24-8270_-_Bid_Schedule_Rev._1.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Stan Gober Memorial Bridge Rehabilitation
- Solicitation number
- 24-8270
- Issued by
- Collier County, Florida
About this file
The document is a Bid Schedule for Bid No. 24-8270, issued by Collier County, Florida, for the Stan Gober Memorial Bridge Rehabilitation Project. The project involves comprehensive bridge rehabilitation, including tasks such as mobilization, maintenance of traffic, removal of existing concrete, concrete topping, bridge deck grooving, cathodic protection systems, concrete surface treatments, expansion joint rehabilitation, and various restoration and marking activities. The bid is scheduled for submission by July 15, 2024, at 3:00 p.m., with a non-mandatory pre-bid meeting on June 14, 2024, at 10:00 a.m. at the Procurement Services Division. Prospective bidders are required to register on the county's procurement portal to obtain complete project documents.
The bid schedule includes 35 line items with quantities ranging from 1 to 81,048 units, covering various bridge rehabilitation components. While the bid schedule shows zero dollar amounts for each line item, the county has allocated a $650,000 Owner's Allowance to be used at the owner's discretion for unforeseen conditions or additional work. Expenditures from this allowance will be processed through change orders with documented time and materials. Bidders must access the complete bid package through the Collier County procurement portal, suggesting a transparent and competitive bidding process for this infrastructure rehabilitation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Stan Gober Memorial Bridge Rehabilitation | |||||
| Construction ITB 24-8270 | |||||
| Bid Schedule | |||||
| Item No. | DESCRIPTION | UNIT | QTY | Unit Price | TOTAL AMOUNT |
| 0101-1 | MOBILIZATION | LS | 1 | $ - 0 | |
| 0102-1 | MAINTENANCE OF TRAFFIC | LS | 1 | $ - 0 | |
| 104-11 | FLOATING TURBIDITY BARRIER | LF | 3,112 | $ - 0 | |
| 104-30 | TURBIDITY MONITORING | LS | 1 | $ - 0 | |
| 110-3-10 | LADDERS AND PLATFORMS, REMOVE | EA | 2 | $ - 0 | |
| 0110-4-10 | REMOVAL OF EXIST CONC | SY | 2,137 | $ - 0 | |
| 400-4-47 | CONCRETE CLASS IV, CAST IN PLACE TOPPING WITH SRA | CY | 89.1 | $ - 0 | |
| 400-7-1 | BRIDGE DECK GROOVING | SY | 2,137 | $ - 0 | |
| 0400-142-2 | CATHODIC PROTECTION SYSTEM, ZINC ARC SPRAY | SF | 4,802 | $ - 0 | |
| 0400-142-10 | EMBEDDED GALVANIC ANODE | EA | 6 | $ - 0 | |
| 0400-142-11 | GALVANIC OVERBUILD WITH ANODES FOR FOOTINGS/STRUTS | SF | 13,854 | $ - 0 | |
| 0401-70-5 | RESTORE SPALLED AREAS, CONTRACTOR'S OPTION | CF | 79 | $ - 0 | |
| 0413-150 | PENETRATING CORROSION INHIBITOR | GA | 933 | $ - 0 | |
| 413-154 | CLEANING AND SEALING CONCRETE SURFACES - PENETRANT SEALER OR METHACRYLATES | SF | 81,048 | $ - 0 | |
| 0457-2-131 | CATHODIC PROTECTION INTEGRAL COLUMN JACKET, NON-STRUCUTRAL, GALVANIC SYSTEM | LF | 108 | $ - 0 | |
| 0457-2-221 | CATHODIC PROTECTION INTEGRAL PILE JACKET, STRUCTURAL, 16.1-30" GALVANIC SYSTEM | LF | 8 | $ - 0 | |
| 0458-1-21 | BRIDGE DECK EXPANSION JNT, REHAB, POURED JOINT WITH BACKER ROD | LF | 1,064 | $ - 0 | |
| 0470-75-2 | TIMBER FENDER SYSTEM REPAIR | LS | 1 | $ - 0 | |
| 0530-3-3 | RIPRAP-RUBBLE, BANK AND SHORE | TN | 5,872 | $ - 0 | |
| 0530-74 | BEDDING STONE | TN | 1,961 | $ - 0 | |
| 0561-1-1 | COATING EXISTING STRUCTURAL STEEL, BEARING | EA | 4 | $ - 0 | |
| 0630-2-30 | CONDUIT ANCHOR REPLACE | EA | 1 | $ - 0 | |
| 0630-2-31 | CONDUIT REPAIR/REPLACE | LF | 100 | $ - 0 | |
| 706-1-3 | RAISED PAVEMENT MARKER, TYPE B | EA | 44 | $ - 0 | |
| 711-16-101 | THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" | GM | 0.04 | $ - 0 | |
| 711-16-201 | THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" | GM | 0.04 | $ - 0 | |
| 713-103-101 | PERMANENT TAPE, WHITE, SOLID, 6" FOR CONCRETE BRIDGES | GM | 0.44 | $ - 0 | |
| 713-103-201 | PERMANENT TAPE, YELLOW, SOLID, 6" FOR CONCRETE BRIDGES | GM | 0.54 | $ - 0 | |
| TOTAL BID AMOUNT | $ - 0 |
* Staff has allocated $650,000.00 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.
File details come from the government source that posted it. Updated .