This is a bid schedule for Collier County, Florida's construction of the BCIRP Phase 2A Signalized Intersection project on Oil Well Road at Big Corkscrew Drive (Bid No. 24-8314). The project encompasses six major sections of work: general mobilization and project initiation items; demolition and erosion control; paving and sidewalk improvements totaling 2,870 square yards of asphalt and concrete work; storm drainage installation including 273 linear feet of 18-inch reinforced concrete pipe; potable water distribution system modifications; and comprehensive signalization installation featuring traffic signal equipment, detection systems, lighting, CCTV cameras, and associated infrastructure. The bid schedule itemizes 112 line items across all sections with specified quantities for each component. A non-mandatory pre-bid meeting is scheduled for November 12, 2024, at 10:00 a.m., with sealed bids due December 12, 2024, at 3:00 p.m. local time. The project requires substantial completion within 195 calendar days and final completion within 30 calendar days thereafter.

The anticipated project estimate is $4,724,898.03, with the county allocating an additional $200,000 owner's allowance for unforeseen conditions or owner-directed work. Mobilization and demobilization costs are capped at 5 percent of the respective bid totals. Bidders must submit a 5 percent bid bond or certified/cashier's check, with successful contractors required to provide 100 percent payment and performance bonds. Liquidated damages are assessed at $2,512 per calendar day for failure to achieve substantial completion on schedule. The project is funded through Parks and Recreation Impact Fees, with the adjacent commercial developer responsible for reimbursing Collier County for portions of public utilities and intersection costs. Work hours are restricted to 7:00 a.m. to 7:00 p.m., Monday through Friday. Contractors must maintain comprehensive insurance coverage including commercial general liability, workers' compensation, and automobile liability, and comply with FDOT 2023 design standards, ADA requirements, and Florida Building Code standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BidSch

BCIRP Phase 2A Signalized Intersection on Oil Well at Big Corkscrew Dr.
Construction ITB No. 24-8314
Bid Schedule
Item No.DescriptionUnitQuantityPriceTotal
Section 1 - General
1.1Mobilization/DemobilizationLS1$ - 0$ - 0
1.2Maintenance of TrafficLS1$ - 0
1.3SurveyLS1$ - 0
1.4Pre-Construction Video and PhotographsLS1$ - 0
1.5Project Sign - Furnish and InstallEA1$ - 0
Section 1 Subtotal:$ - 0
Section 2 - Demolition & Erosion Control
2.1Silt FenceLF605$ - 0
2.2Turbidity BarrierLF94$ - 0
2.3Curb Inlet ProtectionEA4$ - 0
2.4Remove/Dispose Existing Concrete SidewalkSF2,975$ - 0
2.5Remove/Dispose Existing Curb and/or GutterLF974$ - 0
2.6Remove/Dispose Existing PavementSY263$ - 0
Section 2 Subtotal:$ - 0
Section 3 - Paving & Sidewalk Improvements
3.1Earthwork and Site GradingLS1$ - 0
3.212" Stabilized SubgradeSY2,870$ - 0
3.310" Limerock Base (Compacted and Primed)SY2,870$ - 0
3.43" Type SP-12.5 Structural Course (2-1.5 inch Lifts)SY2,870$ - 0
3.51" Type SP-9.5 Surface CourseSY2,870$ - 0
3.6Type "A" CurbLF554$ - 0
3.7Type "F" Curb & GutterLF917$ - 0
3.8Concrete Median 5" thickSY114$ - 0
3.96" Thick Concrete SidewalkSY377$ - 0
3.10Detectable Warnings for RampsEA10$ - 0
3.11Remove and Relocate Existing Light PolesEA2$ - 0
3.12Bahia SodSY2,830$ - 0
3.13Single Post Sign, F&I Ground Mount, Up to 12 SFEA10$ - 0
3.14Pavement MarkingsLS1$ - 0
3.15RPM's, F&ILS1$ - 0
3.16Paint Median NosesEA3$ - 0
Section 3 Subtotal:$ - 0
Section 4 - Storm Drainage
4.118" RCPLF273$ - 0
4.2FDOT Curb Inlet Type 6EA1$ - 0
4.3Junction Box with 2' SumpEA2$ - 0
4.4Connect 18" RCP to Existing Curb InletEA2$ - 0
4.518" Mitered End Section 2:1 (Cross Drain)EA2$ - 0
Section 4 Subtotal:$ - 0
Section 5 - Potable Water Distribution System
5.1Remove/Replace 12" PVC DR 14 Water Main at ConflictLF54$ - 0
5.2Air Release Valve on Existing 12" MainEA4$ - 0
Section 5 Subtotal:$ - 0
Section 6 - Signalization Installation
630-2-11CONDUIT (F&I) (UNDERGROUND)LF217$ - 0
630-2-12DIRECTIONAL BORE (F&I)LF403$ - 0
632-7-1SIGNAL CABLE (F&I)PI1$ - 0
633-1-122ITS FIBER OPTIC CABLE (F&I) (UNDERGROUND) (13-48 FIBERS)LF40$ - 0
633-3-11ITS FIBER OPTIC CONNECTION HARDWARE (F&I) (SPLICE ENCLOSURE)EA1$ - 0
633-3-12ITS FIBER OPTIC CONNECTION HARDWARE (F&I) (SPLICE TRAY)EA4$ - 0
633-3-14ITS FIBER OPTIC CONNECTION HARDWARE (F&I) (BUFFER TUBE FAN OUT KIT)EA1$ - 0
633-3-15ITS FIBER OPTIC CONNECTION HARDWARE (F&I) (PATCH PANEL, PRETERMINATED)EA1$ - 0
633-8-1MULTI-CONDUCTOR COMMUNICATION CABLELF5$ - 0
635-2-11PULL BOX (F&I) (13"X24" COVER SIZE)EA4$ - 0
635-2-11APULL BOX (F&I) (17"X30" COVER SIZE)EA9$ - 0
635-2-12PULL BOX (F&I) (24"x36" COVER SIZE)EA1$ - 0
639-1-122ELECTRICAL POWER SERVICE (F&I) (UNDERGROUND)AS1$ - 0
639-2-1ELECTRICAL SERVICE WIRE (F&I)LF300$ - 0
641-2-12PRESTRESSED CONCRETE POLE (F&I) (TYPE P-II SERVICE)EA1$ - 0
646-1-11ALUMINUM SIGNAL POLE (PEDESTAL)EA8$ - 0
649-21-10STEEL MAST ARM ASSEMBLIES (SINGLE ARM 60') Furnish MaterialsEA2$ - 0
649-21-10STEEL MAST ARM ASSEMBLIES (SINGLE ARM 60') Coordination and InstallationEA2$ - 0
649-21-21STEEL MAST ARM ASSEMBLIES (SINGLE ARM 78') Furnish MaterialsEA2$ - 0
649-21-21STEEL MAST ARM ASSEMBLIES (SINGLE ARM 78') Coordination and InstallationEA2$ - 0
650-1-14TRAFFIC SIGNAL 12" STD. (F&I) (ALUMINUM) (3 SECTION, 1-WAY)AS9$ - 0
650-1-16TRAFFIC SIGNAL 12" STD. (F&I) (ALUMINUM) (4 SECTION, 1-WAY)AS2$ - 0
653-1-11PEDESTRIAN SIGNAL (F&I) (LED COUNTDOWN) (1 WAY)AS8$ - 0
660-1-110INDUCTIVE LOOP DETECTOR (F&I)EA6$ - 0
660-2-106LOOP ASSEMBLY (TYPE F) (40 FOOT)AS10$ - 0
660-3-11VEHICLE DETECTION SYSTEM - MICROWAVE (F&I) (CABINET EQUIPMENT)EA1$ - 0
660-3-12VEHICLE DETECTION SYSTEM - MICROWAVE (F&I) (ABOVE GROUND EQUIPMENT)EA2$ - 0
663-1-111SIGNAL PRIORITY AND PREEMPTION SYSTEM (F&I), (OPTICOM), (CABINET ELECTRONICS)EA1$ - 0
663-1-112SIGNAL PRIORITY AND PREEMPTION SYSTEM (F&I) (OPTICOM), (DETECTOR)EA4$ - 0
665-1-11DETECTOR, PEDESTRIAN (F&I) (STANDARD)EA8$ - 0
671-2-11Traffic Controller (Controller withouut Cabinet) (F&I)EA1$ - 0
676-1-17Traffic Signal Controller Cabinet (Cabinet without Controller) (F&I)EA1$ - 0
682-1-133ITS CCTV CAMERA (F&I) (DOME ENCLOSURE) (NON-PRESSURIZED) (BOSCH)EA2$ - 0
684-1-1ETHERNET SWITCH (F&I)EA1$ - 0
685-1-13SYSTEM AUXILIARIES (F&I) (UNINTERRUPTIBLE POWER SOURCE)EA1$ - 0
700-2-12MULTI COLUMN (POST) GROUND SIGN (F&I) (12.0-20.0 SQ. FT)AS1$ - 0
700-2-14MULTI COLUMN (POST) GROUND SIGN (F&I) (30.1-50.0 SQ. FT)AS2$ - 0
700-5-22INTERNALLY ILLUMINATED STREET NAME SIGN (F&I) (OVERHEAD MOUNT) (12-18 SF)EA2$ - 0
700-5-22AINTERNALLY ILLUMINATED STREET NAME SIGN (F&I) (OVERHEAD MOUNT) (MORE THAT 18 SF)EA2$ - 0
715-4-74LIGHT POLE COMPLETE (LUMINAIRE, POLE, FOUNDATION)EA1$ - 0
715-5-31LUMINAIRE AND BRACKET ARM (F&I) (ALUMINUM)EA4$ - 0
Section 6 Subtotal:$ - 0
Total Base Bid:$ - 0
Bid Alternate
A1Temporary SignalizationLS1$ - 0
Total Alternate:$ - 0
Total Base Bid + Alternate$ - 0

*Note: The scheduled value for mobilization plus demobilization shall not exceed 5 percent of the Base Bid Project Total. **Note: The scheduled value for mobilization plus demobilization shall not exceed 5 percent of the Bid Alternate Total.

Staff has allocated $200,000.00 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.

&"-,Bold"&11Big Corkscrew Island Regional Park - Phase 2

&14BID SCHEDULE&11

Oil Well Road - Big Corkscrew Drive Intersection Improvements&12 &10September 27, 2024

&8&D &"-,Regular"&8&Z&F &"-,Regular"Page &P

File details come from the government source that posted it. Updated .