This is a Structures Calculations Book for the 16th Street NE Bridge, prepared for Collier County Transportation Management Services Department by Kisinger Campo & Associates, Corp. The document contains comprehensive structural design calculations for a bridge crossing the Golden Gate Main Canal, including detailed geometry, superstructure design, substructure design, and foundation analysis. The bridge features three spans with horizontal and vertical alignment adjustments, utilizing Florida Slab Beams (FSBs) in varying sizes to accommodate bridge width requirements.
The superstructure design includes FSB 15x60 interior and exterior beams, along with FSB 15x57 exterior beams, with a 6-inch composite deck including sacrificial thickness and 2% cross-slope. The design incorporates 23 prestressing strands per beam with carbon steel low relaxation properties, bearing pads measuring 48 inches wide, and 4K stirrup reinforcement with variable spacing. Substructure elements consist of four bents with pile foundations, wingwall lengths of 7.5 feet, and design specifications for end bent and intermediate bent cap elevations. The vertical clearance requirement of 2 feet 3.5 inches above Design High Water Elevation of 12.64 feet addresses the Golden Gate Main Canal crossing with a South Florida Water Management District waiver, as the standard 4-foot clearance could not be accommodated due to profile constraints. Material properties specify 4.5 ksi deck concrete strength, 8.5 ksi beam concrete strength at 28 days, and 6.8 ksi release strength, with all designs meeting FDOT LRFD criteria and service limit state stress requirements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Collier County Transportation Management Services Department FPID No. 451283-1-58-01
16th Street NE Bridge
Structures Calculations Book
This item has been digitally signed and sealed by:
on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Prepared for:
Collier County Transportation Management Services Department
Prepared by:
Kisinger Campo & Associates, Corp.
13461 Parker Commons Blvd.
Suite 104 Fort Myers, FL 33912
FPID No. 451283-1 Structures Calculations Book
Table of Contents
1.0 Geometry ............................................................................................ iv
1.1 Horizontal Geometry ............................................................................................. v
1.2 Vertical Geometry .................................................................................................vi
1.3 Wingwall Length ................................................................................................... vii
1.4 Vertical Clearance ............................................................................................... viii
1.5 Substructure Elevations ........................................................................................ix
1.6 Finished Grade Elevations .................................................................................... x
2.0 Superstructure ................................................................................... xi
2.1 FSB Layout .......................................................................................................... xii
2.2 Beam Design ...................................................................................................... xiii
2.2.1 FSB 15x60, Interior ...................................................................................... xiv
2.2.2 FSB 15x60, Exterior ......................................................................................xv
2.2.3 FSB 15x57, Exterior ..................................................................................... xvi
2.3 Build-Up and Deflection ..................................................................................... xvii
2.4 Bearing Pad Design .......................................................................................... xviii
2.5 Expansion Join Design........................................................................................ xix
3.0 Substructure ..................................................................................... xx
3.1 End Bent Design ................................................................................................. xxi
3.1.1 End Bent Loads .......................................................................................... xxii
3.1.2 End Bent Design ........................................................................................ xxiii
3.1.3 Wingwall Design ........................................................................................ xxiv
3.2 Intermediate Bent Design ................................................................................... xxv
3.2.1 Intermediate Bent Loads ............................................................................ xxvi
3.2.2 Intermediate Bent Design ......................................................................... xxvii
4.0 Foundation ................................................................................... xxviii
4.1 FB-Pier Loads ................................................................................................... xxix
4.2 Intermediate Bent Factored Design Load........................................................... xxx
4.3 Intermediate Bent Minimum Tip Analysis .......................................................... xxxi
4.4 End Bent Factored Design Load ...................................................................... xxxii
4.5 End Bent Minimum Tip Analysis ..................................................................... xxxiii
5.0 Rebar ............................................................................................ xxxiv
6.0 Quantities and Estimates ............................................................. xxxv
6.1 Quantities ........................................................................................................ xxxvi
6.2 Engineer’s Estimate ....................................................................................... xxxvii
7.0 Strain Pole .................................................................................. xxxviii
FPID No. 451283-1 iii Structures Calculations Book
1.0 Geometry
FPID No. 451283-1 iv Structures Calculations Book
1.1 Horizontal Geometry
HORIZONTAL GEOMETRY DSG: BAH 03/23
16TH ST NE BRIDGE
Copyright: (c) 2013 Bentley Systems, Incorporated. All rights reserved.
Project:
Subject:
Job No. 01 Operator: ST
Date: Tuesday March 14, 2023 10:46 am
SYSTEM FIX 4 ASEC 2 BEAR PRI 0 RED NE STA 4 FILE: '16THST_ALIGN'
* 1 $ 16TH ST NE BRIDGE
* 2 $ HORIZONTAL ALIGNMENTS
* 3 $ PRINTED BY BAH 03/13/23
* 4 $
* 5 $
* 6 $ ============================================================
* 7 $ CL CONST. 16TH ST.
* 8 $ ============================================================
* 9 $
* 10 DESCRIBE CHA CL_16TH_ST
Chain CL_16TH_ST contains:
1001 1003 1005 1007 1009 1010
Beginning chain CL_16TH_ST description
Description: CURRENT USE
Point 1001 N 689,581.7178 E 467,941.0724 Sta 1000+00.0000
Course from 1001 to 1003 N 0° 28' 38.85" W Dist 5,491.9112
Point 1003 N 695,073.4383 E 467,895.3076 Sta 1054+91.9112
Course from 1003 to 1005 N 2° 28' 38.85" W Dist 544.4205
Point 1005 N 695,617.3499 E 467,871.7742 Sta 1060+36.3316
Course from 1005 to 1007 N 0° 28' 38.85" W Dist 253.0000
Point 1007 N 695,870.3411 E 467,869.6660 Sta 1062+89.3316
Course from 1007 to 1009 N 1° 31' 21.15" E Dist 544.4205
Point 1009 N 696,414.5694 E 467,884.1313 Sta 1068+33.7521
Course from 1009 to 1010 N 0° 28' 38.85" W Dist 10,866.2479
Point 1010 N 707,280.4400 E 467,793.5814 Sta 1177+00.0000
HORIZONTAL GEOMETRY DSG: BAH 03/23
Ending chain CL_16TH_ST description
* 11 $
* 12 $ ============================================================
* 13 $ BL SURVEY 16TH ST.
* 14 $ ============================================================
* 15 $
* 16 DESCRIBE CHA BL_SURV_16TH
Chain BL_SURV_16TH contains:
154 155
Beginning chain BL_SURV_16TH description
Point 154 N 689,781.5525 E 467,920.4064 Sta 100+00.0000
Course from 154 to 155 N 0° 28' 38.85" W Dist 17,290.0000
Point 155 N 707,070.9522 E 467,776.3265 Sta 272+90.0000
Ending chain BL_SURV_16TH description
* 17 $
* 18 END
CHK: LM 03/2023
FPID No. 451283-1 v Structures Calculations Book
1.2 Vertical Geometry
VERTICAL GEOMETRY DSG: BAH 03/23
Copyright: (c) 2013 Bentley Systems, Incorporated. All rights reserved.
Project:
Subject:
Job No. 01 Operator: ST
Date: Tuesday March 14, 2023 10:47 am
SYSTEM FIX 4 ASEC 2 BEAR PRI 0 RED NE STA 4 FILE: '16THST_PROF'
* 1 $ 16TH ST NE BRIDGE
* 2 $ VERTICAL PROFILES
* 3 $ PRINTED BY BAH 03/13/23
* 4 $
* 5 $
* 6 $ ============================================================
* 7 $ CL CONST. 16TH ST.
* 8 $ ============================================================
* 9 $
* 10 PRINT PROFILE PR_16TH_ST
Beginning profile PR_16TH_ST description:
STATION ELEV GRADE TOTAL L BACK L AHEAD L
VPI 1 1054+91.9100 12.8947
VPC 1058+70.0000 12.8947 0.0000 K = 43.3
VPI 2 1059+25.0000 12.8947 110.0000 55.0000 55.0000
VPT 1059+80.0000 14.2923 2.5411
VPC 1060+95.0000 17.2146 2.5411 K = 30.7 SSD = 287.1
High Point 1061+73.0510 18.2062
VPI 3 1061+75.0000 19.2475 160.0000 80.0000 80.0000
VPT 1062+55.0000 17.1130 -2.6680
VPC 1063+70.0000 14.0448 -2.6680 K = 41.2
VPI 4 1064+25.0000 12.5774 110.0000 55.0000 55.0000
VPT 1064+80.0000 12.5774 0.0000
VPI 5 1068+33.7500 12.5774 0.0000
VPI 6 1068+90.0000 12.5774 0.0000
VPI 7 1069+35.0000 12.3346 -0.5395
VERTICAL GEOMETRY DSG: BAH 03/23
VPI 8 1069+81.8700 12.3346 0.0000
Ending profile PR_16TH_ST description
* 11 $
* 12 END
CHK: LM 03/2023
FPID No. 451283-1 vi Structures Calculations Book
1.3 Wingwall Length
KISINGER CAMPO & ASSOCIATES
COLLIER COUNTY
16TH STREET NE BRIDGE
WINGWALL LENGTH
DSG: BAH 02/23
CHK: BAH 02/23
Ver�cal Alignment:
VPC Sta�on: PCSta 106095ft:= VPC Eleva�on: PCEL 17.215ft:=
VPI Sta�on: PISta 106175ft:= VPI Eleva�on: PIEL 19.248ft:=
VPT Sta�on: PTSta 106255ft:= VPT Eleva�on: PTEL 17.113ft:=
Grade 1: g1 PIEL PCEL-( ) PISta PCSta-( ):= g1 2.541 %=
Grade 2: g2 PTEL PIEL-( ) PTSta PISta-( ):= g2 2.669- %=
Length of Profile: LVC PTSta PCSta-:= LVC 160 ft=
Ver�cal Profile Eqn.:
PGL x( ) PCEL x PCSta-( ) g1+ x PCStaif
PCEL x PCSta-( ) g1+ g2 g1-
2 LVC
x PCSta-( )2 + PCSta x< PTStaif
PTEL x PTSta-( ) g2+ otherwise
Bridge Geometry - Abutment 1
Begin Bridge Sta�on: Stabb 106096.75ft:=
PGL Eleva�on at Beg. Bridge: ELbb PGL Stabb( ):= ELbb 17.259 ft=
Length of front Berm: (Start slope at F.F. of Cap) berm 0ft:=
Width of Bent Cap: bcap 3.5ft:=
Width of Back Wall (Approach Slab): bbw 1ft:=
Offset to Le? Coping: offLt 25ft 1in+:=
Offset to Right Coping: offRt 25ft 4in+:=
Cross slope: xs 2%:=
Skew: ϕ 0deg:=
Sidewalk Curb Height (Le? Only): hcurb 6in:=
Sidewalk Width: bsw 6ft:=
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\WingwallLength.xmcd 1 of 5
LM 03/2023
COLLIER COUNTY
CHK: BAH 02/23
Bridge Geometry - Abutment 1..Cont'd
Sidewalk Height at Le?
Coping:
hsw hcurb 2 xs bsw+:= hsw 0.740 ft=
End Bent 1 BoBom of Cap
Eleva�on at Le? Coping:
(See Substructure Eleva�ons) Elbotcap1 11.860ft:=
End Bent 1 BoBom of Cap
Eleva�on at Right Coping:
(See Substructure Eleva�ons) Elbotcap2 11.855ft:=
Design Wingwall Length - Abutment 1 Le0:
Eleva�on of Point 'A': ELA Elbotcap1 1ft+:= ELA 12.860 ft=
Dimension 'C': C bcap bbw-:= C 2.500 ft=
Ini�al Guess: x Stabb 4ft-:=
Given PGL x offLt tan ϕ( )-( ) offLt xs- hsw+ ELA
Stabb C+ berm+ x-( )+=
Loca�on of Point 'B': StaB Find x( ):= StaB 106090.30 ft=
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\WingwallLength.xmcd 2 of 5
COLLIER COUNTY
CHK: BAH 02/23
Design Wingwall Length - Abutment 1 Le0...Cont'd
Eleva�on at Point 'B': ELB ELA
Stabb C+ berm+ StaB-( )+:= ELB 17.334 ft=
Change in Eleva�on: ∆h ELB ELA-:= ∆h 4.474 ft=
Dimension 'L': L 2 ∆h C- berm-:= L 6.448 ft=
Design Wingwall Length: Ldes
Ceil L in 12+ 1, ( ) in:= Ldes
7.5 ft=
Design Wingwall Length - Abutment 1 Right:
Eleva�on of Point 'A': ELA Elbotcap2 1ft+:= ELA 12.855 ft=
Ini�al Guess: x Stabb 4ft-:=
Given PGL x offRt tan ϕ( )-( ) offRt xs- ELA
Stabb C+ berm+ x-( )+=
Loca�on of Point 'B': StaB Find x( ):= StaB 106091.71 ft=
Eleva�on at Point 'B': ELB ELA
Stabb C+ berm+ StaB-( )+:= ELB 16.625 ft=
Change in Eleva�on: ∆h ELB ELA-:= ∆h 3.770 ft=
Dimension 'L': L 2 ∆h C- berm-:= L 5.039 ft=
Design Wingwall Length: Ldes
Ceil L in 12+ 1, ( ) in:= Ldes
6.083 ft=
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\WingwallLength.xmcd 3 of 5
COLLIER COUNTY
CHK: BAH 02/23
Bridge Geometry - Abutment 4
End Bridge Sta�on: Staeb 106243.79ft:=
PGL Eleva�on at End. Bridge: ELeb PGL Staeb( ):= ELeb 17.392 ft=
End Bent 4 BoBom of Cap
Eleva�on at Le? Coping:
(See Substructure Eleva�ons) Elbotcap3 11.993ft:=
End Bent 4 BoBom of Cap
Eleva�on at Right Coping:
(See Substructure Eleva�ons) Elbotcap4 11.988ft:=
Design Wingwall Length - Abutment 4 Le0:
Eleva�on of Point 'A': ELA Elbotcap3 1ft+:= ELA 12.993 ft=
Ini�al Guess: x Staeb 4ft+:=
Given PGL x offLt tan ϕ( )-( ) offLt xs- hsw+ ELA x Staeb C- berm-( )- +=
StaB Find x( ):= StaB 106250.25 ft=
Eleva�on at Point 'B': ELB ELA
StaB Staeb C- berm-( )- +:= ELB 17.474 ft=
Change in Eleva�on: ∆h ELB ELA-:= ∆h 4.481 ft=
Dimension 'L': L 2 ∆h C- berm-:= L 6.463 ft=
Design Wingwall Length: Ldes
Ceil L in 12+ 1, ( ) in:= Ldes
7.5 ft=
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\WingwallLength.xmcd 4 of 5
COLLIER COUNTY
CHK: BAH 02/23
Design Wingwall Length - Abutment 4 Right:
Eleva�on of Point 'A': ELA Elbotcap4 1ft+:= ELA 12.988 ft=
Ini�al Guess: x Staeb 4ft+:=
Given PGL x offRt tan ϕ( )-( ) offRt xs- ELA x Staeb C- berm-( )- +=
StaB Find x( ):= StaB 106248.84 ft=
Eleva�on at Point 'B': ELB ELA
StaB Staeb C- berm-( )- +:= ELB 16.764 ft=
Change in Eleva�on: ∆h ELB ELA-:= ∆h 3.776 ft=
Dimension 'L': L 2 ∆h C- berm-:= L 5.053 ft=
Design Wingwall Length: Ldes
Ceil L in 12+ 1, ( ) in:= Ldes
6.083 ft=
Design Wingwall Length:
Design Wingwall Length: Ldes T
7.5 6.083 7.5 6.083( ) ft=
Ldes max Ldes( ):= Ldes 7.5 ft=
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\WingwallLength.xmcd 5 of 5
FPID No. 451283-1 vii Structures Calculations Book
1.4 Vertical Clearance
COLLIER COUNTY
GEOMETRY
VERTICAL CLEARANCE
CALCULATION QUALITY CONTROL
RESPONSIBLE PROFESSIONAL / ORIGINATOR INITIALS: BAH DATE: 03/23
QUALITY REVIEWER INITIALS: DATE:
SUMMARY OF SECTION
The Low Member Elevation (LME)of the bridge is calculated in accordance with SDG Figure 1.1.3-1. LME is compared to the Design High Water Elevation (DHW) to ensure compliance with vertical clearance criteria.
FDM 260.8.1 gives vertical clearance criteria for bridges over waterways. For non-navigable waterways, a minimum of two feet vertical clearance from the design flood stage to the LME of the bridge is required to allow debris to pass under the bridge in a storm event.
The South Florida Water Management District (SFWMD) Right of Way Criteria Manual imposes additional requirements for bridges over their waterways. The 16th Street NE Bridge crosses over the Golden Gate
Main Canal, which is part of the Big Cypress Basin. For this waterway, SFWMD calls for a vertical clearance of four feet above DHW.
Due to profile constraints, a waiver is required for the vertical clearance criteria which will allow for the bridge to be built with a two-foot clearance between the LME and DHW.
BAH 03/23
Description: Vertical Clearance
Station Elevation Grade 1 = 2.54%
PC 1060+95.00 17.215 Grade 2 = -2.67%
PI 1061+75.00 19.248 G2-G1= -5.21%
PT 1062+55.00 17.113 LVC = 160.00'
25.333
2.00%
3.500
1.208
3.667
1.125
Beam Type Deck (in.) Build-Up (in.) Beam (in.) Total (ft.)
15" FSB 6.500 1.000 15.000 1.875
Location Station Brng. Sta. PGL at CL Brng. Bot. of Bm. El. Sta. FF of Cap LME
Begin Bridge 1060+96.75 1060+97.96 17.288 14.907 1060+99.25 14.928
Int. Bent 2 Bk. 1061+45.79 1061+44.67 18.075 15.693 1061+43.96 15.682
Int. Bent 2 Ah. 1061+45.79 1061+46.92 18.095 15.713 1061+47.63 15.714
Int. Bent 3 Bk. 1061+94.75 1061+93.63 18.137 15.756 1061+92.92 15.755
Int. Bent 3 Ah. 1061+94.75 1061+95.88 18.121 15.740 1061+96.58 15.729
End Bridge 1062+43.79 1062+42.58 17.419 15.038 1062+41.29 15.057
Location LME DHW El. Vertical Clr.
Begin Bridge 14.928 12.640 2.288
2'-3 1/2"
Vertical Clearance
COLLIER COUNTY
16TH STREET NE BRIDGE
VERTICAL CLEARANCE
Vertical Clearance =
Vertical Alignment
Low Member Elevation
Superstructure Depth
DESIGNED BY:
CHECKED BY:
X-Slope
Max. Coping Offset (ft.)
Bridge Geometry
End Bent Cap Width (ft.)
End Bent Brng. Distance (ft.)
Int. Bent Cap Width (ft.)
Int. Bent Brng. Distance (ft.)
Vertical Clearance LME.xlsx 1 of 1
FPID No. 451283-1 viii Structures Calculations Book
1.5 Substructure Elevations
Description: End Bent 1 Elevations
L = 160.00'
Station Elevation Grade Out 3.000'
PT 1060+95.00 17.215 2.54% 3.500'
PI 1061+75.00 19.248 -2.67% 1.792'
PC 1062+55.00 17.113 - 0.083'
-25.083'
25.333'
Station Elevation Skew 1.000'
Beg. Bridge 1060+96.75 17.259 00.00° 7.500'
Int. Bent 2 1061+45.79 18.085 00.00° 7.500'
Int. Bent 3 1061+94.75 18.130 00.00° 11.375'
End Bridge 1062+43.79 17.392 00.00° 0.500'
6.000'
Point Length
From FFAS Offset Station PGL Elev. Elevation
A 0.000' 0.000' 1060+96.75 17.259' 15.384'
B 0.000' -25.167' 1060+96.75 17.259' 14.880'
C 0.000' 25.417' 1060+96.75 17.259' 14.875'
D 0.000' -26.167' 1060+96.75 17.259' 11.860'
E 0.000' 0.000' 1060+96.75 17.259' 12.384'
F 0.000' 26.417' 1060+96.75 17.259' 11.855'
G 2.500' -25.083' 1060+99.25 17.320' 17.558'
H -7.500' -25.083' 1060+89.25 17.068' 17.307'
J 2.500' 25.333' 1060+99.25 17.320' 16.813'
K -7.500' 25.333' 1060+89.25 17.068' 16.562'
Top of Cap at CL Const.
Location
End Bent 1 Table of Elevations
Bottom of Cap, Rt. Coping
Bottom of Cap, CL Const.
Bottom of Cap, Lt. Coping
Top of Cap, Rt. Coping
Top of Cap, Lt. Coping
El. A - hcap
PGL Elev. - 0.02 x Offset - tslab - tbrng - hcap
Top of W.W., Rt. Cop., End W.W.
Top of W.W., Rt. Cop., F.F. Cap
Top of W.W., Lt. Cop., End W.W.
Top of W.W, Lt. Cop., F.F. Cap
PGL Elev. - 0.02 x Offset
PGL Elev. - 0.02 x Offset
PGL Elev. - 0.02 x Offset + hcurb + 0.04 x bsw
PGL Elev. - 0.02 x Offset + hcurb + 0.04 x bsw
Slab + Buildup, tslab
PGL Elev. - 0.02 x Offset - tslab - tbrng - hcap
PGL Elev. - 0.02 x Offset - tslab - tbrng
Curb Height, hcurb
Sidewalk Width, bsw
Wingwall Width, bww
DESIGNED BY:
CHECKED BY:
Cap Height, hcap
Additional Geometry
COLLIER COUNTY
16TH STREET NE BRIDGE
SUBSTRUCTURE ELEVATIONS
PGL Elev. - 0.02 x Offset - tslab - tbrng
Wingwall Length Lt., Lwwlt
Off. Coping Rt., Offcopingrt
Off. Coping Lt., Offcopinglt
Bearing Height, tbrng
Wingwall Length Rt., Lwwrt
Pile Spacing, spapile
Vertical Alignment
Bridge Geometry
Cap Width, bcap
Equation
PGL Elev. - tslab - tbrng
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\
SubstructureElevations_JHJ.xlsx 1 of 8
Description: End Bent 1 Elevations
DESIGNED BY:
CHECKED BY:
COLLIER COUNTY
16TH STREET NE BRIDGE
SUBSTRUCTURE ELEVATIONS
Pile No.
Length
From FFAS Offset Station PGL Elev. Elevation
1 0.000' -22.625' 1060+96.75 17.259' 12.931'
2 0.000' -11.250' 1060+96.75 17.259' 13.159'
3 0.000' 0.125' 1060+96.75 17.259' 13.381'
4 0.000' 11.500' 1060+96.75 17.259' 13.154'
5 0.000' 22.875' 1060+96.75 17.259' 12.926'
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
Equation
El. E - 0.02 x Offset + 1ft.
Pile Cutoff Elevations
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\
SubstructureElevations_JHJ.xlsx 2 of 8
JHJ 11/23
Description: Intermediate Bent 2 Elevations
L = 160.00'
Station Elevation Grade Out 3.000'
PT 1060+95.00 17.215 2.54% 3.667'
PI 1061+75.00 19.248 -2.67% 1.792'
PC 1062+55.00 17.113 - 0.083'
-25.083'
25.333'
Station Elevation Skew 7.583'
Beg. Bridge 1060+96.75 17.259 00.00°
Int. Bent 2 1061+45.79 18.085 00.00°
Int. Bent 3 1061+94.75 18.130 00.00°
End Bridge 1062+43.79 17.392 00.00°
Point
Length
From CL
Cap
Offset Station PGL Elev. Elevation
A 0.000' 0.000' 1061+45.79 18.085' 16.210'
B 0.000' -25.167' 1061+45.79 18.085' 15.707'
C 0.000' 25.417' 1061+45.79 18.085' 15.702'
D 0.000' -25.167' 1061+45.79 18.085' 12.707'
E 0.000' 0.000' 1061+45.79 18.085' 13.210'
F 0.000' 25.417' 1061+45.79 18.085' 12.702'
PGL Elev. - 0.02 x Offset - tslab - tbrng - hcap
El. A - hcap
PGL Elev. - 0.02 x Offset - tslab - tbrng - hcap
Pile Spacing, spapile
Equation
Intermediate Bent 2 Table of Elevations
Location
Bottom of Cap, Rt. Coping
Bottom of Cap, CL Const.
Bottom of Cap, Lt. Coping
Top of Cap, Rt. Coping
Top of Cap, Lt. Coping
Top of Cap at CL Const.
Slab + Buildup, tslab
COLLIER COUNTY
16TH STREET NE BRIDGE
SUBSTRUCTURE ELEVATIONS
DESIGNED BY:
CHECKED BY:
Additional Geometry
Cap Height, hcap
Cap Width, bcap
PGL Elev. - tslab - tbrng
PGL Elev. - 0.02 x Offset - tslab - tbrng
PGL Elev. - 0.02 x Offset - tslab - tbrng
Bearing Height, tbrng
Off. Coping Lt., Offcopinglt
Off. Coping Rt., OffcopingrtBridge Geometry
Vertical Alignment
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\
SubstructureElevations_JHJ.xlsx 3 of 8
LM 11/2023
JHJ 11/23
Description: Intermediate Bent 2 Elevations
COLLIER COUNTY
16TH STREET NE BRIDGE
SUBSTRUCTURE ELEVATIONS
DESIGNED BY:
CHECKED BY:
Pile No.
Length
From CL
Cap
Offset Station PGL Elev. Elevation
1 0.000' -22.625' 1061+45.79 18.085' 13.758'
2 0.000' -15.042' 1061+45.79 18.085' 13.909'
3 0.000' -7.458' 1061+45.79 18.085' 14.061'
4 0.000' 0.125' 1061+45.79 18.085' 14.208'
5 0.000' 7.708' 1061+45.79 18.085' 14.056'
6 0.000' 15.292' 1061+45.79 18.085' 13.904'
7 0.000' 22.875' 1061+45.79 18.085' 13.753'
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
Pile Cutoff Elevations
Equation
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\
SubstructureElevations_JHJ.xlsx 4 of 8
Description: Intermediate Bent 3 Elevations
L = 160.00'
Station Elevation Grade Out 3.000'
PT 1060+95.00 17.215 2.54% 3.667'
PI 1061+75.00 19.248 -2.67% 1.792'
PC 1062+55.00 17.113 - 0.083'
-25.083'
25.333'
Station Elevation Skew 7.583'
Beg. Bridge 1060+96.75 17.259 00.00°
Int. Bent 2 1061+45.79 18.085 00.00°
Int. Bent 3 1061+94.75 18.130 00.00°
End Bridge 1062+43.79 17.392 00.00°
Point
Length
From CL
Cap
Offset Station PGL Elev. Elevation
A 0.000' 0.000' 1061+94.75 18.130' 16.255'
B 0.000' -25.167' 1061+94.75 18.130' 15.751'
C 0.000' 25.417' 1061+94.75 18.130' 15.746'
D 0.000' -25.167' 1061+94.75 18.130' 12.751'
E 0.000' 0.000' 1061+94.75 18.130' 13.255'
F 0.000' 25.417' 1061+94.75 18.130' 12.746'
Intermediate Bent 3 Table of Elevations
Top of Cap at CL Const.
Top of Cap, Lt. Coping
Top of Cap, Rt. Coping
PGL Elev. - 0.02 x Offset - tslab - tbrng - hcap
PGL Elev. - tslab - tbrng
PGL Elev. - 0.02 x Offset - tslab - tbrng
PGL Elev. - 0.02 x Offset - tslab - tbrng
PGL Elev. - 0.02 x Offset - tslab - tbrng - hcap
El. A - hcap
Bottom of Cap, Lt. Coping
Bottom of Cap, CL Const.
Bottom of Cap, Rt. Coping
LocationEquation
COLLIER COUNTY
16TH STREET NE BRIDGE
SUBSTRUCTURE ELEVATIONS
DESIGNED BY:
CHECKED BY:
Additional Geometry
Cap Height, hcap
Cap Width, bcap
Slab + Buildup, tslab
Bearing Height, tbrng
Off. Coping Lt., Offcopinglt
Off. Coping Rt., Offcopingrt
Pile Spacing, spapile
Vertical Alignment
Bridge Geometry
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\
SubstructureElevations_JHJ.xlsx 5 of 8
Description: Intermediate Bent 3 Elevations
COLLIER COUNTY
16TH STREET NE BRIDGE
SUBSTRUCTURE ELEVATIONS
DESIGNED BY:
CHECKED BY:
Pile No.
Length
From CL
Cap
Offset Station PGL Elev. Elevation
1 0.000' -22.625' 1061+94.75 18.130' 13.802'
2 0.000' -15.042' 1061+94.75 18.130' 13.954'
3 0.000' -7.458' 1061+94.75 18.130' 14.105'
4 0.000' 0.125' 1061+94.75 18.130' 14.252'
5 0.000' 7.708' 1061+94.75 18.130' 14.100'
6 0.000' 15.292' 1061+94.75 18.130' 13.949'
7 0.000' 22.875' 1061+94.75 18.130' 13.797'
El. E - 0.02 x Offset + 1ft.
Pile Cutoff Elevations
Equation
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\
SubstructureElevations_JHJ.xlsx 6 of 8
Description: End Bent 4 Elevations
L = 160.00'
Station Elevation Grade Out 3.000'
PT 1060+95.00 17.215 2.54% 3.500'
PI 1061+75.00 19.248 -2.67% 1.792'
PC 1062+55.00 17.113 - 0.083'
-25.083'
25.333'
Station Elevation Skew 1.000'
Beg. Bridge 1060+96.75 17.259 00.00° 7.500'
Int. Bent 2 1061+45.79 18.085 00.00° 7.500'
Int. Bent 3 1061+94.75 18.130 00.00° 11.375'
End Bridge 1062+43.79 17.392 00.00° 0.500'
6.000'
Point Length
From FFAS Offset Station PGL Elev. Elevation
A 0.000' 0.000' 1062+43.79 17.392' 15.517'
B 0.000' -25.167' 1062+43.79 17.392' 15.013'
C 0.000' 25.417' 1062+43.79 17.392' 15.008'
D 0.000' -26.167' 1062+43.79 17.392' 11.993'
E 0.000' 0.000' 1062+43.79 17.392' 12.517'
F 0.000' 26.417' 1062+43.79 17.392' 11.988'
G -2.500' -25.083' 1062+41.29 17.448' 17.686'
H 7.500' -25.083' 1062+51.29 17.210' 17.448'
J -2.500' 25.333' 1062+41.29 17.448' 16.941'
K 7.500' 25.333' 1062+51.29 17.210' 16.703'
Location
Top of Cap at CL Const.
Top of W.W., Rt. Cop., End W.W.
Top of W.W., Rt. Cop., F.F. Cap
Top of W.W., Lt. Cop., End W.W.
Top of W.W, Lt. Cop., F.F. Cap
Bottom of Cap, Rt. Coping
Bottom of Cap, CL Const.
Bottom of Cap, Lt. Coping
Top of Cap, Rt. Coping
Top of Cap, Lt. Coping
Bridge Geometry
PGL Elev. - 0.02 x Offset
PGL Elev. - 0.02 x Offset
Pile Spacing, spapile
Equation
PGL Elev. - tslab - tbrng
PGL Elev. - 0.02 x Offset + hcurb + 0.04 x bsw
Curb Height, hcurb
Sidewalk Width, bsw
End Bent 4 Table of Elevations
PGL Elev. - 0.02 x Offset + hcurb + 0.04 x bsw
Wingwall Length Rt., Lwwrt
PGL Elev. - 0.02 x Offset - tslab - tbrng
PGL Elev. - 0.02 x Offset - tslab - tbrng - hcap
El. A - hcap
PGL Elev. - 0.02 x Offset - tslab - tbrng - hcap
PGL Elev. - 0.02 x Offset - tslab - tbrng
COLLIER COUNTY
16TH STREET NE BRIDGE
SUBSTRUCTURE ELEVATIONS
DESIGNED BY:
CHECKED BY:
Additional Geometry
Cap Height, hcap
Cap Width, bcap
Vertical Alignment
Wingwall Length Lt., Lwwlt
Slab + Buildup, tslab
Bearing Height, tbrng
Off. Coping Lt., Offcopinglt
Off. Coping Rt., Offcopingrt
Wingwall Width, bww
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\
SubstructureElevations_JHJ.xlsx 7 of 8
Description: End Bent 4 Elevations
COLLIER COUNTY
16TH STREET NE BRIDGE
SUBSTRUCTURE ELEVATIONS
DESIGNED BY:
CHECKED BY:
Pile No.
Length
From FFAS Offset Station PGL Elev. Elevation
1 0.000' -22.625' 1062+43.79 17.392' 13.064'
2 0.000' -11.250' 1062+43.79 17.392' 13.292'
3 0.000' 0.125' 1062+43.79 17.392' 13.514'
4 0.000' 11.500' 1062+43.79 17.392' 13.287'
5 0.000' 22.875' 1062+43.79 17.392' 13.059'
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
Pile Cutoff Elevations
Equation
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
El. E - 0.02 x Offset + 1ft.
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\
SubstructureElevations_JHJ.xlsx 8 of 8
FPID No. 451283-1 ix Structures Calculations Book
1.6 Finished Grade Elevations
KISINGER CAMPO & ASSOCIATES, CORP.
YT 06/23
Finished Grade Elevations
Station Elevation Grade 1 = 0.000% Station Elevation Grade 1 = 2.541% Station Elevation Grade 1 = -2.668%
PVC 1058+70.00 12.895 Grade 2 = 2.541% PVC 1060+95.00 17.215 Grade 2 = -2.668% PVC 1063+70.00 14.045 Grade 2 = 0.000%
PVI 1059+25.00 12.895 G2-G1 = 2.541% PVI 1061+75.00 19.248 G2-G1= -5.209% PVI 1064+25.00 12.577 G2-G1 = 2.668%
PVT 1059+80.00 14.292 L = 110.00 PVT 1062+55.00 17.113 L= 160.00 PVT 1064+80.00 12.577 L = 110.00
Begin A.S. 1 T-1 T-2 Begin Bridge
Station 1060+66.75 1060+76.75 1060+86.75 1060+96.75
FGE 16.497 16.751 17.005 17.259
Offset X-Slope Begin A.S. 1 T-1 T-2 Begin Bridge
-25.083 0.02 15.995 16.249 16.503 16.757
-24.000 0.02 16.017 16.271 16.525 16.779
-18.000 0.02 16.137 16.391 16.645 16.899
0.000 0.00 16.497 16.751 17.005 17.259
24.000 -0.02 16.017 16.271 16.525 16.779
25.333 -0.02 15.990 16.244 16.498 16.752
Left Front Face of Barrier
Right Coping
Approach Slab 1
Right Gutter Line
CL Const. 16th St. & PGL
Left Gutter Line
COLLIER COUNTY
16TH STREET NE BRIDGE
Vertical Alignment Along CL_16TH_ST
Left Coping
Location
16TH STREET NE OVER GOLDEN GATE MAIN CANAL
Vertical Alignment Along CL_16TH_ST
DESIGNED BY:
CHECKED BY:
Vertical Alignment Along CL_16TH_ST
Information Along T-Lines
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\Finished_Grade_Elev_16.xlsx Page 1 of 5 Printed 7/3/2023
JHJ 06/23
T-Line Information and Elevations Checked Independently
KISINGER CAMPO & ASSOCIATES, CORP.
YT 06/23
Finished Grade Elevations
Station Elevation Grade 1 = 0.000% Station Elevation Grade 1 = 2.541% Station Elevation Grade 1 = -2.668%
PVC 1058+70.00 12.895 Grade 2 = 2.541% PVC 1060+95.00 17.215 Grade 2 = -2.668% PVC 1063+70.00 14.045 Grade 2 = 0.000%
PVI 1059+25.00 12.895 G2-G1 = 2.541% PVI 1061+75.00 19.248 G2-G1= -5.209% PVI 1064+25.00 12.577 G2-G1 = 2.668%
PVT 1059+80.00 14.292 L = 110.00 PVT 1062+55.00 17.113 L= 160.00 PVT 1064+80.00 12.577 L = 110.00
COLLIER COUNTY
16TH STREET NE BRIDGE
Vertical Alignment Along CL_16TH_ST
16TH STREET NE OVER GOLDEN GATE MAIN CANAL
Vertical Alignment Along CL_16TH_ST
DESIGNED BY:
CHECKED BY:
Vertical Alignment Along CL_16TH_ST
End Bridge T-1 T-2 End A.S. 2
Station 1062+43.79 1062+53.79 1062+63.79 1062+73.79
FGE 17.392 17.145 16.878 16.612
Offset X-Slope End Bridge T-1 T-2 End A.S. 2
-25.083 0.02 16.890 16.644 16.377 16.110
-24.000 0.02 16.912 16.665 16.398 16.132
-18.000 0.02 17.032 16.785 16.518 16.252
0.000 0.00 17.392 17.145 16.878 16.612
24.000 -0.02 16.912 16.665 16.398 16.132
25.333 -0.02 16.885 16.639 16.372 16.105
Location
Left Coping
Right Gutter Line
Right Coping
Approach Slab 2
Information Along T-Lines
Left Gutter Line
CL Const. 16th St. & PGL
Left Front Face of Barrier
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\01_Geometry\Finished_Grade_Elev_16.xlsx Page 2 of 5 Printed 7/3/2023
Information Along T-Lines
Begin Bridge CL Exp. Joint T-1 T-2 T-3 T-4 T-5 CL Int. Bent
Station 1060+96.75 1060+96.83 1061+04.92 1061+13.10 1061+21.27 1061+29.44 1061+37.62 1061+45.79
FGE 17.259 17.261 17.451 17.621 17.770 17.897 18.002 18.085
Span 1
Location Offset X-Slope Begin Bridge CL Exp. Joint T-1 T-2 T-3 T-4 T-5 CL Int. Bent
Left Coping -25.083 0.02 16.757 16.760 16.949 17.119 17.268 17.395 17.500 17.584
Left Front Face of Barrier -24.000 0.02 16.779 16.781 16.971 17.141 17.290 17.417 17.522 17.605
CL Beam 1 -22.750 0.02 16.804 16.806 16.996 17.166 17.315 17.442 17.547 17.630
Left Gutter Line -18.000 0.02 16.899 16.901 17.091 17.261 17.410 17.537 17.642 17.725
CL Beam 2 -17.792 0.02 16.903 16.905 17.095 17.265 17.414 17.541 17.646 17.729
CL Beam 3 -12.708 0.02 17.005 17.007 17.197 17.367 17.516 17.643 17.748 17.831
CL Beam 4 -7.625 0.02 17.107 17.109 17.298 17.469 17.617 17.744 17.849 17.933
CL Beam 5 -2.542 0.02 17.208 17.210 17.400 17.570 17.719 17.846 17.951 18.034
CL Const. 16th St. & PGL 0.000 0.00 17.259 17.261 17.451 17.621 17.770 17.897 18.002 18.085
CL Beam 6 2.542 -0.02 17.208 17.210 17.400 17.570 17.719 17.846 17.951 18.034
CL Beam 7 7.625 -0.02 17.107 17.109 17.298 17.469 17.617 17.744 17.849 17.933
CL Beam 8 12.708 -0.02 17.005 17.007 17.197 17.367 17.516 17.643 17.748 17.831
CL Beam 9 17.792 -0.02 16.903 16.905 17.095 17.265 17.414 17.541 17.646 17.729
CL Beam 10 22.875 -0.02 16.802 16.804 16.993 17.164 17.312 17.439 17.544 17.628
Right Gutter Line 24.000 -0.02 16.779 16.781 16.971 17.141 17.290 17.417 17.522 17.605
Right Coping 25.333 -0.02 16.752 16.755 16.944 17.114 17.263 17.390 17.495 17.579
KISINGER CAMPO & ASSOCIATES, CORP.
COLLIER COUNTY
16TH STREET NE BRIDGE
DESIGNED BY:
CHECKED BY:
YT 08/23
Finished Grade Elevations
16TH STREET NE OVER GOLDEN GATE MAIN CANAL
Vertical Alignment Along CL_16TH_ST Vertical Alignment Along CL_16TH_ST Vertical Alignment Along CL_16TH_ST
Station Elevation Grade 1 = 0.000% Station Elevation Grade 1 = 2.541% Station Elevation Grade 1 = -2.668%
PVC 1058+70.00 12.895 Grade 2 = 2.541% PVC 1060+95.00 17.215 Grade 2 = -2.668% PVC 1063+70.00 14.045 Grade 2 = 0.000%
PVI 1059+25.00 12.895 G2-G1 = 2.541% PVI 1061+75.00 19.248 G2-G1= -5.209% PVI 1064+25.00 12.577 G2-G1 = 2.668%
PVT 1059+80.00 14.292 L = 110.00 PVT 1062+55.00 17.113 L= 160.00 PVT 1064+80.00 12.577 L = 110.00
Finished_Grade_Elev_16.xlsx Page 3 of 5 Printed 8/9/2023
JHJ 08/23
CL Int. Bent
T-1 T-2 T-3 T-4 T-5 CL Int. Bent
Station 1061+45.79 1061+53.95 1061+62.11 1061+70.27 1061+78.43 1061+86.59 1061+94.75
FGE 18.085 18.147 18.187 18.205 18.202 18.176 18.130
Span 2
Location Offset X-Slope CL Int. Bent
T-1 T-2 T-3 T-4 T-5
CL Int. Bent
Left Coping -25.083 0.02 17.584 17.645 17.685 17.703 17.700 17.675 17.628
Left Front Face of Barrier -24.000 0.02 17.605 17.667 17.707 17.725 17.722 17.696 17.650
CL Beam 1 -22.750 0.02 17.630 17.692 17.732 17.750 17.747 17.721 17.675
Left Gutter Line -18.000 0.02 17.725 17.787 17.827 17.845 17.842 17.816 17.770
CL Beam 2 -17.792 0.02 17.729 17.791 17.831 17.849 17.846 17.821 17.774
CL Beam 3 -12.708 0.02 17.831 17.893 17.933 17.951 17.947 17.922 17.875
CL Beam 4 -7.625 0.02 17.933 17.994 18.034 18.053 18.049 18.024 17.977
CL Beam 5 -2.542 0.02 18.034 18.096 18.136 18.154 18.151 18.126 18.079
CL Const. 16th St. & PGL 0.000 0.00 18.085 18.147 18.187 18.205 18.202 18.176 18.130
CL Beam 6 2.542 -0.02 18.034 18.096 18.136 18.154 18.151 18.126 18.079
CL Beam 7 7.625 -0.02 17.933 17.994 18.034 18.053 18.049 18.024 17.977
CL Beam 8 12.708 -0.02 17.831 17.893 17.933 17.951 17.947 17.922 17.875
CL Beam 9 17.792 -0.02 17.729 17.791 17.831 17.849 17.846 17.821 17.774
CL Beam 10 22.875 -0.02 17.628 17.689 17.729 17.748 17.744 17.719 17.672
Right Gutter Line 24.000 -0.02 17.605 17.667 17.707 17.725 17.722 17.696 17.650
Right Coping 25.333 -0.02 17.579 17.640 17.680 17.698 17.695 17.670 17.623
KISINGER CAMPO & ASSOCIATES, CORP.
COLLIER COUNTY
16TH STREET NE BRIDGE
DESIGNED BY:
CHECKED BY:
YT 08/23
Finished Grade Elevations
16TH STREET NE OVER GOLDEN GATE MAIN CANAL
Vertical Alignment Along CL_16TH_ST Vertical Alignment Along CL_16TH_ST Vertical Alignment Along CL_16TH_ST
Station Elevation Grade 1 = 0.000% Station Elevation Grade 1 = 2.541% Station Elevation Grade 1 = -2.668%
PVC 1058+70.00 12.895 Grade 2 = 2.541% PVC 1060+95.00 17.215 Grade 2 = -2.668% PVC 1063+70.00 14.045 Grade 2 = 0.000%
PVI 1059+25.00 12.895 G2-G1 = 2.541% PVI 1061+75.00 19.248 G2-G1= -5.209% PVI 1064+25.00 12.577 G2-G1 = 2.668%
PVT 1059+80.00 14.292 L = 110.00 PVT 1062+55.00 17.113 L= 160.00 PVT 1064+80.00 12.577 L = 110.00
Finished_Grade_Elev_16.xlsx Page 4 of 5 Printed 8/9/2023
JHJ 08/23
CL Int. Bent
T-1 T-2 T-3 T-4 T-5 CL Exp. Joint End Bridge
Station 1061+94.75 1062+02.92 1062+11.10 1062+19.27 1062+27.44 1062+35.62 1062+43.71 1062+43.79
FGE 18.130 18.061 17.971 17.858 17.725 17.569 17.394 17.392
Span 3
Location Offset X-Slope CL Int. Bent
T-1 T-2 T-3 T-4 T-5 CL Exp. Joint End Bridge
Left Coping -25.083 0.02 17.628 17.559 17.469 17.357 17.223 17.067 16.892 16.890
Left Front Face of Barrier -24.000 0.02 17.650 17.581 17.491 17.378 17.245 17.089 16.914 16.912
CL Beam 1 -22.750 0.02 17.675 17.606 17.516 17.403 17.270 17.114 16.939 16.937
Left Gutter Line -18.000 0.02 17.770 17.701 17.611 17.498 17.365 17.209 17.034 17.032
CL Beam 2 -17.792 0.02 17.774 17.705 17.615 17.503 17.369 17.213 17.038 17.036
CL Beam 3 -12.708 0.02 17.875 17.807 17.716 17.604 17.470 17.315 17.139 17.137
CL Beam 4 -7.625 0.02 17.977 17.908 17.818 17.706 17.572 17.417 17.241 17.239
CL Beam 5 -2.542 0.02 18.079 18.010 17.920 17.808 17.674 17.518 17.343 17.341
CL Const. 16th St. & PGL 0.000 0.00 18.130 18.061 17.971 17.858 17.725 17.569 17.394 17.392
CL Beam 6 2.542 -0.02 18.079 18.010 17.920 17.808 17.674 17.518 17.343 17.341
CL Beam 7 7.625 -0.02 17.977 17.908 17.818 17.706 17.572 17.417 17.241 17.239
CL Beam 8 12.708 -0.02 17.875 17.807 17.716 17.604 17.470 17.315 17.139 17.137
CL Beam 9 17.792 -0.02 17.774 17.705 17.615 17.503 17.369 17.213 17.038 17.036
CL Beam 10 22.875 -0.02 17.672 17.603 17.513 17.401 17.267 17.112 16.936 16.934
Right Gutter Line 24.000 -0.02 17.650 17.581 17.491 17.378 17.245 17.089 16.914 16.912
Right Coping 25.333 -0.02 17.623 17.554 17.464 17.352 17.218 17.062 16.887 16.885
KISINGER CAMPO & ASSOCIATES, CORP.
COLLIER COUNTY
16TH STREET NE BRIDGE
DESIGNED BY:
CHECKED BY:
YT 08/23
Finished Grade Elevations
16TH STREET NE OVER GOLDEN GATE MAIN CANAL
Vertical Alignment Along CL_16TH_ST Vertical Alignment Along CL_16TH_ST Vertical Alignment Along CL_16TH_ST
Station Elevation Grade 1 = 0.000% Station Elevation Grade 1 = 2.541% Station Elevation Grade 1 = -2.668%
PVC 1058+70.00 12.895 Grade 2 = 2.541% PVC 1060+95.00 17.215 Grade 2 = -2.668% PVC 1063+70.00 14.045 Grade 2 = 0.000%
PVI 1059+25.00 12.895 G2-G1 = 2.541% PVI 1061+75.00 19.248 G2-G1= -5.209% PVI 1064+25.00 12.577 G2-G1 = 2.668%
PVT 1059+80.00 14.292 L = 110.00 PVT 1062+55.00 17.113 L= 160.00 PVT 1064+80.00 12.577 L = 110.00
Finished_Grade_Elev_16.xlsx Page 5 of 5 Printed 8/9/2023
FPID No. 451283-1 x Structures Calculations Book
2.0 Superstructure
FPID No. 451283-1 xi Structures Calculations Book
2.1 FSB Layout
COLLIER COUNTY
FSB LAYOUT
DSG: BAH 03/23
CHK: BAH 03/23
References
FSB Layout
Bridge Geometry
Lane Width: Lane 12ft:=
Number of Lanes: NoLane 2:=
Shoulder Width: ShldrLT 6ft:=
ShldrRT 12ft:=
Sidewalk Width: SW 6ft:=
Barrier Width: (Ver�cal Face) BarrierLT 1ft 1in+:=
Barrier Width: (Single-Slope) BarrierRT 1ft 4in+:=
Cross slope: XS 0.02:=
Le1 Coping Offset: offC_LT Lane ShldrLT+ SW+ BarrierLT+:= offC_LT 25.083 ft=
Right Coping Offset: offC_RT Lane ShldrRT+ BarrierRT+:= offC_RT 25.333 ft=
Bridge Width (coping to coping):
WC offC_LT offC_RT+:= WC 50.417 ft=
FSB Layout
Beam Width (working
pt. to working pt.):
(FDOT IDS 450-450) WFSB_1 4ft 9in+:=
WFSB_2 5ft 0in+:=
Number of Beams: NoFSB_1 1:=
NoFSB_2 9:= NoFSB NoFSB_1 NoFSB_2+:=
Width of Gap Between
FSBs:
WG
WC 1in+( ) 1 XS
+ NoFSB_1 WFSB_1 NoFSB_2 WFSB_2+( )-
NoFSB 1- := WG 1.013 in=
Spacing of FSBs: SFSB_1 WFSB_1 WFSB_2+( ) 2 WG+ cos atan XS( )( ):= SFSB_1 4.958ft=
SFSB_2 WFSB_2 WG+( ) cos atan XS( )( ):= SFSB_2 5.083ft=
FSBLayout.xmcd 1 of 1
FPID No. 451283-1 xii Structures Calculations Book
2.2 Beam Design
13461 Parker Commons Blvd., Suite 104 | Ft. Myers 33912 | Phone: 239.278.5999 | Fax: 239.278.1776 | www.kisingercampo.com
SUPERSTRUCTURE DESIGN
BEAM DESIGN
CALCULATION QUALITY CONTROL
RESPONSIBLE PROFESSIONAL / ORIGINATOR INITIALS: JHJ DATE: 06/23
QUALITY REVIEWER INITIALS: DATE:
SUMMARY OF SECTION
Three beam designs consider the two different Florida Slab Beam (FSB) sizes necessary to accommodate the bridge width with interior and exterior distribution factors. Beam designs apply to all three spans due to matching span length and build-up geometry. All beam designs are in accordance with FDOT Standard
Plans Index 450-451.
Included in this section:
FSB 15x60, Interior
FSB 15x60, Exterior
FSB 15x57, Exterior
The bridge has a 6 ½” -inch deck, including a ½” sacrificial thickness, and a 2% cross-slope on both sides of the centerline. Design of these beams has been completed utilizing the FDOT LRFD Prestressed Beam
Program and AASHTO approximate distribution factors. All loads are generated within the program.
Composite loads on the bridge include the weight of a 32” Vertical Shape Traffic Railing with
Pedestrian/Bicycle Bullet Railing, a 6’-0” raised sidewalk, and a 36” Single-Slope Traffic Railing. The total composite load of these components is applied as a single barrier load in the program.
BAH 07/23
13461 Parker Commons Blvd., Suite 104 | Ft. Myers 33912 | Phone: 239.278.5999 | Fax: 239.278.1776 | www.kisingercampo.com
Beam Strand Pattern The same strand patterns was used for all beams.
Strand Pattern:
Beam Stirrup Spacing:
The shear reinforcement considered for design was utilizing only the 4k stirrups. The number of spaces and spacing for A1, A2, A3, S1, S2, S3 shall be taken as S1, and the calculated number of spaces and spacing for S4 shall be taken as S2. The plans will show a more conservative spacing schedule to satisfy FDOT
Standard Index 450-450.
4K Variable Bar Spacing (Calculation)
Location Number of Spaces Spacing (in.)
S1 1 18
S2 1 18
4K Variable Bar Spacing (Plans)
Location Number of Spaces Spacing (in.)
S1 5 12
S2 12 18
13461 Parker Commons Blvd., Suite 104 | Ft. Myers 33912 | Phone: 239.278.5999 | Fax: 239.278.1776 | www.kisingercampo.com
Bearing Pad Design Data:
Beam Line:
All
Spans
Live Load Reaction (kip) 38.38
Dead Load Reaction (kip) 38.6
Temperature Load Reaction (kip) 4.38
Pad Width (in.) 48.0
FSB Dimension Data:
Spans 1 through 3:
Interior/Exterior Change in L @ Top
@ 120 days (in)
Change in L @ Bot.
@ 120 days (in) Dimension “R”
Exterior (15x57) -0.22 -0.64 0-3/8”
Exterior (15x60) -0.23 -0.60 0-3/8”
Interior (15x60) -0.23 -0.60 0-3/8”
Elastic and time dependent shortening effects (Dimension “R”) at mid-height of beam @ 120 days may be taken as the average of the calculated values for the top and bottom of the beam (Index 450-450).
Build-Up & Deflection Design Data:
Dead Load Deflection
@ 120 days (in)
Camber @ 120 days
(in)
Spans 1 through 3 Ext.
(15x57)
0.810 1.420
Spans 1 through 3 Ext.
(15x60)
0.810 1.230
Spans 1 through 3 Int.
(15x60)
0.840 1.230
KISINGER CAMPO AND ASSOCIATES
Beam Design Data
(in) (in) (in) (deg) (ft) (ft) (ft) (ft)
1 2.00 48.00 8.00 0.000 1.208 1.125 2.875 3.500
2 2.00 48.00 8.00 0.000 1.125 1.125 3.583 3.667
3 2.00 48.00 8.00 0.000 1.125 1.208 2.875 3.500 ft ft ft % ft ft
1 49.04 47.79 46.71 1.77% 1.21 1.13
2 48.96 47.79 46.71 0.10% 1.13 1.13
3 49.04 47.79 46.71 -1.58% 1.13 1.21
28 Day Release End 1 End 2
1 FSB 15x57 VI 8.5 6.8 1 1 1 90 90 4.75 4'-9" 47.83 47'-10" 0.4300 0'-0 3/8"
2 thru 9 FSB 15x60 VI 8.5 6.8 1 1 1 90 90 5.00 5'-0" 47.83 47'-9 7/8" 0.4150 0'-0 3/8"
10 FSB 15x60 VI 8.5 6.8 1 1 1 90 90 5.00 5'-0" 47.83 47'-10" 0.4150 0'-0 3/8"
* "DIM L" accounts for length increase due to beam grade and "DIM R" accounts for elastic and time dependent shortening effects.
5E Spacing
≥4" & ≤10"
4K Spacing
≤V2/2
(in) No. DIM C DIM D DIM D No. DIM D No. DIM E No. DIM E DIM Y DIM Y No. S1 S2 V1 V2 (in) (in)
1 6.5 49 52.5 28.5 28.5 44 28.5 - - 95 53.5 40.5 40.5 148 5 12 12 18 5.01 GOOD 4.51
2 thru 9 6.5 49 55.5 30.0 30.0 44 30.0 95 58.0 - - 43.5 43.5 148 5 12 12 18 4.96 GOOD 4.46
10 6.5 49 55.5 30.0 30.0 44 30.0 - - 95 56.5 43.5 43.5 148 5 12 12 18 4.99 GOOD 4.49
* Spacing at center of beam
(in)
Beam Dimensions
DIM L * DIM R
(ft) (ft)
DIM W
Class
Location
Beam
No.
Beam TypeSpan
No.
COLLIER COUNTY
16TH STREET NE BRIDGE
DESIGNED BY:
CHECKED BY:
Expansion
Joint Width
Bearing pad width
Bearing pad length
Beam skew
Begin K1
Min Bent
Width
Bent Width
Used Span
No.
K2
Bearing Dimensions
ALL
Beam
No.
3C 4D1 4D2Span
No.
Length Beam
End to S1
ALL
Location
Beam Data Table
Reinforcing Steel
Check Bar Spacing
6Y1 4K4D3 5E1 5E2 6Y2 No. of Bar Spaces Bar Spacing* 4D Spacing
≤12"
Beam Geometry
Bearing 2
Angle
Span
No.
Bridge Span Beam Length Bearing 1Design Span Beam Grade
Strengths (ksi) End 1 End 2
Beam Data Table
Concrete Properties Stnd Ptrn
Type
Plan View Case
C:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\02_Superstructure\Copy of Beam_Table_JHJ.xlsx 1 of 1
BAH 07/23
FPID No. 451283-1 xiii Structures Calculations Book
2.2.1 FSB 15x60, Interior
FDOT
Structure No.
FDOT LRFD Prestressed Beam Program v6.2
© 2022 Florida Department of Transportation
Select Beam Data Folder
I-Beam
FSB
FUB
FlatSlab
InvertedT
DoubleT
Category and Beams
I-Beams: Florida I-Beams (FIBs) and formerly used Florida Bulb Tee and AASHTO Beams
Slab Beams: Florida Slab Beams (FSBs)
U-Beams: Florida U-Beams (FUBs)
Flat Slab Previously used Florida Flat Slab Beams, superceded by FSBs
Inverted Tee: Former FDOT Standard Inverted Tee Beams
Double Tee: Former FDOT Standard Double Tee Beams from the 1990's
Data Files Folder
Change FolderC:\PW\KCA\Collier Co 16th St NE Bridge 22-7944\60212.1\Structures\eng_data\02_Superstructure\Beam Program\DataFiles-FSB
Open Existing Data File (required). To save New Data Files, enter new data name at the end of Section IX.
Refresh List16thStNE_FSB15x57_Ext.dat
16thStNE_FSB15x60_Ext.dat
16thStNE_FSB15x60_Int.dat
FSB-40ftSpan-12inx53inBeam .dat
FSB-50ftSpan-15inx53inBeam.dat
FSB-60ftSpan-18inx53inBeam.dat
Open File Reset All Data
InputDataFile "16thStNE_FSB15x60_Int.dat"=
Project Information
Project Information
16th Street NE BridgeProject Name
FPID No. 451283-1Project No.
BAH 03/23Designed by Date
Checked by Date
FSB15x60 IntStructure Name
3/27/2023 PrestressedBeamV6.2.xmcd 1
Plan, Elevation, and Cross Section Data
Note: All dimensions shown in Beam Elevation measured along centerline of beam (requiring adjustment for a skew)
Note: The top of the precast beam is the location of the origin for the coordinate system.
Superstructure Data InputDataFile "16thStNE_FSB15x60_Int.dat"=
FSB12
FSB15
FSB18
Beam Type Beam Types are the designations found in FDOT standards. The user can also create a coordinate file for a custom shape. Top of the beam is at the y=0 ordinate.
BMPfile concat substr inpBeamType 0, strlen inpBeamType( ), ( ) ".bmp", ( ):=
BMPfile "FSB15.bmp"=
47.7917Lbeam ft See Beam Elevation above.
6.5Bearing Distance in See Beam Elevation above.
8Pad Width in Width of the bearing pad, see Beam Elevation above.
5.0833Beam Spacing ft Measured from beam centerline to centerline.
2.4583Overhang ft Measured from centerline of exterior beam.
6Deck Thickness in Not including sacrificial thickness.
0.5 Sacrificial thickness cast with the deck (used
for DL only, not section properties).
tsacrificial in
(0" for BridgeLengths 100 ft , SDG 4.2.2)
1.125de ft Front face of barrier to centerline of exterior beam (3 ft max). (LRFD 4.6.2.2.1)
Interior
Exterior Beam Position Use either "interior" or "exterior" .
0Weightfuture.ws kip/ft
Future wearing surface. ( 0.015ksf for BridgeLengths 100 ft , SDG Table 2.1)
1.4925Weightbarrier kip/ft Weight of single barrier. ( 0.43 klf for 36" single slope barrier , SDG Table 2-2.1)
1Number of Barriers Number of barriers in x-section (multiplies single barrier weight).
10Number of Beams Number of beams in the span cross section. (LRFD 4.6.2.2.1)
0Skew deg measured from the perpendicular to the longitudinal axis in bridge plan view.
3/27/2023 PrestressedBeamV6.2.xmcd 2
JHJ 03/23
okay
Dimensions Specific to Certain Beam Categories
I-Beams, U-Beams and Inverted-T Beams hbuildup in Buildup or haunch is the concrete between the bottom of deck and top of beam.
Slab-Beams (Florida Slab Beams. Flat Slab Beams)
60Slab Beam Width in Width of the slab unit (not including Gap width)
15Slab BeamThickness in Thickness of the slab unit.
maximum additional deck thickness over support to accommodate camber, used for additional DL only.
tdeck.delta in
1Gap in Gap distance between slab beams.(Beam Spacing - Slab Beam Width)
Double Tee Beams
Width Double-T ft Width of the Double-T unit.
Depthflange in Depth of the flange of the Double-T unit, See Beam Cross Section above.
Concrete Mat erial Properties
Slightly
Moderately
Extremely
FDOT Environmental
Classification Environmental Classification determines the Allawable Tension Stress
4.5f `c of deck or WS ksi Strength of deck or wearing surface concrete.
8.5 Help - Conc. Strengthf `c of beam or slab ksi 28 day concrete strength of beam or slab.
6.8f `ci of beam or slab ksi Release concrete strength of beam or slab.
Permit Truck Axle Loads and Spacings
Reset Permit Truck Data
Default value for the permit truck is the FL-120 truck
3Number of Permit Axles Number of wheel loads that comprise the permit truck
0 Help - Permit TruckPermit Uniform LL kip/ft Permit Uniform Live Load coincident with truck load
Axle Number
1 2 3 4 5 6 7 8 9 10 11
13.33 53.33 53.33 0 0 0 0 0 0 0 0 Load (kips) n/a 14 14 0 0 0 0 0 0 0 0 Spacing (ft)
3/27/2023 PrestressedBeamV6.2.xmcd 3
Custom Beam Coordinates, Initialize Data, Section Properties and Dead Loads
LRFD Live Load Distribution Factors, User Defined Live Load Distribution Factors and Section Properties
Section View: Beam, Deck and Effective Deck Slab
0 20 40 60
40-
20-
Beam
Deck
Eff. Deck
Beam, Total Beck and Effective Deck Slab BeamType "FSB15"= tdeck 6 in= hbuildup 0 in= hbeam 15 in=
BeamSpacing 60 in= be 61 in= effective slab width
Additional Dead Load Data:
Uniform Dead Loads
0.034 Additional Uniform
Noncomposite DL wdeck 0.57 kip ft = wbeam 0.79 kip ft = wforms 0.00 kip ft =kip ft
Additional Uniform
Composite DL wfuture.ws 0 kip ft = wbarrier 0.15 kip ft =kip ft
Diaphragms (Point) Dead Loads Lbeam 47.79 ft=
End Diaphragms or Point Loads over bearing included in bearing reaction calculation only.
Intermediate Diaphragms or Point Loads included in shear, moment, and bearing reaction calculations
Diaphragm (Point) Dead Loads and Location
Begin Int. 1 Int. 2 Int. 3 End
0.683 0 0 0 0.683 Load (kips)
0 0 0 0 46.708 Distance (ft)
Distance measured from CL Bearing at begin bridge
Dead Loads, DL Moment, DL Shears
3/27/2023 PrestressedBeamV6.2.xmcd 4
Release Dead Load Moments and Shears Lspan 46.71 ft=
0 10 20 30 40
20-
10-
Release Moment
Release Shear
Release DL, Moment (kip-ft) & Shear (kip)
Location (feet)
M o m en t
(k ip fe et
S h ea r (k ip s) max Vrelease( ) 19.0 kip= max Mrelease( ) 226.5 kip ft= min Vrelease( ) 19.0- kip=
Noncomposite Dead Load Moments and Shears
0 10 20 30 40 100-
40-
20-
Non-composite DL Moment
Non-composite DL Shear
Non-composite DL, Moment (kip-ft) & Shear (kip)
Location (feet)
M o m en t
(k ip fe et
S h ea r (k ip s) max Vdl.non.comp( ) 32.5 kip= max Mdl.non.comp( ) 379.9 kip ft= min Vdl.non.comp( ) 32.5- kip=
Composite Dead Load Moments and Shear
0 10 20 30 40 10-
4-
2-
Composite DL Moment
Composite DL Shear
Composite DL, Moment (kip-ft) & Shear (kip)
Location (feet)
M o m en t
(k ip fe et
S h ea r (k ip s) max Vdl.comp( ) 3.5 kip= max Mdl.comp( ) 40.7 kip ft= min Vdl.comp( ) 3.5- kip=
3/27/2023 PrestressedBeamV6.2.xmcd 5
Live Load Moments and Shears
Distributed Live Load Moments and Shears Lspan 46.71 ft= BeamSpacing 5 ft= Skew 0 deg=
Live Load Shear Distribution Correction Factor for Skewed Bridges: CorrectionFactor 1.00=
Final Live Load Distribution Factors: gmom 0.35= gmom.fatigue 0.19= gshear 0.64=
0 10 20 30 40 100-
100-
50-
Distributed LL, Moment (kip-ft) & Shear (kip)
Location (feet)
M o m en t
(k ip ft
S h ea r (k ip s)
Mdist.live.pos n kip ft
Mdist.live.neg n kip ft
Mshrdist.live.pos n kip ft
Mshrdist.live.neg n kip ft
Vdist.live.pos n kip
Vdist.live.neg n kip
Locationn ft max Vdist.live.pos( ) 58.9 kip= max Mdist.live.pos( ) 329.2 kip ft= min Vdist.live.neg( ) 58.9- kip=
ReactionLL 59.9 kip= min Mdist.live.neg( ) 8.2- kip ft=
ReactionDL 37.6 kip= max Mshrdist.live.pos( ) 290 kip ft=
Beam End Reactions...
with IM factor only
3/27/2023 PrestressedBeamV6.2.xmcd 6
Reinforcement Properties InputDataFile "16thStNE_FSB15x60_Int.dat"=
Carbon Steel - Grade 60
Stainless Steel - Grade 60
Glass Fiber Reinforced Polymer
Carbon Steel - Grade 80
Stainless Steel - Grade 75
Help on Mild Reinforcement Types Mild Reinforcement Type:
Help on Longitudinal Mild and Partial PS Reinforcement Longitudinal Mild and
Partial PS Reinforcement:
Excel Table of Standard FDOT
Prestressed Beam Mild and Partial
PS Longitudinal Reinforcement
Mild Reinforcement Partial PS (Dormant) Strand
Deck Bottom of Beam
Beam End:
Top
Beam End:
Bottom
Top of BeamLocation
Location 3/8 inch
1/2 inch0.4133 0 0 0 Diameter(in)
Area (in^2) *1
2.8125 0 2Distance (in) *2 *3 Distance (in)
0 0 4Length (ft) # Strands
5 0 0 10 Force per
Strand (kip) Bar Size *4 *4 *4
*1 - Area of longitudinal deck reinf. per unit width of deck, both layers combined. Typically one #5 Bar top & bottom for 8" decks.
*2 - Distance measured from top of deck to centroid of deck longitudinal reinforcement, positive value.
*3 - Distance measured from top of beam, positive value.
*4 - Size of bars used to create As.long needed to calculate development length.
Prestressing Tendons:
75Humidity % % relative humidity (75% typical)
0.75Time: jacking to transfer days Time in days between jacking and transfer.
Carbon Steel - Low Lax
Carbon Steel - Stress Relieved
Stainless Steel
Carbon Fiber Reinforced Polymer
Help on Prestress Reinforcement Types Prestress Strand Type
0.6 in.
0.5 in.
0.5 in. Special
9/16 in.
0.7 in.
Prestress Strand Size
Help on Strand Generator Help on Strand Debonding
Strand Pattern
Generator…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .