24_FAC_003_Addendum No_ 2_10252023.pdf
PDF 614 KB Posted
- Attached to
- ALBANY MIDDLE SCHOOL HVAC UPGRADES
- Solicitation number
- PE-64710-NONST-2024-000000006
- Issued by
- Dekalb County, Georgia
About this file
This document is an Addendum to the contract for the Albany Middle School HVAC Upgrades project in Albany, Georgia, issued by the Dougherty County Board of Education. The addendum provides clarification and changes to the original specifications and drawings, including addressing questions from bidders regarding allowances, temporary classroom connections, master keys, acoustical ceiling requirements, and insulation. The changes include updates to the acoustical panel ceiling specifications and architectural and electrical drawings. The document requires bidders to acknowledge receipt of the addendum on their bid price form.
The addendum also provides general notes for the contractor, including coordinating construction phasing with the owner, temporarily removing and reinstalling insulation above ceilings, and protecting existing furniture and finishes during construction. The project involves HVAC upgrades at the Albany Middle School, with the work to be completed by the contractor awarded the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Albany Middle School September 22, 2023 HVAC Upgrades Dougherty County Board of Education Albany, Georgia
Addendum No. 2 - Page 1 of 2
ANDREWS, HAMMOCK & POWELL, INC. 250 CHARTER LANE, SUITE 100, MACON, GA 31210
ADDENDUM NUMBER: TWO DATED: October 25, 2023
To: All contract bidders of record.
This addendum forms a part of the Contract Documents and modifies the original Specifications and Drawings dated September 22, 2023, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Price Form; failure to do so may subject bidder to disqualification.
1. Question: Will there be any Allowances (i.e. furniture removal)?
Answer: Addressed in Addendum #1
2. Question: With the Mobile Modular Mod Pod classroom set-up we recently used, for the 6-classroom set-up, there were actually 7 units, and therefore 7 electrical connections.
For the 8-classroom set-up, there were 9.
Answer: Coordinate with Mobile Modular for all connections necessary to achieve 6 or 8 classroom ModPod installation. (i.e. 7 or 9).
3. Question: Can you clarify the Master Key System for the temporary classrooms?
Answer: The contractor awarded the project will coordinate with owner to acquire a master key that is capable of opening all doors in the temporary classrooms. All portable classrooms at all schools shall open with the master key.
4. Question: For Radium Springs Elementary School, the specifications do not list any temporary sidewalks like the other schools.
Answer: Correct, Radium Springs Elementary School does not have temporary sidewalks.
5. Question: For acoustical ceilings, please clarify what is deemed as wet areas (APC #2).
Answer: See A100 sheets for ceilings that shall be water resistant type.
6. Question: We are working to establish an actual schedule for temporary classrooms (delivery date and removal date).
Answer: All temporary classroom schedules/delivery/removal should be coordinated with Dougherty County BOE after bid award.
7. Question: It’s probably unknown as to whether or not there is existing batt insulation laid on acoustical ceilings to be replaced. Please clarify intent. We assume that batt insulation will need to be re-installed and/or replaced where found.
Answer: Addressed in this Addendum.
Albany Middle School September 22, 2023 HVAC Upgrades Dougherty County Board of Education Albany, Georgia
Addendum No. 2 - Page 2 of 2
CHANGES TO THE SPECIFICATIONS
1. SECTION 095113 – ACOUSTICAL PANEL CEILINGS
A. On page 095113-2, delete paragraph 2.3.A.2. in its entirety and replace with the following:
“2. CertainTeed Corp (HHF-157).”
B. On page 095113-3, delete paragraphs 2.3.D and 2.3.E. in their entirety and replace with the following:
“D. LR: Not less than 0.84.
E. NRC: Not less than 0.55.”
CHANGES TO DRAWINGS
1. SHEET A100 – ARCHITECTURAL CEILING PLAN - OVERALL
A. Delete Sheet A100 in its entirety and replace with Sheet A100, revised 10/25/2023, included herewith.
2. SHEET E101 – ELECTRICAL NEW WORK POWER PLAN OVERALL
A. Delete Sheet E101 in its entirety and replace with Sheet E101, revised 10/25/2023, included herewith.
END OF ADDENDUM #2
NEW CEILING TILE SHALL BE
WATER RESISTANT TYPE.
DEMO HATCH LEGEND
DEMO EXISTING CEILING TILE
DEMO EXISTING CEILING TILE & GRID
(NO HATCH) EXISTING CEILING TILE AND
GRID TO REMAIN
GENERAL NOTE: REMOVAL OF CEILINGS REQUIRED FOR REMOVAL OF EXISTING EXHAUST FANS
LOCATED ABOVE RESTROOMS NOT SHOWN. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF
ITEMS LOCATED ABOVE CEILINGS THAT MAY REQUIRE REMOVAL OF CEILING TILES.
GENERAL NOTE: REMOVAL OF CEILINGS REQUIRED FOR INSTALLATION OF NEW DUCTLESS FAN
COIL UNITS IS NOT SHOWN. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF NEW DFCUS.
TEMPORARILY REMOVE CEILING TILE & GRID AS REQUIRED TO INSTALL NEW DFCUS,
REFRIGERANT PIPING, CONDENSATE PIPING, SUPPORTS, ETC. AND REINSTALL CEILING.
REPLACE ANY TILE/GRID DAMAGED DURING DEMOLITION/INSTALLATION OF NEW DFCUS.
GENERAL NOTE: PRIOR TO CONSTRUCTION, CONTRACTOR SHALL COORDINATE WITH OWNER
TO REMOVE ALL PERSONAL ITEMS FROM SPACES AFFECTED BY DEMOLITION. CONTRACTOR
SHALL PROTECT EXISTING CASEWORK, FURNITURE, FLOORING, WALLS, CEILINGS, ETC. NOT
ABLE TO BE REMOVED. AT THE END OF CONSTRUCTION, CONTRACTOR SHALL REMOVE ALL
PROTECTIVE COVERS AND WIPE DOWN AND CLEAN ALL SURFACES AFFECTED BY DUST, DIRT,
CONSTRUCTION DEBRIS, ETC.
GENERAL NOTE: CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION PHASING WITH THE
OWNER. COORDINATE MOVING EXISTING CLASSROOMS TO MODULAR CLASROOMS PRIOR TO
BEGINNING CONSTRUCTION IN EACH AREA.
GENERAL NOTE: CONTRACTOR SHALL TEMPORARILY REMOVE ANY INSULATION INSTALLED ATOP
CEILING PRIOR TO DEMOLITION AND REPLACE AFTER INSTALLATION OF NEW CEILING.
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID #: 0101
A100
ARCHITECTURAL CEILING
PLAN - OVERALL
2023124
A L B
A N
Y M
ID
D
L E
S C
H O
O L
H
V A
C U
P G
R A
D E
S
09/22/2023
HHP
JA3
C
O R
D E
L L A
V E
A
L B
A N
Y G
A
1" = 20'-0"
ARCHITECTURAL CEILING PLAN - OVERALL
No. Description Date
2 ADDENDUM #2 10/25/23
SB
SB
IHP-E1
IHP-C1 IHP-A1 IHP-A2
IHP-B1IHP-B2
HM1 LM1
OAU-1
CH-A4
F-A2
F-A1
IU-1.1
IU-1.8
IU-1.2
MDC-1
IU-1.7
IU-1.6
F-AD4
F-AD2
IU-1.9
IU-1.10 IU-1.11
IU-1.12
F-AD1
IU-1.5
CH-A3
WHHP-AD1IU-1.4
IU-1.3
WHHP-D12 WHHP-D1 WHHP-D9 WHHP-D10 WHHP-D2 WHHP-D3
WHHP-D11 WHHP-D8 WHHP-D7 WHHP-D6 WHHP-D5 WHHP-D4
WHHP-C14
F-D6
DFCU-D1.2DOU-D1DFCU-D1.1CH-D1
CH-D2 CH-D3
F-D3 F-D4
F-D1
HC1
HC2
LC1
LC2
WHHP-C10
WHHP-C1
WHHP-C9
WHHP-C8
WHHP-C6
WHHP-C7
WHHP-C5
WHHP-C11
WHHP-C2
WHHP-C13
WHHP-C3
WHHP-C2
WHHP-C4
CH-C1
DFCU-C1.1
CH-C2
CH-C3
F-C6
F-C4
F-C5
DOU-C1
DFCU-C1.2
WHHP-E13
WHHP-E4
WHHP-E10
WHHP-E11
WHHP-E3
WHHP-E2
WHHP-E1
WHHP-E12
WHHP-E9
WHHP-E8
WHHP-E7
WHHP-E6
WHHP-E5
WHHP-E14
CH-E1
DFCU-E1.2
DOU-E1
DFCU-E1.1
CH-E3
CH-E2
F-E10
F-B4
OHP-B1
OHP-E1
OHP-B2
OHP-A2
HRU-1
OHP-A1
OHP-C1
CH-B1 CH-B2
F-K3
TW-K1
F-G4
F-G1F-G2
F-AD3
CH-A2CH-A1
OAU-CU-1
TW-B1
F-E2
F-E1
F-E7
F-E4
F-E6
F-E11
F-C2
F-C3 F-C7
TW-C1
F-C1
IU-1.14IU-1.15
F-B1
OHP-G1
RTU-G2 RTU-G1
F-E5
F-D5
F-D2
F-E9
F-E8 F-E3
IU-1.16
F-AD5
HA1 LA1HE1
HE2
HD2
HD1
LE1
LE2
LD2
LD1
HB1LB2
LB1
HMCY
DCFU-4 DCFU-5
DOU-5
DOU-4
KEF-1 KSF-1
F-K1
IHP-G1
F-G3
F-K6
MSG
LGEN
LK1
HK1
LF2
LF1
HF1
NOTES: (THIS SHEET ONLY)
1. GENERAL: SEE MECHANICAL EQUIPMENT POWER SCHEDULE SHEET E801 FOR NEW EQUIPMENT WIRING.
2. CONTRACTOR SHALL PROVIDE A 60A/3P, HEAVY DUTY, NON-FUSIBLE DISCONNECT IN NEMA 3R ENCLOSURE FOR RELOCATED HRU-1.
ROUTE 3#6, #10G; 1”C POWER CIRCUIT FROM BREAKER UP THRU PIPE CURB AND STANCHION MOUNT DISCONNECT ADJACENT TO UNIT.
COORDINATE EXACT LOCATION WITH EQUIPMENT INSTALLER.
WH-G1
IU-1.13
C
D
E
B
A
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID #: 0101
E101
ELECTRICAL NEW WORK
PLAN - OVERALL
2023124
A L B
A N
Y M
ID
D
L E
S C
H O
O L
H
V A
C
U P
G R
A D
E S
09/22/2023
CTS
NHO
C
O R
D E
L L A
V E
A
L B
A N
Y G
A
SCALE: 1/16" = 1'-0"
NEW WORK FLOOR PLAN - ELECTRICAL MEZZANINE
SCALE: 1/16" = 1'-0"
ELECTRICAL OVERALL NEW WORK POWER PLAN
No. Description Date
2 ADDENDUM #2 10/25/23
| ANDREWS, HAMMOCK & POWELL, INC. 250 CHARTER LANE, SUITE 100, MACON, GA 31210 |
| ADDENDUM NUMBER: TWO DATED: October 25, 2023 |
| CHANGES TO THE SPECIFICATIONS |
| CHANGES TO DRAWINGS |
| Combined Drawings - AMS - Addendum #2.pdf |
| Sheets |
| A100 - ARCHITECTURAL CEILING PLAN - OVERALL |
| Electrical Drawings - Addendum |
| E101 - ELECTRICAL NEW WORK PLAN - OVERALL |
File details come from the government source that posted it. Updated .