This is a Scope of Work document for Collier County, Florida's 16th Street NE Bridge Project (Bid No. 24-8265), a federally funded infrastructure improvement initiative. The project encompasses approximately 3.3 miles of roadway improvements along 16th Street NE from Golden Gate Boulevard West to Randall Boulevard, including construction of a new 147-foot bridge over the Golden Gate Main Canal with two 12-foot travel lanes, a 12-foot shoulder on the east side, and a 6-foot shoulder with 6-foot sidewalk on the west side. Additional project elements include roadway widening to provide 11-foot travel lanes with 6-foot shoulders throughout the corridor, installation of a 6-foot sidewalk west of the roadway, minor drainage modifications to existing roadside swales, new concrete driveway installations, and a new traffic signal system at 16th Street NE and Randall Boulevard. Sealed bids are due November 20, 2025, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for October 21, 2025, at 10:00 a.m. in Naples, Florida. Prospective bidders must register on the county's procurement portal to obtain complete project documents and must be pre-qualified by the Florida Department of Transportation in specified work classes including minor bridges, pavement marking, roadway signing, traffic signals, and sidewalk work. Contractors must achieve substantial completion within 520 consecutive calendar days and final completion within 30 calendar days thereafter.
The total project budget is approximately $26,361,418 and is primarily funded through federal highway administration grants under the Local Agency Program (LAP). Bidders must submit a 5% bid bond with their proposal and comply with federal regulations including Davis-Bacon wage requirements, Buy America provisions, and equal employment opportunity standards. The project carries a significant disadvantaged business enterprise (DBE) goal of 10.54%. Contractors face liquidated damages of $7,442 per calendar day for failure to achieve substantial completion. Environmental compliance requirements include mitigation for 2.35 acres of wetland impacts through the Panther Island Mitigation Bank Expansion and strict adherence to endangered species protections, including protections for the Florida black bear, gopher tortoise, and eastern indigo snake.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Scope Outline
16th Street NE Bridge (Project No. 60212.1)
The project encompasses approximately a 3.3-mile section of 16th Street NE from the intersection with Golden Gate Boulevard West extending north to the intersection of Randall Boulevard. 16th Street NE intersects with a series of narrow dead-end streets.
The improvements proposed will provide connectivity and roadway enhancements to those dead-end streets and improve emergency response times and safety along the corridor.
A PD&E Study entitled “Golden Gate Estates Bridge Crossings” was completed for this site in September 2016. The proposed roadway improvements for this project consist of adding a new bridge, providing additional lane width and shoulders by widening to the west of the existing roadway. The widening will provide 11-foot travel lanes with 6-foot shoulders (4-foot paved plus 2-foot unpaved) along the entire length of the project. A 6-foot sidewalk will be constructed to the west of the roadway. The improvements will include minor drainage modifications to existing roadside swales and the installation of new concrete driveways up to the existing right- of-way.
The typical section of the proposed bridge consists of two, 12-foot travel lanes, a 12-foot shoulder on the east side, and a 6-foot shoulder and a 6-foot sidewalk on the west side of the bridge. The proposed bridge width and length is 50 feet 5 inches and 147 feet 0.5 inches, respectively.
The project will add a new signal system at 16th Street NE and Randall Boulevard.