24-8265_Exhibit_K-1_-_ERP_No._11-108960_Permit.pdf

PDF 177 KB Posted

Attached to
16th Street NE Bridge Project (LAP) GRANT FUNDED
Solicitation number
24-8265
Issued by
Collier County, Florida

About this file

This document is a Notice of Compliance letter from the South Florida Water Management District (SFWMD) to Jay Ahmad, PE of Collier County Board of County Commissioners, regarding the 16th Street NE Bridge project located between Golden Gate Boulevard and Randall Boulevard in Collier County. The letter acknowledges receipt of a May 9, 2025 mitigation bank ledger deduction required by Special Condition No. 7 of Environmental Resource Permit (ERP) No. 11-108960-P. The document confirms that the project is in compliance with the ERP and includes enclosed documents such as a Location Map, Mitigation Bank Ledger Deduction, and a Project Deliverables Schedule.

The letter provides contact information for Dylan Humenay, an Environmental Analyst IV at SFWMD, who can be reached at (239) 338-2929 ext 7755 or dhumenay@sfwmd.gov for any questions or additional assistance. The document is filed in the RegPermitting system under Permit Number 11-108960-P and includes a copy to Catie Neal at Kisinger Campo and Associates. No specific financial details or funding sources are discussed in this compliance notification letter.

View the file

Other files

File Type Posted
24-8265_–_Gopher_Tortoise_Burrow_Map.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
24-8265_Exhibit_J-3_-_Specifications_SS_4.16.25.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-14_-_City_of_Naples_No_Conflict.pdf PDF
24-8265_Exhibit_L-1_-_BHR_Signed.pdf PDF
24-8265_Exhibit_L-2_-_Geotechnical_Report_Mast_Arm_Signed.pdf PDF
24-8265_Exhibit_L-7_-_Scope_of_Work.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
24-8265_Exhibit_K-1_-_ERP_No._11-108960_Permit.pdf PDF
24-8265_Exhibit_K-2_-_ROW_16774-R_Permit.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-11_-_SummitBB_No_Conflict.pdf PDF
24-8265_Exhibit_L-12_-_Comcast_No_Conflict.pdf PDF
24-8265_Exhibit_L-14_-_City_of_Naples_No_Conflict.pdf PDF
24-8265_Exhibit_L-18_-_Structure_Geotech_Report_3.19.25.pdf PDF
24-8265_Exhibit_L-19_-_Roadway_Geotechnical_Report_Signed.pdf PDF
24-8265_Exhibit_L-1_-_BHR_Signed.pdf PDF
24-8265_Exhibit_L-20_-_Railroad_Clear_16th_st_ne_bridge_dm.pdf PDF
24-8265_Exhibit_L-4_-Pavement_Design_Memorandum_S&S.pdf PDF
24-8265_Exhibit_L-6_-_Structures_Load_Rating_Signed.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
24-8265_Federal_Provisions_Package.pdf PDF
24-8265_Federal_Provisions_Package.pdf PDF
24-8265_Authorization_to_Advertise.pdf PDF
24-8265_Exhibit_L-11_-_SummitBB_No_Conflict.pdf PDF
24-8265_Exhibit_L-16_-_Utilities_Clear_16th_St_Ne_Bridge_dm.pdf PDF
24-8265_Exhibit_L-18_-_Structure_Geotech_Report_3.19.25.pdf PDF
24-8265_Exhibit_L-19_-_Roadway_Geotechnical_Report_Signed.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
24-8265_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
24-8265_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
24-8265_Exhibit_J-1_-_Collier_County_Signalization_Technical_Special_Provisions.pdf PDF
24-8265_Exhibit_K-2_-_ROW_16774-R_Permit.pdf PDF
24-8265_Exhibit_K-4_-_SFWMD_230510-38578_Permit.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-3_-_LDAR_Signed.pdf PDF
24-8265_Exhibit_L-6_-_Structures_Load_Rating_Signed.pdf PDF
Construction_Services_LAP_Agreement_2024_version_1-FLAT_w-Exhibits.pdf PDF
24-8265_Exhibit_J-3_-_Specifications_SS_4.16.25.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-2_-_Geotechnical_Report_Mast_Arm_Signed.pdf PDF
24-8265_Exhibit_L-3_-_LDAR_Signed.pdf PDF
24-8265_Exhibit_L-8_-_Drainage_Design_Documentation_S&S.pdf PDF
24-8265_Exhibit_L-9_-_UWS_FPL_Distribution_Signed.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

May 13, 2025

Jay Ahmad, PE Collier County Board Of County Commissioners 2885 South Horseshoe Drive Naples, FL 34104

Delivered via email

Subject: 16th Street NE Bridge from Golden Gate Blvd to Randall Blvd

Notice of Compliance Environmental Resource Permit (ERP) No. 11-108960-P Collier County

Dear Mr. Ahmad:

This letter is to acknowledge that the South Florida Water Management District (District) is in receipt of your May 9, 2025, mitigation bank ledger deduction required by Special Condition No. 7 of the referenced ERP. As of the date of this letter, a review of the provided materials and our files show that your project is in compliance with the ERP. For your convenience a schedule of permit deliverables is enclosed.

If you have any questions or require additional assistance, please contact Dylan Humenay at (239) 338-2929 ext 7755 or via email at dhumenay@sfwmd.gov.

Sincerely, Dylan Humenay Environmental Analyst IV eEnclosures: Location Map (230510-38578_Exhibit1_0_LocMap_20230512.pdf)

Mitigation Bank Ledger Deduction (11-108960-P_ENV_MitCredit_20250311.pdf) Project Deliverables Schedule (11-108960-P_WorkSched_20250512.pdf) c: Catie Neal, Kisinger Campo and Associates (E-Mail)

This document is filed in the RegPermitting system under Permit Number 11-108960-P via the Application/Permit Section on the Search Records home page https://api.sfwmd.gov/v1/service/cms/documents/0900eeea9520aaa0/content https://api.sfwmd.gov/v1/service/cms/documents/0900eeea96deaa48/content https://api.sfwmd.gov/v1/service/cms/documents/0900eeea96deaa49/content

File details come from the government source that posted it. Updated .