About this file
This document appears to be construction drawings and specifications for HVAC upgrades at Merry Acres Middle School in Albany, Georgia. The project involves the demolition and replacement of various mechanical equipment, including wall hung heat pumps, ductless fan coil units, packaged terminal heat pumps, rooftop units, and exhaust fans. The work is to be completed by September 22, 2023. The project is being managed by the Georgia Department of Education, project number 2023125.
The drawings and specifications provide detailed technical information on the new equipment to be installed, including capacities, airflow, heating and cooling outputs, motor sizes, and control requirements. Pricing terms, funding sources, and other commercial details are not included in this set of documents. The project appears to be an upgrade to the existing HVAC systems at the middle school to improve energy efficiency and indoor air quality.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D A
D E
BLECKLEY LAURENS
CHATHAM
EFFINGHAM
IRWIN
BERRIEN
LOWNDESGRADY
SE
MI
NO
LE
DECATUR
EARLY
MILLER
BAKER
THOMAS
BROOKS
COLQUITT
MITCHELL
COOK
TIFT
SCHLEY
TERRELL
DOUGHERTY
WEBSTER
RANDOLPH
QUITMAN
CLAY
CALHOUN
CHATTAHOOCHEE
STEWART
MARION
WILCOX
CRISP
WORTH
LEE
TURNER
DOOLY
MACON
SUMTER
HOUSTON
PULASKI
McINTOSH
PIERCE
CHARLTON
LA
NIE
R
CLINCH
ECHOLS
ATKINSON
WARE
CAMDEN
BRANTLEY
GLYNN
TOOMBS
APPLING
COFFEE
BEN HILL
TELFAIR
DAVIS
JEFF
WHEELER
DODGE
TREUTLEN
M
ON
TG
OM
ER
Y
LONG
WAYNE
LIBERTY
BULLOCH
EVANS
CANDLER
TATTNALL
BRYAN
DAWSON FRANKLIN
CLARKE
OCONEE
PUTNAM
BALDWIN
TWIGGS
HENRY
FA
YE
TT
E
PIKE
UPSON
SPALDING
M
ER
IW
ET
HER
HARRIS
MUSCOGEE
TALBOT
COWETA
HEARD
TROUP
PEACH
CRAWFORD
TAYLOR
BIBB
MONROE
LAMAR
BUTTS
JASPER
JONES
CHEROKEE
FULTON
PAULDING
HARALSON
CARROLL
DOUGLAS
BARTOWFLOYD
POLK
COBB
NEWTON
DEKALB
CL
AY
TO
N
ROCKD
AL
E
WALTON
MORGAN
GWINNETT
FORSYTH
JACKSON
HALL BANKS
BARROW
M cD
U F
FI
E
JEFFERSON
EMANUEL
WASHINGTON
WILKINSON
JOHNSON
HANCOCK
WARREN
GLASCOCK
JENKINS
SCREVEN
RICHMOND
BURKE
COLUMBIA
OGLETHORPE
WILKES
TALIAFERROGREENE
LINCOLN
ELBERT
HART
MADISON
RABUN
STEPHENS
FANNIN
PICKENS
GILMER
WHITF
IELD
GORDON
C H
AT
TO
O G
A
WALKER M
U
R R
AY
CATOOSA
UNION
LUMPKIN
WHITE
HABERSHAM
TOWNS
BACON
DOUGHERTY
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID #: 4056
T100
TITLE SHEET
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
T100 TITLE SHEET
C100 SITE PLAN
A100 ARCHITECTURAL CEILING PLAN - OVERALL
MD100 MECHANICAL DEMOLITION PLAN - OVERALL
MD101 MECHANICAL DEMOLITION PLAN - FIRST FLOOR AREA A
MD102 MECHANICAL DEMOLITION PLAN - FIRST FLOOR AREA B
MD103 MECHANICAL DEMOLITION PLAN - FIRST FLOOR AREAS C & D
MD202 MECHANICAL DEMOLITION PLAN - SECOND FLOOR AREA B
MD203 MECHANICAL DEMOLITION PLAN - SECOND FLOOR AREA C
M100 MECHANICAL OVERALL PLAN
M101 MECHANICAL NEW WORK PLAN - FIRST FLOOR AREA A
M102 MECHANICAL NEW WORK PLAN - FIRST FLOOR AREA B
M103 MECHANICAL NEW WORK PLAN - FIRST FLOOR AREAS C & D
M202 MECHANICAL NEW WORK PLAN - SECOND FLOOR AREA B
M203 MECHANICAL NEW WORK PLAN - SECOND FLOOR AREA C
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES, DIAGRAMS, LEGEND & GENERAL NOTES
ED101 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
ED102 ELECTRICAL DEMOLITION CLASSROOM PLANS
E100 ELECTRICAL OVERALL PLAN
E101 ELECTRICAL NEW WORK PLAN - FIRST FLOOR
E102 ELECTRICAL NEW WORK CLASSROOM PLANS
E801 ELECTRICAL SCHEDULES AND LEGEND
INDEX OF DRAWINGS GEORGIA/COUNTY MAP PROJECT LOCATION
MERRY ACRES MIDDLE SCHOOL - HVAC
UPGRADES
1601 FLORENCE DR, ALBANY, GA 31707
GA DOE ID#: 4056
No. Description Date
FLORENCE DR
MIMOSA DR
PARKING LOT
E X
IS
T
IN
G
P
O R
T A
B L E
C
A
S S
R O
O M
POWER POLE
POWER POLE
TEMPORARY MODULAR CLASSROOMS
8 CLASSROOM MODULE
FLORENCE DR
PARKING
LOT
SIDEWALK
S
ID
E W
A L K
S
ID
E W
A L K
E X
IS
T
R
T A
B
A
S S
R O
O M
EXISTING PORTABLE
CLASSROOM
E X
IS
T
R
T A
B
A
S S
R O
O M
GENERAL NOTE: EXISTING DOMESTIC WATER LINES, SANITARY SEWER LINES,
MANHOLES, ETC. SIZES AND LOCATIONS SHOWN ARE BASED ON ORIGINAL DESIGN
DOCUMENTS AND MAY DIFFER FROM INSTALLED CONDITIONS. CONTRACTOR FIELD
VERIFY EXISTING CONDITIONS AS REQUIRED.
GENERAL NOTE: LOCATIONS OF MODULAR CLASSROOM TRAILER IS APPROXIMATE.
CONTRACTOR SHALL CAREFULLY COORDINATE PLACEMENT OF CLASSROOMS TO
AVOID CONFLICT AND MAINTAIN REQUIRED CLEARANCES.
S
ID
E W
A L K
E X
IS
T
IN
G
W A
T E
R L
IN
E
CONTRACTOR SHALL COORDINATE
WITH OWNER FOR TEMPORARY
CONNECTION OF 2" DOMESTIC COLD
WATER PIPING TO EXISTING PIPING
IN THIS APPROXIMATE LOCATION.
2" DCW
CONTRACTOR SHALL COORDINATE
LOCATION OF MODULAR CLASSROOM
WATER CONNECTION AND ADJUST
TEMPORARY WATER LINE ROUTING AS
REQUIRED.
123' - 0"
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID #: 4056
C100
SITE PLAN
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1" = 30'-0"
SITE PLAN
CEILING HATCH LEGEND
DEMO EXISTING CEILING TILE & GRID AS REQUIRED TO
REMOVE EXISTING EQUIPMENT AND INSTALL NEW
EQUIPMENT. REPLACE WITH NEW CEILING TILE AND GRID.
NEW TILE SHALL BE STANDARD ACT TO MATCH EXISTING.
(NO HATCH) EXISTING CEILING TILE & GRID TO REMAIN.
GENERAL NOTE: REMOVAL OF CEILING REQUIRED FOR REMOVAL OF
EXISTING EXHAUST FANS LOCATED ABOVE CEILINGS IN RESTROOMS IS NOT
SHOWN. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF ITEMS LOCATED
ABOVE CEILINGS THAT MAY REQUIRE REMOVAL OF CEILING TILES.
GENERAL NOTE: REMOVAL OF CEILINGS REQUIRED FOR INSTALLATION OF
NEW DUCTLESS FAN COIL UNITS IS NOT SHOWN. SEE MECHANICAL
DRAWINGS FOR LOCATIONS OF NEW DFCUS. TEMPORARILY REMOVE
CEILING TILE & GRID AS REQUIRED TO INSTALL NEW DFCUS, REFRIGERANT
PIPING, CONDENSATE PIPING, SUPPORTS, ETC. AND REINSTALL CEILING.
REPLACE ANY TILE/GRID DAMAGED DURING DEMOLITION/INSTALLATION OF
NEW DFCUS.
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID #: 4056
A100
ARCHITECTURAL CEILING
PLAN - OVERALL
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
No. Description Date
3/64" = 1'-0"
LEVEL 1 CEILING PLAN - OVERALL
3/64" = 1'-0"
LEVEL 2 CEILING PLAN - OVERALL
MD101
MD102
MD103
MD103
MD202
MD203
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
MD100
MECHANICAL DEMOLITION
PLAN - OVERALL
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
3/64" = 1'-0"
LEVEL 1 MECHANICAL DEMOLITION PLAN - OVERALL
No. Description Date
LEVEL 2 MECHANICAL DEMOLITION PLAN - OVERALL
CORRIDOR
A128
TEACHER PLANNING
A130
TEACHER PLANNING
A131
TEACHER PLANNING
A132
MEDIA CENTER
A122
2579.03 SF
ELECT.
A121
STORAGE
A127
PRODUCTION
A126
CONFERENCE
A117
PRINCIPAL
A118
TOILET
A119
WAITING
A102
RECEPTION
A103
WAITING
A104
TOILET
A115
VAULT
A113
STORAGE
A125A
IDF
A125
WORK ROOM
A124
OFFICE
A123
WORK ROOM
A112
CONF.
A110
ASSIST. PRINCIPAL
A109
COUNSELOR
A108
COUNSELOR
A107
COUNSELOR
A106
CORRIDOR
A111
ATHLETIC STORAGE
A134
ELEC.
A135
WOMEN'S COACH
A136
STORAGE
A138
MEN'S COACH
A139
FOOTBALL EQUIP.
A141
LAUNDRY
A142
OFFICE
A145
STORAGE
A146
CHORAL
A143
COMPUTER
A144
BOY'S LOCKER RM
A147
GIRL'S LOCKER RM
A148
GYM LOBBY
A150
BOYS
A151
GIRLS
A152
WEIGHT ROOM
A154
LOCKER ROOM
A153
SP. ED. SHOWER
A152A
TEACHER LOUNGE
A155
TOILET
A156
TOILET
A157
JAN.
A158
TECHNOLOGY LAB
A159
MATERIAL
PROCESSING
A159A
CLASSROOM
A161
OFFICE
A162
STORAGE
A176A
COMPUTER NETWORK
A160
JANITOR
A164
OFFICE
A177
RECEPTION
A165 DIRECTOR
A166
WORK ROOM
A176
OAKTREE
A170
CLASSROOM
A168
CAFETERIA
A188
DRESSING
A189
STAGE
A190
MECHANICAL
A192
OFFICE
A180
INST. STORAGE
A182
PRACTICE
A181 PRACTICE
A183
STORAGE
A186
PRACTICE
A185
BAND ROOM
A179
COOLER
A203
COOLER
A202
RECEIVING
A204
STORAGE
A199LOCKERS
A196
OFFICE
A195
TIME OUT
A173
TIME OUT
A174
TIME OUT
A171
STORAGE
A169
ELECTRICAL RM
A172A
SPRINKLE RISER RM
A171A
TIME OUT
A172
JAN.
A198
TOILET
A197
CAN WASH
A205
VEST
A191
VEST
A187
CLOSET
A137
CLOSET
A140
1 1 1
(TYP)
(TYP)
11 (TYP)
11 (TYP)
(TYP)
11 (TYP)
11 (TYP)
17 17 17 1717
D D
D
D
D
D
D
D D
D
D
25 25
D
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
MD101
MECHANICAL DEMOLITION
PLAN - FIRST FLOOR AREA A
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 1 - MECHANICAL DEMOLITION PLAN - AREA A
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING WALL HUNG HEAT PUMP. REMOVE EXISTING GPS
BIPOLAR IONIZATION UNIT AND STORE FOR INSTALLATION IN NEW WALL
HUNG HEAT PUMP. SEE NEW WORK PLAN FOR INSTALLATION OF NEW WALL
HUNG HEAT PUMP.
2 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
3 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN. EXISTING
ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
ROOF MOUNTED EXHAUST FAN.
4 . REMOVE EXISITNG HEAT PUMP/CONDENSING UNIT MOUNTED ATOP
EQUIPMENT SUPPORT PLATFORM ON ROOF AND ASSOCIATED
REFRIGERANT PIPING. EXISTING SUPPORT PLATFORM TO REMAIN. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW HEAT PUMP/CONDENSING UNIT
5 . REMOVE EXISTING WALL MOUNTED DUCTLESS FAN COIL UNIT AND
ASSOCIATED REFRIGERANT PIPING. REMOVE CONDENSATE PIPING AS
REQUIRED TO ALLOW FOR INSTALLATION OF NEW WALL MOUNTED DFCU IN
THE SAME LOCATION. SEE NEW WORK PLANS.
6 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW PTHP IN SAME LOCATION.
No. Description Date
7 . REMOVE EXISTING ROOF MOUNTED KITCHEN MAKE-UP AIR UNIT. EXISTING
SUPPORTS TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
MAKE-UP AIR UNIT.
8 . REMOVE EXISTING ROOFTOP UNIT AND ASSOCIATED CONDENSATE DRAIN.
EXISTING ROOF CURB TO REMAIN. REMOVE EXISTING BIPOLAR IONIZATION
UNIT AND STORE FOR REUSE IN NEW ROOFTOP UNIT. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW ROOFTOP UNIT IN THE SAME LOCATION.
9 . REMOVE EXISTING ROOFTOP UNIT, ASSOCIATED CONDENSATE DRAIN,
DUCTWORK, DIFFUSUERS, ETC. ROOF CURB TO REMAIN. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW 100% OUTSIDE AIR UNIT IN THIS
LOCATION.
10 . REMOVE EXISTING ZONE DAMPER AND ELECTRIC DUCT HEATER.
11 . REMOVE EXISTING DUCTWORK, DIFFUSER, FLEX DUCT, SUPPORTS, ETC.
12 . REMOVE EXISTING DUCTWORK, FLEX DUCT, SUPPORTS, ETC. ASSOCIATED
WITH ZONE DAMPER UP TO TRUNK DUCT AT THIS APPROXIMATE LOCATION.
SEAL AIR TIGHT AND INSULATE OPENING IN EXISTING DUCTWORK WHERE
EXISTING DUCT WAS REMOVED.
13 . REMOVE EXISTING RETURN GRILLE AND ASSOCIATED DUCTWORK UP TO
TRUNK DUCT. SEAL AIR TIGHT AND INSULATE EXISTING TRUNK DUCT
WHERE RETURN BRANCH WAS REMOVED.
14 . EXISTING CABLE TRAY TO REMAIN.
15 . AND CONDENSATE DRAIN PIPING TO REMAIN. SEE NEW WORK PLAN FOR
NEW CONDENSATE PIPE SUPPORTS.
16 . EXISTING POWER CIRCUIT FOR RTU/CONVENIENCE OUTLET RISES
THROUGH EXISTING PITCH POCKET. SEE ELECTRICAL DRAWINGS FOR
REMOVAL OF POWER CIRCUIT TO BELOW ROOF DECK, AND JUNCTIONING
BELOW ROOF LEVEL AND ROUTING CIRCUIT UP INSIDE ROOF CURB
ADAPTER OF NEW EQUIPMENT. FILL PITCH POCKET FOLLOWING POWER
CIRCUIT REMOVAL. PROVIDE 18 GAUGE METAL CAP TO EXISTING PITCH
POCKET. SEAL AIR AND WATER TIGHT.
17 . REMOVE EXISTING SIDEWALL GRILLE. FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES) SEE NEW WORK PLAN FOR
INSTALLATION OF NEW GRILLE IN SAME LOCATION.
18 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX DUCT (IF
APPLICABLE). FIELD VERIFY EXISTING SIZES AND LOCATIONS. (TYPICAL ALL
GRILLES/DIFFUSERS) SEE NEW WORK PLAN FOR INSTALLATION OF NEW
GRILLE/DIFFUSER IN SAME LOCATION.
19 . REMOVE EXISTING DUCT, SUPPORT, FLEX DUCT, AND DIFFUSER AS SHOWN.
CAP EXISTING DUCT AND SEAL AIR TIGHT. PROVIDE NEW CEILING TILE IN
GRID WHERE DIFFUSER WAS REMOVED. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW WALL MOUNTED DUCTLESS FAN COIL UNIT IN THIS
SPACE.
20 . COMPLETELY REMOVE EXISTING CEILING MOUNTED UNIT HEATER,
SUPPORTS, THERMOSTAT. ETC.
21 . REMOVE EXISTING GRAVITY VENTILATOR, ASSOCIATED DUCT, GRILLE, ETC.
EXISTING ROOF CURB TO REMAIN. PROVIDE CAP AT EXISTING CURB. SEE
CAP AT EXISTING CURB DETAIL. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW DUCTLES OUTDOOR UNIT ATOP EXISTING ROOF CURB.
22 . REMOVE EXISTING EXHAUST FAN, ASSOCIATED DUCT, GRILLE, ETC.
EXISTING ROOF CURB TO REMAIN. PROVIDE CAP AT EXISTING CURB. SEE
CAP AT EXISTING CURB DETAIL. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW DUCTLESS OUTDOOR UNIT ATOP EXISTING ROOF CURB.
23 . COMPLETELY REMOVE EXISTING DUCT COVER. REMOVE EXISTING SUPPLY
AND RETURN DUCTWORK UP TO WALL PENETRATION. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW RTU AND DUCT SUPPORTS, AND CONNECTION
OF NEW DUCT TO EXISTING DUCT.
24 . REMOVE EXISTING DOOR AIR CURTAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW DOOR AIR CURTAIN IN THE SAME LOCATION.
25 . REMOVE EXISTING ROOF MOUNTED HEATER AND VENTILATOR. EXISTING
ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
RTU IN SAME LOCATION.
1ST FLOOR STAIR NO. 2
B119
COMP.
B122
CORRIDOR
B102
SCIENCE
B120
COMPUTER
CLASSROOM
B124
CLASSROOM
B125
BOOK STORE
B127
CLASSROOM
B128
CLASSROOM
B130
SCIENCE
B132
SCI. PREP
B135
1ST FLOOR STAIR NO. 1
B100
CLASSROOM
B118
CLASSROOM
B116
STORAGE
B115
OFFICE
B115A
LAUNDRY
B114
HOME EC. CLASSOOM
B112
BOYS
B110
JAN.
B111
GIRLS
B109
CLASSROOM
B107
CLASSROOM
B105
SPECIAL ED.
B103
RAMP
B101
CORRIDOR LOBBY
A129
COMP.
B134
1 1 1 1 1 1
1 1 1 1 1 1
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
MD102
MECHANICAL DEMOLITION
PLAN - FIRST FLOOR AREA B
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 1 - MECHANICAL DEMOLITION PLAN - AREA B
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING WALL HUNG HEAT PUMP. REMOVE EXISTING GPS
BIPOLAR IONIZATION UNIT AND STORE FOR INSTALLATION IN NEW WALL
HUNG HEAT PUMP. SEE NEW WORK PLAN FOR INSTALLATION OF NEW WALL
HUNG HEAT PUMP.
2 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
3 . REMOVE EXISTING CEILING MOUNTED FAN AND ASSOCIATED DUCTWORK
AS REQUIRED TO REMOVE FAN AT THIS APPROXIMATE LOCATION. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW FAN IN SAME LOCATION.
4 . EXISTING INLINE EXHAUST FAN TO REMAIN.
5 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX DUCT (IF
APPLICABLE). FIELD VERIFY EXISTING SIZES AND LOCATIONS. (TYPICAL ALL
GRILLES/DIFFUSERS) SEE NEW WORK PLAN FOR INSTALLATION OF NEW
GRILLE/DIFFUSER IN SAME LOCATION.
6 . REMOVE EXISTING CEILING MOUNTED EXHAUST FAN FROM THIS
APPROXIMATE LOCATION. SEE NEW WORK PLAN FOR INSTALLATION OF
NEW CEILING MOUNTED EXHAUST FAN.
MD103
SCIENCE
C109
PREP. STORAGE
C108
OFFICE
C107
SCIENCE
C105
LOUNGE \ SPEC. ED.
C110
TOILET
C132
VESTIBULE
C106
STAIR NO. 3
C104
LOBBY
C102
MECHANICAL
C111
MATH CLASSROOM
C112
CLASSROOM
C113
CLASSROOM
C114
MATH CLASSROOM
C115
STAIR NO. 4
C116
CORRIDOR
C103
SPRINKLER
C133
PROJ. STO.
C117
KILN
C118
DARK ROOM
C119
ART CLASSROOM
C123
SUPPLIES
C121
OFFICE
C122
POTTERY
C120
BOYS
C124
JAN.
C125
GIRLS
C126
ELECT. RM
C127
STOR.
C128
ELEVATOR
C129
ELEV. LOBBY
C130
CONNECTING LOBBY
C101
3 3
11 11
7 24
GYMNASIUM
D100
19 19
(TYP)
12 (TYP)
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
MD103
MECHANICAL DEMOLITION
PLAN - FIRST FLOOR AREAS C
& D
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 1 - MECHANICAL DEMOLITION PLAN - AREA C
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. REMOVE EXISTING
BIPOLAR IONIZATION UNIT AND STORE FOR REUSE IN NEW PTHP. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW PTHP.
2 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
3 . REMOVE EXISTING INLINE CENTRIFUGAL EXHAUST FAN ABOVE CEILING.
SEE NEW WORK PLAN FOR INSTALLATION OF NEW INLINE MOUNTED
EXHAUST FAN.
4 . REMOVE EXISTING EXHAUST DUCT UP TO JUST BELOW STRUCTURAL
MEMBERS. MAINTAIN DUCT FOR CONNECTION OF NEW EXHAUST DUCT
5 . EXISTING SPRINKLER PIPING TO REMAIN.
6 . COMPLETELY REMOVE EXISTING REFRIGERANT PIPING, INSULATION,
SUPPORTS, ETC AND ASSOCIATED PLYWOOD COVER.
7 . COMPLETELY REMOVE EXISTING CONDENSATE PIPING, P-TRAP, SUPPORTS,
ETC.
8 . REMOVE PORTION OF EXISTING FENCE TO INSTALL NEW DUCTLESS
OUTDOOR UNIT ATOP NEW CONCRETE EQUIPMENT PAD. SEE NEW WORK
PLAN.
9 . EXISTING DUCT SILENCER TO REMAIN.
10 . COMPLETELY REMOVE EXISTING CEILING HEATER, SUPPORTS, ETC. FROM
THIS APPROXIMATE LOCATION.
11 . REMOVE EXISTING OUTDOOR UNIT, ASSOCIATED SUPPORTS, PIPING, ETC.
FROM THIS APPROXIMATE LOCATION. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CONDENSING UNITS IN SIMILAR LOCATION.
12 . EXISTING GYM DIFFUSERS TO REMAIN. CLEAN DIFFUSERS TO REMOVE ALL
DIRT, DEBRIS, ETC.
13 . REMOVE EXISTING DUCT MOUNTED ELECTRIC HEATER, ASSOCIATED
WIRING, CONTROLS, ETC. FROM THIS APPROXIMATE LOCATION. PROVIDE
NEW DUCT SIZED TO MATCH EXISTING DUCT WHERE HEATER WAS
REMOVED. SEAL DUCT AIR TIGHT AND INSULATE IN ACCORDANCE WITH
SPECIFICATION.
14 . REMOVE EXISTING WALL MOUNTED DUCTLESS FAN COIL UNIT. REMOVE
CONDENSATE PIPING AS REQUIRED TO ALLOW FOR INSTALLATION OF NEW
WALL MOUNTED DFCU IN THE SAME LOCATION. SEE NEW WORK PLAN.
15 . REMOVE EXISTING CEILING MOUNTED EXHAUST FAN AND ASSOCIATED
FLEX DUCT FROM THIS APPROXIMATE LOCATION. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW CEILING MOUNTED EXHAUST FAN.
16 . REMOVE EXISTING HEAT PUMP, ASSOCIATED PIPING, SUPPORTS, ETC.
FROM THIS APPROXIMATE LOCATION. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW HEAT PUMP IN SAME LOCATION.
17 . REMOVE EXISTING VERTICAL FAN COIL UNIT, ASSOCIATED RETURN AIR
PLENUM STAND, CONDENSATE PIPING, REFRIGERANT PIPING, SUPPORTS,
ETC. SEE NEW WORK PLAN FOR INSTALLATION OF NEW VERTICAL FAN COIL
UNIT IN SAME LOCATION.
18 . REMOVE EXISTING WALL MOUNTED EXHAUST FAN. FIELD VERIFY EXISTING
FAN WALL OPENING DIMENSIONS. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW FAN IN SAME LOCATION.
19 . REMOVE EXISTING SIDEWALL GRILLE. FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES) SEE NEW WORK PLAN FOR
INSTALLATION OF NEW GRILLE IN SAME LOCATION.
20 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX DUCT (IF
APPLICABLE). FIELD VERIFY EXISTING SIZES AND LOCATIONS. (TYPICAL ALL
GRILLES/DIFFUSERS) SEE NEW WORK PLAN FOR INSTALLATION OF NEW
GRILLE/DIFFUSER IN SAME LOCATION.
21 . COMPETELY REMOVE EXISTING ENERGY RECOVERY UNIT, ASSOCIATED
REFRIGERANT PIPING, CONDENSATE PIPING, DUCTWORK, ETC. AS SHOWN.
22 . EXISTING LOUVER MAY BE REMOVED IF REQUIRED FOR REMOVAL OF
EXISTING ENERGY RECOVERY UNIT. CONTRACTOR SHALL PROVIDE NEW
LOUVER TO MATCH EXISTING SIZE, BASIS OF DESIGN GREENHECK EDJ-601.
PROVIDE INSULATED BLANK OFF PLATE ON BACK OF NEW LOUVER.
23 . EXISTING WATER LINE TO REMAIN.
24 . COMPLETELY REMOVE EXISTING REFRIGERANT PIPING, INSULATION,
SUPPORTS, ETC.
25 . REMOVE EXISTING WALL HEATER. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW WALL HEATER.
26 . REMOVE EXISTING DUCTOWKR UP TO THIS APPROXIMATE LOCATION. SEE
NEW WORK PLAN FOR CONNECTION OF NEW DUCTWORK.
1/4" = 1'-0"MD103
3 LEVEL 1 - MECHANICAL ROOM DEMOLITION PLAN
2 LEVEL 1 MECHANICAL ROOM DEMOLITION - ISOMETRIC
1/8" = 1'-0"
LEVEL 1 - MECHANICAL DEMOLITION PLAN - AREA D
2ND FLOOR STAIR NO. 2
B218
CORRIDOR
B201
SCI. PREP.
B222
SCIENCE
B129
CLASSROOM
B223
CLASSROOM
B225
CLASSROOM
B227
CLASSROOM
B229
CLASSROOM
B231
SCIENCE
B233
SCI. PREP.
B236
2ND FLOOR STAIR NO. 1
B200
CLASSROOM
B202
CLASSROOM
B204
CLASSROOM
B206
GIRLS
B208
JAN.
B210
BOYS
B209
COMPUTER
CLASSROOM
B211
SCIENCE
B212
COMP.
B214
SCI. PREP.
B215
CLASSROOM
B216
COMP.
B221
COMP.
B2351 1 1 1 1 1 1
1 1 1 1 1 1 1 1
5 5
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
MD202
MECHANICAL DEMOLITION
PLAN - SECOND FLOOR AREA
B
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 2 - MECHANICAL DEMOLTION PLAN - AREA B
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING INTERIOR HEAT PUMP. REMOVE EXISTING
BIPOLAR IONIZATION UNIT AND STORE FOR INSTALLATION IN NEW
INTERIOR HEAT PUMP. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW INTERIOR HEAT PUMP.
2 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
3 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
4 . REMOVE EXISTING CEILING MOUNTED FAN AND ASSOCIATED
DUCTWORK AS REQUIRED TO REMOVE FAN AT THIS APPROXIMATE
LOCATION. SEE NEW WORK PLAN FOR INSTALLATION OF NEW FAN
IN SAME LOCATION.
5 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX
DUCT (IF APPLICABLE). FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES/DIFFUSERS) SEE NEW WORK
PLAN FOR INSTALLATION OF NEW GRILLE/DIFFUSER IN SAME
LOCATION.
MD203
SCIENCE
C143
PREP. \ STORAGE
C140
OFFICE
C141
SCIENCE
C139
WORK ROOM
C144
TOILET
C165
VESTIBULE
C142
2ND FLOOR STAIR NO. 3
C138
MECH. ROOM
C137
LOBBY
C136
STORAGE
C164
ELECT.
C163
ELEV. LOBBY
C161
ELEVATOR
C160
MACH.
C159
COMPUTER
C158
CORRIDOR
C151
MECHANICAL
C145
MECH. ROOM
C162
CLASSROOM
C146
MATH CLASSROOM
C147
CLASSROOM
C148
CLASSROOM
C149
2ND FLOOR STAIR NO. 4
C150
CLASSROOM
C152
MATH CLASSROOM
C153
CLASSROOM
C154
BOYS
C155JAN.
C156
GIRLS
C157
3 3
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
MD203
MECHANICAL DEMOLITION
PLAN - SECOND FLOOR AREA
C
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 2 - MECHANICAL DEMOLTION PLAN - AREA C
1/4" = 1'-0"MD203
2 LEVEL 2 - MECHANICAL ROOM DEMOLTION LARGE SCALE PLAN
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. REMOVE
EXISTING BIPOLAR IONIZATION UNIT AND STORE FOR REUSE IN
NEW PTHP. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
PTHP.
2 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
3 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
4 . REMOVE EXISTING DUCTLESS HEAT PUMP. EXISTING EQUIPMENT
SUPPORT PLATFORM TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW DUCTLESS HEAT PUMP.
5 . REMOVE EXISTING WALL MOUNTED DUCTLESS FAN COIL UNIT.
REMOVE CONDENSATE PIPING AS REQUIRED TO ALLOW FOR
INSTALLATION OF NEW WALL MOUNTED DFCU IN THE SAME
LOCATION. SEE NEW WORK PLAN.
6 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
CAP EXISTING ROOF CURB, SEE CAP AT EXISTING CURB DETAIL.
SEE NEW WORK PLAN FOR INSTALLATION OF NEW DUCTLESS
OUTDOOR UNIT.
7 . REMOVE EXISTING CEILING GRILLE AND DUCTWORK ASSOCIATED
WITH EXHAUST FAN REMOVED.
8 . REMOVE EXISTING TRANSFER DUCT AND GRILLES. MOVE CEILING
TILE FROM COMPUTER ROOM TO CORRIDOR TO MATCH THE
EXISTING CORRIDOR CEILING TILE. PROVIDE 2 NEW TILES FOR
COMPUTER ROOM. EXISTING FIRE DAMPER TO REMAIN.
9 . EXISTING DUCT SILENCER TO REMAIN.
10 . EXISTING GRAVITY VENTILATOR ON ROOF TO REMAIN.
11 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX
DUCT (IF APPLICABLE). FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES/DIFFUSERS) SEE NEW WORK
PLAN FOR INSTALLATION OF NEW GRILLE/DIFFUSER IN SAME
LOCATION.
12 . REMOVE EXISTING DUCT MOUNTED ELECTRIC HEATER,
ASSOCIATED WIRING, CONTROLS, ETC. FROM THIS APPROXIMATE
LOCATION. PROVIDE NEW DUCT SIZED TO MATCH EXISTING DUCT
WHERE HEATER WAS REMOVED. SEAL DUCT AIR TIGHT AND
INSULATE IN ACCORDANCE WITH SPECIFICATION.
13 . COMPLETELY REMOVE EXISTING CONDENSATE PIPING, P-TRAP,
SUPPORTS, ETC.
14 . COMPLETELY REMOVE EXISTING REFRIGERANT PIPING,
INSULATION, SUPPORTS, ETC.
15 . EXISTING LOUVER MAY BE REMOVED IF REQUIRED FOR REMOVAL
OF EXISTING ENERGY RECOVERY UNIT. CONTRACTOR SHALL
PROVIDE NEW LOUVER TO MATCH EXISTING SIZE, BASIS OF
DESIGN GREENHECK EDJ-601. PROVIDE INSULATED BLANK OFF
PLATE ON BACK OF NEW LOUVER.
16 . COMPETELY REMOVE EXISTING ENERGY RECOVERY UNIT,
ASSOCIATED REFRIGERANT PIPING, CONDENSATE PIPING,
DUCTWORK, ETC. AS SHOWN.
17 . REMOVE EXISTING DUCTOWORK UP TO THIS APPROXIMATE
LOCATION. SEE NEW WORK PLAN FOR CONNECTION OF NEW
DUCTWORK.
3 LEVEL 2 MECHANICAL ROOM DEMOLITION - ISOMETRIC
MD101
1MD102
MD103
MD103
M202
M203
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID #: 4056
M100
MECHANICAL OVERALL PLAN
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
3/64" = 1'-0"
MECHANICAL NEW WORK PLAN - OVERALL
No. Description Date
LEVEL 2 MECHANICAL NEW WORK PLAN - OVERALL
IU-1.13
IU-1.12
IU-1.10
IU-1.11
MDC-1
IU-1.9
IU-1.8
IU-1.7
IU-1.5
IU-1.6
IU-1.4
HRU-1
IU-1.2
IU-1.3
IU-1.1
OAU-1
F-9
F-24
F-6
DAC-1
F-1
F-2
F-3
F-7
F-8
F-25
F-10
F-11
F-12
WHHP-1 WHHP-3WHHP-2
WHHP-4
WHHP-5
DFCU-4
DOU-4
RTU-1
RTU-5
RTU-6
RTU-8
RTU-10
RTU-11
RTU-12
CH-3 CH-4
CH-5
CH-6
CH-7
CH-8
CH-9
CH-10
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
6"ø
A2
KEF-1
PTHP-40
KSF-1
DFCU-1.1
DFCU-1.2
CONF.
A110
ASSIST. PRINCIPAL
A109
COUNSELOR
A108
COUNSELOR
A107
COUNSELOR
A106
WORK ROOM
A124
OFFICE
A123
WORK ROOM
A112
VAULT
A113
CONFERENCE
A117
PRINCIPAL
A118
RECEPTION
A103
A2
A2
D1
D1
D1
A1
A1
M.V.D.
6"ø
6"ø
6"ø
6"ø
6"ø
A2
8"ø
8"ø
8"ø
5"ø
5"ø5"ø
40"x18" 16"ø
M.V.D.
8"ø10"ø8"ø8"ø
10"ø 14"ø
A2
A2
130 A2
TT
A2
A2
A2
8"ø
8"ø
10"ø
8"ø
8"ø
12"ø
C1
C1
PRODUCTION
A126
STORAGE
A127
DFCU-3
DFCU-2
RTU-3 RTU-4
RTU-7
RTU-9
CHORAL
A143
GIRL'S LOCKER RM
A148
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A1
A1
A2
A2
A1
75 A1
A2
A2
0B2
B2
G3
G3 F3
F3
F3
F3
B2
B2
B2
B2
B2A3
A3
A2
RTU-2
A2
A2
B2
A3
A3
A3
A2
A2
F1
F1
A5
F1
F1
A2
A2
A2
A1
A1
A1
A2
A2
A2
A2
A2
A2
A2
A2
B2
B2
B2
B2
B2
A3
A3
A3
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A3
A3
A3
A3
B2
A3
B2
A1
A2
A2
A2
B2
B2
A1
B2
A2
B2
A2
A4
A2
B2
B2
B2
B2B2
B2
A3
A3
A2
A3
A3
A3
A3
A3
A3
A3
A3
A2
A1
A2
B2
A2
B1
F2
F2
B2
B1
B2
G1
G1
G1
G1
G1
G1
A2
A2
B2
B2
B2
G4
G2
B2
B1
B1
B1
B1
B1
DOU-1
M.V.D.
DOU-3
DOU-2
"ø
"ø
"ø
"ø
8"ø
8"ø
8"ø
"ø
"ø
6"ø
12"ø
B2
B2
B2
B2
32"x32"
34"x20"
32"x32"
34"x20"
22 22 22 22
R
R
D
R
D
R ø12"
C1
B1
TECHNOLOGY LAB
A159
H2
H1
H1 H1H1
THTH
TT
WHHP-5
THTH
THTH
RTU-2
TT
TT
TT
TT
CC
CC
TTTT
RTU-9
RTU-7
TT
RTU-5
TT
RTU-8
TT
TT TT TT
WHHP-3WHHP-2WHHP-1
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
DFCU-12
DOU-12
TT
TT
TT
CC
CC
T
TT
CC
MM
T
D R
D R
R
D
R
D R
R
D
D
R
R
D
6"ø
6"ø
6"ø
6"ø
6"ø
6"ø 8"ø
R
R
R
D
R
D
D
R
R
D
/2
D
1 1/2" D
R
D
D
D
R
D
10"ø
R
R
R
R D
R
D
D
D
D
D
D
D
D
38 38
1 1/2" D 1 1/4" D D
39 39
D
D
D
D
D D
COOLER
A202
COOLER
A203
TT TT
40 40
TT
TT
G
G
TT
43 PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
M101
MECHANICAL NEW WORK
PLAN - FIRST FLOOR AREA A
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 1 - MECHANICAL NEW WORK PLAN - AREA A
NOTES: (THIS SHEET ONLY)
1 . NEW WALL HUNG HEAT PUMP MOUNTED IN SAME LOCATION AS
WHHP REMOVED DURING DEMOLITION. PROVIDE ADAPTER CURB
AS REQUIRED FOR NEW INSTALLATION OF WHHP.
2 . NEW CEILING HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
3 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT.
4 . NEW OUTDOOR HEAT PUMP/CONDENSING UNIT MOUNTED ATOP
EXISTING EQUIPMENT SUPPORT PLATFORM ON ROOF.
5 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED IN
SAME LOCATION AS DFCU REMOVED DURING DEMOLITION.
CONNECT NEW CONDENSATE PIPE TO EXISTING PIPE. FIELD
VERIFY EXACT LOCATION.
6 . NEW PACKAGED TERMINAL HEAT PUMP IN SAME LOCATION AS
NEW PTHP REMOVED DURING DEMOLITION.
7 . NEW ROOFTOP UNIT MOUNTED ATOP EXISTING ROOF CURB.
PROVIDE ADAPTER CURB AS REQUIRED TO TRANSITION FROM
NEW UNIT CONNECTIONS TO EXISTING DUCT LAYOUT. REINSTALL
BIPOLAR IONIZATION UNIT REMOVED DURING DEMOLITION.
8 . NEW VRF CEILING CASSETTE SUSPENDED FROM DROP RODS (MIN
3/8") CONNECTED TO STRUCTURE WITH SUPPLEMENTAL 2"X2"X1/4"
ANGLE IRON. SEE VRF / MINI SPLIT CEILING CASSETTE UNIT DETAIL
AND COMPACT CEILING CASSETTE IN CEILING GRID DETAIL.
No. Description Date
9 . DUCTED VRF FAN COL UNIT SUSPENDED FROM DROP RODS (MIN
3/8") CONNECTED TO OVERHEAD STRUCTURE WITH
SUPPLEMENTAL 2" X 2" X 1/4" ANGLE IRON. SEE VRF DUCTED
INDOOR UNIT DETAIL.
10 . NEW VRF MAIN DISTRIBUTION CONTROLLER MOUNTED ABOVE
CEILING, SUSPENDED FROM DROP RODS (MIN 3/8") CONNECTED
TO STRUCTURE WITH SUPPLEMENTAL 2"X2"X1/4" ANGLE IRON.
PROVIDE AUXILIARY DRAIN PAN BENEATH UNIT. SEE VRF HEAT
RECOVERY DISTRIBUTION CONTROLLER DETAIL AND AUXILIARY
DRAIN PAN DETAIL.
11 . NEW VRF HEAT RECOVERY UNIT MOUNTED ATOP NEW CONCRETE
EQUIPMENT PAD. SEE CONCRETE EQUIPMENT PAD DETAIL. HOLD
CONCRETE PAD ~6" OFF WALL TO ACCOMODATE EXISTING DOWN
SPOUT. COORDINATE EXACT PLACEMENT WITH EXISTING
DOWNSPOTS, CONDUIT, ELECTRICAL EQUIPMENT, GENERATOR,
ETC.
12 . NEW 100% OUTSIDE AIR UNIT MOUNTED ATOP EXISTING ROOF
CURB. MODIFY EXISTING DUCTWORK AND PROVIDE ADAPTER
CUBR AS REQUIRED TO TRANSITION FROM EXISTING DUCT
CONNECTION TO NEW OAU DUCT CONNECTION.
13 . NEW KITCHEN EXHAUST FAN AND KITCHEN MAKE-UP AIR UNIT
MOUNTED IN SAME LOCATION AS KEF & KMUAU REMOVED DURING
DEMOLITION.
14 . EXISTING ROOFTOP UNIT TO REMAIN. REPLACE EXISTING
BAKELITE LABEL AND ELECTRICAL PANEL LABEL TO MATCH NEW
TAG SHOWN ON FLOOR PLAN.
15 . NEW DUCT CONNECTS TO EXISTING RETURN PLENUM AT THIS
APPROXIMATE LOCATION. PROVIDE OFFSETS AND TRANSITIONS
AS REQUIRED TO MAKE CONNECTION. EXTERIOR DUCT SHALL
HAVE ONE LAYER OF 2" THICK ARMAFLEX CLOSED CELL
ELASTOMERIC INSULATION ON EXTERIOR OF DUCT. COVER
INSULATION WITH EMBOSSED ALUMINUM COVER. PROVIDE DUCT
SUPPORTS ON MAXIMUM 4' CENTERS TO ADEQUATELY SUPPORT
DUCT. PROVIDE NEW EMBOSSED ALUMINUM COVER OVER
EXISTING EXTERIOR DUCT. SEE NON-PENETRATING DUCT
SUPPORT DETAIL.
16 . NEW DUCT CONNECTS TO EXISTING SUPPLY DUCT AT THIS
APPROXIMATE LOCATION. PROVIDE OFFSETS AND TRANSITIONS
AS REQUIRED TO MAKE CONNECTION. EXTERIOR DUCT SHALL
HAVE ONE LAYER OF 2" THICK ARMAFLEX CLOSED CELL
ELASTOMERIC INSULATION ON EXTERIOR OF DUCT. COVER
INSULATION WITH EMBOSSED ALUMINUM COVER. PROVIDE DUCT
SUPPORTS ON MAXIMUM 4' CENTERS TO ADEQUATELY SUPPORT
DUCT. PROVIDE NEW EMBOSSED ALUMINUM COVER OVER
EXISTING EXTERIOR DUCT. SEE NON-PENETRATING DUCT
SUPPORT DETAIL.
17 . NEW DUCTLESS CEILING CASSETTE SUSPENDED FROM DROP
RODS (MIN 3/8") CONNECTED TO OVERHEAD STRUCTURE WITH
SUPPLEMENTAL 2"X2"X1/4" SUPPLEMENTAL ANGLE IRON. SEE
SUSPENDED EQUIPMENT SUPPORT DETAIL AND COMPACT
CEILING CASSETTE IN CEILING GRID DETAIL. COORDINATE
THERMOSTAT LOCATION WITH OWNER.
18 . DFCU DRAIN PIPING ROUTED TO SPILL ON ROOF. ONCE TUBING
PENETRATES PIPE BOX IT SHALL BE CONCEALED IN PVC PIPING
THAT IS ELBOWED DOWN TO 4" ABOVE ROOF LEVEL AND
SECURED TO PIPE BOX. CONCEALING VINYL TUBING SHALL
PROTECT IT FROM UV DAMAGE. DO NOT EXPOSE TUBING TO
OUTDOORS.
19 . NEW PIPE BOX MOUNTED ON ROOF. SEE PIPE BOX DETAIL.
20 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP NEW EQUIPMENT
SUPPORT PLATFORM ON ROOF. SEE EQUIPMENT SUPPORT
PLATFORM DETAIL.
21 . CONDENSATE DRAIN PIPING DROPS DOWN WALL TO MOP SINK AT
THIS APPROXIMATE LOCATION. BRACKET DRAIN PIPING TO WALL.
22 . PROVIDE NEW SIDEWALL GRILLE. FIELD VERIFY EXISTING SIZES
AND LOCATIONS. (TYPICAL ALL GRILLES) PROVIDE SIZE TO MATCH
EXISTING GRILLE.
23 . PROVIDE NEW GRILLE/DIFFUSER. PROVIDE NEW FLEX DUCT (IF
APPLICABLE) OF NECK SIZE SCHEDULED. PROVIDE
TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK. (TYPICAL ALL
GRILLES/DIFFUSERS)
24 . VRF CENTRAL CONTROLLER MOUNTED ON WALL AT 4'-6" A.F.F.
PROVIDE BACNET INFTERFACE TO ALLOW VRF SYSTEM TO
COMMUNICATE WITH DDC SYSTEM.
25 . DDC CONTROL PANEL ON 3/4" PLYWOOD BACKBOARD.
26 . CEILING HEATER THERMOSTAT MOUNTED IN EXHAUST DUCT IN
SAME LOCATION AS THERMOSTAT REMOVED DURING
DEMOLITION. FIELD VERIFY EXISTING LOCATION.
27 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP EXISTING ROOF
CURB. PROVIDE NEW CAP AT EXISTING CURB. SEE DUCTLESS
HEAT PUMP CAP AT EXISTING CURB DETAIL.
28 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP EXISTING ROOF
CURB. PROVIDE CAP AT EXISTING CURB. SEE EQUIPMENT
SUPPORT PLATFORM DETAIL.
29 . FAN MANUFACTURER FURNISHED, CONTRACTOR INSTALLED
CEILING MOUNTED MOTION DETECTOR TO START EXHAUST FAN
WHEN OCCUPANCY IS DETECTED. PROVIDE 15 MINUTE
ADUSTABLE TIME DELAY.
30 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED ABOVE
DOOR. SEE WALL MOUNTED INDOOR UNIT DETAIL.
31 . 1½" CONDENSATE DRAIN PIPE ELBOWS DOWN IN TO EXISTING HUB
DRAIN ABOVE CEILING AT THIS APPROXIMATE LOCATION. FIELD
VERIFY EXACT LOCATION.
32 . PROVIDE 1½" ELBOW UP AND MINIMUM 8" TALL VERTICAL OPEN
STAND PIPE AT THIS APPROXIMATE LOCATION.
33 . REFRIGERANT PIPING RISES UP EXTERIOR WALL, PENETRATES
WALL ABOVE CEILING LEVEL AND IS ROUTED AS SHOWN. PROVIDE
PIPE SLEEVE AT WALL PENETRATION.
34 . PROVIDE FULL SIZE, SLOPED, INSULATED PVC VINYL TUBE FOR
DRAIN PIPING FROM UNIT DRAIN PORT AND TRANSITION TO RIGID
DRAIN PIPE AS DETAILED INVRF CONDENSATE DRAIN
CONNECTION DETAIL. PROVIDE FITTINGS AS REQUIRED TO
CONNECT DRAIN PIPE.
35 . PROVIDE RECTORSEAL FORTRESS LINE HIDE KIT OR EQUAL TO
CONCEAL ALL PIPING EXPOSED TO VIEW. PROVIDE CONDENSATE
PUMP. SEE WALL MOUNTED INDOOR UNIT CONDENSATE PUMP.
36 . APPROXIMATE OUTLINE OF EXISTING ELECTRICAL EQUIPMENT.
37 . COORDINATE REFRIGERANT PIPING WITH EXISTING CONDUIT.
FIELD VERIFY EXACT LOCATIONS (TYPICAL)
38 . ROUTE SLOPED (1/4" PER FOOT), TRAPPED, PVC CONDENSATE
DRAIN PIPING FROM ROOFTOP EQUIPMENT TO ELBOW DOWN INTO
ROOF DRAIN/GUTTER AS SHOWN. PROVIDE NON-PENETRATING
PIPE SUPPORTS ON MAXIMUM 6' CENTERS. SEE CONDENSATE
DRAIN TRAP DETAIL AND CONDENSATE PIPE SUPPORT ON ROOF
DETAIL.
39 . CONDENSATE PIPE SUPPORT ON ROOF. SEE CONDENSATE PIPE
SUPPORT ON ROOF DETAIL. (TYPICAL)
40 . COOLER/FREEZER DDC TEMPERATURE SENSOR. MOUNTED NEAR
CENTER OF FREEZER IN LOCATION THAT ACCURATELY MEASURES
COOLER/FREEZER TEMPERATURE.
41 . WALL MOUNTED DDC TEMPERATURE SENSOR TO ALLOW FOR
MONITORING OF SPACE TEMPERATURE BY DDC SYSTEM.
42 . CONTRACTOR SHALL MODIFY EXISTING GAS PIPING AS REQUIRED
FOR CONNECTION TO NEW UNIT. VERIFY EXACT LOCATION OF GAS
CONNECTION WITH APPROVED UNIT SUBMITTED. SEE TYPICAL
RTU GAS CONNECTION DETAIL.
43 . PROVIDE NEW DDC THERMOSTAT FOR CONTROL OF INDICATED
PTHPS MOUNTED ON WALL WITH B.E. AT 4'-6" A.F.F. PROVIDE
SURFACE MOUNTED RACEWAY AS REQUIRED TO CONCEAL ALL
CONTROL WIRING BELOW CEILING ROUTED FROM PTHP TO
THERMOSTAT. COORDINATE NEW THERMOSTAT WITH EXISTING
LIGHT SWITCHES, WALL BOARDS, ETC.
F-31
WHHP-6 WHHP-7 WHHP-8 WHHP-9 WHHP-11 WHHP-12 WHHP-13
WHHP-14 WHHP-15 WHHP-16 WHHP-17 WHHP-18 WHHP-19
CH-1
CH-2
CH-11
CH-12
11 1 1 1 1 1
1 1 1 1 1 1
A1
A1
A1
A1
A1
A1
A3
A3
A3
A3
A4
A4
A4
A4
A4
A4
A4
A4
A3
A3
A3
A3
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A1
A3
A3
A5
A4
A4
A4
A4
A4
A4
A4
A4
6"ø
6"ø
A5
A5
A5
40 A4
A4
A4
A4
B2
B2
B2B2
B2
B1
B2
B2
B2
B2
A4
A4
A4
A4
A4
A4
A4
A4
A2
A2
A2
A2
B2
B2
1ST FLOOR STAIR NO. 2
B119
COMP.
B122
CORRIDOR
B102
SCIENCE
B120
COMPUTER
CLASSROOM
B124 CLASSROOM
B125
BOOK STORE
B127
CLASSROOM
B128
CLASSROOM
B130 SCIENCE
B132
SCI. PREP
B135
1ST FLOOR STAIR NO. 1
B100
CLASSROOM
B118
CLASSROOM
B116
STORAGE
B115
OFFICE
B115A
LAUNDRY
B114
HOME EC. CLASSOOM
B112
BOYS
B110
GIRLS
B109
CLASSROOM
B107
CLASSROOM
B105 SPECIAL ED.
B103
RAMP
B101
CORRIDOR LOBBY
A129
COMP.
B134
5 5 5
B2
F-26 4 ø8"
H1H2H2H2H2H2
H2 H2 H2 H2 H2 H2 H2TT TT TT TT
TT
TT TT TT
TTTTTTTTTTTT
TT TT
TT
TT
SS
EF-20
SS
EF-30
SS
SS
F-16
B2
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
M102
MECHANICAL NEW WORK
PLAN - FIRST FLOOR AREA B
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
NOTES: (THIS SHEET ONLY)
1/8" = 1'-0"
LEVEL 1 - MECHANICAL NEW WORK PLAN - AREA B
1 . NEW WALL HUNG HEAT PUMP MOUNTED IN SAME LOCATION AS
WHHP REMOVED DURING DEMOLITION. PROVIDE ADAPTER CURB
AS REQUIRED FOR NEW INSTALLATION OF WHHP.
2 . NEW CEILING HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
3 . NEW CENTRIFUGAL INLINE EXHAUST FAN MOUNTED IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION.
4 . NEW CEILING MOUNTED EXHAUST FAN MOUNTED IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION. PROVIDE NEW
FLEX DUCT. PROVIDE TRANSITIONS AND OFFSETS AS REQUIRED
TO CONNECT NEW FAN TO EXISTING DUCT.
5 . PROVIDE NEW GRILLE/DIFFUSER. PROVIDE NEW FLEX DUCT (IF
APPLICABLE) OF NECK SIZE SCHEDULED. PROVIDE
TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK. (TYPICAL ALL
GRILLES/DIFFUSERS)
6 . CEILING HEATER THERMOSTAT MOUNTED IN EXHAUST DUCT IN
SAME LOCATION AS THERMOSTAT REMOVED DURING
DEMOLITION. FIELD VERIFY EXISTING LOCATION.
7 . EXISTING EXHAUST FAN CONTROLLED VIA WALL SWITCH. FIELD
VERIFY EXISTING SWITCH LOCATION AS REQUIRED.
F-C4 F-C5
F-C6
F-C1
F-C12
PTHP-1
PTHP-2
PTHP-3
PTHP-4
PTHP-5
PTHP-6
PTHP-7
PTHP-8
PTHP-9
PTHP-10
PTHP-11
PTHP-12
PTHP-13
PTHP-14
PTHP-15
PTHP-16
DFCU-5
FCU-1
HP-1
CH-C9
CH-C5
CH-C1
CH-C6
CH-C2
3 3
DFCU-6
DFCU-7.1
DFCU-7.2
A4
A4
A4
A4
A2
A4
B1
A2
SCIENCE
C109
PREP. STORAGE
C108
OFFICE
C107
SCIENCE
C105
LOUNGE \ SPEC. ED.
C110
VESTIBULE
C106
STAIR NO. 3
C104
LOBBY
C102
MECHANICAL
C111
MATH CLASSROOM
C112
CLASSROOM
C113
CLASSROOM
C114
MATH CLASSROOM
C115
STAIR NO. 4
C116
CORRIDOR
C103
SPRINKLER
C133
PROJ. STO.
C117
KILN
C118
DARK ROOM
C119
ART CLASSROOM
C123
SUPPLIES
C121
OFFICE
C122
POTTERY
C120
BOYS
C124
JAN.
C125
GIRLS
C126
ELECT. RM
C127
STOR.
C128
ELEVATOR
C129
ELEV. LOBBY
C130
CONNECTING LOBBY
C101
ERU-CU-1
ERU-CU-2 R D
DOU-6
D
R
R
D
DOU-7
B2
A2
A2
A2
A2
A2
A2
A3
EWH-1
B2 B2
B2
B1
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
A2
A4
A2
B2
B2
B2
B2
ERU-1
M103
TT
TT
TT
TT
TT
FCU-1
TT
TT
TT
F-C8
SS
EF-C11
SS
SS
SS
SS
R(TYP)
R(TYP)
25 26
25 26
D D
D
R R
TT
PTHP-14
PTHP-15
PTHP-16
TT
TT
PTHP-10
PTHP-11
PTHP-12
TT
PTHP-927
TT
PTHP-7
PTHP-8
TT
PTHP-5
PTHP-6
TT
PTHP-3
PTHP-4
E1E1 10 10
THTH
RTU-11
RTU-12
ERU-1
16"x16"
14"x16"
16"x16"
22"x22"
D R
D
R(TYP)20
D
R
R
D
D
R(TYP)
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
M103
MECHANICAL NEW WORK
PLAN - FIRST FLOOR AREAS C
& D
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 1 - MECHANICAL NEW WORK PLAN - AREA C
1/8" = 1'-0"
LEVEL 1 - MECHANICAL NEW WORK PLAN - AREA D
NOTES: (THIS SHEET ONLY)
1/4" = 1'-0"M103
3 LEVEL 1 - MECHANICAL ROOM LARGE SCALE NEW WORK PLAN
4 LEVEL 1 MECHANICAL ROOM NEW WORK - ISOMETRIC
No. Description Date
GENERAL NOTE: NOT ALL EXISTING CONDUIT, SPRINKLER PIPING,
DOMESTIC WATER PIPING, STRUCTURAL MEMBERS, ETC. ARE SHOWN.
COORDINATE NEW ERU, DUCTWORK, PIPING, ETC. WITH EXISTING
CONDUIT, SPRINKLER PIPING, ETC.
1 . NEW PACKAGED TERMINAL HEAT PUMP IN SAME LOCATION AS
NEW PTHP REMOVED DURING DEMOLITION.
2 . NEW CEILING HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
3 . NEW CENTRIFUGAL INLINE EXHAUST FAN MOUNTED IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION.
4 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED IN
SAME LOCATION AS DFCU REMOVED DURING DEMOLITION.
5 . NEW CENTRIFUGAL CEILING EXHAUST FAN MOUNTED IN SAME
LOCATON AS FAN REMOVED DURING DEMOLITION. PROVIDE NEW
FLEX DUCT TO CONNECT NEW FAN TO EXISTING DUCT. FIELD
VERIFY DUCT SIZE.
6 . NEW VERTICAL FAN COIL UNIT MOUNTED ATOP RETURN AIR
PLENUM MOUNTED IN SAME LOCATION AS FCU REMOVED DURING
DEMOLITION. SEE VERTICAL FCU DETAIL.
7 . NEW HEAT PUMP MOUNTED ATOP EXISTING CONCRETE
EQUIPMENT PAD IN SAME LOCATION AS HEAT PUMP REMOVED
DURING DEMOLITION.
8 . NEW WALL MOUNTED PROPELLER FAN MOUNTED IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION. FIELD VERIFY
EXISTING WALL OPENING SIZE AND MODIFY AS REQUIRED TO
INSTALL NEW FAN.
9 . CONDENSATE DRAIN PIPING DROPS DOWN WALL TO MOP SINK AT
THIS APPROXIMATE LOCATION. BRACKET DRAIN PIPING TO WALL.
10 . PROVIDE NEW SIDEWALL GRILLE. FIELD VERIFY EXISTING SIZES
AND LOCATIONS. (TYPICAL ALL GRILLES) PROVIDE SIZE TO MATCH
EXISTING GRILLE.
11 . PROVIDE NEW GRILLE/DIFFUSER. PROVIDE NEW FLEX DUCT (IF
APPLICABLE) OF NECK SIZE SCHEDULED. PROVIDE
TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK. (TYPICAL ALL
GRILLES/DIFFUSERS)
12 . CEILING HEATER THERMOSTAT MOUNTED IN EXHAUST DUCT IN
SAME LOCATION AS THERMOSTAT REMOVED DURING
DEMOLITION. FIELD VERIFY EXISTING LOCATION.
13 . EXISTING EXHAUST FAN CONTROLLED VIA WALL SWITCH. FIELD
VERIFY EXISTING SWITCH LOCATION AS REQUIRED.
14 . NEW ERU EXHAUST DUCT CONNECTS TO EXISTING EXHAUST
DUCT AT THIS APPROXIMATE LOCATION. PROVIDE OFFSETS AND
TRANSITIONS AS REQUIRED FOR CONNECTION TO EXISTING DUCT.
15 . CONNECTION SIZE OUTSIDE AIR DUCT PUNCHES INTO EXISTING
BLANKED OFF LOUVER.
16 . SUPPLY AIR DUCT CONNECTS TO EXISTING SUPPLY DUCT AT THIS
APPROXIMATE LOCATION. PROVIDE OFFSETS AND FITTINGS AS
REQUIRED TO MAKE CONNECTION.
17 . RETURN DUCT CONNECTIONS TO EXISTING RETURN DUCT AT THIS
APPROXIMATE LOCATION IN VERTICAL DUCT. PROVIDE OFFSETS
AND FITTINGS AS REQUIRED TO MAKE CONNECTION.
18 . ROUTE NEW EXHAUST DUCT FROM ERU TO EXISTING EXHAUST
DUCT AS HIGH AS POSSIBLE.
19 . TRAPPED, SLOPED (1/4" PER FOOT), INSULATED, COPPER
CONDENSATE PIPE ROUTED FROM UNIT CONDENSATE
CONNECTION TO ELBOW DOWN INTO EXISTING FLOOR DRAIN AS
SHOWN.
20 . REFRIGERANT PIPING DROPS ALONG EXTERIOR WALL AND
PENETRATES EXTERIOR WALL NEAR FLOOR LEVEL, IN SIMILAR
LOCATION AS PIPING REMOVED DURING DEMOLITION. BRACKET
PIPING TO WALL. PROVIDE PIPE SLEEVES AT WALL
PENETRATIONS. SEE WALL SLEEVE DETAIL. (TYPICAL)
21 . REFRIGERANT PIPING ELBOWS TO SIDE OF ERU THEN RISES TO
MIN 9'-0" A.F.F. AND IS ROUTED AS SHOW. DO NOT INSTALL PIPING
IN FRONT OF ACCESS PANELS.
22 . NEW WALL HEATER MOUNTED IN SAME LOCATION AS WALL
HEATER REMOVED DURING DEMOLITION.
23 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP CONCRETE
EQUIPMENT PAD. EXTEND EXISTING CONCRETE EQUIPMENT PAD
AS SHOWN.
24 . PROVIDE NEW 6' CHAINLINK FENCE TO MATCH EXISTING FENCING.
EXTEND AS SHOWN TO INSTALL NEW CONCRETE EQUIPMENT PAD
AND DUCTLESS OUTDOOR UNIT.
25 . NEW DUCTLESS CEILING CASSETTE SUSPENDED FROM DROP
RODS (MIN 3/8") CONNECTED TO OVERHEAD STRUCTURE WITH
SUPPLEMENTAL 2"X2"X1/4" SUPPLEMENTAL ANGLE IRON. SEE
SUSPENDED EQUIPMENT SUPPORT DETAIL AND COMPACT
CEILING CASSETTE IN CEILING GRID DETAIL. COORDINATE
THERMOSTAT LOCATION WITH OWNER.
26 . PROVIDE FULL SIZE, SLOPED, INSULATED PVC VINYL TUBE FOR
DRAIN PIPING FROM UNIT DRAIN PORT AND TRANSITION TO RIGID
DRAIN PIPE AS DETAILED INVRF CONDENSATE DRAIN
CONNECTION DETAIL. PROVIDE FITTINGS AS REQUIRED TO
CONNECT DRAIN PIPE.
27 . PROVIDE NEW DDC THERMOSTAT FOR CONTROL OF INDICATED
PTHPS MOUNTED ON WALL WITH B.E. AT 4'-6" A.F.F. PROVIDE
SURFACE MOUNTED RACEWAY AS REQUIRED TO CONCEAL ALL
CONTROL WIRING BELOW CEILING ROUTED FROM PTHP TO
THERMOSTAT. COORDINATE NEW THERMOSTAT WITH EXISTING
LIGHT SWITCHES, WALL BOARDS, ETC. COORDINATE CONTROL
WIRING FROM PTHPS WITH WALL BOARDS, WINDOWS, OUTLETS,
ETC. COORDINATE WITH OWNER AS REQUIRED FOR RELOCATION
OF EXISTING WALL BOARDS, ETC. ON WALL.
28 . NEW ENERGY RECOVERY UNIT CONDENSING UNIT MOUNTED
ATOP EXISTING CONCRETE EQUIPMENT PAD. SEE SPECIFICATION
SECTION 237433 FOR ADDITIONAL INFORMATION.
29 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP EXISTING
CONCRETE EQUIPMENT PAD.
30 . NEW ENERGY RECOVERY UNIT MOUNTED ATOP EXISTING
CONCRETE EQUIPMENT PAD IN MECHANICAL ROOM. SEE
SPECIFICATION SECTION 237434 FOR ADDITIONAL INFORMATION.
F-29
F-30 F-20
F-19
F-18 F-17
F-16
F-15F-28
F-14
WHHP-27 WHHP-28A WHHP-28B WHHP-29A WHHP-29B WHHP-30 WHHP-31 WHHP-32
WHHP-26WHHP-25WHHP-24WHHP-23WHHP-22WHHP-21WHHP-20
CH-13 CH-14
1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
3 3
A1
A1
A1
A1
A1
100 6"ø
6"ø
6"ø
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A3
A3
A3
A4
A4
A4
A4
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A2
A1
A1
A1
A2
A2
B1
B2
B2
B1
B2
B2
B2
B2
B2
B2 B2 B2
B1
2ND FLOOR STAIR NO. 2
B218
CORRIDOR
B201
SCI. PREP.
B222
SCIENCE
B129
CLASSROOM
B223
CLASSROOM
B225
CLASSROOM
B227
CLASSROOM
B229
CLASSROOM
B231
SCIENCE
B233
SCI. PREP.
B236
2ND FLOOR STAIR NO. 1
B200
CLASSROOM
B202
CLASSROOM
B204
CLASSROOM
B206
GIRLS
B208
JAN.
B210
BOYS
B209
COMPUTER
CLASSROOM
B211
SCIENCE
B212
COMP.
B214
SCI. PREP.
B215
CLASSROOM
B216
COMP.
B221
COMP.
B235
F-27ø8" 4
B2
TTTTTTTTTTTTTT
TT TT TT
TT TT TT TT TT
TT TT
SS
CC CC
SS
SS
SS
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
M202
MECHANICAL NEW WORK
PLAN - SECOND FLOOR AREA
B
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 2 - MECHANICAL NEW WORK PLAN - AREA B
NOTES: (THIS SHEET ONLY)
1 . NEW INTERIOR HEAT PUMP MOUNTED IN SAME LOCATION AS
WHHP REMOVED DURING DEMOLITION.
2 . NEW CEILING HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
3 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT.
4 . NEW CEILING MOUNTED EXHAUST FAN MOUNTED IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION. PROVIDE NEW
FLEX DUCT. PROVIDE TRANSITIONS AND OFFSETS AS REQUIRED
TO CONNECT NEW FAN TO EXISTING DUCT.
5 . PROVIDE NEW CEILING MOUNTED GRILLE/DIFFUSER. PROVIDE
NEW FLEX DUCT (IF APPLICABLE) OF NECK SIZE SCHEDULED.
PROVIDE TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK.
6 . CEILING HEATER THERMOSTAT MOUNTED IN EXHAUST DUCT IN
SAME LOCATION AS THERMOSTAT REMOVED DURING
DEMOLITION. FIELD VERIFY EXISTING LOCATION.
7 . EXISTING EXHAUST FAN CONTROLLED VIA WALL SWITCH. FIELD
VERIFY EXISTING SWITCH LOCATION AS REQUIRED.
8 . CONDENSATE DRAIN PIPING DROPS DOWN WALL TO MOP SINK AT
THIS APPROXIMATE LOCATION. BRACKET DRAIN PIPING TO WALL.
M203
F-C10
F-C3 F-C2
F-C11
F-C7
F-C8
PTHP-17
PTHP-18
PTHP-19
PTHP-20
PTHP-21
PTHP-22
PTHP-23
PTHP-24
PTHP-25
PTHP-26
PTHP-27
PTHP-28
PTHP-30
PTHP-31
PTHP-32
PTHP-33
PTHP-34
PTHP-35
PTHP-36
PTHP-37
PTHP-38
PTHP-39
PTHP-29
DOU-5 DOU-8
DFCU-8
DFCU-10
DOU-10
CH-C11
CH-C3
CH-C4
CH-C12
3 3
DFCU-11.2
DFCU-11.1
DFCU-9
A4
A4
A2
A4
A4
A4
A4
A4
A4
A4
A2
B2
B2
B1
B1
B1
B1B1
B1
D
DOU-9
R D
B2
B2
B2 B2
B2
B2
B2
B2
B2
B2
B2
B2
SCIENCE
C143
PREP. \ STORAGE
C140
OFFICE
C141
SCIENCE
C139
WORK ROOM
C144
TOILET
C165
VESTIBULE
C142
2ND FLOOR STAIR NO. 3
C138
MECH. ROOM
C137
LOBBY
C136
STORAGE
C164
ELECT.
C163
ELEV. LOBBY
C161
ELEVATOR
C160
MACH.
C159
COMPUTER
C158
CORRIDOR
C151
MECH. ROOM
C162
CLASSROOM
C146
MATH CLASSROOM
C147
CLASSROOM
C148
CLASSROOM
C149
2ND FLOOR STAIR NO. 4
C150
CLASSROOM
C152
MATH CLASSROOM
C153
CLASSROOM
C154
BOYS
C155
JAN.
C156
GIRLS
C157
B2
D R
B2
B2
DOU-11
R
D
R R
TT
TT 12
TT TT
SS SS
B1
TT
TT
R
TT
PTHP-36
PTHP-37
PTHP-38
TT
PTHP-26
PTHP-27
PTHP-28
TT
TT
PTHP-23
PTHP-24
TT
PTHP-21
PTHP-22
TT
PTHP-19
PTHP-20
TT
PTHP-17
PTHP-18
TT
TT
PTHP-34
PTHP-35
TT
PTHP-32
PTHP-33
TT
PTHP-30
PTHP-31
TTPTHP-25
ERU-2
16"x16"
14"x16"
22"x22"
16"x16"
14"x16"
R R
D
D
"x
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
M203
MECHANICAL NEW WORK
PLAN - SECOND FLOOR AREA
C
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 2 - MECHANICAL NEW WORK PLAN - AREA C
1/4" = 1'-0"M203
2 LEVEL 2 - MECHANICAL ROOM NEW WORK LARGE SCALE PLAN
NOTES: (THIS SHEET ONLY)
No. Description Date
3 LEVEL 2 MECHANICAL ROOM NEW WORK - ISOMETRIC
GENERAL NOTE: NOT ALL EXISTING CONDUIT, SPRINKLER PIPING,
DOMESTIC WATER PIPING, STRUCTURAL MEMBERS, ETC. ARE SHOWN.
COORDINATE NEW ERU, DUCTWORK, PIPING, ETC. WITH EXISTING
CONDUIT, SPRINKLER PIPING, ETC.
1 . NEW PACKAGED TERMINAL HEAT PUMP IN SAME LOCATION AS
NEW PTHP REMOVED DURING DEMOLITION.
2 . NEW CEILING HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
3 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT.
4 . NEW OUTDOOR HEAT PUMP/CONDENSING UNIT MOUNTED ATOP
EXISTING EQUIPMENT SUPPORT PLATFORM ON ROOF.
5 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED IN
SAME LOCATION AS DFCU REMOVED DURING DEMOLITION.
6 . NEW OUTDOOR HEAT PUMP/CONDENSING UNIT MOUNTED ATOP
EXISTING ROOF CURB. SEE EQUIPMENT SUPPORT PLATFORM
DETAIL. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO
PROPERLY SUPPORT NEW DOU ATOP EXISTING CURB.
7 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED ABOVE
DOOR. SEE WALL MOUNTED INDOOR UNIT DETAIL.
8 . REFRIGERANT PIPING AND CONDENSATE PIPING RISE THRU PIPE
BOX ON ROOF. PROVIDE RECTORSEAL FORTRESS LINE HIDE KIT
OR EQUAL TO CONCEAL ALL PIPING EXPOSED TO VIEW. PROVIDE
CONDENSATE PUMP. SEE WALL MOUNTED INDOOR UNIT
CONDENSATE PUMP DETAIL.
9 . DFCU DRAIN PIPING ROUTED TO SPILL ON ROOF. ONCE TUBING
PENETRATES PIPE BOX IT SHALL BE CONCEALED IN PVC PIPING
THAT IS ELBOWED DOWN TO 4" ABOVE ROOF LEVEL AND
SECURED TO PIPE BOX. CONCEALING VINYL TUBING SHALL
PROTECT IT FROM UV DAMAGE. DO NOT EXPOSE TUBING TO
OUTDOORS.
10 . NEW PIPE BOX MOUNTED ON ROOF. SEE PIPE BOX DETAIL.
11 . PROVIDE NEW CEILING MOUNTED GRILLE/DIFFUSER. PROVIDE
NEW FLEX DUCT (IF APPLICABLE) OF NECK SIZE SCHEDULED.
PROVIDE TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK.
12 . CEILING HEATER THERMOSTAT MOUNTED IN EXHAUST DUCT IN
SAME LOCATION AS THERMOSTAT REMOVED DURING
DEMOLITION. FIELD VERIFY EXISTING LOCATION.
13 . EXISTING EXHAUST FAN CONTROLLED VIA WALL SWITCH. FIELD
VERIFY EXISTING SWITCH LOCATION AS REQUIRED.
14 . EXISTING EXHAUST DUCT CONTINUES TO ROOF VENTILATOR.
15 . CONNECTION SIZE OUTSIDE AIR DUCT PUNCHES INTO EXISTING
BLANKED OFF LOUVER.
16 . SUPPLY AIR DUCT CONNECTS TO EXISTING SUPPLY DUCT AT THIS
APPROXIMATE LOCATION. PROVIDE OFFSETS AND FITTINGS AS
REQUIRED TO MAKE CONNECTION.
17 . RETURN DUCT CONNECTIONS TO EXISTING RETURN DUCT AT THIS
APPROXIMATE LOCATION IN VERTICAL DUCT. PROVIDE OFFSETS
AND FITTINGS AS REQUIRED TO MAKE CONNECTION.
18 . ROUTE NEW EXHAUST DUCT FROM ERU TO EXISTING EXHAUST
DUCT AS HIGH AS POSSIBLE.
19 . REFRIGERANT PIPING DROPS TO BELOW. SEE SHEE M103 FOR
CONTINUATION. PROVIDE PIPE SLEEVE AT FLOOR PENETRATION.
SEE PIPE SLEEVE DETAIL.
20 . PROVIDE NEW EXHAUST DUCT TO MATCH EXISTING SIZE AT
FLOOR PENETRATION. MAINTAIN EXISTING DAMPERS AT FLOOR
PENETRATION. DUCT RISES AND TRANSITIONS TO APPROX 27" X
40" TO MATCH EXISTING DUCT SIZE ABOVE. FIELD VERIFY
EXISTING DUCT SIZE. PROVIDE OFFSETS AND FITTINGS AS
REQUIRED TO MAKE CONNECTIONS. SEE SHEET M103 FOR DUCT
CONTINUATION BELOW.
21 . REFRIGERANT PIPING ELBOWS TO SIDE OF ERU THEN RISES TO
MIN 8'-0" A.F.F. AND IS ROUTED AS SHOW. DO NOT INSTALL PIPING
IN FRONT OF ACCESS PANELS.
22 . NEW DUCTLESS CEILING CASSETTE SUSPENDED FROM DROP
RODS (MIN 3/8") CONNECTED TO OVERHEAD STRUCTURE WITH
SUPPLEMENTAL 2"X2"X1/4" SUPPLEMENTAL ANGLE IRON. SEE
SUSPENDED EQUIPMENT SUPPORT DETAIL AND COMPACT
CEILING CASSETTE IN CEILING GRID DETAIL. COORDINATE
THERMOSTAT LOCATION WITH OWNER.
23 . PROVIDE FULL SIZE, SLOPED, INSULATED PVC VINYL TUBE FOR
DRAIN PIPING FROM UNIT DRAIN PORT AND TRANSITION TO RIGID
DRAIN PIPE AS DETAILED INVRF CONDENSATE DRAIN
CONNECTION DETAIL. PROVIDE FITTINGS AS REQUIRED TO
CONNECT DRAIN PIPE.
24 . WALL MOUNTED DDC TEMPERATURE SENSOR TO ALLOW FOR
MONITORING OF SPACE TEMPERATURE BY DDC SYSTEM.
25 . PROVIDE NEW DDC THERMOSTAT FOR CONTROL OF INDICATED
PTHPS MOUNTED ON WALL WITH B.E. AT 4'-6" A.F.F. PROVIDE
SURFACE MOUNTED RACEWAY AS REQUIRED TO CONCEAL ALL
CONTROL WIRING BELOW CEILING ROUTED FROM PTHP TO
THERMOSTAT. COORDINATE NEW THERMOSTAT WITH EXISTING
LIGHT SWITCHES, WALL BOARDS, ETC. COORDINATE CONTROL
WIRING FROM PTHPS WITH WALL BOARDS, WINDOWS, OUTLETS,
ETC. COORDINATE WITH OWNER AS REQUIRED FOR RELOCATION
OF EXISTING WALL BOARDS, ETC. ON WALL.
26 . NEW ENERGY RECOVERY UNIT MOUNTED ATOP EXISTING
CONCRETE EQUIPMENT PAD IN MECHANICAL ROOM. SEE
SPECIFICATION SECTION 237434 FOR ADDITIONAL INFORMATION.
NOTE: DETAIL IS SIMILAR FOR UNINSULATED DUCTS.
CAULK AROUND FULL PERIMETER OF ESCUTCHEON
EACH SIDE OF WALL.
3" WIDE (MINIMUM) GAUGE SHEET METAL ESCUTCHEON
AROUND PERIMETER OF DUCT EACH SIDE OF WALL.
ANCHOR TO WALL WITH EXPANSION ANCHOR.
DUCT
R-6 DUCT WRAP INSULATION WITH FSK JACKET.
INSULATION IS CONTINUOUS THROUGH WALL OPENING.SEAL WITH FSK TAPE OVERLAPPING ESCUTCHEON AND DUCT
WRAP FSK JACKET TO PREVENT PASSAGE OF SMOKE.
NOTE: THIS DETAIL IS APPLICABLE TO CONCEALED ROUND, FLAT OVAL,
AND SPIRAL DUCTWORK. THIS DETAIL IS NOT APPLICABLE TO THE
INSTALLATION OF EXPOSED NON-RECTANGULAR DUCTWORK.
ELEVATION
SECTION
MASONRY WALL SHOWN. INSTALLATION REQUIREMENTS
ARE THE SAME FOR GYP BOARD WALLS.
SEAL WITH FSK TAPE OVERLAPPING ESCUTCHEON AND DUCT
WRAP FSK JACKET TO PREVENT PASSAGE OF SMOKE.
R-6 DUCT WRAP INSULATION WITH FSK JACKET.
INSULATION IS CONTINUOUS THROUGH WALL OPENING.
3" WIDE (MINIMUM) 22 GAUGE SHEET METAL ESCUTCHEON
AROUND PERIMETER OF DUCT EACH SIDE OF WALL.
ANCHOR TO WALL WITH EXPANSION ANCHOR.
ENSURE ESCUTCHEON WIDTH IS SUFFICIENT TO CONCEAL
EDGES OF WALL OPENING.
CAULK AROUND FULL PERIMETER OF ESCUTCHEON
EACH SIDE OF WALL.
WALL SLEEVE
OUTSIDE EXTRUDED ANODIZED BRONZE
ARCHITECTURAL WALL GRILLE
PTHP UNIT
ANCHOR SLEEVE IN WALL OPENING
ALL FOUR SIDES.
CAULK WEATHERTIGHT AROUND PERIMETER.
COLOR SHALL MATCH EXTERIOR WALL.
EXTERIOR WALL
FLOOR
SUB-BASE WITH LEVELING FEET
UNIT CHASSIS AND INDOOR PANEL
ADJUSTABLE AIR DISCHARGE GRILLE
LINTEL BY STRUCTURAL
CAULK SLEEVE ALL AROUND PERIMETER
WITH PAINTABLE CAULK AND PROVIDE
TRIM STRIP AROUND INTERIOR PERIMETER OF UNIT.
NOTE: EMBED LINTELS A MINIMUM OF 8" BEYOND BOTH SIDES OF UNIT.
1/4"
3 ¾" MINIMUM
1½"
3"
UNION
AC UNIT
DRAIN CONNECTION
DRAIN PIPE SHALL BE AT LEAST
THE SAME DIAMETER AS THE NIPPLE
ON THE DRAIN PAN CONNECTION
OPEN END NIPPLE
SEE DRAWINGS FOR
PIPE REQUIRED MATERIAL
SLOPE AS REQUIRED
IN SPECIFICATIONS
PIPE NIPPLE
20 GAUGE GALVANIZED SHEET METAL COVER
SEAL AND CAULK ALL JOINTS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .