22-Attachment C - 100% R ZAYO URS 9.8.25.pdf

PDF 2 MB Posted

Attached to
North Himes Avenue at West Waters Avenue
Solicitation number
IFB-26-00271
Issued by
Hillsborough County, Florida

About this file

This is an Attachment C document related to a construction project for Hillsborough County Engineering and Operations Department in Florida involving intersection improvements at North Himes Avenue at West Waters Avenue. The project scope includes replacing the existing box span wire signal with mast arms, roadway widening, milling and resurfacing, installation of miscellaneous drainage improvements, ADA sidewalk and pedestrian curb ramp improvements, and signing and pavement marking. The estimated project cost is $2,594,198.34, with the document appearing to contain detailed specifications, cost breakdowns, and technical requirements necessary for contractor bidding and project execution.

The solicitation establishes a Small Business Enterprise (SBE) participation goal of 5% for subcontractor involvement on the resulting contract. The document serves as a supporting exhibit or attachment providing comprehensive project details, specifications, and requirements that bidders must review and comply with when preparing their proposals. Funding for this infrastructure improvement project is provided through Hillsborough County's engineering and operations budget allocation for roadway and intersection enhancement initiatives.

View the file

Other files

File Type Posted
33-IFB-26-00271 Payment Bond.pdf PDF
21-Attachment C - 100% R URS 5-19-2025 DATED - REVISED UNITI FIBER signed.pdf PDF
17-Attachment A - Hillsborough County (4x6) Construction Sign Specs 202507.pdf PDF
12-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
13-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
34-IFB-26-00271 Performance Bond.pdf PDF
18-Attachment B - Geotech.pdf PDF
16-IFB-26-00271 Bid Bond.doc DOC document
31-Attachment I - Supplemental Specifications.pdf PDF
20-Attachment C - 100% R PEOPLES GAS URS 7.7.25 -SIGNED.pdf PDF
19-Attachment C - 100% R COT Water URS 9.04.2025PDF-R RCL.pdf PDF
28-Attachment E - Drainage Report.pdf PDF
29-Attachment G - Plans.pdf PDF
5-Consent of Surety-Change Order.pdf.pdf PDF
15-Subcontractor Letter of Intent .pdf PDF
7-Consent of Surety to Final Payment.pdf.pdf PDF
27-Attachment D - SWFWMD Permit.pdf PDF
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
26-Attachment C - Waters Ave 100% URS FRONTIER updated 09.15.25.pdf PDF
9-Insurance Certificate.doc.doc DOC document
6-Subcontractors Statement of Satisfaction.pdf.pdf PDF
25-Attachment C - COT Wastewater URS Signed.pdf PDF
14-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
36-IFB-26-00271 Agreement.pdf PDF
10-Substitute W9 Form.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
24-Attachment C - 100%R TECO URS 8.20.2025.pdf PDF
4-Application for Payment.pdf.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
30-Attachment H - Project Map.pdf PDF
8-Change Order Form.pdf.pdf PDF
32-Attachment F - Insurance Requirements.pdf PDF
37-1. IFB-26-00271 Terms and Conditions.pdf PDF
35-Human Trafficking Affidavit.pdf PDF
23-Attachment C - 100%R CROWN CASTLE UPDATED URS 6.17.25.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hillsborough County County Road: N/A Plans Dated: May 2025

CIP Number: 69600.102 B Project Name: Himes Ave at Waters Ave- Intersection Improvements

Utility Agency/Owner (UAO): ZAYO Group LLC

NON-CONSTRUCTION ITEMS

ESTIMATED

*CALENDAR DAYS

CONSTRUCTION ITEMS

ESTIMATED

*CALENDAR DAYS

Total Preliminary 30 Prior to County Project Construction 50

Total Material Procurement 30 During County Project Construction 05

Total Right-of-Way Acquisition As-Built Information _____________

Total Other * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule

This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Hillsborough County, the roadway contractor, and other right-of-way users, the location, relocation, adjustment, installation, and/or protection of facilities, on this Hillsborough County project. The following data is based on the plans dated as listed in the Title Block.

Any deviation by Hillsborough County or its Contractor from plans, as provided may render this work schedule null and void.

Upon notification by, Hillsborough County of such change, this utility may require additional days for assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond the control of the UAO that could not reasonably be anticipated by the UAO and which could not be avoided by the UAO with the exercise of due diligence at the time of the occurrence. The UAO agrees to notify Hillsborough County in writing prior to starting, stopping, resuming, or completing work. The UAO is to provide As-Built information.

The UAO shall obtain a utility permit and comply with the requirements of the Hillsborough County UAM.

During the project, the UAO shall locate their facilities within 48 hours of notice to their Representative: Jake Sansom Telephone Number: 813.763.5999

UAO Project Representative: Telephone Number:

UAO Field Representative: Jake Sansom Telephone Number: 813.763.5999

This document is a printout of a Hillsborough County form maintained in an electronic format and all revisions thereto by the UAO in the form of additions, deletions or substitutions are reflected only in an Appendix entitled “Changes to Form Document” and no change is made in the text of the document itself. Hand notations on affected portions of this document may refer to changes reflected in the above-named Appendix but are for reference purposes only and do not change the terms of the document. By signing this document, the UAO hereby represents that no change has been made to the text of this document except through the terms of the Appendix entitled “Changes to Form Document”.

You MUST signify by selecting or checking which of the following applies:

No changes to forms document.

Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.

Authorized Utility Agent: **Engineer of Record (EOR): Acceptance by Hillsborough

County:

(Signature) (Signature)

Jake Sansom

Pavan Paiavula, P.E.

Steffanie Workman, P.E.

(Printed Name) (Printed Name) (Printed Name)

Regional OSP Operations Sr

Engineer of Record

County Project Manager

(Title) (Title) (Title)

09/02/2025

(Date) (Date) (Date)

Final Approval by Hillsborough County:

(Signature) (Date)

Sandra Gonzalez, P.E. Section Manager (Printed Name) (Title)

(**When requested by the County, the EOR will attest to compatibility of plans, specifications and Utility Work Schedule)

(Signature)

Jake Sansom 813.763.5999

09/19/25

PPaiavula Image

PPaiavula Text Box 9/18/2025

GonzalezSa Placed Image

GonzalezSa Typewritten Text 09/22/2025

Special Conditions and Constraints

1) Contact Jake Sansom 48 hours prior to any work that requires Zayo to be on site.

2) Exercise extrema caution when working near or around existing Zayo facilities.

3) Zayo requests a copy of the Roadway Contractor’s approved Work Schedule.

4) Zayo requests access to their existing facilities throughout the construction of the project.

5) Receipt of Final County Plans and any approved permits needed, NTP.

6) 2-week written notification of completion of dependent activities

7) Drainage structures, mast arms, light poles, walls, Centerline & ROW (or equivalent to be staked in the field)

C. Disposition of Facilities (List All Existing & Proposed) on Project

TYPE / SIZE / MATERIAL

/ OFFSET

TO BASELINE FROM

STA TO STA

DESCRIPTION

OF

UTILITY WORK

DEPENDENT

ACTIVITIES

M.O.T.

PHASE

NUMBER

CONSECUTIVE

CALENDAR

DAYS

Prior During

ZAYO (3) 1-1/4" HDPE

DUCTS E/W 144CT FOC

STA 17+04 (49 LT) to

ZAYO 24"X36"X30" HH

located 850 ft east from the center line of N Himes Ave

(28.025550 -82.498104)

Remove Fiber and place conduit Out of service

Completion of all Zayo proposed boring, fiber placement and splicing for new path

I 5 0

ZAYO (3) 1-1/4" HDPE

DUCTS E/W 144CT FOC

STA 17+04 to ZAYO 24"X36"X30" HH located 850 ft east from the center line of N Himes Ave (28.025550 -82.498104)

Proposed bore of approx. 950 ft starting from the HH at the northwest corner of W Waters Ave and N Himes Ave, heading east to the next existing Zayo Hand hole, to avoid conflict with Mast Arm 1. Keep proper clearance from utilities and drainages

I 15 0

DUCTS E/W 144CT FOC

STA 17+04 (49 RT) to

18+15 (67 RT)

DUCTS E/W 144CT FOC

STA 17+04 (49 RT) to

18+15 (67 RT)

Proposed bore of 105 ft, to avoid conflict with Mast Arm 4. Keep proper clearance from utilities and drainages

I 10 0

ZAYO 24"X36"X30" HH

STA 17+04 (49 RT)

Raise to final grade Road contractor to complete final grade

I 0 5

DUCTS E/W 144CT FOC

STA 17+02 (49 LT) to ZAYO HH and Small Cell Pole (TP2338BA_41LAB) located at 28.026428, -

82.500885

Proposed bore of 320 ft, to avoid conflict with Mast Arm 1. Keep proper clearance from utilities, drainage and Mast Arm.

I 10 0

DUCTS E/W 144CT FOC

STA 17+02 (49 LT) to ZAYO HH and Small Cell Pole (TP2338BA_41LAB) located at 28.026428, -

82.500885

Proposed Mast Arm 1 (to be staked in the field)

Proposed Mast Arm 4 (to be staked in the field)

Proposed Mast Arm 1 (to be staked in the field)

File details come from the government source that posted it. Updated .