24-Attachment C - 100%R TECO URS 8.20.2025.pdf
PDF 750 KB Posted
- Attached to
- North Himes Avenue at West Waters Avenue
- Solicitation number
- IFB-26-00271
- Issued by
- Hillsborough County, Florida
About this file
This is an attachment document related to a construction project solicitation by the Hillsborough County Engineering and Operations Department in Florida for intersection improvements at North Himes Avenue at West Waters Avenue. The project encompasses replacing the existing box span wire signal with mast arms, roadway widening, milling and resurfacing, installation of miscellaneous drainage improvements, ADA sidewalk and pedestrian curb ramp improvements, and signing and pavement marking at the specified intersection location. The estimated project value is $2,594,198.34, with the work designed to enhance traffic safety, accessibility, and roadway conditions at this critical intersection.
The solicitation establishes a Small Business Enterprise (SBE) subcontractor participation goal of 5% for the resulting contract. Hillsborough County is seeking qualified contractors capable of executing the full scope of intersection improvement work, which includes both traffic signal infrastructure modifications and comprehensive roadway rehabilitation. Interested bidders should review all contract documents and specifications to ensure their qualifications and bonding capacity align with the project's technical and financial requirements. The SBE goal requirement indicates the county's commitment to inclusive contracting practices and small business participation in county infrastructure projects.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hillsborough County County Road: N/A Plans Dated: 5/19/2025
CIP Number: 69600.102 B Project Name: Himes Ave at Waters Ave- Intersection Improvements
Utility Agency/Owner (UAO): TECO
NON-CONSTRUCTION ITEMS
ESTIMATED
*CALENDAR DAYS
CONSTRUCTION ITEMS
ESTIMATED
*CALENDAR DAYS
Total Preliminary 90 Prior to County Project Construction 0
Total Material Procurement During County Project Construction 99
Total Right-of-Way Acquisition As-Built Information _____________
Total Other * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule
This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Hillsborough County, the roadway contractor, and other right-of-way users, the location, relocation, adjustment, installation, and/or protection of facilities, on this Hillsborough County project. The following data is based on the plans dated as listed in the Title Block.
Any deviation by Hillsborough County or its Contractor from plans, as provided may render this work schedule null and void.
Upon notification by, Hillsborough County of such change, this utility may require additional days for assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond the control of the UAO that could not reasonably be anticipated by the UAO and which could not be avoided by the UAO with the exercise of due diligence at the time of the occurrence. The UAO agrees to notify Hillsborough County in writing prior to starting, stopping, resuming, or completing work. The UAO is to provide As-Built information.
The UAO shall obtain a utility permit and comply with the requirements of the Hillsborough County UAM.
During the project, the UAO shall locate their facilities within 48 hours of notice to their Representative: Call 811 Sunshine
UAO Project Representative: Jason T. Payne Telephone Number: 813-275-3428
UAO Field Representative: Robbie Nieman Telephone Number: 813-635-6993
This document is a printout of a Hillsborough County form maintained in an electronic format and all revisions thereto by the UAO in the form of additions, deletions or substitutions are reflected only in an Appendix entitled “Changes to Form Document” and no change is made in the text of the document itself. Hand notations on affected portions of this document may refer to changes reflected in the above-named Appendix but are for reference purposes only and do not change the terms of the document. By signing this document, the UAO hereby represents that no change has been made to the text of this document except through the terms of the Appendix entitled “Changes to Form Document”.
You MUST signify by selecting or checking which of the following applies:
No changes to forms document.
Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.
Authorized Utility Agent: **Engineer of Record (EOR): Acceptance by Hillsborough
County:
(Signature) (Signature) (Signature)
Jason T. Payne
Steven L. Wallace P.E.
Steffanie Workman, P.E.
(Printed Name) (Printed Name) (Printed Name)
Government Liaison
Engineer of Record
County Project Manager
(Title) (Title) (Title)
8/20/2025
(Date) (Date) (Date)
Final Approval by Hillsborough County:
(Signature) (Date)
Sandra Gonzalez, P.E. Section Manager (Printed Name) (Title)
(**When requested by the County, the EOR will attest to compatibility of plans, specifications and Utility Work Schedule)
10/13/25
Pavan Paiavula, PE
Lisa Strout Capital Utility Coordinator
Special Conditions and Constraints
SPECIAL NOTATIONS
1. TEC (TAMPA ELECTRIC COMPANY) REQUIRES A MINIMUM OF 30 CALENDAR DAYS TO SCHEDULE ANY TEC WORK RELATED TO THIS PROJECT, INCLUDING BUT NOT LIMITED TO "DURING CONSTRUCTION" WORK IDENTIFIED IN THIS RELOCATION SCHEDULE, REQUESTS FOR THE INSTALLATION OF LINE COVER, REQUESTS FOR OVERHEAD/UNDERGROUND ELECTRIC OUTAGE(S), REQUESTS FOR TEC POLE HOLDING, AND/OR REQUESTS TO MONITOR ANY TEC FACILITIES WITH SAID REQUESTS BEING INITIATED BY FDOT, THE FDOT CONTRACTOR AND/OR THEIR SUBCONTRACTOR. THIS NOTICE INCLUDES POLE REMOVAL ONCE A JOINT USER HAS VACATED THE FACILITY AND PROPERLY NOTIFIED TEC FIELD REPRESENTATIVE TO ALLOW SCHEDULING
OF ACTIVITY TO OCCUR.
2. FOR SAFETY REASONS, TEC LINE CREWS SHALL NOT WORK IN ADVERSE WEATHER CONDITIONS.
3. THE TEC LINE CREW AVAILABILITY SHALL BE AFFECTED AND/OR LIMITED DUE TO OUR REQUIRED RESPONSE TO EMERGENCY CONDITIONS. THIS LIMITATION WILL BE DEPENDENT UPON THE SEVERITY OF THE
EMERGENCY.
4. TEC AND/OR TEC'S SUBCONTRACTORS NORMAL WORK SCHEDULE IS MONDAY THROUGH FRIDAY FROM 8 A.M. TO 5 P.M., EXCLUDING TEC OBSERVED HOLIDAY'S WHICH INCLUDE NEW YEARS DAY, GOOD FRIDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, CHRISTMAS
EVE DAY AND CHRISTMAS DAY.
5. TEC CAN NOT REMOVE ANY TEC POLES THAT HAVE EXISTING JOINT USERS STILL ATTACHED.
SUBSEQUENTLY, ALL JOINT USERS SUCH AS FRONTIER, SPECTRUM, TRAFFIC, ETC. MUST BE REMOVED
BEFORE TEC CAN REMOVE THE POLE ITSELF.
6. IF TRANSMISSION OUTAGE IS REQUIRED, BELOW ARE THE RECOMMENDED SEASONAL OUTAGE TIMES FOR
69KV, 138KV AND 230KV:
- JANUARY THROUGH MARCH: TYPICALLY NO OUTAGES FOR ANY VOLTAGE TRANSMISSION LINES WILL BE
SCHEDULED DUE TO SYSTEM DEMANDS
- APRIL THROUGH MAY: TYPICALL 69KV ELECTRIC LINES CAN BE SCHEDULED FOR CONSECUTIVE DAYTIME
OR NIGHTTIME OUTAGES.
- APRIL THROUGH MAY: TYPICALLY 138KV AND 230KV ELECTRIC LINES CAN BE SCHEDULED FOR NIGHTTIME
OUTAGES ONLY.
- JUNE THROUGH SEPTEMBER: WITH TEMPERATURES ABOVE 90 DEGREES, TYPICALLY NO OUTAGES WILL
BE SCHEDULED DUE TO SYSTEM DEMANDS.
- JUNE THROUGH SEPTEMBER: WITH TEMPERATURES BELOW 90 DEGREES, TYPICALLY 69KV ELECTRIC
LINES CAN BE SCHEDULED AT NIGHT ONLY.
- SEPTEMBER THROUGH DECEMBER: TYPICALLY 69KV ELECTRIC LINES CAN BE SCHEDULED FOR
CONSECUTIVE DAYTIME OR NIGHTTIME OUTAGES.
- SEPTEMBER THROUGH DECEMBER: TYPICALLY 138KV AND 230KV ELECTRIC LINES CAN BE USUALLY
SCHEDULED FOR NIGHTTIME OUTAGES ONLY.
7. IF A NEW TEC ELECTRIC SERVICE MUST BE ESTABLISHED, PLEASE EMAIL ONE SOURCE AT
CEREPS@TECOENERGY.COM OR 813-635-1500 AND REQUEST THE "PROCEDURE FOR ESTABLISHING A NEW ELECTRIC SERVICE". ALSO INCLUDED IN THIS SAME TEC DOCUMENT IS THE PROCEDURE FOR THE REMOVAL
OF AN EXISTING TEC ELECTRIC SERVICE.
8. THIS RELOCATION SCHEDULE WILL BE CONSIDERED VOID SHOULD THE FDOT NOT BEGIN CONSTRUCTION WITHIN 12 MONTHS FROM SIGNATURE DATE OF TEC REPRESENTATIVE. IF SCHEDULE SHOULD BECOME VOID, TEC WILL THEN REQUIRE THE LATEST SET OF PLANS THAT REFLECT CURRENT FIELD CONDITIONS AT THAT
TIME FOR REVIEW AND RE-WRITE OF SCHEDULE IF DEEMED NECESSARY BY TEC.
9. IF A CSX FLAGGER IS REQUIRED, THE SCHEDULING OF SUCH SERVICES MAY NECESSITATE A LEAD TIME OF
UP TO 6 MONTHS.
EMERGENCY NUMBER FOR NIGHTS, WEEKENDS & TECO HOLIDAYS - 877-588-1010
PROJECT MANAGEMENT: CSADMIN@TECOENERGY.COM
13KV DISTRIBUTION FACILITIES CONTACT: ROBBIE NEIMAN 813-635-6993
69KV TRANSMISSION FACILITIES CONTACTS: BILL PARMLEY 813-635-1595 OR TOM PETTYS 813-630-6646
C. Disposition of Facilities (List All Existing & Proposed) on Project
TYPE / SIZE /
MATERIAL / OFFSET
TO BASELINE FROM
STA TO STA
DESCRIPTION
OF
UTILITY WORK
DEPENDENT
ACTIVITIES
M.O.T.
PHASE
NUMBER
CONSECUTIVE
CALENDAR
DAYS
Prior During
DESIGN - ONCE EXECUTED UWS AND NTP
IS RECEIVED
PRIOR 30 0
PERMITTING - ONCE EXECUTED UWS AND NTP
IS RECEIVED
PRIOR 30 0
MATERIAL
PROCUREMENT
- ONCE EXECUTED UWS AND NTP
IS RECEIVED
PRIOR 30 0
13.2KV OE SLACK
109+04’ RT 36’ TO
109+04’ LT 32’
INSTALL
ONCE PROPOSED POLE(S)
HAVE BEEN INSTALLED
I 0 1
POLE
109+33’ RT 35’
INSTALL ONCE PROPOSED POLE(S)
HAVE BEEN INSTALLED
I 0 2
POLE
109+04’ LT 32’
INSTALL ONCE ROW HAS BEEN
STAKED BY COUNTY
CONTRACTOR
I 0 2
13.2KV BE
109+04’ LT 32’ TO
106+19’ LT 37’
INSTALL
ONCE ROW HAS BEEN
STAKED BY COUNTY
CONTRACTOR
I 0 5
BORE 6’’ CONDUIT
AT 8 FT 109+04’ LT
32’ TO
106+19’ LT 37’
CONTRACTOR
I 0 5
SWITCH GEAR
106+19’ LT 37’
INSTALL ONCE ROW HAS BEEN
STAKED BY COUNTY
CONTRACTOR
I 0 5
13.2 KV BE
106+19’ LT 37’ TO
16+54’ RT 49’
CONTRACTOR
I 0 5
BORE 6’’ CONDUIT
AT 6 FT 106+19’ LT
37’ TO
16+54’ RT 49’
CONTRACTOR
I 0 5
13.2 KV BE
106+19’ LT 37’ TO
17+93’ RT 95’
CONTRACTOR
I 0 5
13.2 KV BE
17+93’ RT 95’ TO S
SOUTH OF
CONSTRUCTION
(MID-SPAN NEW
TERMINATION POLE)
CONTRACTOR
I 0 5
BORE 6’’ CONDUIT
AT 8 FT 17+93’ RT 95’
TO S
SOUTH OF
CONSTRUCTION
(MID-SPAN NEW
TERMINATION POLE)
CONTRACTOR
I 0 5
13.2 KV BE
106+19’ LT 37’ TO
17+91’ RT 98’
CONTRACTOR
I 0 5
13.2 KV BE
17+91’ RT 98’ TO
17+93’ RT 33’
CONTRACTOR
I 0 5
13.2 KV BE INSTALL
I 0 5
Utility Agency/Owner (UAO): TECO
17+93’ RT 33’ TO
19+09’ RT 41’
CONTRACTOR
BORE 6’’ CONDUIT
AT 8 FT 106+19’ LT
37’ TO 19+09’ RT 41’
CONTRACTOR
I 0 5
POLE
19+09’ RT 41’
INSTALL ONCE ROW HAS BEEN
STAKED BY COUNTY
CONTRACTOR
I 0 2
13.2 KV OE
19+09’ RT 41’ TO
20+07’ RT 45’
INSTALL
ONCE PROPOSED POLE(S)
HAVE BEEN INSTALLED
I 0 1
13.2 KV OE
19+09’ RT 41’ TO
18+ 78’ RT 41’
INSTALL
ONCE PROPOSED POLE(S)
HAVE BEEN INSTALLED
I 0 1
POLE & DOWN GUYS
18+ 78’ RT 41’
18+61’ RT 41’
INSTALL ONCE ROW HAS BEEN
CONTRACTOR
I 0 1
DOWN GUYS &
ANCHORS
104+97’ RT 30’
104+99’ RT 30’
INSTALL ONCE ROW HAS BEEN
STAKED BY COUNTY
CONTRACTOR
I 0 1
POLE
109+33’ RT 35’
INSTALL ONCE ROW HAS BEEN
STAKED BY COUNTY
CONTRACTOR
I 0 2
TELECOM HAND
HOLE 15+82, 49R
INSTALL N/A I 0 2
TELECOM HAND
HOLE 19+06, 41R
INSTALL N/A I 0 2
(2) 96C FIBER BE
15+82, 49R – 19+06, 41R
INSTALL ONCE ROW HAS BEEN
STAKED BY COUNTY
CONTRACTOR
I 0 5
120/240 OE
109+04’ RT 36’ TO
18+23’ LT 51’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
120/240 OE
109+04’ RT 36’ TO
17+07’ RT 27’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
SPAN GUY
18+23’ LT 51’ TO
16+28’ LT 47’
REMOVE NA I 0 1
120/240 OE
16+28’ LT 47’ TO
17+16’ LT 52’
REMOVE NA I 0 1
DOWN GUYS &
ANCHORS
16+09’ LT 47’
16+12’ LT 47’
REMOVE NA I 0 1
13.2 KV OE
16+54’ RT 49’ TO
18+33’ RT 44’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
13.2 KV OE
18+33’ RT 44’ TO
20+07’ RT 45’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
120/240 OE
16+54’ RT 49’ TO
17+32’ RT 55’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
120/240 OE
17+32’ RT 55’ TO
17+07’ RT 27’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
POLE & DOWN GUY
17+07’ RT 27’
REMOVE ONCE JOINT USERS HAVE
VACATED POLE AND TEC
I 0 1
17+28’ RT 27’ HAS BEEN PROPERLY
NOTIFIED
120/240 OE
17+07’ RT 27’ TO
18+08’ RT 50’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
120/240 OE
18+08’ RT 50’ TO
18+33’ RT 44’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
13.2 KV OE
109+04’ RT 36’ TO
17+07’ RT 27’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
13.2 KV OE
17+07’ RT 27’ TO
104+84’ RT 30’
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
I 0 1
DOWN GUY
104+72’ RT 30’
REMOVE NA I 0 1
(2) 96C FIBER OE
15+79, 49R – 19+09, 41R
REMOVE ONCE NEW FACILITES HAVE
BEEN INSTALLED AND
ENERGIZED
1 0 1