTU-1.
11. Please provide weights/dimensions of the chilled water coils.
12. Drawing P1.12 & P1.32– Boxed note regarding field painting – please confirm that this work is by Bid Category
09D Painting.
13. Drawings P1.13, P1.26, P1.27 – Please confirm notes regarding painting is by Bid Category 09D Painting.
14. Should the coil piping be included in Alternate 1 & 2 along with the new pumps?
15. What do the ‘Hose Kits’ for the Heat Pumps consist of that are pre-purchased with the Trane equipment?
16. For Alternate 1 & 2, can you provide a pump piping detail for the new pumps and the replacement pumps?
Page 1 of 2Printed on: 1/10/2024ProjectSight
0012 - BP-2 - Saline HS Additions - Mechanical Clarifications
ANSWER Matt Wielechowski on 1/9/2024 02:18 PM
1. Toilet Accessories are furnished and installed by Bid Category 06 Carpentry & General Trades.
2. See Pre-bid RFI-0003 for clarification.
3. Painting of pipe, hangers and supports is the responsibility of Bid Category 09D - Painting.
4. Removal and replacement of ceiling tiles is the responsibility of Bid Category 09A - Metal Studs. This will be covered by this bid category allowance.
5. Painting per this note is by Bid Category 09D - Painting.
6. Painting of gas piping per note M1.13 is by Bid Category 09D - Painting.
7. Confirmed, responsibility of Bid Category 09D - Painting.
8. The lead times for coils and WSHP are 8 weeks, The ERU-1 is 37 weeks, The DOAS is 14 weeks.
9. See attached shipping weights of ERU-1.
10. Weight is listed in schedule on M6.0.
11. See attached weights of chilled water coils.
12. Confirmed, responsibility of Bid Category 09D - Painting.
13. Confirmed, responsibility of Bid Category 09D - Painting.
14. Yes, Alternate includes all piping and work associated with adding pumps and re-piping coils as needed to accommodate the pumps.
15. The hose kit comes with isolation valves, strainers, and balance device.
16. Use coil piping details on Sheet M5.1 – all scenarios are shown for 2-way and 3-way valves, stacked or non-stacked coils.
File
Saline HS - STEAM...
Matt Wielechowski
File
Saline HS (4).pdf
Matt Wielechowski
ASSIGNMENTS
Matt Wielechowski (Clark Construction Company) Due On 1/16/2024
Karol Bartlam (Kingscott Associates, Inc.) Due On 1/16/2024
Trevor Garland (Kingscott Associates, Inc.) Due On 1/16/2024
Page 2 of 2Printed on: 1/10/2024ProjectSight https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=0QX7l-GJetw https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=0ZjSTAl-uDQ
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0013 - BP-2 - Saline HS Additions - Building Pad Section
Subject BP-2 - Saline HS Additions - Building Pad Section
Status Closed by Clark n
Discipline LocationPhase
Preconstruction
Created On
1/9/2024
Due Date
1/16/2024
Date Resolved
1/10/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Matt Wielechowski
Clark Construction Company
QUESTION Matt Wielechowski on 1/9/2024 01:36 PM
What is the cross section for the floor in the building? What I’m seeing on sheet S0.3 is: 4" COMPACTED FINE
GRADED GRANULAR MATERIAL OVER 4" GRANULAR SUB-BASE
So, does this mean the concrete bid category will need to install 8” of granular material under his 4” concrete?
ANSWER Matt Wielechowski on 1/10/2024 11:35 AM
See attached clarification on scope of work related to the building pad. The section on S0.3 is correct, 4" compacted fine graded granular material over 4" granular sub-base material. Reference Geo-tech report for additional information.
File
Slab On Grade Cut...
Matt Wielechowski
ASSIGNMENTS
Karol Bartlam (Kingscott Associates, Inc.) Due On 1/16/2024
Trevor Garland (Kingscott Associates, Inc.) Due On 1/16/2024 https://prod.projectsightapp.trimble.com/web/dashboard.aspx?orgid=b3aa1dd5-8e59-4df0-a565-5749fd1ed64f&projid=78&nomsg=1&filekey=n2wET0QNHA8
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0013 - BP-2 - Saline HS Additions - Building Pad Section
Subject BP-2 - Saline HS Additions - Building Pad Section
Status Submitted for Review n
Discipline LocationPhase
Preconstruction
Created On
1/9/2024
Due Date
1/16/2024
Date Resolved
Author
Matt Wielechowski
Clark Construction Company
Resolved By
QUESTION Matt Wielechowski on 1/9/2024 01:36 PM
What is the cross section for the floor in the building? What I’m seeing on sheet S0.3 is: 4" COMPACTED FINE
GRADED GRANULAR MATERIAL OVER 4" GRANULAR SUB-BASE
So, does this mean the concrete bid category will need to install 8” of granular material under his 4” concrete?
ASSIGNMENTS
Karol Bartlam (Kingscott Associates, Inc.) Due On 1/16/2024
Trevor Garland (Kingscott Associates, Inc.) Due On 1/16/2024
Page 1 of 1Printed on: 1/10/2024ProjectSight
This is typical detail which should be verified against the geotechnical report. Per Driesenga & Associates report dated August 8, 2023 (DA Job #2320500.3A), an 8" mat is acceptable. Please verify and coordinate geotechnical with Driesenga.
Brad Cutter Robert Darvas Associates January 10, 2024
Detailed
Saline Area Schools 2022 Bond Program (23-2914) 7265 Ann Arbor Street
Saline, MI 48176
0014 - BP-2 - Saline HS Additions - Weight Room Retaining Wall Sequence
Subject BP-2 - Saline HS Additions - Weight Room Retaining Wall Sequence
Status Closed by Clark n
Discipline
Civil
LocationPhase
Preconstruction
Created On
1/9/2024
Due Date
1/16/2024
Date Resolved
1/9/2024
Author
Matt Wielechowski
Clark Construction Company
Resolved By
Matt Wielechowski
Clark Construction Company
QUESTION Matt Wielechowski on 1/9/2024 01:48 PM
What is the sequence of installing the retaining wall on the east side of the weightroom? We are supposed to keep the existing water main live for as long as possible, but the new water main is supposed to go in between the retaining wall and existing wall. Will the new retaining wall need to be installed first?
ANSWER Matt Wielechowski on 1/9/2024 01:53 PM
This work will need to be closely coordinated between Bid Category 31 and Bid Category 03B - Building Foundations.
The sequence is as follows;
1. Excavate and pour retaining wall foundation (03B)
2. Install and test new water main. (31)
3. Install new retaining wall (03B)
4. Backfill retaining wall (03B)
ASSIGNMENTS
Matt Wielechowski (Clark Construction Company) Due On 1/16/2024