24_FAC_004_Addendum No_ 1_10202023_MAMS (1).pdf
PDF 4 MB Posted
- Attached to
- MERRY ACRES MIDDLE SCHOOL HVAC UPGRADES
- Solicitation number
- PE-64710-NONST-2024-000000005
- Issued by
- Douglas County, Georgia
About this file
This document is an Addendum to the bid documents for the HVAC Upgrades project at Merry Acres Middle School in Albany, Georgia for the Dougherty County Board of Education. The Addendum provides changes to the bid specifications, including revisions to the bid form, instructions to bidders, general conditions, and various technical sections. Key changes include extending the bid due date, modifications to bid submittal requirements, revisions to warranty periods, and updates to the allowances. The Addendum also includes changes to several drawings, such as the architectural ceiling plan, mechanical demolition plans, and mechanical new work plans.
The base bid amount for the project is a lump sum to be awarded to a single Georgia Licensed Contracting Firm, which will coordinate the work at all five schools included in the bid. Allowances are included for each school to cover unforeseen conditions and labor for furniture moves. Bidders are required to submit specific information with their bids, including qualifications, references, and licensing documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Merry Acres Middle School September 22, 2023
HVAC Upgrades
Dougherty County Board of Education
Albany, Georgia
Addendum No. 1- Page 1 of 5
ANDREWS, HAMMOCK & POWELL, INC. 250 CHARTER LANE, SUITE 100, MACON, GA 31210
ADDENDUM NUMBER: ONE DATED: October 20, 2023
To: All contract bidders of record.
This addendum forms a part of the Contract Documents and modifies the original Specifications and Drawings dated September 22, 2023, as noted below. Acknowledge receipt of this
Addendum in the space provided on the Bid Price Form; failure to do so may subject bidder to disqualification.
ANSWERS TO QUESTIONS FROM PRE-BID MEETING
1. Question: Are Davis Bacon Wages required for this project?
Answer: No
2. Question: At the pre-bid meeting it was mentioned that an addendum would come out changing the bid date. When will this happen?
Answer: Addressed in this addendum.
3. Question: They also mentioned a GC was required. Where in the bid documents does it state General Contractor? I see the wording for a single GA licensed contracting firm.
What would exclude a mechanical contractor from being just that as they can manage and hire subs also?
Answer: The contractor shall be a Georgia licensed contractor qualified to perform the work in accordance with the licensing requirements of the State of Georgia.
4. Is Monroe High School the only one needing new controls and the rest keep existing? I just want to verify this information to be correct.
Answer: All projects are to receive new controls.
5. What software would you prefer to be used by the winning contractor to be compatible with your system as relating to management purposes?
Answer: See Section 013100.
6. A copy of the Pre-Bid Sign In Sheet is included with the addendum.
CHANGES TO THE SPECIFICATIONS
1. SECTION A - INVITATION TO BID
A. On page A-1, delete the paragraph in its entirety and replace with the following:
Sealed Bids will be received by the Dougherty County Board of Education in the
Office of the Logistical Services Department located at 601 Flint Avenue, Albany, Georgia, 31701 until 1:30 PM EST on Tuesday, October 31, 2023. Those Bids will then be publicly opened and read. Bidders will be required to submit specific information/documentation with their Bids.
Addendum No. 1- Page 2 of 5
2. SECTION B - BID FORM
A. Delete pages B-1 through B-8 in their entirety and replace with pages B-1 through B-9, revised October 20, 2023, included herewith.
3. SECTION C - INSTRUCTIONS TO BIDDERS
A. On page C-1, paragraph C-05, change “October 17, 2023” to “October 24, 2023.”
B. On page C-5, delete paragraph C-18 -9 in its entirety and replace with the following:
“9. Provide list of two (2) projects of similar size completed in last two (2) years along with detailed Reference Contact Information.”
4. SECTION E – GENERAL CONDITIONS
A. On page E-17, in the third line of paragraph E-53.a. ,change the words “one year” to “two years.”
B. On page E-22, in the second line of paragraph E-74. ,change the words “one year” to
“two years.”
C. On page E-22, paragraph E-75:
1) In the twentieth line of this paragraph, change the words “one year” to “two years.”
2) In the twenty-first line of this paragraph, change the words “one year” to “two years.”
5. SECTION G – EXHIBIT B PAYMENT BOND
A. On page G-4, in paragraph 4., change the words “one year” to “two years.”
6. SECTION 012100 – ALLOWANCES
A. Add Section 012100, dated October 20, 2023, included herewith.
Addendum No. 1- Page 3 of 5
7. SECTION 230514 – CLOSEOUT DOCUMENT REQUIREMENTS FOR HVAC
A. On page 230514-6, in paragraph 1.11, delete the “TRANSFER OF EXTRA
MATERIALS AND SPARE PARTS” table in its entirety and replace with the following:
TRANSFER OF EXTRA MATERIALS AND SPARE PARTS
Spec Section Total Quantity
Received
Owner's
Rep. Initials
Date
Received
ADDITIONAL REFRIGERANT
Provide one (1) cylinder of R-410a refrigerant.
ADDITIONAL EQUIPMENT
Provide one (1) each of the following components for a Bard T36S1D Wall Hung
Heat Pump or equal:
• Compressor
• Condenser Fan Motor
• Blower Motor
• Reversing Valve
• Thermal Expansion Valve
• Control Board
• Blower Control Board
• Indoor Blower Control Board
• Defrost Control Board
• Timer Control
Provide one (1) each of the following components for a Bard T48S1D Wall Hung
Heat Pump or equal:
• Compressor
• Condenser Fan Motor
• Blower Motor
• Reversing Valve
• Thermal Expansion Valve
• Control Board
• Blower Control Board
• Indoor Blower Control Board
• Defrost Control Board
• Timer Control
Provide two (2) complete GREE
ETAC2-15HP packaged terminal heat pumps or equal.
"I certify that the above list of spare parts and materials have been turned over to the Owners Representative."
Company:
Name:
Title:
Signature:
Date:
Addendum No. 1- Page 4 of 5
8. SECTION 230900 – INSTRUMENTATION AND CONTROLS FOR HVAC
A. On page 230900-5, add the following as paragraph 2.3.K:
“K. Carbon-Dioxide (CO2) Sensor: Provide a CO2 sensor/transmitter which shall be capable of sending a variable (4-20 mA or 0 to 10 volt) signal to the DDC system proportionate to the room CO2 level. CO2 sensor shall be by KMC. Provide mounting base and mount on wall at 4’-6” above finished floor. Unit shall operate from 60°F to 90°F and 10% to 95% RH, non-condensing.”
9. SECTION 238119 – SELF-CONTAINED AIR CONDITIONERS
A. On page 238119-2, paragraph 2.1.A., add “Tempmaster” as an acceptable manufacturer.
10. SECTION 238126 – SPLIT-SYSTEM AIR CONDITIONERS
A. On page 238126-3, paragraph 2.1.I, add “LG” as an acceptable manufacturer.
B. On page 238126-3, paragraph 2.2.I, add “LG” as an acceptable manufacturer.
C. On page 238126-5, paragraph 2.3.H, add “LG” as an acceptable manufacturer.
11. SECTION 238128 – VARIABLE REFRIGERANT FLOW SYSTEM (HEAT RECOVERY)
A. On page 238128-2, paragraph 2.1.C, add “LG” as an acceptable manufacturer.
CHANGES TO DRAWINGS
1. SHEET A100 – ARCHITECTURAL CEILING PLAN - OVERALL
A. Delete Sheet A100 in its entirety and replace with Sheet A100, revised 10/20/2023, included herewith.
2. SHEET MD101 - MECHANICAL DEMOLITION PLAN – FIRST FLOOR AREA A
A. Delete Sheet MD101 in its entirety and replace with Sheet MD101, revised 10/20/2023, included herewith.
3. SHEET MD103 - MECHANICAL DEMOLITION PLAN – FIRST FLOOR AREAS C
& D
A. Delete Sheet MD103 in its entirety and replace with Sheet MD103, revised 10/20/2023, included herewith.
Addendum No. 1- Page 5 of 5
4. SHEET M101 - MECHANICAL NEW WORK PLAN – FIRST FLOOR AREA A
A. Delete Sheet M101 in its entirety and replace with Sheet M101, revised 10/20/2023, included herewith.
5. SHEET M103 - MECHANICAL NEW WORK PLAN – FIRST FLOOR AREAS C & D
A. Delete Sheet M103 in its entirety and replace with Sheet M103, revised 10/20/2023, included herewith.
6. SHEET M501 - MECHANICAL DETAILS
A. Delete Sheet M501 in its entirety and replace with Sheet M501, revised 10/20/2023, included herewith.
7. SHEET M601 - MECHANICAL SCHEDULES
A. Delete Sheet M601 in its entirety and replace with Sheet M601, revised 10/20/2023, included herewith.
8. SHEET M602 - MECHANICAL SCHEDULES, DIAGRAMS, LEGEND & GENERAL
NOTES
A. Delete Sheet M602 in its entirety and replace with Sheet M602, revised 10/20/2023, included herewith.
END OF ADDENDUM #1
Revised October 20, 2023
B-1
SECTION B
BID FORM
HVAC Upgrades Projects – Phase 2
Company Name: _______________________________________________________ Date: __________________
BASE BID:
Having carefully examined the Bid Documents entitled Albany Middle School HVAC Upgrades, Bid No. 24-FAC- 003, Merry Acres Middle School HVAC Upgrades, Bid No. 24-FAC-004, Monroe High School HVAC Upgrades, Bid No. 24-FAC-005, Radium Springs Elementary School HVAC Upgrades, Bid No. 24-FAC-006, and Robert Cross Middle School HVAC Upgrades, Bid No. 24-FAC-007 for the Dougherty County Board of Education, Albany, Georgia, dated September 22, 2023; their attachments; and addendum no. (s)___________; as well as the premises and conditions affecting the Work, the undersigned proposes to provide all services, labor, materials, and equipment required to perform the entire Work, in accordance with said Documents. The scope of work includes all labor, material, and equipment required to replace the heating and air conditioning systems as specified in the bid document at Albany Middle School (1700 Cordell Avenue), Merry Acres Middle School (1601 Florence Drive), Monroe High School (900 Lippitt Drive), Radium Springs Elementary School (2400 Roxanna Road), and Robert Cross Middle School (324 Lockett Station Road) for the lump sum of:
______________________________________________________________________________________ Dollars
($__________________________) which sum is herein after called the “Base Bid”.
Provide a total cost for the scope of work at each school listed below (when combined shall be equivalent of the base bid):
Bid No. 24-FAC-003 – Albany Middle School $
Bid No. 24-FAC-004 – Merry Acres Middle School $
Bid No. 24-FAC-005 – Monroe High School $
Bid No. 24-FAC-006 – Radium Springs Elementary School $
Bid No. 24-FAC-007 – Robert Cross Middle School $
ALLOWANCES:
The base bid amount provided above to include the following allowances;
Bid No. 24-FAC-003 – Albany Middle School $ $4,250.00
Bid No. 24-FAC-004 – Merry Acres Middle School $ $4,800.00
Bid No. 24-FAC-005 – Monroe High School $ $2,400.00
Bid No. 24-FAC-006 – Radium Springs Elementary School $ $4,250.00
Bid No. 24-FAC-007 – Robert Cross Middle School $ $4,250.00
B-2
Unit Price:
The base bid for this project shall include the total cost of items listed below as defined by the contract documents.
This form should be completed in its entirety.
Unit price shall include all labor, materials, overhead, profit, insurance, etc. to cover finished work.
Where applicable unit cost shall include related work activities necessary to complete the work.
No additional surcharges shall be added to unit cost.
The following unit prices apply:
Item Description Unit Price Replace inoperative Needlepoint Bipolar Ionization Unit With New
1 Model No. GPS-FC24-AC EA $ 2 Model No. GPS-FC48-AC EA $ 3 Model No. GPS-iRIB18-36 EA $
BID BOND:
Enclosed herewith is a Bid Bond in the amount of $__________________, being not less than 5% of the Base Bid payable to Dougherty County Board of Education. Certified checks or other forms of bid security are not acceptable.
Bids in excess of $100,000.00 must be accompanied by a five percent (5%) Surety Bid Bond. Bids less than $100,000 do not require a Bid Bond. The undersigned agrees that the above stated amount is the proper measure of liquidated damages which the Owner will sustain by the failure of the undersigned to execute the Contract and/or to furnish the Performance and Bond in case this Bid is accepted.
The undersigned further agrees that if this bid is accepted within sixty (60) days after the date set for the opening of bids and the undersigned fails to execute a Contract for the Work within ten (10) business days after written notice of such acceptance, or if he fails to furnish the Performance Bond, Payment Bond, and Insurance, the obligation of the Bid Bond, if applicable, will remain in full force and effect and the money payable thereon shall be paid into funds of the Owner as liquidated damages for such failure; otherwise the obligation of the bond will be null and void.
BID ACCEPTANCE:
Prior to the bid opening date and hour, errors may be stricken or revisions made and corrections entered on the Bid Form(s) and/or on the outside of the Sealed Envelope, provided that any such strike-over or revision is signed in ink by the person signing the bid or their agent. No oral, telephonic, telegraphic, or facsimile modification to the Bids will be considered after the time set for opening proposals.
The undersigned agrees that this proposal may not be revoked or withdrawn after the time set for opening of bids, but shall remain open for acceptance for a period of sixty (60) days following such time.
BID AWARD:
It is the Owners intent to award the project to a single Georgia Licensed Contracting Firm which will act as the Prime Contractor responsible for coordinating the work of all trades and ensuring the entire project is completed as scheduled at Albany Middle School, Merry Acres Middle School, Monroe High School, Radium Springs Elementary School, and Robert Cross Middle School.
The undersigned understands and agrees, if this bid is awarded, it will be awarded in one Lump Sum to the lowest qualified Bidder judged most advantageous to the DCSS in the areas of lowest responsible bid, financial stability, and proof of ability to fully complete the project on schedule. Upon Owner’s request all information needed to
B-3 document the above requirements will be provided immediately. The Owner reserves the right to reject any or all bids, to waive technicalities and informalities, and to reduce or expand the Project as they deem appropriate.
In the event the undersigned is notified in writing by facsimile, mail, or delivery of the acceptance of this lump sum bid within sixty (60) days after the time set for the opening of bids, the undersigned agrees to execute a separate Contract for the Work at each School for the above stated compensation and/or to schedule a Pre-Contract Meeting with the Owner within ten (10) business days after the issuance of the Notice of Acceptance. All required Pre-Contract Submittals shall be reviewed during this meeting.
Once the Pre-Contract Submittals have been reviewed and approved, the Owner shall issue Contracts for the Work for the above stated compensation for the Contractor to execute.
The undersigned understands and agrees, if the Contract Sum exceeds $100,000.00, they shall be required to furnish a Performance and a Payment Bond, both in an amount equal 100% of the Contract Sum, issued by a Corporate Surety authorized to conduct business in the State of Georgia, and payable to Dougherty County Board of Education.
COMMENCEMENT OF WORK:
The undersigned agrees to commence actual physical work with an adequate force and equipment within ten (10) calendar days of a date to be specified in a written Notice to Proceed and shall achieve Final Completion at each school by October 30, 2024.
If the undersigned fails to commence actual physical work with an adequate force and equipment within ten (10) calendar days of the date to be specified in a written Notice to Proceed, the Owner reserves the right to null and void the Contract.
BID SUBMITTAL INFORMATION:
Bids shall be submitted on the Bid Form provided. The Bid Form shall not be changed or modified in any way. Fill in all blanks on the Bid Form. Bid submittal and signature of authorized representative shall indicate intention to comply with all of the requirements of the Bidding Documents.
Bid submittal certifies that Bidder has been granted and possesses all necessary, valid, current licenses to do business in the State of Georgia as issued by the respective State Boards and Government Agencies responsible for regulating and licensing the services to be provided and pursuant to this Agreement.
Provide one (1) original Proposal Form with the following information in the order specified:
1. Executed Bid Form.
2. Executed Bid Bond, if the Bid exceeds $100,000.00.
3. Statement of Bidders Qualifications
4. Executed Certification of Non-Collusion.
5. Executed Contractor’s Affidavit.
6. Executed DJEA-E Statement of Assurance for Competitively Bid Contracts.
7. Current Business License.
8. Contractor License.
9. Provide a list of Sub-Contractors to be utilized on this project.
10. Provide list of two (2) projects of similar size completed in last two (2) years along with detailed Reference Contact Information.
B-4
BID CERTIFICATION:
The above Bid is in response to the Bid Documents titled Albany Middle School HVAC Upgrades Bid No. 24- FAC-003, Merry Acres Middle School HVAC Upgrades Bid No. 24-FAC-004, Monroe High School HVAC Upgrades Bid No. 24-FAC-005, Radium Springs Elementary School HVAC Upgrades Bid No. 24-FAC-006, Robert Cross Middle School HVAC Upgrades Bid No. 24-FAC-007 for the Dougherty County Board of Education, Albany, Georgia; dated September 22, 2023; and their attachments and addenda.
By submitting this Bid, the undersigned acknowledges that they or their representative have visited each of the project sites and have taken into consideration all observed conditions that might affect the work.
Under oath I certify that I am principal or other representative of the Bidder and that I am authorized by it to execute the forgoing offer on its behalf:
Company Name: ______________________________________________________________________________
Address: _____________________________________________________________________________________
City: __________________________________________________________ State: _____ Zip: _______________
Name: Title: __________________________________
Signature: Date: __________________
Notary Public: _____________________________
____________________________County, Georgia
(Apply Seal Here) My Commission Expires: ____________________
Subscribed and Sworn Before Me On This ___ Day of ____________________, 20___.
B-5
STATEMENT OF BIDDER’S QUALIFICATIONS
HVAC Upgrades Project - Phase 2
Name of Bidder________________________________________________________________________
Business Address______________________________________________________________________
When Organized________________________ Where Incorporated ______________________________
How many years have you been engaged in the business under the present firm name? _____________
Indicate if Bid is a Joint Venture: Yes ( ) or No ( ).
Bid price is $ _________________________________________________________________________
Credit Available for this Contract $________________________________________________________
Contracts now in hand, Gross Amount $____________________________________________________
Plan of Organization: Corporation: __________ Partnership: ________ Sole Proprietorship: _________
Have you ever refused to sign a contract based on your original bid? _____________________________
Have you ever defaulted on a contract? ____________________________________________________
Remarks_____________________________________________________________________________
By __________________________________________________________________________________
Date_______________
Printed Name and Title
Notary Public: _____________________________
____________________________County, Georgia
This_______ Day of _________________, 20___.
RETURN WITH BID FORM
B-6
CERTIFICATION OF NON-COLLUSION
I certify that this Bid/Proposal is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a Bid/Proposal for the same materials, supplies, or equipment, and is in all respects fair and without collusion or fraud per the requirements of OCGA 50-5-67 (e).
I certify that this Bid/Proposal is made without prior understanding, agreement, or connection with any member of the government agency letting this public works contract and is in all respects fair and without collusion or fraud per the requirements of OCGA 36-91-21 (f).
I further certify that the provisions of the Official Code of Georgia Annotated 45-10-20 et. seq. has not and will not be violated in any respect.
I understand that collusive bidding is a violation of State and Federal law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of this Bid/Proposal, and certify that I am authorized to sign this Bid/Proposal for the Bidder/Offeror.
The Bidder being sworn disposes and says, its agents, officers, or employees have not directly or indirectly entered into any agreements, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.
Name: Title: __________________________________
Signature: Date: __________________
(Apply Seal Here)
B-7
CONTRACTOR’S AFFIDAVIT
STATE OF GEORGIA, COUNTY OF ___________________________________________________,
______________________________________________________________________being duly sworn, (Insert Name of Affiant) hereby deposes and says that he/she has read, and is familiar with, the provisions of the Official Code of Georgia Annotated Section 36-91-21(d) which provides as follows:
Whenever a public works construction contract for any governmental entity subject to the requirements of this chapter is to be let out by competitive sealed bid or proposal, no person, by himself or herself or otherwise, shall prevent or attempt to prevent competition in such bidding or proposals by any means whatever. No persons who desires to procure such work for himself or herself or for another shall prevent or endeavor to prevent anyone from making a bid or proposal therefore by any means whatever, nor shall such person so desiring work cause or induce another to withdraw a bid or proposal for work.
And that he/she has not directly or indirectly violated said provisions of the law.
In accordance with the Official Code of Georgia Annotated Section 36-91-21(e):
If the Contractor is a Partnership, the Affidavit shall be executed by all partners and any officer, agent, or other person who may have represented or acted for them in bidding for or procuring the contract.
If the Contractor is a Corporation, the Affidavit shall be executed by all officers, agents, or other persons who may have acted for or represented the corporation in bidding for or procuring the contract shall execute the affidavit.
Further, Affiant saith not.
This ___ day of ____________________, 20____
(Signature of Affiant)
Notary Public: _____________________________
____________________________County, Georgia
(Apply Seal Here)
B-8
DJEA~E
DJEA - COMPETITIVELY BID CONTRACTS
Equal Opportunity for Competitive Bids
It shall be the policy of the Dougherty County Board of Education to promote and insure equal opportunity for all persons, without regard to race, color, religion, sex, handicap, or national origin, employed by or seeking employment with vendors and/or contractors doing business with the Board. As a condition of doing business with the Board, each vendor and/or contractor shall furnish assurance that its business will be operated in accordance with the policy attached hereto and identified as "Competitively Bid Contracts," Policy DJEA.
The following equal opportunity clause shall be deemed incorporated into every contract and agreement between the Board and any of its vendors and/or contractors:
1. The vendor/contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, handicap, or national origin. The vendor/contractor shall take appropriate action to ensure that applicants are employed and that employees are treated during employment without regard to race, color, religion, sex, handicap, or national origin. Such action shall include, but shall not be limited to, the following: employment, upgrading, demotion, transfer, recruitment, layoff, termination, rates of pay or other forms of compensation, and training.
2. In the event of the vendor/contractor's noncompliance with the nondiscrimination policy of the
Board, any contract or purchase order may be canceled, terminated or suspended, in whole or in part, and the vendor/contractor may be declared ineligible to transact further business with the Board.
All vendors and persons desiring to transact business with the Board are to provide assurance that their business will be conducted in accordance with this nondiscrimination policy and that such vendors and/or contractors agree to and shall abide by the equal opportunity clause set forth in this policy.
It is the further policy of the Board to insure equal opportunity for minority/women owned businesses and minority/women professionals with regard to all work, services, and supplies purchased by the Board and all construction projects undertaken by the Board which are competitively bid by the Board.
B-9
DJEA~E
DJEA - COMPETITIVELY BID CONTRACTS
STATEMENT OF ASSURANCE
The undersigned Vendor/Contractor provides this Statement of Assurance to the Dougherty County School System wherein the Undersigned acknowledges receipt and awareness of the DJEA - Competitively Bid Contracts policy and agrees to observe and be bound by all applicable provisions contained therein.
The undersigned submits this Statement of Assurance, understanding that a failure to submit said Statement of Assurance may constitute a basis for rejecting the undersigned’s bid.
Name: Title: __________________________________
Signature: Date: __________________
(Apply Seal Here)
Merry Acres Middle School October 20, 2023
ALLOWANCES 012100 - 1
SECTION 012100 - ALLOWANCES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. The contractor shall include in the base bid a contingency allowance of $4,800.00. This allowance will be utilized to pay for the costs associated for casual labor to assist with the furniture move from classrooms to portables. By change order the contract amount will be adjusted to cover the stated cost for this item. At the end of the contract, the remaining amount in the contingency allowance will be deducted from the contract.
B. The cost for unforeseen conditions will be added to the contract by change order.
PART 2 - PRODUCTS: NOT USED
PART 3 - EXECUTION: NOT USED
END OF SECTION 012100
Merry Acres Middle School October 20, 2023
ALLOWANCES 012100 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
1 1
CEILING HATCH LEGEND
DEMO EXISTING CEILING TILE & GRID AS REQUIRED TO
REMOVE EXISTING EQUIPMENT AND INSTALL NEW
EQUIPMENT. REPLACE WITH NEW CEILING TILE AND GRID.
NEW TILE SHALL BE STANDARD ACT TO MATCH EXISTING.
(NO HATCH) EXISTING CEILING TILE & GRID TO REMAIN.
GENERAL NOTE: REMOVAL OF CEILING REQUIRED FOR REMOVAL OF
EXISTING EXHAUST FANS LOCATED ABOVE CEILINGS IN RESTROOMS IS NOT
SHOWN. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF ITEMS LOCATED
ABOVE CEILINGS THAT MAY REQUIRE REMOVAL OF CEILING TILES.
GENERAL NOTE: REMOVAL OF CEILINGS REQUIRED FOR INSTALLATION OF
NEW DUCTLESS FAN COIL UNITS IS NOT SHOWN. SEE MECHANICAL
DRAWINGS FOR LOCATIONS OF NEW DFCUS. TEMPORARILY REMOVE
CEILING TILE & GRID AS REQUIRED TO INSTALL NEW DFCUS, REFRIGERANT
PIPING, CONDENSATE PIPING, SUPPORTS, ETC. AND REINSTALL CEILING.
REPLACE ANY TILE/GRID DAMAGED DURING DEMOLITION/INSTALLATION OF
NEW DFCUS.
GENERAL NOTE: PRIOR TO CONSTRUCTION, CONTRACTOR SHALL
COORDINATE WITH OWNER TO REMOVE ALL PERSONAL ITEMS FROM
SPACES AFFECTED BY DEMOLITION. CONTRACTOR SHALL PROTECT
EXISTING CASEWORK, FURNITURE, FLOORING, WALLS, CEILINGS, ETC. NOT
ABLE TO BE REMOVED. AT THE END OF CONSTRUCTION, CONTRACTOR
SHALL REMOVE ALL PROTECTIVE COVERS AND WIPE DOWN AND CLEAN ALL
SURFACES AFFECTED BY DUST, DIRT, CONSTRUCTION DEBRIS, ETC.
GENERAL NOTE: CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION
PHASING WITH THE OWNER. COORDINATE MOVING EXISTING CLASSROOMS
TO MODULAR CLASROOMS PRIOR TO BEGINNING CONSTRUCTION IN EACH
AREA.
DEMO EXISTING CEILING TILE & GRID AS REQUIRED TO
REMOVE EXISTING EQUIPMENT AND INSTALL NEW
EQUIPMENT. REPLACE WITH NEW CEILING TILE AND GRID.
NEW TILE SHALL BE WATER RESISTANT TYPE.
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID #: 4056
A100
ARCHITECTURAL CEILING
PLAN - OVERALL
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
No. Description Date
1 ADDENDUM #1 10/20/23
3/64" = 1'-0"
LEVEL 1 CEILING PLAN - OVERALL
3/64" = 1'-0"
LEVEL 2 CEILING PLAN - OVERALL
CORRIDOR
A128
TEACHER PLANNING
A130
TEACHER PLANNING
A131
TEACHER PLANNING
A132
MEDIA CENTER
A122
2579.03 SF
ELECT.
A121
STORAGE
A127
PRODUCTION
A126
CONFERENCE
A117
PRINCIPAL
A118
TOILET
A119
WAITING
A102
RECEPTION
A103
WAITING
A104
TOILET
A115
VAULT
A113
STORAGE
A125A
IDF
A125
WORK ROOM
A124
OFFICE
A123
WORK ROOM
A112
CONF.
A110
ASSIST. PRINCIPAL
A109
COUNSELOR
A108
COUNSELOR
A107
COUNSELOR
A106
CORRIDOR
A111
ATHLETIC STORAGE
A134
ELEC.
A135
WOMEN'S COACH
A136
STORAGE
A138
MEN'S COACH
A139
FOOTBALL EQUIP.
A141
LAUNDRY
A142
OFFICE
A145
STORAGE
A146
CHORAL
A143
COMPUTER
A144
BOY'S LOCKER RM
A147
GIRL'S LOCKER RM
A148
GYM LOBBY
A150
BOYS
A151
GIRLS
A152
WEIGHT ROOM
A154
LOCKER ROOM
A153
SP. ED. SHOWER
A152A
TEACHER LOUNGE
A155
TOILET
A156
TOILET
A157
JAN.
A158
TECHNOLOGY LAB
A159
MATERIAL
PROCESSING
A159A
CLASSROOM
A161
OFFICE
A162
STORAGE
A176A
COMPUTER NETWORK
A160
JANITOR
A164
OFFICE
A177
RECEPTION
A165 DIRECTOR
A166
WORK ROOM
A176
OAKTREE
A170
CLASSROOM
A168
CAFETERIA
A188
DRESSING
A189
STAGE
A190
MECHANICAL
A192
OFFICE
A180
INST. STORAGE
A182
PRACTICE
A181 PRACTICE
A183
STORAGE
A186
PRACTICE
A185
BAND ROOM
A179
COOLER
A203
COOLER
A202
RECEIVING
A204
STORAGE
A199LOCKERS
A196
OFFICE
A195
TIME OUT
A173
TIME OUT
A174
TIME OUT
A171
STORAGE
A169
ELECTRICAL RM
A172A
SPRINKLE RISER RM
A171A
TIME OUT
A172
JAN.
A198
TOILET
A197
CAN WASH
A205
VEST
A191
VEST
A187
CLOSET
A137
CLOSET
A140
1 1 1
(TYP)
(TYP)
11 (TYP)
11 (TYP)
(TYP)
11 (TYP)
11 (TYP)
17 17 17 1717
D D
D
D
D
D
D
D D
D
D
25 25
D
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
MD101
MECHANICAL DEMOLITION
PLAN - FIRST FLOOR AREA A
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 1 - MECHANICAL DEMOLITION PLAN - AREA A
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING WALL HUNG HEAT PUMP. REMOVE EXISTING GPS
BIPOLAR IONIZATION UNIT AND STORE FOR INSTALLATION IN NEW WALL
HUNG HEAT PUMP. SEE NEW WORK PLAN FOR INSTALLATION OF NEW WALL
HUNG HEAT PUMP.
2 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
3 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN. EXISTING
ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
ROOF MOUNTED EXHAUST FAN.
4 . REMOVE EXISITNG HEAT PUMP/CONDENSING UNIT MOUNTED ATOP
EQUIPMENT SUPPORT PLATFORM ON ROOF AND ASSOCIATED
REFRIGERANT PIPING. EXISTING SUPPORT PLATFORM TO REMAIN. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW HEAT PUMP/CONDENSING UNIT
5 . REMOVE EXISTING WALL MOUNTED DUCTLESS FAN COIL UNIT AND
ASSOCIATED REFRIGERANT PIPING. REMOVE CONDENSATE PIPING AS
REQUIRED TO ALLOW FOR INSTALLATION OF NEW WALL MOUNTED DFCU IN
THE SAME LOCATION. SEE NEW WORK PLANS.
6 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW PTHP IN SAME LOCATION.
No. Description Date
1 ADDENDUM #1 10/20/23
7 . REMOVE EXISTING ROOF MOUNTED KITCHEN MAKE-UP AIR UNIT. EXISTING
SUPPORTS TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
MAKE-UP AIR UNIT.
8 . REMOVE EXISTING ROOFTOP UNIT AND ASSOCIATED CONDENSATE DRAIN.
EXISTING ROOF CURB TO REMAIN. REMOVE EXISTING BIPOLAR IONIZATION
UNIT AND STORE FOR REUSE IN NEW ROOFTOP UNIT. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW ROOFTOP UNIT IN THE SAME LOCATION.
9 . REMOVE EXISTING ROOFTOP UNIT, ASSOCIATED CONDENSATE DRAIN,
DUCTWORK, DIFFUSUERS, ETC. ROOF CURB TO REMAIN. SEE NEW WORK
PLAN FOR INSTALLATION OF NEW 100% OUTSIDE AIR UNIT IN THIS
LOCATION.
10 . REMOVE EXISTING ZONE DAMPER AND ELECTRIC DUCT HEATER.
11 . REMOVE EXISTING DUCTWORK, DIFFUSER, FLEX DUCT, SUPPORTS, ETC.
12 . REMOVE EXISTING DUCTWORK, FLEX DUCT, SUPPORTS, ETC. ASSOCIATED
WITH ZONE DAMPER UP TO TRUNK DUCT AT THIS APPROXIMATE LOCATION.
SEAL AIR TIGHT AND INSULATE OPENING IN EXISTING DUCTWORK WHERE
EXISTING DUCT WAS REMOVED.
13 . REMOVE EXISTING RETURN GRILLE AND ASSOCIATED DUCTWORK UP TO
TRUNK DUCT. SEAL AIR TIGHT AND INSULATE EXISTING TRUNK DUCT
WHERE RETURN BRANCH WAS REMOVED.
14 . EXISTING CABLE TRAY TO REMAIN.
15 . EXISTING ROFOTOP UNIT AND CONDENSATE DRAIN PIPING TO REMAIN. SEE
NEW WORK PLAN FOR NEW CONDENSATE PIPE SUPPORTS.
16 . EXISTING POWER CIRCUIT FOR RTU/CONVENIENCE OUTLET RISES
THROUGH EXISTING PITCH POCKET. SEE ELECTRICAL DRAWINGS FOR
REMOVAL OF POWER CIRCUIT TO BELOW ROOF DECK, AND JUNCTIONING
BELOW ROOF LEVEL AND ROUTING CIRCUIT UP INSIDE ROOF CURB
ADAPTER OF NEW EQUIPMENT. FILL PITCH POCKET FOLLOWING POWER
CIRCUIT REMOVAL. PROVIDE 18 GAUGE METAL CAP TO EXISTING PITCH
POCKET. SEAL AIR AND WATER TIGHT.
17 . REMOVE EXISTING SIDEWALL GRILLE. FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES) SEE NEW WORK PLAN FOR
INSTALLATION OF NEW GRILLE IN SAME LOCATION.
18 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX DUCT (IF
APPLICABLE). FIELD VERIFY EXISTING SIZES AND LOCATIONS. (TYPICAL ALL
GRILLES/DIFFUSERS) SEE NEW WORK PLAN FOR INSTALLATION OF NEW
GRILLE/DIFFUSER IN SAME LOCATION.
19 . REMOVE EXISTING DUCT, SUPPORT, FLEX DUCT, AND DIFFUSER AS SHOWN.
CAP EXISTING DUCT AND SEAL AIR TIGHT. PROVIDE NEW CEILING TILE IN
GRID WHERE DIFFUSER WAS REMOVED. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW WALL MOUNTED DUCTLESS FAN COIL UNIT IN THIS
SPACE.
20 . COMPLETELY REMOVE EXISTING CEILING MOUNTED UNIT HEATER,
SUPPORTS, THERMOSTAT. ETC.
21 . REMOVE EXISTING GRAVITY VENTILATOR, ASSOCIATED DUCT, GRILLE, ETC.
EXISTING ROOF CURB TO REMAIN. PROVIDE CAP AT EXISTING CURB. SEE
CAP AT EXISTING CURB DETAIL. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW DUCTLES OUTDOOR UNIT ATOP EXISTING ROOF CURB.
22 . REMOVE EXISTING EXHAUST FAN, ASSOCIATED DUCT, GRILLE, ETC.
EXISTING ROOF CURB TO REMAIN. PROVIDE CAP AT EXISTING CURB. SEE
CAP AT EXISTING CURB DETAIL. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW DUCTLESS OUTDOOR UNIT ATOP EXISTING ROOF CURB.
23 . COMPLETELY REMOVE EXISTING DUCT COVER. REMOVE EXISTING SUPPLY
AND RETURN DUCTWORK UP TO WALL PENETRATION. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW RTU AND DUCT SUPPORTS, AND CONNECTION
OF NEW DUCT TO EXISTING DUCT.
24 . REMOVE EXISTING DOOR AIR CURTAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW DOOR AIR CURTAIN IN THE SAME LOCATION.
25 . REMOVE EXISTING ROOF MOUNTED HEATER AND VENTILATOR. EXISTING
ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
RTU IN SAME LOCATION.
26 . EXISTING EXHAUST FAN TO REMAIN.
MD103
SCIENCE
C109
PREP. STORAGE
C108
OFFICE
C107
SCIENCE
C105
LOUNGE \ SPEC. ED.
C110
TOILET
C132
VESTIBULE
C106
STAIR NO. 3
C104
LOBBY
C102
MECHANICAL
C111
MATH CLASSROOM
C112
CLASSROOM
C113
CLASSROOM
C114
MATH CLASSROOM
C115
STAIR NO. 4
C116
CORRIDOR
C103
SPRINKLER
C133
PROJ. STO.
C117
KILN
C118
DARK ROOM
C119
ART CLASSROOM
C123
SUPPLIES
C121
OFFICE
C122
POTTERY
C120
BOYS
C124
JAN.
C125
GIRLS
C126
ELECT. RM
C127
STOR.
C128
ELEVATOR
C129
ELEV. LOBBY
C130
CONNECTING LOBBY
C101
3 3
11 11
7 24
GYMNASIUM
D100
19 19
(TYP)
12 (TYP)
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
MD103
MECHANICAL DEMOLITION
PLAN - FIRST FLOOR AREAS C
& D
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 1 - MECHANICAL DEMOLITION PLAN - AREA C
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. REMOVE EXISTING
BIPOLAR IONIZATION UNIT AND STORE FOR REUSE IN NEW PTHP. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW PTHP.
2 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
3 . REMOVE EXISTING INLINE CENTRIFUGAL EXHAUST FAN ABOVE CEILING.
SEE NEW WORK PLAN FOR INSTALLATION OF NEW INLINE MOUNTED
EXHAUST FAN.
4 . REMOVE EXISTING EXHAUST DUCT UP TO JUST BELOW STRUCTURAL
MEMBERS. MAINTAIN DUCT FOR CONNECTION OF NEW EXHAUST DUCT
5 . EXISTING SPRINKLER PIPING TO REMAIN.
6 . COMPLETELY REMOVE EXISTING REFRIGERANT PIPING, INSULATION,
SUPPORTS, ETC AND ASSOCIATED PLYWOOD COVER.
7 . COMPLETELY REMOVE EXISTING CONDENSATE PIPING, P-TRAP, SUPPORTS,
ETC.
8 . REMOVE PORTION OF EXISTING FENCE TO INSTALL NEW DUCTLESS
OUTDOOR UNIT ATOP NEW CONCRETE EQUIPMENT PAD. SEE NEW WORK
PLAN.
9 . EXISTING DUCT SILENCER TO REMAIN.
10 . COMPLETELY REMOVE EXISTING CEILING HEATER, SUPPORTS, ETC. FROM
THIS APPROXIMATE LOCATION.
11 . REMOVE EXISTING OUTDOOR UNIT, ASSOCIATED SUPPORTS, PIPING, ETC.
FROM THIS APPROXIMATE LOCATION. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CONDENSING UNITS IN SIMILAR LOCATION.
12 . EXISTING GYM DIFFUSERS TO REMAIN. CLEAN DIFFUSERS TO REMOVE ALL
DIRT, DEBRIS, ETC.
13 . REMOVE EXISTING DUCT MOUNTED ELECTRIC HEATER, ASSOCIATED
WIRING, CONTROLS, ETC. FROM THIS APPROXIMATE LOCATION. PROVIDE
NEW DUCT SIZED TO MATCH EXISTING DUCT WHERE HEATER WAS
REMOVED. SEAL DUCT AIR TIGHT AND INSULATE IN ACCORDANCE WITH
SPECIFICATION.
14 . REMOVE EXISTING WALL MOUNTED DUCTLESS FAN COIL UNIT. REMOVE
CONDENSATE PIPING AS REQUIRED TO ALLOW FOR INSTALLATION OF NEW
WALL MOUNTED DFCU IN THE SAME LOCATION. SEE NEW WORK PLAN.
15 . REMOVE EXISTING CEILING MOUNTED EXHAUST FAN AND ASSOCIATED
FLEX DUCT FROM THIS APPROXIMATE LOCATION. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW CEILING MOUNTED EXHAUST FAN.
16 . REMOVE EXISTING HEAT PUMP, ASSOCIATED PIPING, SUPPORTS, ETC.
FROM THIS APPROXIMATE LOCATION. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW HEAT PUMP IN SAME LOCATION.
17 . REMOVE EXISTING VERTICAL FAN COIL UNIT, ASSOCIATED RETURN AIR
PLENUM STAND, CONDENSATE PIPING, REFRIGERANT PIPING, SUPPORTS,
ETC. SEE NEW WORK PLAN FOR INSTALLATION OF NEW VERTICAL FAN COIL
UNIT IN SAME LOCATION.
18 . REMOVE EXISTING WALL MOUNTED EXHAUST FAN. FIELD VERIFY EXISTING
FAN WALL OPENING DIMENSIONS. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW FAN IN SAME LOCATION.
19 . REMOVE EXISTING SIDEWALL GRILLE. FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES) SEE NEW WORK PLAN FOR
INSTALLATION OF NEW GRILLE IN SAME LOCATION.
20 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX DUCT (IF
APPLICABLE). FIELD VERIFY EXISTING SIZES AND LOCATIONS. (TYPICAL ALL
GRILLES/DIFFUSERS) SEE NEW WORK PLAN FOR INSTALLATION OF NEW
GRILLE/DIFFUSER IN SAME LOCATION.
21 . COMPETELY REMOVE EXISTING ENERGY RECOVERY UNIT, ASSOCIATED
REFRIGERANT PIPING, CONDENSATE PIPING, DUCTWORK, ETC. AS SHOWN.
22 . EXISTING LOUVER MAY BE REMOVED IF REQUIRED FOR REMOVAL OF
EXISTING ENERGY RECOVERY UNIT. CONTRACTOR SHALL PROVIDE NEW
LOUVER TO MATCH EXISTING SIZE, BASIS OF DESIGN GREENHECK EDJ-601.
PROVIDE INSULATED BLANK OFF PLATE ON BACK OF NEW LOUVER.
23 . EXISTING WATER LINE TO REMAIN.
24 . COMPLETELY REMOVE EXISTING REFRIGERANT PIPING, INSULATION,
SUPPORTS, ETC.
25 . REMOVE EXISTING WALL HEATER. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW WALL HEATER.
26 . REMOVE EXISTING DUCTOWKR UP TO THIS APPROXIMATE LOCATION. SEE
NEW WORK PLAN FOR CONNECTION OF NEW DUCTWORK.
27 . EXISTING FENCE GATE TO REMAIN.
1/4" = 1'-0"MD103
3 LEVEL 1 - MECHANICAL ROOM DEMOLITION PLAN
2 LEVEL 1 MECHANICAL ROOM DEMOLITION - ISOMETRIC
1/8" = 1'-0"
LEVEL 1 - MECHANICAL DEMOLITION PLAN - AREA D
No. Description Date
1 ADDENDUM #1 10/20/23
IU-1.13
IU-1.12
IU-1.10
IU-1.11
MDC-1
IU-1.9
IU-1.8
IU-1.7
IU-1.5
IU-1.6
IU-1.4
HRU-1
IU-1.2
IU-1.3
IU-1.1
OAU-1
F-24
F-6
DAC-1
F-1
F-2
F-3
F-7
F-8
F-25
F-10
F-11
F-12
WHHP-1 WHHP-3WHHP-2
WHHP-4
WHHP-5
DFCU-4
DOU-4
RTU-1
RTU-5
RTU-6
RTU-8
RTU-10
RTU-11
RTU-12
CH-3 CH-4
CH-5
CH-6
CH-7
CH-8
CH-9
CH-10
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
6"ø
A2
KEF-1
PTHP-40
KSF-1
DFCU-1.1
DFCU-1.2
CONF.
A110
ASSIST. PRINCIPAL
A109
COUNSELOR
A108
COUNSELOR
A107
COUNSELOR
A106
WORK ROOM
A124
OFFICE
A123
WORK ROOM
A112
VAULT
A113
CONFERENCE
A117
PRINCIPAL
A118
RECEPTION
A103
A2
A2
D1
D1
D1
A1
A1
M.V.D.
6"ø
6"ø
6"ø
6"ø
6"ø
A2
8"ø
8"ø
8"ø
5"ø
5"ø5"ø
40"x18" 16"ø
M.V.D.
8"ø10"ø8"ø8"ø
10"ø 14"ø
A2
A2
130 A2
TT
A2
A2
A2
8"ø
8"ø
10"ø
8"ø
8"ø
12"ø
C1
C1
PRODUCTION
A126
STORAGE
A127
DFCU-3
DFCU-2
RTU-3 RTU-4
RTU-7
RTU-9
CHORAL
A143
GIRL'S LOCKER RM
A148
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A1
A1
A2
A2
A1
75 A1
A2
A2
0B2
B2
G3
G3 F3
F3
F3
F3
B2
B2
B2
B2
B2A3
A3
A2
RTU-2
A2
A2
B2
A3
A3
A3
A2
A2
F1
F1
A5
F1
F1
A2
A2
A2
A1
A1
A1
A2
A2
A2
A2
A2
A2
A2
A2
B2
B2
B2
B2
B2
A3
A3
A3
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A3
A3
A3
A3
B2
A3
B2
A1
A2
A2
A2
B2
B2
A1
B2
A2
B2
A2
A4
A2
B2
B2
B2
B2B2
B2
A3
A3
A2
A3
A3
A3
A3
A3
A3
A3
A3
A2
A1
A2
B2
A2
B1
F2
F2
B2
B1
B2
G1
G1
G1
G1
G1
G1
A2
A2
B2
B2
B2
G4
G2
B2
B1
B1
B1
B1
B1
DOU-1
M.V.D.
DOU-3
DOU-2
"ø
"ø
"ø
"ø
8"ø
8"ø
8"ø
"ø
"ø
6"ø
12"ø
B2
B2
B2
B2
32"x32"
34"x20"
32"x32"
34"x20"
22 22 22 22
R
R
D
R
D
R ø12"
C1
B1
TECHNOLOGY LAB
A159
H2
H1
H1 H1H1
THTH
TT
WHHP-5
THTH
THTH
RTU-2
TT
TT
TT
TT
CC
CC
TTTT
RTU-9
RTU-7
TT
RTU-5
TT
RTU-8
TT
TT TT TT
WHHP-3WHHP-2WHHP-1
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
DFCU-12
DOU-12
TT
TT
TT
CC
CC
T
TT
CC
MM
T
D R
D R
R
D
R
D R
R
D
D
R
R
D
6"ø
6"ø
6"ø
6"ø
6"ø
6"ø 8"ø
R
R
R
D
R
D
D
R
R
D
/2
D
1 1/2" D
R
D
D
D
R
D
10"ø
R
R
R
R D
R
D
D
D
D
D
D
D
D
38 38
1 1/2" D 1 1/4" D D
39 39
D
D
D
D
D D
COOLER
A202
COOLER
A203
TT TT
40 40
TT
TT
G
G
TT
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
M101
MECHANICAL NEW WORK
PLAN - FIRST FLOOR AREA A
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 1 - MECHANICAL NEW WORK PLAN - AREA A
NOTES: (THIS SHEET ONLY)
1 . NEW WALL HUNG HEAT PUMP MOUNTED IN SAME LOCATION AS
WHHP REMOVED DURING DEMOLITION. PROVIDE ADAPTER CURB
AS REQUIRED FOR NEW INSTALLATION OF WHHP.
2 . NEW CEILING HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
3 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT.
4 . NEW OUTDOOR HEAT PUMP/CONDENSING UNIT MOUNTED ATOP
EXISTING EQUIPMENT SUPPORT PLATFORM ON ROOF.
5 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED IN
SAME LOCATION AS DFCU REMOVED DURING DEMOLITION.
CONNECT NEW CONDENSATE PIPE TO EXISTING PIPE. FIELD
VERIFY EXACT LOCATION.
6 . NEW PACKAGED TERMINAL HEAT PUMP IN SAME LOCATION AS
NEW PTHP REMOVED DURING DEMOLITION.
7 . NEW ROOFTOP UNIT MOUNTED ATOP EXISTING ROOF CURB.
PROVIDE ADAPTER CURB AS REQUIRED TO TRANSITION FROM
NEW UNIT CONNECTIONS TO EXISTING DUCT LAYOUT. REINSTALL
BIPOLAR IONIZATION UNIT REMOVED DURING DEMOLITION.
8 . NEW VRF CEILING CASSETTE SUSPENDED FROM DROP RODS (MIN
3/8") CONNECTED TO STRUCTURE WITH SUPPLEMENTAL 2"X2"X1/4"
ANGLE IRON. SEE VRF / MINI SPLIT CEILING CASSETTE UNIT DETAIL
AND COMPACT CEILING CASSETTE IN CEILING GRID DETAIL.
No. Description Date
1 ADDENDUM #1 10/20/23
9 . DUCTED VRF FAN COL UNIT SUSPENDED FROM DROP RODS (MIN
3/8") CONNECTED TO OVERHEAD STRUCTURE WITH
SUPPLEMENTAL 2" X 2" X 1/4" ANGLE IRON. SEE VRF DUCTED
INDOOR UNIT DETAIL.
10 . NEW VRF MAIN DISTRIBUTION CONTROLLER MOUNTED ABOVE
CEILING, SUSPENDED FROM DROP RODS (MIN 3/8") CONNECTED
TO STRUCTURE WITH SUPPLEMENTAL 2"X2"X1/4" ANGLE IRON.
PROVIDE AUXILIARY DRAIN PAN BENEATH UNIT. SEE VRF HEAT
RECOVERY DISTRIBUTION CONTROLLER DETAIL AND AUXILIARY
DRAIN PAN DETAIL.
11 . NEW VRF HEAT RECOVERY UNIT MOUNTED ATOP NEW CONCRETE
EQUIPMENT PAD. SEE CONCRETE EQUIPMENT PAD DETAIL. HOLD
CONCRETE PAD ~6" OFF WALL TO ACCOMODATE EXISTING DOWN
SPOUT. COORDINATE EXACT PLACEMENT WITH EXISTING
DOWNSPOTS, CONDUIT, ELECTRICAL EQUIPMENT, GENERATOR,
ETC.
12 . NEW 100% OUTSIDE AIR UNIT MOUNTED ATOP EXISTING ROOF
CURB. MODIFY EXISTING DUCTWORK AND PROVIDE ADAPTER
CUBR AS REQUIRED TO TRANSITION FROM EXISTING DUCT
CONNECTION TO NEW OAU DUCT CONNECTION.
13 . NEW KITCHEN EXHAUST FAN AND KITCHEN MAKE-UP AIR UNIT
MOUNTED IN SAME LOCATION AS KEF & KMUAU REMOVED DURING
DEMOLITION.
14 . EXISTING ROOFTOP UNIT TO REMAIN. REPLACE EXISTING
BAKELITE LABEL AND ELECTRICAL PANEL LABEL TO MATCH NEW
TAG SHOWN ON FLOOR PLAN.
15 . NEW DUCT CONNECTS TO EXISTING RETURN PLENUM AT THIS
APPROXIMATE LOCATION. PROVIDE OFFSETS AND TRANSITIONS
AS REQUIRED TO MAKE CONNECTION. EXTERIOR DUCT SHALL
HAVE ONE LAYER OF 2" THICK ARMAFLEX CLOSED CELL
ELASTOMERIC INSULATION ON EXTERIOR OF DUCT. COVER
INSULATION WITH EMBOSSED ALUMINUM COVER. PROVIDE DUCT
SUPPORTS ON MAXIMUM 4' CENTERS TO ADEQUATELY SUPPORT
DUCT. PROVIDE NEW EMBOSSED ALUMINUM COVER OVER
EXISTING EXTERIOR DUCT. SEE NON-PENETRATING DUCT
SUPPORT DETAIL.
16 . NEW DUCT CONNECTS TO EXISTING SUPPLY DUCT AT THIS
APPROXIMATE LOCATION. PROVIDE OFFSETS AND TRANSITIONS
AS REQUIRED TO MAKE CONNECTION. EXTERIOR DUCT SHALL
HAVE ONE LAYER OF 2" THICK ARMAFLEX CLOSED CELL
ELASTOMERIC INSULATION ON EXTERIOR OF DUCT. COVER
INSULATION WITH EMBOSSED ALUMINUM COVER. PROVIDE DUCT
SUPPORTS ON MAXIMUM 4' CENTERS TO ADEQUATELY SUPPORT
DUCT. PROVIDE NEW EMBOSSED ALUMINUM COVER OVER
EXISTING EXTERIOR DUCT. SEE NON-PENETRATING DUCT
SUPPORT DETAIL.
17 . NEW DUCTLESS CEILING CASSETTE SUSPENDED FROM DROP
RODS (MIN 3/8") CONNECTED TO OVERHEAD STRUCTURE WITH
SUPPLEMENTAL 2"X2"X1/4" SUPPLEMENTAL ANGLE IRON. SEE
SUSPENDED EQUIPMENT SUPPORT DETAIL AND COMPACT
CEILING CASSETTE IN CEILING GRID DETAIL. COORDINATE
THERMOSTAT LOCATION WITH OWNER.
18 . DFCU DRAIN PIPING ROUTED TO SPILL ON ROOF. ONCE TUBING
PENETRATES PIPE BOX IT SHALL BE CONCEALED IN PVC PIPING
THAT IS ELBOWED DOWN TO 4" ABOVE ROOF LEVEL AND
SECURED TO PIPE BOX. CONCEALING VINYL TUBING SHALL
PROTECT IT FROM UV DAMAGE. DO NOT EXPOSE TUBING TO
OUTDOORS.
19 . NEW PIPE BOX MOUNTED ON ROOF. SEE PIPE BOX DETAIL.
20 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP NEW EQUIPMENT
SUPPORT PLATFORM ON ROOF. SEE EQUIPMENT SUPPORT
PLATFORM DETAIL.
21 . CONDENSATE DRAIN PIPING DROPS DOWN WALL TO MOP SINK AT
THIS APPROXIMATE LOCATION. BRACKET DRAIN PIPING TO WALL.
22 . PROVIDE NEW SIDEWALL GRILLE. FIELD VERIFY EXISTING SIZES
AND LOCATIONS. (TYPICAL ALL GRILLES) PROVIDE SIZE TO MATCH
EXISTING GRILLE.
23 . PROVIDE NEW GRILLE/DIFFUSER. PROVIDE NEW FLEX DUCT (IF
APPLICABLE) OF NECK SIZE SCHEDULED. PROVIDE
TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK. (TYPICAL ALL
GRILLES/DIFFUSERS)
24 . VRF CENTRAL CONTROLLER MOUNTED ON WALL AT 4'-6" A.F.F.
PROVIDE BACNET INFTERFACE TO ALLOW VRF SYSTEM TO
COMMUNICATE WITH DDC SYSTEM.
25 . DDC CONTROL PANEL ON 3/4" PLYWOOD BACKBOARD.
26 . CEILING HEATER THERMOSTAT MOUNTED IN EXHAUST DUCT IN
SAME LOCATION AS THERMOSTAT REMOVED DURING
DEMOLITION. FIELD VERIFY EXISTING LOCATION.
27 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP EXISTING ROOF
CURB. PROVIDE NEW CAP AT EXISTING CURB. SEE DUCTLESS
HEAT PUMP CAP AT EXISTING CURB DETAIL.
28 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP EXISTING ROOF
CURB. PROVIDE CAP AT EXISTING CURB. SEE EQUIPMENT
SUPPORT PLATFORM DETAIL.
29 . FAN MANUFACTURER FURNISHED, CONTRACTOR INSTALLED
CEILING MOUNTED MOTION DETECTOR TO START EXHAUST FAN
WHEN OCCUPANCY IS DETECTED. PROVIDE 15 MINUTE
ADUSTABLE TIME DELAY.
30 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED ABOVE
DOOR. SEE WALL MOUNTED INDOOR UNIT DETAIL.
31 . 1½" CONDENSATE DRAIN PIPE ELBOWS DOWN IN TO EXISTING HUB
DRAIN ABOVE CEILING AT THIS APPROXIMATE LOCATION. FIELD
VERIFY EXACT LOCATION.
32 . PROVIDE 1½" ELBOW UP AND MINIMUM 8" TALL VERTICAL OPEN
STAND PIPE AT THIS APPROXIMATE LOCATION.
33 . REFRIGERANT PIPING RISES UP EXTERIOR WALL, PENETRATES
WALL ABOVE CEILING LEVEL AND IS ROUTED AS SHOWN. PROVIDE
PIPE SLEEVE AT WALL PENETRATION.
34 . PROVIDE FULL SIZE, SLOPED, INSULATED PVC VINYL TUBE FOR
DRAIN PIPING FROM UNIT DRAIN PORT AND TRANSITION TO RIGID
DRAIN PIPE AS DETAILED INVRF CONDENSATE DRAIN
CONNECTION DETAIL. PROVIDE FITTINGS AS REQUIRED TO
CONNECT DRAIN PIPE.
35 . PROVIDE RECTORSEAL FORTRESS LINE HIDE KIT OR EQUAL TO
CONCEAL ALL PIPING EXPOSED TO VIEW. PROVIDE CONDENSATE
PUMP. SEE WALL MOUNTED INDOOR UNIT CONDENSATE PUMP.
36 . APPROXIMATE OUTLINE OF EXISTING ELECTRICAL EQUIPMENT.
37 . COORDINATE REFRIGERANT PIPING WITH EXISTING CONDUIT.
FIELD VERIFY EXACT LOCATIONS (TYPICAL)
38 . ROUTE SLOPED (1/4" PER FOOT), TRAPPED, PVC CONDENSATE
DRAIN PIPING FROM ROOFTOP EQUIPMENT TO ELBOW DOWN INTO
ROOF DRAIN/GUTTER AS SHOWN. PROVIDE NON-PENETRATING
PIPE SUPPORTS ON MAXIMUM 6' CENTERS. SEE CONDENSATE
DRAIN TRAP DETAIL AND CONDENSATE PIPE SUPPORT ON ROOF
DETAIL.
39 . CONDENSATE PIPE SUPPORT ON ROOF. SEE CONDENSATE PIPE
SUPPORT ON ROOF DETAIL. (TYPICAL)
40 . COOLER/FREEZER DDC TEMPERATURE SENSOR. MOUNTED NEAR
CENTER OF FREEZER IN LOCATION THAT ACCURATELY MEASURES
COOLER/FREEZER TEMPERATURE.
41 . WALL MOUNTED DDC TEMPERATURE SENSOR TO ALLOW FOR
MONITORING OF SPACE TEMPERATURE BY DDC SYSTEM.
42 . CONTRACTOR SHALL MODIFY EXISTING GAS PIPING AS REQUIRED
FOR CONNECTION TO NEW UNIT. VERIFY EXACT LOCATION OF GAS
CONNECTION WITH APPROVED UNIT SUBMITTED. SEE TYPICAL
RTU GAS CONNECTION DETAIL.
43 . PROVIDE NEW DDC THERMOSTAT FOR CONTROL OF INDICATED
PTHPS MOUNTED ON WALL WITH B.E. AT 4'-6" A.F.F. PROVIDE
SURFACE MOUNTED RACEWAY AS REQUIRED TO CONCEAL ALL
CONTROL WIRING BELOW CEILING ROUTED FROM PTHP TO
THERMOSTAT. COORDINATE NEW THERMOSTAT WITH EXISTING
LIGHT SWITCHES, WALL BOARDS, ETC.
F-C4 F-C5
F-C6
F-C1
F-C12
PTHP-1
PTHP-2
PTHP-3
PTHP-4
PTHP-5
PTHP-6
PTHP-7
PTHP-8
PTHP-9
PTHP-10
PTHP-11
PTHP-12
PTHP-13
PTHP-14
PTHP-15
PTHP-16
DFCU-5
FCU-1
HP-1
CH-C9
CH-C5
CH-C1
CH-C6
CH-C2
3 3
DFCU-6
DFCU-7.1
DFCU-7.2
A4
A4
A4
A4
A2
A4
B1
A2
SCIENCE
C109
PREP. STORAGE
C108
OFFICE
C107
SCIENCE
C105
LOUNGE \ SPEC. ED.
C110
VESTIBULE
C106
STAIR NO. 3
C104
LOBBY
C102
MECHANICAL
C111
MATH CLASSROOM
C112
CLASSROOM
C113
CLASSROOM
C114
MATH CLASSROOM
C115
STAIR NO. 4
C116
CORRIDOR
C103
SPRINKLER
C133
PROJ. STO.
C117
KILN
C118
DARK ROOM
C119
ART CLASSROOM
C123
SUPPLIES
C121
OFFICE
C122
POTTERY
C120
BOYS
C124
JAN.
C125
GIRLS
C126
ELECT. RM
C127
STOR.
C128
ELEVATOR
C129
ELEV. LOBBY
C130
CONNECTING LOBBY
C101
ERU-CU-1
ERU-CU-2 R D
DOU-6
D
R
R
D
DOU-7
B2
A2
A2
A2
A2
A2
A2
A3
EWH-1
B2 B2
B2
B1
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
A2
A4
A2
B2
B2
B2
B2
ERU-1
M103
TT
TT
TT
TT
TT
FCU-1
TT
TT
TT
F-C8
SS
EF-C11
SS
SS
SS
SS
R(TYP)
R(TYP)
25 26
25 26
D D
D
R R
TT
PTHP-14
PTHP-15
PTHP-16
TT
TT
PTHP-10
PTHP-11
PTHP-12
TT
PTHP-927
TT
PTHP-7
PTHP-8
TT
PTHP-5
PTHP-6
TT
PTHP-3
PTHP-4
TT
PTHP-1
PTHP-2
E1E1 10 10
THTH
RTU-11
RTU-12
ERU-1
16"x16"
14"x16"
16"x16"
22"x22"
D R
D
R(TYP)20
D
R
R
D
D
R(TYP)
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
B
C
A
D
GA DOE ID #: 4056
M103
MECHANICAL NEW WORK
PLAN - FIRST FLOOR AREAS C
& D
M E
R R
Y A
C R
E S
M
ID
D L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
WBF
JA3
F
L O
R E
N C
E D
R
A L
B A
N Y
G
A
2023125
09/22/2023
1/8" = 1'-0"
LEVEL 1 - MECHANICAL NEW WORK PLAN - AREA C
1/8" = 1'-0"
LEVEL 1 - MECHANICAL NEW WORK PLAN - AREA D
NOTES: (THIS SHEET ONLY)
1/4" = 1'-0"M103
3 LEVEL 1 - MECHANICAL ROOM LARGE SCALE NEW WORK PLAN
4 LEVEL 1 MECHANICAL ROOM NEW WORK - ISOMETRIC
No. Description Date
1 ADDENDUM #1 10/20/23
GENERAL NOTE: NOT ALL EXISTING CONDUIT, SPRINKLER PIPING,
DOMESTIC WATER PIPING, STRUCTURAL MEMBERS, ETC. ARE SHOWN.
COORDINATE NEW ERU, DUCTWORK, PIPING, ETC. WITH EXISTING
CONDUIT, SPRINKLER PIPING, ETC.
1 . NEW PACKAGED TERMINAL HEAT PUMP IN SAME LOCATION AS
NEW PTHP REMOVED DURING DEMOLITION.
2 . NEW CEILING HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
3 . NEW CENTRIFUGAL INLINE EXHAUST FAN MOUNTED IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION.
4 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED IN
SAME LOCATION AS DFCU REMOVED DURING DEMOLITION.
5 . NEW CENTRIFUGAL CEILING EXHAUST FAN MOUNTED IN SAME
LOCATON AS FAN REMOVED DURING DEMOLITION. PROVIDE NEW
FLEX DUCT TO CONNECT NEW FAN TO EXISTING DUCT. FIELD
VERIFY DUCT SIZE.
6 . NEW VERTICAL FAN COIL UNIT MOUNTED ATOP RETURN AIR
PLENUM MOUNTED IN SAME LOCATION AS FCU REMOVED DURING
DEMOLITION. SEE VERTICAL FCU DETAIL.
7 . NEW HEAT PUMP MOUNTED ATOP EXISTING CONCRETE
EQUIPMENT PAD IN SAME LOCATION AS HEAT PUMP REMOVED
DURING DEMOLITION.
8 . NEW WALL MOUNTED PROPELLER FAN MOUNTED IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION. FIELD VERIFY
EXISTING WALL OPENING SIZE AND MODIFY AS REQUIRED TO
INSTALL NEW FAN.
9 . CONDENSATE DRAIN PIPING DROPS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .