24-8270_-_Exhibit_M_-_Stan_Gober_-_Final_Plans_SS_Rev._1.pdf
PDF 19 MB Posted
- Attached to
- Stan Gober Memorial Bridge Rehabilitation
- Solicitation number
- 24-8270
- Issued by
- Collier County, Florida
About this file
The provided document is a comprehensive set of construction plans for the Stan Gober Memorial Bridge Rehabilitation Project, prepared by Cardno for the Collier County Growth Management Department's Transportation Engineering Division. The project involves the rehabilitation of Bridge No. 030184 located on CR 92 over Marco Channel, with detailed engineering drawings covering various aspects of the bridge restoration, including deck repairs, beam repairs, scour protection, cathodic protection, traffic control, and structural modifications. The plans include multiple sheets detailing elevation views, plan layouts, reinforcement details, zinc arc spray locations, galvanic anode placements, and turbidity monitoring strategies. The project encompasses repairs to the bridge's deck, beams, columns, and footings, with specific attention to corrosion mitigation, structural reinforcement, and environmental protection measures.
The rehabilitation project includes extensive technical specifications for concrete repairs, prestressed beam treatments, and structural enhancements. The plans outline specific quantities of materials and repairs, such as 2,137 square yards of deck repair, concrete class IV topping, penetrating corrosion inhibitor application, and various zinc and galvanic anode installations. The design incorporates environmental considerations, including turbidity barriers and monitoring plans to minimize environmental impact during construction. The project appears to be funded through Collier County's infrastructure improvement budget, with the engineering design following Florida Department of Transportation (FDOT) standard specifications and design guidelines. The comprehensive nature of the plans suggests a thorough approach to bridge rehabilitation, addressing structural integrity, corrosion prevention, and long-term durability of the Stan Gober Memorial Bridge.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF STRUCTURE PLANS
SHEET NO. SHEET DESCRIPTION
GENERAL SHEETS
ill 8-1 8-2 ill BQ-1 8-3
KEY SHEET
SIGNATURE SHEET
SUMMARY OF QUANTITIES
GENERAL NOTES
BRIDGE NO. 030184
PLAN & ELEVATION
TURBIDITY BARRIER PLAN FOR CONCRETE WORK
COLLllER COUNTY GROWTH MANAGEMENT DEPARTMENT
TRANSPORTATllON ENGllNEERllNG DllVllSllON
CONTRACT PLANS
COLLIER COUNTY PROJECT NO. 66066.2
ST AN GOBER MEMORIAL BRIDGE REHAB/LIT AT/ON
STRLJCTLJRE PLANS
BRIDGE NO. 030184
TURBIDITY MONITORING PLAN FOR SCOUR PROTECTION WORK
DECK REPAIR DETAILS
SPALL REPAIR DETAILS
TO t
NAPLES
I
LU LU
IO "-
1'\j"' cc cc
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
81-1 81-2 81-3 81-4 81-5 81-6 81-7 81-8 81-9 81-10 81-11 81-12 81-13 81-14 81-15 81-16 81-17 81-18 81-19 81-20 81-21 81-22 81-23
BEAM REPAIR DETAILS(] OF 2)
BEAM REPAIR DETAILS (2 OF 2)
BEAM ARC SPRAY ZINC LOCATION
ZINC CONNECTION DETAILS
GALVANIC ANODE PLACEMENT DETAIL Location of Project
GALVANIC ANODE SINGLE WIRE CONNECTION GENERAL NOTES
GALVANIC ANODE SINGLE WIRE CONNECTION INSTALLATION STEPS
GALVANIC ANODE SINGLE WIRE CONNECTION SECTIONS AND DETAILS
COLUMN AND FOOTING JACKET OVERBUILD (1 OF 2)
COLUMN AND FOOTING JACKET OVERBUILD (2 OF 2)
JACKET OVERBUILD PIER 10 AND 11 (1 OF 2)
JACKET OVERBUILD PIER 10 AND 11 (2 OF 2)
STRUCTURAL PILE JACKET
WIRING DETAILS
STRUCTURE CONNECTIONS
TYPICAL MONITORING PANELS
TYPICAL PANEL WIRING
SCOUR PROTECTION
TRAFFIC CONTROL PLAN
TC-I
TC-2 - TC-3
TC-4 - TC-5
TEMPORARY TRAFFIC CONTROL PHASING TYPICAL SECTIONS
TRAFFIC CONTROL PLAN (PHASE I)
TRAFFIC CONTROL PLAN (PHASE II)
EXISTING PLANS
BX-I - BX-13
BX-14 - BX-44
GOVERNING DESIGN STANDARDS:
Florida Department of Transportation, FY2022-23 Standard Plans for Road and Bridge Construction.
Standard Plans for Road Construction are available at the following website:
http://www.fdot.gov/design/standard plans
GOVERNING STANDARD SPECIFICATIONS:
Florida Department of Transportation, January 2023 Standard Specifications for Road and Bridge Construction at the following website:
http://www.fdot.gov I programmanagement I Implemented /SpecBooks
T 51 S T 52 S
Marco Beach
Pop. 16,..J.l S
BEGIN BRIDGE
NO. 030184
<i. CONST.
Roberts . Barfield
Bay ,;: Bay
Ddvid Key ::
ST A. 268+84.00
Ramsey
Ke
LU LU
IO "-
1'\j"' cc cc
COLLIER COUNTY BOARD OF COMMISSIONERS:
DISTRICT 1: Rick Locastro DISTRICT 2: Chris Hall DISTRICT 3: Burt L. Saunders DISTRICT 4: Dan Kowal DISTRICT 5: William L. McDaniel, Jr.
chgamache
END BRIDGE
NO. 030184
<i. CONST.
STA. 287+26.00
SUMMARY OF REVISIONS
DATE DATE
7/29/2024 ffi SHEET B-1 AND BQ-1 REVISED.
7/29/2024 1:59:39 PM
CONSTRUCTION PLANS
DECEMBER 2022
STRUCTURE PLANS
ENGINEER OF RECORD:
CHRISTOPHER P. GAMACHE, P.E. NO. 82122
CARDNO
380 PARK PLACE BOULEVARD, SUITE 300
CLEARWATER, FL 33759
(7 27) 531-3505
CONTRACT NO. 16-6700
P.O. NO. 4500187 495
COLLIER COUNTY
PROJECT MANAGER
MARIO A. PUENTE, P.E., C.G.C.
CONSTRUCTION
CONTRACT NO.
FISCAL
YEAR
SHEET
NO.
8-1
U:\238200196\ms\struct\Final Submitta/\81 KeySheetOJ - R l .dgn
<...i sc u:
n·i c:::, c:::, G
UJ
:::, ex:
ex:
UJ
Cl Cl
UJ
V, Cl
Cl
UJ
t;:
u a ex:
f-.
u
UJ
UJ
UJ
:i:
f-.
f-.
UJ
UJ
:i:
V, V, a Cl ex:
a u ex:
u t;: " a
UJ
:i:
f-.
u.i u a
By DescriptionDate By DescriptionDate
STAN GOBER MEMORIAL BRIDGE REHAB
PROJECT NAME:
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 12/19/2022 3:21:08 PM J:\00026\00026060.00\ms\struct\Final Submittal\B1Signatures.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
SIGNATURE SHEET
BRIDGE NO. 100845
STATE OF
No 82122
R E
E
NI
G
NE LANOI
S S
E
F O
R P
ESNECI
L
A
DIROL
F
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
SHEET NO. SHEET DESCRIPTION SHEET NO. SHEET DESCRIPTION
E H
C A
M
AG .P REHP
O T
SI
R
H C
CHRISTOPHER P. GAMACHE, P.E. 82122
PHONE NUMBER: (727) 531-3505
CLEARWATER, FL 33759
380 PARK PLACE BOULEVARD, SUITE 300
CARDNO
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
B-2
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
SHEET NO. SHEET DESCRIPTION
STATE OF
No 81340
R E
E
NI
G
NE LANOI
S S
E
F O
R P
ESNECI
L
A
DIROL
F
B
R
IA
N M. PAIL
E S
B1-22
B1-21
B1-20
B1-19
B1-18
B1-17
B1-16
B1-15
B1-14
B1-13
B1-12
B1-11
B1-10
B1-9
B1-8
B-2
B1-23
B1-7
B1-6
B1-5
B1-4
B1-3
B1-2
B1-1
B-3
BQ-1
B-2
B-1
TRAFFIC CONTROL PLAN (PHASE II)
TRAFFIC CONTROL PLAN (PHASE I)
SECTIONS
TEMPORARY TRAFFIC CONTROL PHASING TYPICAL
SIGNATURE SHEET
SCOUR PROTECTION
BEAM REPAIR DETAILS (2 OF 2)
BEAM REPAIR DETAILS (1 OF 2)
SPALL REPAIR DETAILS
DECK REPAIR DETAILS
PROTECTION WORK
TURBIDITY MONITORING PLAN FOR SCOUR
TURBIDITY BARRIER PLAN FOR CONCRETE WORK
PLAN & ELEVATION
GENERAL NOTES
SUMMARY OF QUANTITIES
SIGNATURE SHEET
KEY SHEET
TC-4 - TC-5
TC-2 - TC-3
TC-1
B-2
BRIAN PAILES, P.E. 81340
PHONE NUMBER: (813) 501-1412
TAMPA, FL 34787
8413 LAUREL FAIR CIRCLE, SUITE 200-B
VECTOR CORROSION SERVICES, INC.
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
TYPICAL PANEL WIRING
TYPICAL MONITORING PANELS
STRUCTURE CONNECTIONS
WIRING DETAILS
STRUCTURAL PILE JACKET
JACKET OVERBUILD PIER 10 AND 11 (2 OF 2)
JACKET OVERBUILD PIER 10 AND 11 (1 OF 2)
COLUMN AND FOOTING JACKET OVERBUILD (2 OF 2)
COLUMN AND FOOTING JACKET OVERBUILD (1 OF 2)
SECTIONS AND DETAILS
GALVANIC ANODE SINGLE WIRE CONNECTION
INSTALLATION STEPS
GALVANIC ANODE SINGLE WIRE CONNECTION
GENERAL NOTES
GALVANIC ANODE SINGLE WIRE CONNECTION
GALVANIC ANODE PLACEMENT DETAIL
ZINC CONNECTION DETAILS
BEAM ARC SPRAY ZINC LOCATION
SIGNATURE SHEET
STATE OF
R E
E
NI
G
NE LANOI
S S
E
F O
R P
ESNECI
L
A
DIROL
F
No 62449
MAY .Y NOSAJ
JASON Y. YAM, P.E. 62449
PHONE NUMBER: (727) 431-1617
CLEARWATER, FL 33759
380 PARK PLACE BOULEVARD, SUITE 300
CARDNO
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
SUMMARY OF STRUCTURE QUANTITIES
FOOT
PAY ITEM DESCRIPTION
ITEM NO.
101 - 1 MOBILIZATION
102-1 MAINTENANCE OF TRAFFIC
104-11 FLOATING TURBIDITY BARRIER
104-30 TURBIDITY MONITORING
110-3-10 LADDERS AND PLATFORMS, REMOVE
110-4-10 REMOVAL OF EXIST CONC
400-4-47 CONCRETE CLASS IV, CAST IN PLACE TOPPING WITH SRA
400-7-1 BRIDGE DECK GROOVING
400-142-2 CATHODIC PROTECTION SYSTEM, ZINC ARC SPRAY
400-142-10 EMBEDDED GALVANIC ANODE
400-142-11 GALVANIC OVERBUILD WITH ANODES FOR FOOTINGS/STRUTS
401-70-5 RESTORE SPALLED AREAS, CONTRACTOR'S OPTION
413-150 PENETRATING CORROSION INHIBITOR
413-154 CLEANING AND SEALING CONCRETE SURFACES - PENETRANT SEALER OR METHACRYLATES
457-2-131 CATHODIC PROTECTION INTEGRAL COLUMN JACKET, NON-STRUCTURAL, GALVANIC SYSTEM
457-2-221 CATHODIC PROTECTION INTEGRAL PILE JACKET, STRUCTURAL, 16.1-30", GALVANIC SYSTEM
458-1-21 BRIDGE DECK EXPANSION JNT, REHAB, POURED JOINT WITH BACKER ROD
470-75-2 TIMBER FENDER SYSTEM REPAIR
530-3-3 RIPRAP-RUBBLE, BANK AND SHORE
530-74 BEDDING STONE
561-1-1 COATING EXISTING STRUCTURAL STEEL, BEARING
630-2-30 CONDUIT ANCHOR REPLACE
630-2-31 CONDUIT REPAIR/REPLACE
ill 706-1-3 RAISED PAVEMENT MARKER, TYPE B ill 711-16-101 THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" ill 711 - 16-201 THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" ill 713-103-101 PERMANENT TAPE, WHITE, SOLID, 6" FOR CONCRETE BRIDGES ill 713-103-201 PERMANENT TAPE, YELLOW, SOLID, 6" FOR CONCRETE BRIDGES
REVISIONS
DATE BY DESCR I PT! ON DATE BY DESCRIPTION
ill () �l�.!lt�cffi ADDED PAY ITEMS 7/29/2024 CPG
380 PARK PLACE BLVD. SUITE 300
CLEARWATER, FL 33759
CHRISTOPHER P. GAMACHE P.E. NO. 82122
- BRIDGE NO. 030184
UNIT
QUANTITY DESIGN CONSTRUCTION
NOTES REMARKS
F
LS 1
LS 1
LF 3112
LS 1
EA 2
SY 2137
CY 89.1
SY 2137
SF 4802
EA 6
SF 13584
CF 79
GA 933
SF 81048
LF 108
LF 8
LF 1064
LS 1
TN 5872
TN 1961
EA 4
EA 1
LF 100
EA 44
GM 0.04
GM 0.04
GM 0.44
GM 0.54
PAY ITEM NOTES:
1. ANY EXCAVATION OR DISPOSAL OF EXCAVATED MATERIAL NECESSARY FOR
THE PLACEMENT OF AN ITEM SHALL BE CONSIDERED INCIDENTAL TO THAT ITEM.
2. THE QUANTITIES PROVIDED ARE ESTIMATED. ACTUAL QUANTITIES MAY VARY
AND WILL BE MEASURED IN THE FIELD AND VERIFIED BY THE COUNTY. NO
ADJUSTMENT IN THE CONTRACT BID UNIT PRICE FOR EACH PAY ITEM WILL BE
MADE DUE TO DIFFERENCES BETWEEN THE ESTIMATED AND ACTUAL QUANTITIES.
3. THE FOOT ITEM NUMBER SHALL BE USED TO IDENTIFY THE APPLICABLE
SECTION OF THE FOOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION. SPECIFICATIONS FOR ITEMS WITHOUT AN FOOT ITEM NUMBER
CAN BE FOUND WITHIN THE TECHNICAL SPECIFICATIONS.
ill 4. RESTORE PAVEMENT MARKINGS AND RPMs DISTURBED BY DECK RESTORATION AND
MOT TO MATCH EXISTING.
BRIDGE NO. 030184
Drawn By: SHEET TITLE:
REF. DWG. NO.
MPR COLLIER COUNTY SUMMARY OF QUANTITIES Checked by:
CPG
Designed by: ROAO NO. CARDNO PROJECT NO. COUNTY PROJECT fD
PROJECT NAME:
SHEET NO.
TRH
STAN GOBER MEMORIAL BRIDGE REHAB Checked by: CR 92 00026060.00 66066.2
BQ-1 CPG
chgamache 7/29/2024 1:56:33 PM U:\238200196\ms\struct\Ftnal Subm,ttal\B1 Sum0fQuant1t1es0J - RJ .dgn u.
C C
G\0 -.J
Cl :ae:
Cl -.J
V)
Cl :ae:
<t
Cl :ae: '-' vi -.J
\J
\J -.J
J:
V)
V) u.
Cl \J -.J <t u.
J:
u.i \J i::
:ae:
N O
T I C
E
T H
E
F
F I C I A
L
R
C O
D
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
U
D
L E
1G
-2
.0
F .A .C
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 12/13/2022 1:42:44 PM J:\00026\00026060.00\ms\struct\Final Submittal\B1GeneralNotes.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
GENERAL NOTES
CLASS
STRUCTURE
CONCRETE IN
LOCATION OF
REINFORCEMENT BARS SHALL BE GRADE 60.
IN ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 931. ALL
ALL REINFORCEMENT BARS AND WELDED WIRE REINFORCEMENT SHALL BE
AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 9TH EDITION.
ELEMENTS UNLESS OTHERWISE NOTED.
LOAD AND RESISTANCE FACTOR DESIGN METHOD (LRFD) FOR ALL
SUBSTRUCTURE - EXTREMELY AGGRESSIVE
SUPERSTRUCTURE - EXTREMELY AGGRESSIVE
f'c = 5,500
DESIGN BULLETINS.
FDOT STRUCTURES MANUAL DATED 2022 AND SUBSEQUENT STRUCTURES
4" TO EXTERNAL FORMED SURFACESC.I.P. SUBSTRUCTURE:
2" TO EXTERNAL FORMED SURFACESC.I.P. SUPERSTRUCTURE:
TO FACE OF CONCRETE.
CENTERLINE OF BARS EXCEPT WHERE THE CLEAR DIMENSION IS SHOWN
ALL DIMENSIONS PERTAINING TO LOCATIONS OF REINFORCING ARE TO
FDOT STANDARD SPECIFICATIONS FOR ALLOWABLE TOLERANCES.
FABRICATION TOLERANCES UNLESS SHOWN AS "MINIMUM COVER". SEE
CONCRETE COVER SHOWN IN PLANS DOES NOT INCLUDE PLACEMENT AND
ENGINEER.
ALTERATIONS TO THOSE SHOWN SHALL REQUIRE APPROVAL OF THE
INDICATED IN THE PLANS. ADDITIONAL CONSTRUCTION JOINTS OR
CONSTRUCTION JOINTS WILL BE PERMITTED ONLY AT LOCATIONS
DECK TOPPINGIV (WITH SRA)
STRENGTH (psi)
COMPRESSIVE
28-DAY
MINIMUM
ADJUSTMENT OF 2011 (NAD 83/2011).
SYSTEM USED FOR THE PLANS IS THE NORTH AMERICAN DATUM OF 1983,
VERTICAL DATUM OF 1988 (NAVD 88). THE STATE PLANE COORDINATE
THE BENCH MARK DATUM USED FOR THE PLANS IS THE NORTH AMERICAN
SPAN BEAM PILEBENT/PIER
B-3
SHRINKAGE TO 500 MICROSTRAINS.
SRA USED IN THE DECK TOPPING SHALL LIMIT THE 28-DAY DRYING
ACCORDANCE WITH PERMIT REQUIREMENTS. SEE SHEETS B1-2 AND B1-3.
CONTROL TURBIDITY CAUSED BY CONSTRUCTION OPERATIONS IN
PROVIDE AND MAINTAIN FLOATING TURBIDITY BARRIERS AS REQUIRED TO
1. DESIGN SPECIFICATIONS:
2. DESIGN METHOD:
3. ENVIRONMENT:
4. CONCRETE:
5. SHRINKAGE REDUCING ADMIXTURE (SRA):
6. CONCRETE COVER:
7. JOINTS IN CONCRETE:
9. REINFORCING STEEL:
316 STAINLESS STEEL WITH A MINIMUM BREAKING STRENGTH OF 18,000 LBS.
" DIAMETER 6x19, 6x25, OR 6x37 CLASS IWRC TYPE2
1WIRE ROPE SHALL BE
11. WIRE ROPE FOR FENDER PILES:
SPECIFICATIONS SECTION 510.
FLEXIBLE CONDUIT SHALL MEET THE REQUIREMENTS OF FDOT STANDARD
12. CONDUIT FOR NAVIGATIONAL SWING LIGHTING:
HORIZONTALLY OR VERTICALLY UNLESS OTHERWISE NOTED.
ALL DIMENSIONS IN THESE PLANS ARE MEASURED IN FEET EITHER
13. PLAN DIMENSIONS:
14. VERTICAL & HORIZONTAL DATUMS:
15. EXISTING BRIDGE REMOVAL AND DISPOSAL:
16. TURBIDITY CONTROL:
10 - 18 - 2
EXAMPLE:
NUMBER FOLLOWED BY THE PILE/COLUMN NUMBER.
BY THE BEAM NUMBER. PILES/COLUMNS ARE IDENTIFIED BY THE BENT/PIER
OF STATIONING. BEAMS ARE IDENTIFIED BY THE SPAN NUMBER FOLLOWED
CONSECUTIVELY FROM LEFT TO RIGHT WHEN LOOKING IN THE DIRECTION
STATION (WEST TO EAST). BEAMS AND PILES ARE NUMBERED
BENTS AND PIERS ARE NUMBERED CONSECUTIVELY FROM LOW TO HIGH
18. IDENTIFICATION OF MEMBERS:
GUARD 60 DAYS PRIOR TO ANY WORK OVER THE WATERWAY.
APPROVED BY THE COUNTY, SHALL BE SUBMITTED TO THE US COAST
CONTRACTOR'S PLAN, SCHEDULE, AND SEQUENCE OF OPERATIONS,
REGARDING MAINTENACE OF BOAT TRAFFIC. A COPY OF THE
THE CONTRACTOR SHALL COMPLY WITH COAST GUARD REGULATIONS
19. BOAT TRAFFIC:
ACCORDANCE WITH FDOT STANDARD SPECIFICATIONS SECTION 110.
REMOVE AND DISPOSE OF THE EXISTING BRIDGE MATERIAL IN
STEEL SCREWS.
ALL DECKING AND FRAMING SHALL BE FASTENED WITH #10x4" STAINLESS
SOFTWOOD LUMBER STANDARD PS 20.
OTHERWISE NOTED. DRESSED SIZES SHALL CONFORM TO THE AMERICAN
LUMBER SIZES SHOWN REPRESENT NOMINAL DRESSED SIZES UNLESS
SPECIFICATIONS SECTION 955 FOR SALT WATER ENVIRONMENTS.
AND BE PRESSURE TREATED IN ACCORDANCE WITH FDOT STANDARD
SPECIFICATIONS SECTION 952, SOUTHERN PINE, MARINE GRADE NO. 1,
ALL LUMBER SHALL MEET THE REQUIREMENTS OF FDOT STANDARD
20. LUMBER FOR FENDER DECKING:
CONSTRUCTION. SEE TRAFFIC CONTROL PLANS FOR ADDITIONAL DETAILS.
MAINTAIN A MINIMUM OF ONE LANE OF ALTERANATING TRAFFIC THROUGHOUT
17. TRAFFIC CONTROL:
8. BRIDGE DECK GROOVING:
IN ACCORDANCE WITH SECTION 400-15.2.5 OF THE FDOT SPECIFICATIONS.
THE REPLACED BRIDGE FLOOR SURFACE SHALL RECEIVE A CLASS 4 FINISH
TO APPLYING THE REPAIR MORTAR FOR THESE SITE OBSERVATIONS.
CONTRACTOR SHALL CONTACT THE COUNTY A MINIMUM OF 24 HOURS PRIOR
COMPLETED BUT BEFORE THE REPAIR MATERIAL HAS BEEN APPLIED.
AFTER THE SURFACE PREPARATION FOR THE REPAIR WORK HAS BEEN
TO INSPECT THE AGREED UPON AREA FOR THE CONCRETE SPALL REPAIRS
THE COUNTY (OR THEIR REPRESENTATIVE) SHALL HAVE THE OPPORTUNITY
10. COORDINATION WITH THE COUNTY:
f'c = 5,500
SPALL REPAIR
STRUCTURAL PILE JACKETS
IV
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 11/18/2022 2:05:53 PM J:\00026\00026060.00\ms\struct\Final Submittal\B1PlanElev01.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
E F
E F E F
E F
E F
E F E F
E F E E EE FE
F E
FE
F E
F E
FE
F E F E
FE
F E
F E
PLAN AND ELEVATION
B1-1
P I
S T
A
.0
C L B
E
T
B E
B E
LC
P I
LC
P I
LC
P I
LC
P I
LC LC LC LC LC LC LC
LCLCLC
P I
P I
P I
P I
P I
P I
P I
LC
B
E
LC
B
E
LC
B
E
LC
B
E
LC
B
E
LC
B
E
E N
D
B
E
E N
D
B
E
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.5
S T
A
.1
S T
A
.7
S T
A
.3
S T
A
.9
S T
A
.0
S T
A
.6
S T
A
.2
S T
A
.8
S T
A
.4
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
-20
-20
-40
NAVD88
-40
MHW ELEV. 0.67
MSL ELEV. -0.62
MLW ELEV. -1.89
275 280
STA. 268+84.00
BEGIN BRIDGE
STA. 287+26.00
END BRIDGE
P C
S
T A
.0
P T
S
T A
.1
PLAN
ELEVATION
Direction of Stationing
(SEE NOTE 2)
FENDER
SYSTEM (SEE NOTE 1)
ACCESS LADDER
(SEE NOTE 2)
FENDER
� CONST.
FRONT FACE OF BACKWALL
BEGIN BRIDGE
FRONT FACE OF BACKWALL
END BRIDGE
NOTES:
7 SPANS @ 70'-0" = 490'-0"
5 SPANS @ 95'-7" = 477'-11"
116'-2"
5 SPANS @ 95'-7" = 477'-11"
= 280'-0"
4 SPANS @ 70'-0"
LIGHTING (TYP.)
NAVIGATIONAL
LIGHTING (TYP.)
NAVIGATIONAL
CHANNEL
NAVIGATIONAL
M A
R C
O
C
H A
N N
E L
NO. 030184
BRIDGE
EXPANSION JOINT (TYP.)
REMOVE AND REPLACE DECK
FILLED SCOUR HOLES (TYP.)
BANK AND SHORE OVER
INSTALL RUBBLE RIPRAP,
INSTALL RUBBLE RIPRAP, BANK AND SHORE (TYP.)
FILL SCOUR HOLES WITH BEDDING STONE AND
CONCRETE WITH SRA
DECK AND REPLACE WITH CLASS IV
" OF CONCRETE2
1REMOVE TOP 1
LIGHTING (SEE NOTE 3)
NAVIGATIONAL SWING
1842'-0"
+6.
0±
-6.0±%
R = 5729.58'±
CURVE 1
R = 1495.76'±
CURVE 2
EXISTING GROUND
APPROXIMATE
WITH GALVANIC ANODES AT PILE #15
8'-0" STRUCTURAL PILE JACKET
AT EACH PIER COLUMN (TYP.)
5'-0" TALL GALVANIC JACKET
GALVANIC ANODES (TYP.)
OVERBUILD WITH
PIER FOOTING
WATER LIMITS
SURFACE
APPROXIMATE
WATER LIMITS
SURFACE
APPROXIMATE
WATER LIMITS
SURFACE
APPROXIMATE
WATER LIMITS
SURFACE
APPROXIMATE
ON EXISTING PLANS.
BRIDGE GEOMETRY, DIMENSIONS, AND ELEVATIONS ARE BASED5.
BRIDGE LENGTH IS MEASURED ALONG � OF CONSTRUCTION.4.
AND REPLACE WITH FLEXIBLE CONDUIT.
REMOVE EXISTING CONDUIT TO NAVIGATIONAL SWING LIGHTING3.
WRAPS.
CABLE WRAPS ON FENDER PILES AND REPLACE WITH SS CABLE
3 FT ADJACENT TO NAVIGATIONAL LIGHTS (6 TOTAL). REMOVE ALL
INSTALL NEW TIMBER FRAMING AND PLANKS FOR A LENGTH OF
REMOVE ALL TIMBER PLANKS AND FRAMING ON FENDER WALKWAY. 2.
AND GANGWAY TO THE FENDER WALKWAY.
ALL LADDERS, SUPPORTS, CONNECTING HARDWARE, PLATFORMS
REMOVE THE EXISTING ACCESS LADDER SYSTEM INCLUDING1.
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 11/18/2022 2:12:39 PM J:\00026\00026060.00\ms\struct\Final Submittal\B1TurbidityMonitoring02.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
M A
R C
O
C
H A
N N
E L
275 280
5'-0"
N
BARRIER (TYP.)
FLOATING TURBIDITY
FENDER (TYP.)
BETWEEN FENDER AND PIER
INSTALL TURBIDITY BARRIER
(TYP. U.N.O)
NO. 5
PIER
NO. 6
PIER
NO. 7
PIER
NO. 8
PIER
NO. 9
PIER
NO. 10
PIER
NO. 11
PIER
NO. 12
PIER
NO. 13
PIER
NO. 14
PIER
NO. 15
PIER
NO. 16
PIER
NO. 3
BENT
NO. 4
BENT
NO. 17
BENT
NO. 18
BENT
NO. 19
BENT
TURBIDITY BARRIER PLAN FOR CONCRETE WORK
GALVANIC OVERBUILD (TYP.)
B1-2
GALVANIC OVERBUILD (TYP.)
WITH GALVANIC ANODE
STRUCTURAL PILE JACKET
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 12/13/2022 2:02:34 PM J:\00026\00026060.00\ms\struct\Final Submittal\B1TurbidityMonitoring01.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
N 81° 42' 23" E
MZO1-N MZO2-N MZO3-N MZO4-N MZO5-N
MZO1-S MZO2-S MZO3-S MZO4-S MZO5-S
BS-N
MZI1-N MZI2-N MZI4-NMZI3-N MZI5-N
MZI5-SMZI1-S MZI2-S MZI3-S MZI4-S
BS-S
PIER NO. 10 PIER NO. 11 PIER NO. 12
PIER NO. 13 PIER NO. 14 PIER NO. 15 PIER NO. 16 PIER NO. 17 PIER NO. 18
PIER NO. 19
TURBIDITY MONITORING PLAN FOR SCOUR PROTECTION WORK
(T Y P
U .N .O
N
M A
R C
O
C
H A
N N
E L
(TYP.)
25'-0"
OR AS OTHERWISE DIRECTED BY THE COUNTY’S PROJECT MANAGER (OR THEIR DESIGNEE).
TURBIDITY METER READINGS SHOW ACCEPTABLE TURBIDITY LEVELS HAVE BEEN RESTORED
IN-WATER WORK AND THE FOUR-HOUR SAMPLING INTERVAL WILL NOT RESUME UNTIL
INTERVAL TO SHOW WHEN TURBIDITY LEVELS HAVE RETURNED TO AN ACCEPTABLE LEVEL.
AREA. AT THIS TIME, THE SAMPLING FREQUENCY WILL BE INCREASED TO A TWO-HOUR
REPLACED AS NECESSARY TO CONTROL TURBID DISCHARGES FROM THE IMMEDIATE WORK
TURBIDITY CONTROL DEVICES WILL BE INSPECTED IMMEDIATELY AND REPAIRED OR
IN-WATER WORK AND NOTIFY THE COUNTY’S PROJECT MANAGER (OR THEIR DESIGNEE). ALL
(MZO) EXCEED THE BACKGROUND LEVELS, THE CONTRACTOR WILL IMMEDIATELY STOP ALL
NTUS ABOVE BACKGROUND LEVELS OR READINGS AT THE MIXING ZONE OUTSIDE STATIONS
IF TURBIDITY READINGS AT THE MIXING ZONE INSIDE STATION (MZI) READINGS EXCEED 41 5.
READINGS AT MIXING ZONE OUTSIDE STATIONS MAY NOT EXCEED THE BACKGROUND LEVELS.
OVER THE DAILY AMBIENT BACKGROUND LEVELS AS MEASURED AT BS-N OR BS-S. TURBIDITY
WITHIN THE MIXING ZONE (MIXING ZONE INSIDE STATIONS) TO BE INCREASED TO 41 NTUS
ZONES. THIS PLAN AND THE ERP INCLUDE A MIXING ZONE ALLOWING TURBIDITY LEVELS
INCREASED OVER DAILY AMBIENT BACKGROUND LEVELS OTHER THAN IN APPROVED MIXING
WATERS (OFW). STATE WATER QUALITY STANDARDS DO NOT ALLOW TURBIDITY TO BE
THE ROOKERY BAY NATIONAL ESTUARINE RESEARCH RESERVE IS AN OUTSTANDING FLORIDA 4.
SOUTH (MZI1-S, MZI2-S, MZI3-S, MZI4-S, AND MZI5-S).
FIVE ON THE NORTH (MZI1-N, MZI2-N, MZI3-N, MZI4-N, AND MZI5-N) AND FIVE ON THE
SHOWN ON THIS SHEET, TEN MIXING ZONE INSIDE STATIONS WILL BE ESTABLISHED WITH
WILL BE CONDUCTED AT FOUR-HOUR INTERVALS FOR THE DURATION OF THE WORK DAY. AS
TURBIDITY READINGS AT THE MIXING ZONE INSIDE AND MIXING ZONE OUTSIDE STATIONS 2.
ZONE SAMPLE STATIONS.
TAKEN AT MID-DEPTH AT THE PROPER BACKGROUND STATION PRIOR TO SAMPLING MIXING
OUTGOING OR OUTGOING TO INCOMING), A NEW BACKGROUND TURBIDITY READING WILL BE
EXPECTED DURING THE WORK PERIOD. WHEN TIDAL CONDITIONS CHANGE (E.G. INCOMING TO
MID-DEPTH AT THE PROPER BACKGROUND STATION RELATIVE TO TIDAL CONDITIONS
PLACEMENT WILL BE OCCURRING, A BACKGROUND TURBIDITY READING WILL BE TAKEN AT
APPROXIMATE LOCATION SHOWN ON THIS SHEET. ON ANY GIVEN DAY THAT IN-WATER FILL
TWO BACKGROUND SAMPLE STATIONS (BS-N AND BS-S) WILL BE ESTABLISHED AT THE 1.
AUTHORIZATION FOR A TURBIDITY MONITORING PLAN THAT DEVIATES FROM THIS PLAN.
PROJECT CONSTRUCTION, UNLESS THE PROJECT CONTRACTOR OBTAINS SEPARATE
MONITORING PLAN WILL BE IMPLEMENTED DURING ALL IN-WATER WORK REQUIRED TO COMPLETE
PLACEMENT OF FILL MATERIALS WITHIN WATERS OF THE STATE. THE FOLLOWING TURBIDITY
CONSTRUCTION OF THE STAN GOBER BRIDGE REHABILITATION PROJECT REQUIRES THE
B1-3
EXISTING FENDER (TYP.)
MIXING ZONE
FLOATING TURBIDITY BARRIER (TYP.)
TURBIDITY MONITORING PLAN:
IDENTIFIED WITHIN THE PERMIT OR AS ADVISED BY THE PERMITTING AGENCY.
RESOURCE PERMIT (ERP) NUMBER WILL BE SUBMITTED WEEKLY TO THE ADDRESS
PRECEDING 24 HOURS, ETC.). A SUMMARY OF THE DAILY LOGS LISTING THE ENVIRONMENTAL
RELEVANT INFORMATION (E.G. PROLONGED HIGH WINDS, HEAVY RAINFALL WITHIN THE
WEATHER CONDITIONS, TIDAL CONDITIONS, NATURE OF WORK BEING CONDUCTED, AND OTHER
INTO A LOGBOOK AT THE TIME OF RECORDING ALONG WITH THE DATE, TIME OF DAY,
SOLUTIONS PER THE METER MANUFACTURER’S INSTRUCTIONS. READINGS SHALL BE ENTERED
PORTABLE TURBIDITY METER THAT HAS BEEN CALIBRATED WITH STANDARD CALIBRATION
TURBIDITY READINGS (IN NEPHELOMETRIC TURBIDITY UNITS NTUS) WILL BE TAKEN WITH A 3.
DURING SLACK TIDE CONDITIONS.
ZONE STATIONS (INSIDE AND OUTSIDE) CLOSEST TO THE ACTIVE WORK WILL BE USED
STATIONS (INSIDE AND OUTSIDE) WILL BE UTILIZED DURING OUTGOING TIDES. THE MIXING
(INSIDE AND OUTSIDE) WILL BE USED DURING INCOMING TIDES AND SOUTH MIXING ZONE
OCCURRED DURING THE PREVIOUS FOUR-HOUR PERIOD. NORTH MIXING ZONE STATIONS
MID-DEPTH FOR EACH OF THE MIXING ZONE STATIONS WHERE WORK IS OCCURRING OR HAS
MZO2-S, MZO3-S, MZO4-S, AND MZO5-S). TURBIDITY READINGS WILL BE TAKEN AT
(MZO1-N, MZO2-N, MZO3-N, MZO4-N, AND MZO5-N) AND FIVE ON THE SOUTH (MZO1-S,
TEN MIXING ZONE OUTSIDE STATIONS WILL BE ESTABLISHED WITH FIVE ON THE NORTH 2.
(TYP.) SEE SHEET B1-23
LIMITS OF RUBBLE RIPRAP
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
christopher.gamache 12/14/2022 9:11:42 AM \\cardno.corp\global\US\FL\CLW01\CLW01Projects\00026\00026060.00\ms\struct\Final Submittal\B1DeckRepair01.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
N
DECK REPAIR DETAILS
270 275
STA. 268+84.00
BEGIN BRIDGE
PLAN
� CONST.
NOTES:
Direction of Stationing
REPAIR TYPE QUANTITYLOCATION
DECK REPAIR SUMMARY
SPAN
1-10
2,137 SY
4 SPANS @ 70'-0" = 280'-0" 5 SPANS @ 95'-7" = 477'-11" 116'-2"
M A
T C
H L I N
E
STA. 287+26.00
END BRIDGE
5 SPANS @ 95'-7" = 477'-11"
1842'-0"
M A
T C
H L I N
E
7 SPANS @ 7
0'-0"
= 490 '-0"1842'-0"
SPAN 4SPAN 1 SPAN 2 SPAN 3 SPAN 5 SPAN 6 SPAN 7 SPAN 8 SPAN 9 SPAN 10
2 6
SPAN 11 SPAN 12 SPAN 13 SPAN 14 SPAN 15 SPAN 16 SPAN 17 SPAN 18 SPAN 19
SPAN 20
SPAN 21
SPAN 2
P I
S T
A
.0
B E
B E
B E
LC
P I
LC
P I
LC
P I
LC
P I
LC LC
LC LC LC LC LC
LCLCLC
P I
P I
P I
P I
P I
P I
P I
LC
B
E
LC
B
E
LC
B
E
LC
B
E
LC
B
E N
T
N
O
LC
B
E N
T
N
O
E N
D
B
E N
T
N
O
E N
D
B
E
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.5
S T
A
.1
S T
A
.7
S T
A
.3
S T
A
.9
S T
A
.0
S T
A
.2
S T
A
.8
S T
A
.4
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
S T
A
.0
C L
LC
P I
S T
A
.0
LEGEND:
B1-4
S T
A
.6
SPALL REPAIR
SPALL REPAIR 1 CF
LEFT FASCIA AT END BENT 1 2 CF
17 SPALL REPAIR 1 CF
LEFT FASCIA
LEFT OVERHANG AT PIER 17*
SPALL REPAIR 2 CF
1-22
SPALL REPAIR 2 CF
9 AT 2/3 SPAN BETWEEN GIRDERS 6 & 7*
1-22
80,048 SF
PENETRANT 933 GA
16 SPALL REPAIRRIGHT OVERHANG AT PIER 16* 2 CF
18 SPALL REPAIR 2 CFNEAR PIER 19 BETWEEN GIRDERS 3 & 4*14
SECTION 413.
IN ACCORDANCE WITH FDOT STANDARD SPECIFICATIONS
DECK SURFACE AND APPLY PENETRATING CORROSION INHIBITOR
AFTER ALL OF THE DECK REPAIRS ARE COMPLETE, CLEAN THE3.
STANDARD PLANS INDEX 458-110.
POURED JOINT WITH BACKER ROD IN ACCORDANCE WITH FDOT
REMOVE EXISTING EXPANSION JOINTS AND REPLACE WITH 2.
CLASS IV CONCRETE WITH SRA.
" OF CONCRETE DECK AND REPLACE WITH2
1REMOVE TOP 11.
LIMITS OF REPAIR 1 (SEE NOTE 1)
REPAIRS MARKED WITH AN ASTERISK (*) ARE LOCATED ON THE UNDERSIDE OF THE DECK.*NOTE:
NEAR END BENT 1 BETWEEN GIRDERS 5 & 6*
89.1 CY
1064 LF
NO.
EASTBOUND LANE & SHOULDER (SEE NOTE 1)
DECK REMOVAL
DECK REPAIR
DECK EXPANSION JOINTS (SEE NOTE 2) JOINT REPLACEMENT
CLEAN & SEAL
5 2 RIGHT FASCIA SPALL REPAIR 1 CF
7 SPALL REPAIR 1 CF
8 SPALL REPAIR 1 CFJOINT HEADER
TOP OF BARRIER
15 SPALL REPAIR 1 CF11 SOUTH FACE OF BARRIER
DECK SURFACE (SEE NOTE 3)
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 12/13/2022 3:28:18 PM J:\00026\00026060.00\ms\struct\Final Submittal\B1SpallRepairDet01.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
SPALL REPAIR DETAILS
B1-5
CONCRETE SPALL REPAIR
SPALL
SPALL
SECTION
EXISTING
CONCRETE)
AND SPALLS (UNSOUND
CRACKS, DELAMINATIONS,
MIN. SPLICE LENGTHS
PREFERRED SPALL PATCH CONFIGURATION
SHALL BE KEPT AS SIMPLE AS POSSIBLE
NO FEATHER EDGES. PATCH CONFIGURATIONS
AT EDGE LOCATIONS PROVIDE RIGHT ANGLE CUTS.
CONDITION
EXISTING
REPAIR
PROPOSED
EXISTING REINFORCMENT BAR
NEW SPLICE BAR
LAP LENGTH DETAIL
EXISTING BAR SIZE SPLICE BAR SIZE SPLICE BAR LENGTH
L E
N G
T H
M I N
L A
P
S
P L I C
E
L E
N G
T H
M I N
L A
P
S
P L I C
E
CONCRETE SPALL REPAIR DETAIL
(COSMETIC)
3" MAX.
SMOOTH TO ADJACENT CONCRETE
MATERIAL AND FINISH
APPLY CONCRETE REPAIR
EXISTING REINFORCEMENT
EXISTING REINFORCEMENT
ADJACENT CONCRETE
MATERIAL, AND FINISH SMOOTH TO
", APPLY CONCRETE REPAIR2
1DEPTH OF
REMOVE CONCRETE TO A MINIMUM
" DEEP SAWCUT EDGE (TYP).2
CONCRETE SPALL REPAIR DETAIL
(WITHOUT EXPOSED REINFORCING)
CONCRETE SPALL REPAIR DETAIL
" DEEP SAWCUT EDGE (TYP).2
OF ALL RUST AND DIRT
MECHANICALLY CLEAN REINFORCEMENT
SURFACE (TYP.)
CONCRETE
MATCH EXIST
SMOOTH TO ADJACENT CONCRETE
APPLY CONCRETE REPAIR MATERIAL, AND FINISH
REMOVE CONCRETE TO 1" BEYOND REINFORCEMENT,
(WITH EXPOSED REINFORCING)
16"
20"
24"
28"
7 7
8 8
9 9
DAMAGE WHEN REMOVING CONCRETE)
EXISTING REINFORCEMENT (DO NOT
TYPICAL DELAMINATIONS, CRACKS, AND SPALLS
32"
36"
41"
49"
LINE AND SHAPE OF ADJACENT SURFACES.
SPALLED AREAS SHALL BE FINISHED SMOOTH TO MATCH THE 11.
FLAKING.
" CHAMFER ON ALL EXPOSED EDGES TO AVOID 4
3PROVIDE A 10.
PROVIDE CLEARANCE FOR THE LAP.
LENGTHS. REMOVE ADDITIONAL CONCRETE AS NECESSARY TO
IN ACCORDANCE WITH THE LAP LENGTH DETAIL AND MIN. SPLICE
REDUCTION IN ITS CROSS SECTIONAL AREA, USE A SPLICE BAR
WHEN THE EXISTING BAR EXHIBITS A 25% OR GREATER 9.
THE CONCRETE WITH ABRASIVE.
CLEAN EXPOSED REINFORCEMENT AND THE BOND SURFACE OF 8.
BONDED TO THE SURROUNDING CONCRETE.
SIGNIFICANT CORROSION AND THE REINFORCING STEEL IS WELL
THERE IS NO FURTHER DELAMINATION, CRACKING, OR
REMOVE CONCRETE ALONG THE REINFORCING STEEL UNTIL 7.
ACHIEVED.
EXPOSED REINFORCEMENT AND SURROUNDING CONCRETE IS
REINFORCEMENT UNTIL A MINIMUM 1" CLEARANCE BETWEEN THE
UNSOUND CONCRETE, THE REMOVAL SHALL UNDERCUT THE
IF REINFORCEMENT IS ENCOUNTERED DURING THE REMOVAL OF 6.
COSMETIC SPALL REPAIRS DO NOT REQUIRE A SAW CUT EDGE.5.
ADJACENT SPALLS SHALL BE JOINED INTO ONE REPAIR.
RECTANGULAR IN NATURE WITH CORNERS AT RIGHT ANGLES.
" SAW CUTS ENCOMPASSING SPALLED AREAS SHALL BE 2
1THE 4.
SHEETS B1-4, B1-6, AND B1-7.
WITH A HAMMER. KNOWN DEFICIENCIES CAN BE FOUND ON
OF THE ENGINEER PRIOR TO THE START OF WORK BY SOUNDING
BE IDENTIFIED AND MARKED IN THE FIELD IN THE PRESENCE
THE LOCATION AND LIMITS OF CONCRETE SPALL REPAIR SHALL 3.
SHOWN IN THESE PLANS.
SPECIFICATION T401 AND THE REPAIR CATEGORY DETAILS
SPALL REPAIRS SHALL BE IN ACCORDANCE WITH TECHNICAL 2.
(INCLUDING OVERHEAD) AND VERTICAL.
DETAILS ARE APPLICABLE TO ALL ORIENTATIONS: HORIZONTAL 1.
C L
(M A
X
CROSS SECTION OVER 25%
LOCATION HAS A REDUCTION IN
THAN 1'-0" OR IF AN ISOLATED
OCCURS OVER A LENGTH GREATER
WHERE MINOR SECTION LOSS
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 12/13/2022 4:02:42 PM J:\00026\00026060.00\ms\struct\Final Submittal\B1BeamRepair01.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
GENERAL NOTES:
PROCEDURE FOR REPAIR ON PRESTRESSED CONCRETE BEAMS:
B1-6
PRIOR TO PACHING BEAMS
EPOXY INJECT CRACKS
AND SPALLS IN DIAPHRAGMS (TYP.)
REPAIR CRACKS, DELAMINATIONS,
REPAIR TOP DECK
CONCRETE BEAMS
PRESTRESSED
REPAIR SPALLED
TYPICAL SUPERSTRUCTURES DEFICIENCIES
CURB SPALLS
REPAIR DECK AND
AND COAT WITH ZINC ARC SPRAY
CONCRETE BEAM ENDS
REPAIR SPALLED PRESTRESSED
BEAM REPAIR DETAILS 1 OF 2
1.DEFICIENCIES SHOWN IN THE ADJACENT TYPICAL SUPERSTRUCTURE DEFICIENCIES
DETAIL ARE FOR ILLUSTRATIVE PURPOSES ONLY.
2.REPAIRS FOR PRESTRESSED CONCRETE BEAMS SHALL FOLLOW THE TYPICAL SPALL
AND CRACK REPAIR PROCEDURES EXCEPT AS NOTED BELOW.
3.CHIP CRACKED/SPALLED CONCRETE BACK TO SOUND CONCRETE. LARGE PIECES OF
CONCRETE THAT CONFINE THE STRANDS AND "HOLD DOWN" DRAPED STRANDS (IF
APPLICABLE) SHALL NOT BE DISTURBED OR REMOVED.
4.REPAIRS FOR PRESTRESSED CONCRETE BEAMS THAT ARE DEEP ENOUGH TO EXPOSE
STEEL REINFORCING OR PRESTRESSING STRANDS AND ARE FARTHER THAN 7 FEET
FROM THE END OF THE BEAM, SHALL INCLUDE THE INSTALLATION OF EMBEDDED
GALVANIC ANODES, TYPE 1A, ALKAI-ACTIVATED.
5.AFTER REPAIRS ARE COMPLETE, APPLY ACTIVATED ZINC ARC SPRAY OVER THE
SURFACE OF THE BEAM FOR A DISTANCE OF 7 FEET FROM THE END OF THE BEAM.
BEAM CROSS SECTION AND PROFILE
(TYPE III SHOWN, TYPE IV SIMILIAR)
ZINC METALLIZING
ZINC METALLIZING
7'-0"
BEAM NUMBER DEFICIENCY
1-6 1 CF
2-4
2-5
2-6
2-7
3-4
4-5
4-6
WEST END OF BEAM, SPALL
WEST END OF BEAM, SPALL, DEBRIS, EXPOSED STEEL
RIGHT BOTTOM FLANGE OVER ABUTMENT 1, SPALL WITH EXPOSED CABLES
4-2
4-4
4-5
EAST END OF BEAM, SPALL
WEST END OF BEAM, SPALL WITH EXPOSED STEEL
6-1
6-5
WEST END OF BEAM, CORNER OF BEAM, SPALL
RIGHT BOTTOM FLANGE OVER PIER 7, SPALL AND EXPOSED STEEL
4-6
WEST END OF BEAM AT PIER 2, SPALL WITH EXPOSED STEEL
WEST END OF BEAM AT PIER 2, SPALL AND DEBRIS
WEST END OF BEAM, NORTH FLANGE SPALL, EXPOSED STEEL
ESTIMATED
QUANTITY
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1.PERFORM BEAM REPAIRS IN ACCORDANCE WITH APPLICABLE TECHNICAL
SPECIFICATIONS AND DETAILS SHOWN IN THESE PLANS AND FDOT STANDARD
SPECIFICATIONS SECTION 450.
2.DEFICIENCIES SHOWN ARE FOR ILLUSTRATION ONLY. ANY DIMENSIONS ARE
APPROXIMATE. IN THE PRESENCE OF THE ENGINEER, THE CONTRACTOR SHALL
CLEARLY OUTLINE ALL AREAS IN NEED OF REPAIR WITH AN APPROVED PAINT OR
MARKER PRIOR TO DEMOLITION. NO DEMOLITION OF ANY AREA OR MEMBER OF
THE BRIDGE SHALL BE PERFORMED UNTIL THE CONTRACTOR RECEIVES
APPROVAL FROM THE ENGINEER.
EAST END OF BEAM AT PIER 5, NORTH AND SOUTH FACE, SPALL
EAST END OF BEAM AT PIER 5, NORTH FACE, SPALL
EAST END OF BEAM AT PIER 5, SOUTH FACE, SPALL
EAST END OF BEAM AT PIER 5, NORTH FACE, SPALL
BEAM, DIAPHRAGM, AND PEDESTAL REPAIR SUMMARY
NOTE: REPAIRS MARKED WITH "*" SHALL INCLUDE ZINC METALLIZING
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 12/13/2022 4:03:50 PM J:\00026\00026060.00\ms\struct\Final Submittal\B1BeamRepair02.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122 B1-6
BEAM REPAIR DETAILS 1 OF 2
BEAM NUMBER DEFICIENCY
6-6
8-5
8-7
9-1
9-5
10-4 1 CF
10-8
11-4 EAST END, SPALL WITH EXPOSED STEEL
11-7
12-2
LOWER SOUTH FLANGE AT PIER 8, SPALL AND CORRODED CABLES
EAST END OF BEAM, SPALL
SOUTH FACE OVER PIER 12, SPALL WITH CORRODED CABLES
12-6
14-6
15-2
14-4
15-4
15-5
16-6
17-4 WEST END OF BEAM, SOUTH FACE, SPALL
17-5
18-4 LOWER NORTH FLANGE AT BENT 19, SPALL
19-1
19-2
20-3
21-1
21-3
21-4
21-4
21-5
21-5
21-6
21-6
21-7
EAST END OF BEAM, NORTH FACE, SPALL
WEST END OF BEAM, SPALL
WEST END OF BEAM, SOUTH FACE, SPALL
WEST END OF BEAM, SOUTH FACE, SPALL
21-7
22-2
22-6
12-6
19-4
19-1
22-3
9-6 END DIAPHRAGM, WEST END PIER 10, SPALL WITH EXPOSED REBAR
B2 & B3
B3 & B4 END DIAPHRAGM, PIER 16, SPALL WITH EXPOSED REBAR
END DIAPHRAGM, PIER 16, EXPOSED REBAR
1 CF
1 CF
1 CF
18-1
16-1
1-7 1 EA
1 EA
1 EA
BEARING PLATE AT ABUTMENT 1
BEARING PLATE AT PIER 16
BEARING PLATE AT PIER 18
BENT 19 SOUTH FACE OF BEAM, SPALL
EAST END OF BEAM AT PIER 7, SPALL
WEST END OF BEAM AT PIER 9, NORTH AND SOUTH FACE, SPALL
END OF BEAM AT PIER 11, CRACK
WEST END OF BEAM AT PIER 12, SOUTH FACE, SPALL
WEST END OF BEAM AT BENT 21, NORTH AND SOUTH FACE, SPALL
WEST END OF BEAM AT BENT 21, SOUTH FACE, SPALL
WEST END OF BEAM AT BENT 21, SOUTH FACE, SPALL
EAST END OF BEAM AT BENT 22, NORTH AND SOUTH FACE, SPALL
EAST END OF BEAM AT BENT 22, NORTH/SOUTH FACE
EAST END OF BEAM AT BENT 22, SOUTH FACE, SPALL
WEST END OF BEAM AT BENT 21, NORTH FACE, SPALL
EAST END OF BEAM AT BENT 22, NORTH AND SOUTH FACE, SPALL
END OF BEAM AT END BENT 23, SPALL
BOTTOM FLANGE NEAR END BENT 23, CORNER SPALL
END OF BEAM AT END BENT 23, SPALL
LOWER SOUTH EDGE 4 FT FROM PIER 77-3
7-5 LOWER NORTH EDGE ADJACENT TO PIER 8
10-1 LOWER NORTH EDGE 6 FT FROM PIER 11
12-4
LOWER SOUTH EDGE ADJACENT TO PIER 12
20-7 EAST END OF BEAM, SPALL
8-5 1 CFFIRST INTERMEDIATE DIAPGHRAGM LOWER WEST EDGE
8-6 1 CFEND DIAPHRAGM ADJACENT OVER PIER 9
ESTIMATED
QUANTIY
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
1 CF
EAST END BEARING SEAT, SPALL
EAST END DIAPHRAGM AT PIER 16, DELAMINATION
WEST END OF BEAM AT PIER 8, NORTH AND SOUTH FACE
WEST END OF BEAM AT PIER 12, SOUTH FACE, SPALL
EAST END OF BEAM AT PIER 13, EXPOSED STRANDS
WEST END OF BEAM, AT PIER 15 NEAR BEARING, SPALL
EAST END OF BEAM AT PIER 15
WEST END OF BEAM AT PIER 15, DELAMINATION
WEST END OF BEAM AT PIER 15, SPALL
SOUTH FACE, WEST END OF BEAM, SPALL
WEST END OF BEAM AT BENT 19, SPALL
EAST END OF BEAM AT BENT 20, NORTH AND SOUTH FACE, SPALL
EAST END OF BEAM AT BENT 20, SPALL WITH EXPOSED STEEL
NOTE: REPAIRS MARKED WITH "*" SHALL INCLUDE ZINC METALLIZING
BEAM, DIAPHRAGM, AND PEDESTAL REPAIR SUMMARY (CONTINUED)
ASZ
EXISTING BEAM
ZINC CONNECTION PLATE, AS
REQUIRED. SEE SHEET B1-9
FOR DETAILS
7' FROM
EXPANSION
JOINT
SCALE: N.T.S.1 ARC SPRAY ZINC (ASZ) LOCATION
.\VCS Drawings\XREF's\VCS_Logo_Registered_Full_2.png
4" X 4" ZINC MESHEXISTING CONCRETE
ANCHOR (TYP.)APPLY SECOND LAYER OF ASZ OVER TOP OF
CONNECTION PLATE AND HARDWARE
APPLY FIRST LAYER OF ASZ UNDER THE
CONNECTION PLATE AND HARDWARE
STAINLESS STEEL THREADED
ROD, NUTS AND WASHERS
APPLY TOP COAT OF ZINC SILICATE
NOTES:
1. THESE DETAILS ARE TO BE APPLIED
IN CONJUNCTION WITH ASZ DETAIL
ON B1-8
2. TWO CONNECTION PLATES ARE
REQUIRED PER CONTINUOUS ASZ
SPRAY AREA
STAINLESS STEEL THREADED
ROD, NUTS, AND WASHERS.
REINFORCING
STEEL
HOLE FILLED
WITH EPOXY
1ST ASZ LAYER
2ND ASZ LAYER
ANCHOR ZINC MESHAPPLY ASZ OVER TOP OF CONNECTION PLATE AND
HARDWARE
DRILL AND TAP CONNECTION
TO REBAR
TOP COAT OF
ZINC SILICATE
SCALE: N.T.S.1
NON-MONITORED
ANODE CONNECTION
SCALE: N.T.S.2
NON-MONITORED
ANODE AND STRUCTURE CONNECTION
.\VCS Drawings\XREF's\VCS_Logo_Registered_Full_2.png
B1-9
NOTE:
1. EMBEDDED GALVANIC ANODES WILL ONLY BE INSTALLED IN BEAM
DIAPHRAGM.
2. FOR LARGE REPAIRS PLACE EMBEDDED GALVANIC ANODES AROUND THE
PERIMETER OF SPALL REPAIR AT 12 IN O.C. ANODE SPACING AND LAYOUT
APPLIES FOR BOTH PARTIAL AND FULL DEPTH REPAIR AREAS.
3. IN PATCHES SMALLER THAN 1 SF PLACE ONE EMBEDDED GALVANIC ANODE
SOUND CONCRETEEMBEDDED
GALVANIC
ANODE (TYP.)
REMOVE ALL
DELAMINATED
CONCRETE
12"
SCALE: N.T.S.1 EMBEDDED GALVANIC ANODE PATCH REPAIRS
SCALE: N.T.S.1
SECTION VIEW
GALVANIC ANODE INSTALLATION DETAIL
B1-13
SCALE: N.T.S.1 INSTALLATION STEP #1
SCALE: N.T.S.2 INSTALLATION STEP #2
SCALE: N.T.S.3 INSTALLATION STEP #3
SCALE: N.T.S.4 INSTALLATION STEP #4
SCALE: N.T.S.1 ALTERNATE INSTALLATION AT REBAR INTERSECTION
SCALE: N.T.S.2 SECTION AT ANODE
EXISTING PILES
BOTTOM OF
EXISTING FOOTING
B1 -1
B1 -1
ZINC ANODE
PUMPING PORT
(AS REQUIRED)
STAY-IN-PLACE FORM
FILLED WITH GROUT
PVC TERMINAL BOX A
SEE DETAIL 1 ON B1-19
ZINC ANODE (STOP 2" FROM
TOP OF JACKET)
PVC TERMINAL BOX B
SEE DETAIL 2 ON B1-19EXISTING COLUMN B
PUMPING PORT
(AS REQUIRED)
INSPECTION PORT (AS
REQUIRED) (SEE DETAIL 4
ON B1-15)
INSPECTION PORT (AS
REQUIRED) (SEE DETAIL 4
ON B1-15)
INSPECTION PORT
(AS REQUIRED)
(SEE DETAIL 4 ON
B1-15)
INSPECTION PORT (AS REQUIRED)
(SEE DETAIL 4 ON B1-15)
EXISTING COLUMN A
5'
SCALE: N.T.S.1
SIDE ELEVATION VIEW
COLUMN, FOOTING AND STRUT JACKET OVERBUILD
PUMPING PORT
(AS REQUIRED)
STAY-IN-PLACE FORM
FILLED WITH GROUT
EXISTING COLUMN
BOTTOM OF
EXISTING FOOTING
ZINC ANODE (STOP 2" FROM
TOP OF JACKET)
ZINC ANODE
PVC TERMINAL BOX
INSPECTION PORT (AS REQUIRED)
(SEE DETAIL 4 ON B1-15)
INSPECTION PORT (AS
REQUIRED) (SEE DETAIL 4
ON B1-15)
INSPECTION PORT
(AS REQUIRED)
(SEE DETAIL 4 ON
B1-15)
5'
EXISTING FOOTING
STAY IN PLACE FORM
FILLED WITH GROUT
ZINC ANODE
EXISTING REBAR
GROUT
3"
NEGATIVE CONNECTION
SEE SHEET B1-20
EXISTING STRUT
STAY IN PLACE FORM
FILLED WITH GROUT
ZINC ANODE
GROUT
EXISTING REBAR
3"
3"
NEGATIVE CONNECTION
SEE SHEET B1-20
INSPECTION PORT
1.75"
SCALE: N.T.S.1
ELEVATION VIEW
COLUMN AND FOOTING JACKET OVERBUILD
SCALE: N.T.S.2
SECTION VIEW
FOOTING JACKET OVERBUILD
SCALE: N.T.S.3
SECTION VIEW
STRUT JACKET OVERBUILD
.\VCS Drawings\XREF's\VCS_Logo_Registered_Full_2.png
SCALE: N.T.S.4
SECTION VIEW
INSPECTION PORT DETAILS
ZINC ANODE
STAY-IN-PLACE
FORM FILLED
WITH GROUT
PVC TERMINAL BOX B SEE
DETAIL 4 ON B1-19
ZINC ANODE (STOP 2" FROM
TOP OF JACKET)
PVC TERMINAL
BOX A SEE DEATIL
3 ON B1-19
EXISTING
COLUMN A
EXISTING
COLUMN B
FOOTING LEVEL 1
PUMPING PORT
(AS REQUIRED)
B1 -1
INSPECTION PORT (AS REQUIRED)
(SEE DETAIL 4 ON B1-15)
INSPECTION PORT (AS
REQUIRED) (SEE
DETAIL 4 ON B1-15)
INSPECTION PORT (AS
REQUIRED) (SEE DETAIL 4
ON B1-15)
INSPECTION PORT (AS REQUIRED)
(SEE DETAIL 4 ON B1-15)
PUMPING PORT (AS REQUIRED)
BOTTOM OF
EXISTING FOOTONG
FOOTING LEVEL 2
FOOTING LEVEL 3
2'
SCALE: N.T.S.1
SIDE ELEVATION VIEW
COLUMN AND FOOTING JACKET OVERBUILD PIER 10 AND 11
ZINC ANODE
EXISTING COLUMN
FOOTING LEVEL 1
PVC TERMINAL
BOX
STAY-IN-PLACE FORM
FILLED WITH GROUT
ZINC ANODE (STOP 2" FROM
TOP OF JACKET)
INSPECTION PORT (AS
REQUIRED) (SEE DETAIL 4
ON B1-15)
INSPECTION PORT
(AS REQUIRED) (SEE
DETAIL 4 ON B1-15)
INSPECTION PORT (AS
REQUIRED) (SEE
DETAIL 4 ON B1-15)
BOTTOM OF
EXISTING FOOTONG
FOOTING LEVEL 2
FOOTING LEVEL 3
PUMPING PORT
(AS REQUIRED)
INSPECTION PORT (AS
REQUIRED) (SEE
DETAIL 4 ON B1-15)
2' 3"
ZINC ANODE
EXISTING REBAR
EXISTING
FOOTING
LEVEL 1
STAY IN PLACE
FORM FILLED WITH
GROUT
GROUT
EXISTING
FOOTING
LEVEL 2
EXISTING
FOOTING
LEVEL 3
NEGATIVE CONNECTION
SEE SHEET B1-20
SCALE: N.T.S.1
ELEVATION VIEW
COLUMN AND FOOTING JACKET OVERBUILD PIER 10 AND 11
SCALE: N.T.S.2
SECTION VIEW
FOOTING JACKET OVERBUILD PIER 10 AND 11
PUMPING PORT
(AS REQUIRED)
STAY-IN-PLACE FORM
FILLED WITH GROUT
ZINC ANODE (STOP 2" FROM
TOP OF JACKET)
BOTTOM FACE OF PILE CAP
BULK ZINC ANODE SEE
DETAIL 3 ON SHEET B1-20
EXISTING PILE
B1-18
8'
EXISTING COLUMN
ZINC ANODE
CONCRETE
STAY IN PLACE FORM
FILLED WITH GROUT
EXISTING REBAR
NEW REBAR
5"
NEGATIVE CONNECTION SEE
SHEET B1-20 FOR
CONNECTION DETAILS
STEEL CHANNEL BOLTED TO
ANODE STRAP ON BOTH ENDS
(SEE DETAIL 4: BULK ANODE
ASSEMBLY, SHEET B1-20) 48 LB. BULK ZINC ANODE
#8 AWG HMWPE (RED INSULATION)
COPPER STRAND WIRE BRAZED TO STEEL
BAR. ROUTE INTO CORNER OF JACKET.
8" ROUND STEEL BAR WELDED
AT BOTH ENDS
1-1
4" DIAM. PVC FILLED WITH
EPOXY TO ENCASE
WIRE-BAR CONNECTION
1'-0" MIN. SPACING BETWEEN STRAPPINGS
FIBERGLASS FORM
BULK ZINC ANODE WIRE
WATERTIGHT SEAL (TYPE K
EPOXY)
2"
BOTTOM OF PILE JACKET
4" DIA. PVC PIPE
"X"
1.
TI
M
ES
"X
48 LB. BULK ZINC ANODE2" GALVANIZED STEEL
CHANNEL
8" DIA. GALAVANIZED
CARRAIGE BOLTS
SCALE: N.T.S.1
ELEVATION VIEW
PILE STRUCTURAL JACKET
SCALE: N.T.S.2
SECTION VIEW
PILE STRUCTURAL JACKET
.\VCS Drawings\XREF's\VCS_Logo_Registered_Full_2.png
SCALE: N.T.S.3 BULK ANODE DETAILS
SCALE: N.T.S.4 BULK ANODE ASSEMBLY
6 STRUCTURE CONNECTIONS (2
FROM COLUMN, 2 FROM FOOTING,
2 FROM STRUT)
PVC CONDUIT WITH CONNECTOR
AND BUSHING. INSTALL CONDUIT
WITH NO (OR MINIMAL) SPACE
BETWEEN THE CONDUIT AND THE
CONCRETE SURFACE.
EXISTING COLUMN
3 TEST CONNECTIONS (1 FROM
COLUMN, 1 FROM FOOTING, 1
FROM STRUT)
3 REFERENCE ELECTRODES (1
FROM COLUMN, 1 FROM FOOTING,
1 FROM STRUT)
6 ANODE CONNECTIONS
(2 FROM COLUMN, 2 FROM
FOOTING, 2 FROM STRUT)
MONITORING BOX A
(SEE B1-20 DETAIL 4)
4 STRUCTURE CONNECTIONS (2
FROM COLUMN, 2 FROM FOOTING)
PVC CONDUIT WITH CONNECTOR
AND BUSHING. INSTALL CONDUIT
WITH NO (OR MINIMAL) SPACE
BETWEEN THE CONDUIT AND
THE CONCRETE SURFACE.
EXISTING COLUMN
2 TEST CONNECTIONS (1 FROM
COLUMN, 1 FROM FOOTING)
2 REFERENCE ELECTRODES (1
FROM COLUMN, 1 FROM FOOTING)
4 ANODE CONNECTIONS
(2 FROM COLUMN, 2
FROM FOOTING)
MONITORING BOX B
(SEE B1-20 DETAIL 3)
4 STRUCTURE CONNECTIONS (2
FROM COLUMN, 2 FROM FOOTING
LEVEL 1)
PVC CONDUIT WITH CONNECTOR
AND BUSHING. INSTALL CONDUIT
WITH NO (OR MINIMAL) SPACE
BETWEEN THE CONDUIT AND
THE CONCRETE SURFACE.
EXISTING COLUMN
2 TEST CONNECTIONS (1
FROM COLUMN, 1 FROM
FOOTING LEVEL 1)
2 REFERENCE ELECTRODES (1
FROM COLUMN, 1 FROM FOOTING
LEVEL 1)
4 ANODE
CONNECTIONS (2
FROM COLUMN, 2
FROM FOOTING
LEVEL 1)
MONITORING BOX B
(SEE B1-20 DETAIL 3)
2 STRUCTURE CONNECTIONS
FROM COLUMN
PVC CONDUIT WITH CONNECTOR
AND BUSHING. INSTALL CONDUIT
WITH NO (OR MINIMAL) SPACE
BETWEEN THE CONDUIT AND
THE CONCRETE SURFACE.
EXISTING
COLUMN B
1 TEST CONNECTIONS FROM
COLUMN
1 REFERENCE ELECTRODES 1
FROM COLUMN
2 ANODE CONNECTIONS
FROM COLUMN
MONITORING BOX B (SEE
B1-20 DETAIL 1)
SCALE: N.T.S.1 WIRING DETAIL - COLUMN A
SCALE: N.T.S.2 WIRING DETAIL - COLUMN B
SCALE: N.T.S.3 WIRING DETAIL - COLUMN A PIER 10 AND 11 SCALE: N.T.S.4 WIRING DETAIL - COLUMN B PIER 10 AND 11
CHIP POCKET IN CONCRETE TO
EXPOSE REINFORCING STEEL
ANODE CONNECTION CLAMPED IN
PLACE BY NUT.
HEAD OF BOLT WELDED
TO THE REINFORCING STEEL
EXISTING STEEL
REINFORCEMENT
CONNECTION COVERED 100% IN
MARINE GRADE 2 PART EPOXY
GROUT FILL
CHIP POCKET IN CONCRETE TO
EXPOSE REINFORCING STEEL
ANODE CONNECTION
THREADED BRASS PIN
C/W NUT AND WASHERS
PIN BRAZE
CONNECTION
EXISTING STEEL
REINFORCEMENT
CONNECTION COVERED 100% IN
MARINE GRADE 2 PART EPOXY
CRIMP AND SOLDER
CABLE LUG
GROUT FILL
4-20 STAINLESS STEEL
MACHINE SCREW
ANODE CONNECTION
SEALED CRIMP
CONNECTION W/ RING
DRILLED AND TAPPED
CONNECTION TO REBAR
STAINLESS STEEL NUT
CONNECTION COVERED 100% IN
MARINE GRADE 2 PART EPOXY
GROUT FILL
X AWG 14" STUD NON-INSULATED
BRAZED SEAM RING TERMINAL
(CRIMPED AND SOLDERED)
2" X 3" THIN WALL.
HEAT SHRINK (SHRINK RATIO 2:1)
X AWG SIZE WIRE
WIRE RING TERMINALS FOR CONNECTIONS
THE TYPE OF CRIMPING MECHANISM SHALL BE OF THE RATCHET
TYPE, WHICH PREVENTS THE TOOL FROM OPENING UNTIL THE CRIMP
ACTION IS COMPLETED. SUCH TOOLS SHALL BE A PRODUCT OF THE
CONNECTOR MANUFACTURER AND PROPERLY CALIBRATED.
NOTE: TERMINAL CONNECTION SHOULD BE SIZED APPROPRIATELY
FOR THE SIZE OF WIRE
SCALE: N.T.S.1 STEEL CONNECTION - OPTION 1
SCALE: N.T.S.2 STEEL CONNECTION - OPTION 2
SCALE: N.T.S.3 STEEL CONNECTION - OPTION 3
SCALE: N.T.S.4 RING TERMINAL CONNECTION DETAILS
S H U N T
S T R U C T U R E
J U N C T I O N B O X ID
O N O F F
A N O D E ( P O S I T I V E ) ( N E G A T I V E )
R E F E R E N C E ( AgAg Cl )
T E S T ( S T R U C T U R E )
COLUMN
FOOTING
COLUMN
FOOTING
REFERENCE
ELECTRODE WIRE
TEST WIRE FOR
REFERENCE
ELECTRODE
ANODE WIRE
FROM BUSS
BAR
STRUCTURE WIRE
FROM BUSS BAR
S H U N T
S T R U C T U R E
J U N C T I O N B O X ID
O N O F F
A N O D E ( P O S I T I V E ) ( N E G A T I V E )
R E F E R E N C E ( AgAg Cl )
T E S T ( S T R U C T U R E )
COLUMN
FOOTING
COLUMN
FOOTING
REFERENCE
ELECTRODE WIRE
TEST WIRE FOR
REFERENCE
ELECTRODE
ANODE WIRE
FROM BUSS BAR
STRUCTURE WIRE
FROM BUSS BAR
STRUT STRUT
IMPRINT WITH
PROPER
REFERENCE TYPE
IMPRINT WITH
PROPER
REFERENCE TYPE
S H U N T
S T R U C T U R E
J U N C T I O N B O X ID
O N O F F
A N O D E ( P O S I T I V E ) ( N E G A T I V E )
R E F E R E N C E ( AgAg Cl )
T E S T ( S T R U C T U R E )
COLUMN
FOOTING LEVEL 1
COLUMN
FOOTING LEVEL 1
REFERENCE
ELECTRODE WIRE
TEST WIRE FOR
REFERENCE
ELECTRODE
ANODE WIRE
FROM BUSS BAR
STRUCTURE WIRE
FROM BUSS BAR
IMPRINT WITH PROPER
REFERENCE TYPE
S H U N T
S T R U C T U R E
J U N C T I O N B O X ID
O N O F F
A N O D E ( P O S I T I V E ) ( N E G A T I V E )
R E F E R E N C E ( AgAg Cl )
T E S T ( S T R U C T U R E )
COLUMN COLUMN
ANODE WIRE
FROM BUSS BAR
STRUCTURE WIRE
FROM BUSS BAR
IMPRINT WITH PROPER
REFERENCE TYPE
S H U N T
S T R U C T U R E
J U N C T I O N B O X ID
O N O F F
A N O D E ( P O S I T I V E ) ( N E G A T I V E )
R E F E R E N C E ( AgAg Cl )
T E S T ( S T R U C T U R E )
COLUMN
FOOTING
COLUMN
FOOTING
REFERENCE
ELECTRODE WIRE
TEST WIRE
FOR
REFERENCE
ELECTRODE
ANODE WIRE
FROM BUSS BAR
STRUCTURE
WIRE FROM
BUSS BAR
PILE PILE
IMPRINT WITH
PROPER
REFERENCE
TYPE
NOTE: IF PILE REPAIRS
ARE REQUIRED THE
WIRES NEED TO BE
ADDED TO THESE
PANELS. SEE DETAIL 5
ON B1-21
TEST WIRE FOR
REFERENCE
ELECTRODE
REFERENCE
ELECTRODE WIRE
SCALE: N.T.S.1
MONITORING PANEL
FOR MONITORING BOX B PIER 10 AND 11
SCALE: N.T.S.2
MONITORING PANEL
FOR MONITORING BOX A PIER 10 AND 11
SCALE: N.T.S.3
MONITORING PANEL
FOR MONITORING BOX B
SCALE: N.T.S.4
MONITORING PANEL
FOR MONITORING BOX A
SCALE: N.T.S.5
MONITORING PANEL
FOR MONITORING BOX WITH PILE REPAIRS
ROUTE REFERENCE
ELECTRODE WIRES TO
"REFERENCE ELECTRODE"
TERMINAL ON PANEL
10.25"
8" 10-32 X 11
2" STANDOFFS
MOUNT PANEL ON
UNIVERSAL BACK
PANEL ADJUSTOR.
BUSS BAR
ROUTE TEST WIRES
TO "TEST" ON PANEL
ROUTE AND CONNECT
ALL ANODE WIRES TO
BUS BAR TERMINALS
SHUNT
ROUTE AND CONNECT ALL
STRUCTURE WIRES TO
BUSS BAR TERMINALS
BLACK STRUCTURE WIRES
BLUE REFERENCE
ELECTRODE WIRES
GREEN TEST WIRES
ANODE SHORT WIRE TO PANEL
ANODE WIRES
MANUFACTURER:
ADALET
MODEL NO.:
N4XP-H121006HFLL
WITH UNIVERSAL BACK
PANEL ADJUSTORS
MODEL NO.: VUPAKG OR
APPROVED EQUIVALENT
BUSS BAR
STRUCTURE
SHORT WIRE
TO PANEL
ANODE WIRE ROUTED
FROM BUSS BAR TO PANEL
STRUCTURE WIRE
ROUTED FROM BUSS
BAR TO PANEL
SCALE: N.T.S.1 TYPICAL INSIDE VIEW OF JUNCTION BOX
SCALE: N.T.S.2 TYPICAL SECTION VIEW OF JUNCTION BOX
SCALE: N.T.S.3 TYPICAL 12"x10"x6" JUNCTION BOX INTERIOR
T I C
E
T
F I C I
C O
T
H I S
S
H E
E T
I S
T
H E
E
L E
C T
R O
N I C
F I L E
S I G
N
D
S
E A
L
D
L E
1G
-2
.0
F .A
SHEET TITLE:
BRIDGE NO. 030184
REF. DWG. NO.
SHEET NO.
COLLIER COUNTY
ROAD NO. CARDNO PROJECT NO. COUNTY PROJECT ID
66066.2 CR 92
REVISIONS
michael.regan 11/18/2022 2:20:53 PM J:\00026\00026060.00\ms\struct\Final Submittal\B1ScourDetail02.dgn
Drawn By:
MPR
Checked by:
Designed by:
TRH
Checked by:
CPG
CPG
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
00026060.00 CHRISTOPHER P. GAMACHE P.E. NO. 82122
-20
-40
NAVD88
-20
-40
MSL ELEV. -0.62
MLW ELEV. -1.89
MHW ELEV. 0.67
-20
-40
NAVD88
-20
-40
STA 279+49.25
PIER NO. 13�
STA 280+44.83
PIER NO. 14�
STA 281+40.42
PIER NO. 15�
STA 282+36.00
PIER NO. 16�
PIER �
(TYP.)
24'-0" (TYP.)
24'-0"
BEDDING STONE (TYP.)
FILL SCOUR HOLES WITH
BANK AND SHORE (TYP.)
INSTALL RUBBLE RIPRAP,
:1
T Y P
BEDDING STONE (TYP.)
FILL SCOUR HOLES WITH
FILTER FABRIC
4'-0" (TYP.)
ELEV. -13.00
SECTION B-B SECTION C-C
EXISTING GROUND
GROUND
EXISTING
EXISTING GROUND
(TYP.)
6'-0"
(TYP.)
18'-0"
MSL ELEV. -0.62
MLW ELEV. -1.89
MHW ELEV. 0.67
RIPRAP AND FILL DETAIL
NOTES:
WITH FDOT STANDARD SPECIFICAITONS SECTION 514.
FILTER FABRIC SPLICE LENGTH SHALL BE IN ACCORDANCE2.
WITH FDOT STANDARD SPECIFICATIONS SECTION 985.
FILTER FABRIC SHALL BE TYPE D-2, IN ACCORDANCE 1.
FOUNDATION PLAN
ELEV. -9.00ELEV. -9.00
ELEV. -13.00
ELEV. -9.00
WITH GALVANIC ANODES (TYP.)
PIER FOOTING OVERBUILD
-2
-1
-2
N 81° 42' 23" E
ANODES AT PILE #15
JACKET WITH GALVANIC
8'-0" STRUCTURAL PILE
(TYP.)
30'-0"
(T Y P
STA 279+49.25
PIER NO. 13�
STA 280+44.83
PIER NO. 14�
STA 281+40.42
PIER NO. 15�
STA 282+36.00
PIER NO. 16�
STA 278+53.67
PIER NO. 12�
WITH GALVANIC ANODES (TYP.)
PIER FOOTING OVERBUILD
C
B
C
� CONST.
PIER FOOTING (TYP.)
Direction of Stationing
AND SHORE (TYP.)
RIPRAP, BANK
INSTALL RUBBLE
STA 278+53.67
PIER NO. 12�
ELEV. -5.00
R
B
WATER IMPACT AREA
0.104 ACRE SURFACE
WATER IMPACT AREA
0.104 ACRE SURFACE
WATER IMPACT AREA
0.104 ACRE SURFACE
WATER IMPACT AREA
0.104 ACRE SURFACE
WATER IMPACT AREA
0.104 ACRE SURFACE
B1-23
SCOUR PROTECTION
PILES (TYP.)
CONCRETE
OLD REVETMENT FOOTPRINT (TYP.)
AND SHORE, SHALL NOT EXCEED
INSTALL RUBBLE RIPRAP, BANK
CONCRETE BLOCK (TYP.)
EXISTING ARTICULATING
(PIER NO. 13 SHOWN, PIER NOS. 12, 14 THRU 16 SIMILAR)
BRIDGE NO. 030184
michael.regan 12/19/2022 11:47:02 AM J:\00026\00026060.00\ms\roadway\TCTYRD01.DGN
Default
NO.
SHEET
SHEET TITLE:
PROJECT NAME:
STAN GOBER MEMORIAL BRIDGE REHAB
COLLIER COUNTY
CARDNO PROJECT NO.ROAD NO.
CR 92
66066.2
COUNTY PROJECT ID
00026060.00
Drawn By:
Checked by:
Designed by:
Checked by:
By DescriptionDate By DescriptionDate
REVISIONS
CLEARWATER, FL 33759
380 PARK PLACE BLVD. SUITE 300
KA
JH
JY
JH
T
F I
C I
C O
I
S
E E
T
E C
T R
O N
C
G I
T A
L
Y
G N
A L
D
L E
G
A
C
JASON Y. YAM P.E. NO. 62449
E X I S
T
R
W
L I N
E
E X I S
T
R
W
L I N
E
CONSTRUCTION JOINT
12'-0"
WORK ZONE
NO TRAFFIC
6'-0"
TC-1
TYPICAL SECTIONS
TEMPORARY TRAFFIC CONTROL PHASING
5'-0"
23'23'
THE BRIDGE PLANS.
6. REPAIR THE SOUTH SIDE OF THE BRIDGE IN ACCORDANCE WITH
ONE-LANE, TWO-WAY TRAFFIC CONFIGURATION.
5. SHIFT TRAFFIC ONTO THE NORTH SIDE OF THE BRIDGE IN A
AND ENTRANCES IN ACCORDANCE WITH INDEX 102-606 AND THESE PLANS.
4. REINSTALL SIGNING AND TRAFFIC CONTROL DEVICES ON SAN MARCO ROAD
PHASE II
THE BRIDGE PLANS.
3. REPAIR THE SOUTH SIDE OF THE BRIDGE IN ACCORDANCE WITH
ONE-LANE, TWO-WAY TRAFFIC CONFIGURATION.
SHIFT TRAFFIC ONTO THE NORTH SIDE OF THE BRIDGE IN A 2.
AND ENTRANCES IN ACCORDANCE WITH INDEX 102-606 AND THESE PLANS.
1. INSTALL SIGNING AND TRAFFIC CONTROL DEVICES ON SAN MARCO ROAD
PHASE I
PHASE I & II OPERATIONS ARE TO REPAIR THE SOUTH SIDE OF THE BRIDGE DECK.
SPECIAL SOP
PHASE 2PHASE 1
¡ CONST.
STA. 273+55.17 TO STA. 277+58.08
PHASE II
STA. 268+84.00 TO STA. 273+55.17
PHASE I
SAN MARCO RD ONE-LANE TWO-WAY TRAFFIC
USE DURING LANE CLOSURE
PCMS
BEGINS
CONST XX/XX/XX
USE 14 DAYS PRIOR TO CONSTRUCTION:
PCMS
TO STOP
PREPARE
AHEAD
SIGNAL
TEMP 6" WHITE STRIPETEMP 6" WHITE STRIPE
5. THE CONTRACTOR SHALL INSTALL PCMS AT EACH END OF THE PROJECT THROUGHOUT THE DURATION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .