24-8265_Exhibit_L-8_-_Drainage_Design_Documentation_S&S.pdf
PDF 29 MB Posted
- Attached to
- 16th Street NE Bridge Project (LAP) GRANT FUNDED
- Solicitation number
- 24-8265
- Issued by
- Collier County, Florida
About this file
Based on the drainage design documentation for the 16th Street NE Bridge project in Collier County, Florida, here is a comprehensive summary:
The document is a final drainage design documentation prepared by Kisinger Campo & Associates for Collier County for a roadway improvement project involving a new two-lane bridge over the Golden Gate Main Canal. The project extends from Golden Gate Boulevard to Randall Boulevard and includes roadway widening, a 6-foot sidewalk on the west side of the road, and various drainage improvements.
The project involves constructing a bridge and improving approximately 3.3 miles of 16th Street NE, with detailed drainage design considerations. Key design elements include maintaining existing stormwater conveyance through swales and driveway culverts, implementing dry retention ponds for water quality treatment, and managing stormwater runoff across 26 different drainage basins. The design addresses floodplain impacts, with an estimated 9.3 ac-ft of floodplain impacts mitigated by 14.1 ac-ft of floodplain storage. The project provides water quality treatment for 6.17 acres of new impervious area and achieves a 63% reduction in nitrogen and phosphorus loading. The drainage design was permitted by the South Florida Water Management District and considers seasonal high water elevations ranging from 9.0' to 11.0' NAVD, with careful management of stormwater runoff to various outfall locations including the Golden Gate Main Canal and Orange Tree Canal.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Courtney Richards, Professional Engineer, State of Florida, License No. 93234.
This item has been digitally signed and sealed by Courtney Richards, PE on the date indicated here.
Printed Copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
FINAL DRAINAGE DESIGN DOCUMENTATION
16TH STREET NE BRIDGE
FROM GOLDEN GATE BOULEVARD WEST TO RANDALL BOULEVARD
PROJECT NUMBER: 22-7944
COLLIER COUNTY
PREPARED FOR:
COLLIER COUNTY, FLORIDA
PREPARED BY:
KISINGER CAMPO & ASSOCIATES, CORP.
13461 Parker Commons Blvd., Suite 104
Fort Myers, FL 33912
FEBRUARY 2024
16th Street NE Bridge Drainage Design Document Project Number: 22-7944
TABLE OF CONTENTS
SECTION TITLE PAGE
1.0 INTRODUCTION 3
2.0 PROJECT DESCRIPTION 3
3.0 FLOODPLAIN 4
4.0 DESIGN CRITERIA 4
4.1 DITCHES 4
4.2 WATER QUALITY CRITERIA 4
4.3 WATER QUANITIY CRITERIA 5
4.4 STORMWATER MANAGEMENT FACILITIES 6
4.5 NUTRIENT LOADING 6
4.6 SPREAD 6
4.7 CROSSDRAINS 7
4.8 SIDEWALKS 7
5.0 BASINS 8
5.1 BASIN 1 8
5.2 BASIN 2 8
5.3 BASIN 3 9
5.4 BASIN 4 9
5.5 BASINS 5A & 5B 9
5.6 BASIN 6 10
5.7 BASINS 7, 9, 11, 13, 15, 17, 19, & 21 10
5.8 BASINS 8 & 10 11
5.9 BASINS 12, 14, 16, 18, 20, & 22 11
5.10 BASIN 23 11
5.11 BASIN 24 12
5.12 BASIN 25 12
5.13 BASIN 26 12
6.0 SOILS 14
7.0 BASE CLEARANCE WATER ELEVATION (BCWE) 15
8.0 CONCLUSION 16
LIST OF APPENDICIES
APPENDIX TITLE PAGE
APPENDIX A – PROJECT LOCATION MAP 17
APPENDIX B – TYPICAL SECTION 19
APPENDIX C – FLOODPLAIN MAP 28
APPENDIX D – GEOTECHNICAL REPORT 31
APPENDIX E – 25-YEAR, 3-DAY ICPR MODEL 158
APPENDIX F – NUTRIENT LOADING CALCULATIONS 347
APPENDIX G – FLOODPLAIN COMPENSATION CALCULATIONS 352
APPENDIX H – SPREAD CALCULATIONS 358
APPENDIX I – WATER QUALITY CALCULATIONS 360
APPENDIX J – DRAINAGE EXHIBIT 392
APPENDIX K – OPTIONAL PIPE ANALYSIS 394
APPENDIX L – CORRESPONDENCE 419
APPENDIX M – 5-YEAR, 24-HOUR ICPR MODEL 453
1.0 INTRODUCTION
Collier County proposes to construct a 2-lane bridge over the Golden Gate Main Canal
(GGMC) along 16th Street NE. In addition, the County proposes roadway improvements from Golden Gate Boulevard to Randall Boulevard and a sidewalk on the west side of the road. The existing roadway is a two-lane roadway with narrow flush shoulders and roadside stormwater conveyance. The stormwater runoff south of the GGMC discharges directly to the GGMC. The stormwater runoff north of the GGMC to 10th Avenue NE discharges directly to the GGMC. The stormwater runoff from 10th Avenue NE to Randall Boulevard discharges to the roadside swale of the crossing street, eventually discharging to the Orange
Tree Canal (OTC). All elevations within this report reference North American Vertical
Datum 1988 (NAVD88) unless otherwise stated.
2.0 PROJECT DESCRIPTION
The proposed roadway section will remain a two-lane facility with flush shoulders and roadside stormwater conveyance with proposed road widening and a proposed 6’ sidewalk along the west side of 16th Street NE. In addition, a bridge is proposed to connect the two deadend streets. The stormwater runoff south of the GGMC will continue to discharge directly to the GGMC. The stormwater runoff north of the GGMC to 10th Avenue NE will continue to discharge directly to the GGMC. The stormwater runoff from 10th Avenue NE to Randall Boulevard will continue to discharge to the roadside swale of the crossing street, eventually discharging to the Orange Tree Canal (OTC). The GGMC and OTC is weir controlled, therefore the seasonal high water (SHW) elevation is based on the wet season weir control elevation. Based on discussion with Big Cypress Basin who operates the weirs, adjacent permits, and wetlands, we have determined the seasonal high from Golden
Gate Boulevard to the GGMC is 9.0’ NAVD. North of the GGMC the seasonal high is on a gradient from 9.0’ NAVD at the GGMC to approximately 11.0’ NAVD at Randall
Boulevard. Please see Appendix A for the project location, Appendix B for the typical section, and Appendix J for the drainage exhibit with SHW information.
3.0 FLOODPLAIN
The project site is located on the FEMA Flood Insurance Rate Map (FIRM), Community-
Panel Numbers 12021C0240H and 12021C0430H, both dated May 16, 2012, in Collier
County, Florida. The project is located within floodzone AH and X with elevations of 13’, 13.5’, 14’, 14.5’, and 15’. The FEMA maps are included in Appendix C. Floodplain impacts from the proposed roadway and sidewalks improvements are mitigated through providing additional storage within the floodplain also known as a cup-for-cup analysis.
The proposed floodplain impacts are estimated to be 9.3 ac-ft. The proposed floodplain mitigation is estimated to be 14.1 ac-ft. There will be more cutting than filling in the floodplain. Therefore, there is a net floodplain storage and no additional floodplain compensation is required. Floodplain calculations can be found in Appendix G.
4.0 DESIGN CRITERIA
4.1 DITCHES
The proposed road improvements will impact some of the existing ditches. The project will provide positive drainage in the ditches to the outfall. The linear ponds have a flat ditch bottom.
4.2 WATER QUALITY CRITERIA
The method of stormwater treatment for this project will include dry retention ponds. The dry retention method involves storing stormwater in a dry pond above the SHW. Treatment will be provided for the first two and a half inches of stormwater runoff from the additional impervious area. For dry retention, the treatment volume requirement shall be reduced 50%. For discharging to an impaired waterbody, an additional 50% of treatment is required. The ponds on the west side of the project are providing compensating treatment for the entire project.
The project proposes an additional 6.17 acres of impervious area, requiring 0.97 ac-ft of water quality treatment, see Table 1 below for the pre vs post project areas within the right-of-way. The project provides 3.80 ac-ft of water quality volume.
See Appendix I for water quality calculations. Refer to Appendix E for the recovery calculations that show recovery of the treatment volume within 72 hours.
Table 1: Project Areas Pre-Project Area (acres) Post-Project Area (acres)
Impervious 12.18 18.35 Pervious 29.01 15.34
Open Water/ Retention Area
0.36 9.81
Wetlands 1.95 0.00 Total 43.50 43.50
4.3 WATER QUANITIY CRITERIA
The project is located in the Main Golden Gate Canal Basin which has an allowable discharge rate of 0.04 cfs/ac for the 25-year, 3-day storm. The allowable discharge rate is applicable to construction projects that are designed utilizing the Collier
County Land Development Code. Roadway projects are designed utilizing FDOT design criteria and are exempt from the Land Development Code; therefore, this project is not required to achieve the allowable discharge rate. The rainfall depth utilized for the 25-year, 3-day storm event was 11.0”. Basins that discharge down side streets that were not impacted by the project were not evaluated in the ICPR model (Basin 5A, 5B, 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 25, and 26). Basins that discharge directly to the GGMC and/or provide water quality volume were evaluated (Basin 1, 2, 3, 4, 7, 9, 11, 13, 15, 17, 19, 21, and 23). Although post project discharge rates are higher than pre project, the project is required to accept offsite flow and convey that offsite through the roadside swales. The project provides additional storage in the ROW to offset the additional runoff and to not exacerbate flooding. See discharge rates in Table 2 below. See discharge rates in
Appendix E (pages 192 and 234).
Table 2: Pre vs. Post Basin Discharge Rates
Basin # Pre Basin Discharge Rate (cfs) Post Basin Discharge Rate (cfs)
Basin 1 19.38 (Swale 1) 22.81 (Pond 1)
Basin 2 19.25 (Swale 2) 18.38 (Swale 2)
Basin 3 7.95 (Swale 3) 8.38 (Pond 3)
Basin 4 8.57 (Swale 4) 8.39 (Swale 4)
Basin 7 15.49 (Swale 7) 11.43 (Pond 7)
Basin 9 13.77 (Swale 9) 12.29 (Pond 9)
Basin 11 7.78 (Swale 11) 7.04 (Pond 11)
Basin 13 7.28 (Swale 13) 6.73 (Pond 13)
Basin 15 13.03 (Swale 15) 12.34 (Pond 15)
Basin 17 12.35 (Swale 17) 12.25 (Pond 17)
Basin 19 15.78 (Swale 19) 12.66 (Pond 19)
Basin 21 8.10 (Swale 21) 11.11 (Pond 21)
Basin 23 10.90 (Swale 23) 10.31 (Pond 23)
Total 159.63 154.12
4.4 STORMWATER MANAGEMENT FACILITIES
The proposed project includes linear ponds in the ditches to provide water quality and quantity for the project.
4.5 NUTRIENT LOADING
Site-specific nutrient loading was analyzed to ensure no additional nutrients are discharging into the GGMC or OTC. Utilizing the computer program, BMP Trains
Version 4.3.5, Nitrogen and Phosphorous loading of the project area was evaluated for pre and post conditions. The target load reduction for Nitrogen and Phosphorus is 16%. The project provides a 63% reduction in Nitrogen and Phosphorus. See
Appendix F for nutrient loading calculations.
4.6 SPREAD
Spread was limited based on Table 3.6 of the FDOT Drainage Manual using a rainfall intensity of 4.0 inches per hour for curb inlets and 7.4 inches per hour for shoulder gutter inlets. The design speed for the bridge is 30 mph. Therefore, spread is limited to keeping half of the travel lane clear. Please see Appendix H for the spread calculations.
4.7 CROSSDRAINS
There are three existing crossdrains along 16th St. one under 10th Ave NE, one under
12th Ave NE, and the last under 14th Ave NE. The crossdrains will be replaced using
18” pipes since the proposed roadway conflicts with the existing pipe and the existing pipes are 18” or smaller in size. The inverts provide proper cover over the proposed crossdrains.
4.8 SIDEWALKS
The proposed sidewalk along the west side of 16th St. was designed for the 5-year
24-hour storm event, see Table 3 below. Basin 1 and 3 are connected to the GGMC, therefore the tailwater used for those basins are set based on the GGMC staging.
Due to the high staging in the GGMC during 10-year events and higher, the 5-year
24-hour storm event was used to set the back of sidewalk elevation. Basin 1 was broken into multiple segments to better reflect the hydraulic grade line along the approximately mile long basin. The rainfall depth utilized for the 5-year, 24-hour storm event was 5.5”. Some of the sidewalk blocks offsite flow in Basin 1, double
4” PVC pipes are proposed under the sidewalk to connect the offsite to the proposed pond 1. The PVC pipe eastern invert will match the pond bottom elevation of 10.0’ and the wester invert will match the existing grade elevation at the ROW or the water quality treatment elevation of 10.3’, whichever is higher. See Appendix M for ICPR results for the 5-year 24-hour storm event for the back of sidewalk elevation.
Table 3: 5-Year 24 Hour Basin Stages
Basin # Station Range 5-Year 24-
Hour Stage Minimum Back of Sidewalk Elevation
Basin 1A 1004+00 – 1015+00 11.00 11.68 Basin 1B 1015+00 – 1026+00 10.99 11.03 Basin 1C 1026+00 – 1037+00 10.97 11.01
Basin 1D 1037+00 – 1048+00 10.91 10.95 Basin 1E 1048+00 – 1059+00 10.67 10.69 Basin 3 1063+00 – 1068+00 10.61 11.00 Basin 7 1081+50 – 1095+00 11.61 11.72 Basin 9 1095+00 – 1108+20 12.21 12.21
Basin 11 1108+20 – 1114+80 12.58 12.92 Basin 13 1114+80 – 1121+50 13.09 13.28 Basin 15 1121+50 – 1134+50 12.63 13.23 Basin 17 1134+50 – 1147+80 12.62 12.73 Basin 19 1147+80 – 1161+00 13.12 13.42 Basin 21 1161+00 – 1147+80 13.21 13.31
5.0 BASINS
5.1 BASIN 1
The existing roadside swale in Basin 1 currently conveys runoff to the GGMC directly. The existing driveway culverts vary in size from 15” to 24”. The swales are being regraded to maximize the retention capacity. The proposed driveway culverts will be 18” to 24” or elliptical equivalent. The swale will be regraded flat, at least 1’ above the SHW, with an elevated control structure (S-603) to provide dry retention volume. This basin includes a portion of the bridge, which is captured by a curb inlet (S-604) and discharged to the GGMC. Pond 1 provides water quality treatment and attenuation through S-603. See Table 5 below for the maximum stage for the 25-year storm event. Due to the low and flat nature of the project area, no freeboard is provided in the pond.
5.2 BASIN 2
The existing roadside swale in Basin 2 currently conveys runoff to the GGMC directly. The existing driveway culverts vary in size from 15” to 24”. The swales are being regraded to provide positive drainage to the new outfall structure (S-701).
The proposed driveway culverts will be 18” to 24” or elliptical equivalent. This basin includes a portion of the bridge, which is captured by a shoulder gutter inlet
(S-703) and discharged to the GGMC. There is no control structure for Basin 2 as this basin does not provide any water quality treatment. There is a proposed stormsewer system to convey stormwater to the GGMC.
5.3 BASIN 3
The existing roadside swale in Basin 3 currently conveys runoff to the GGMC directly. The existing driveway culverts are 24”. The swales are being regraded to maximize the retention capacity. The proposed driveway culverts will be 24”. The swale will be regraded flat, at least 1’ above the SHW, with an elevated control structure (S-610 and S-611) to provide dry retention volume. This basin includes a portion of the bridge, which is captured by a curb inlet (S-608) and discharged to the GGMC. Pond 3 provides water quality treatment and attenuation through S-
611 and SD-150. See Table 5 below for the maximum stage for the 25-year storm event. Due to the low and flat nature of the project area, no freeboard is provided in the pond.
5.4 BASIN 4
The existing roadside swale in Basin 4 currently conveys runoff to the GGMC directly. The existing driveway culverts vary in size from 15” to 18”. The swales are being partially regraded to provide positive drainage to the new outfall structure
(S-708). This basin includes a portion of the bridge, which is captured by a shoulder gutter inlet and discharged to the GGMC. This basin is interconnected with basins
6, 8, and 10 via crossdrains. There is no control structure for Basin 4 as this basin does not provide any water quality treatment. There is a proposed stormsewer system to convey stormwater to the GGMC.
5.5 BASINS 5A & 5B
Basin 5A and 5B are part of the Vanderbilt Beach Road extension project. The proposed project includes constructing a sidewalk on the west side of 16th St. NE from 10th Ave NE to the future sidewalk ending and from 12th Ave NE to the future sidewalk ending. There has been coordination with Jacobs Engineering for these basins.
5.6 BASIN 6
Basin 6 is part of the Vanderbilt Beach Road extension project. The proposed project includes tying into the existing roadway in this location. There has been coordination with Jacobs Engineering for these three basins. This basin is interconnected with basins 4, 8, and 10 via crossdrains.
5.7 BASINS 7, 9, 11, 13, 15, 17, 19, & 21
The existing roadside swales in basins 7, 9, 11, 13, 15, 17, 19, and 21 currently convey runoff north and south to the crossroad which conveys water west to the
OTC. The existing driveway culverts vary in size from 15” to 18”. The swales are being regraded to maximize the retention capacity. The proposed driveway culverts will be 18”. The swale will be regraded flat, at least 1’ above the SHW, with a 6” high ditch block at the outfall to provide dry retention volume. The pipes are sumped up to 6” to ensure the pipes meet minimum cover criteria. Pond 7 provides water quality treatment and attenuation through SD-161 and SD-174. Pond 9 provides water quality treatment and attenuation through SD-177 and SD-192.
Pond 11 provides water quality treatment and attenuation through SD-195 and SD-
202. Pond 13 provides water quality treatment and attenuation through SD-205 and
SD-206. Pond 15 provides water quality treatment and attenuation through SD-209 and SD-220. Pond 17 provides water quality treatment and attenuation through SD-
223 and SD-228. Pond 19 provides water quality treatment and attenuation through
SD-231 and SD-244. Pond 21 provides water quality treatment and attenuation through SD-247. See Table 5 below for the maximum stages for each basin for the
25-year storm event. Due to the low and flat nature of the project area, no freeboard is provided in the ponds.
5.8 BASINS 8 & 10
The existing roadside swales in basins 8 and 10 currently convey runoff north and south to the crossroad as well as to crossdrains under 12th Ave NE and 14th Ave NE which conveys water east and south to the GGMC. These crossdrains connect basin
4, 6, 8, and 10. The existing driveway culverts vary in size from 15” to 18”. These swales are not impacted by the proposed project and shall remain as existing.
5.9 BASINS 12, 14, 16, 18, 20, & 22
The existing roadside swales in basins 12, 14, 16, 18, 20, and 22 currently convey runoff north and south to the crossroad which conveys water east to the GGMC.
The existing driveway culverts vary in size from 15” to 18”. These swales are generally not impacted by the proposed project and shall remain as existing. Four driveway culverts are being replaced with elliptical equivalents.
5.10 BASIN 23
The existing roadside swales in basin 23 currently conveys runoff west to the roadside swale that discharges to the OTC directly. The existing driveway culverts vary in size from 15” to 18”. The swales are being regraded to maximize the retention capacity. The proposed driveway culverts will be 18”. The swale will be regraded flat, at least 1’ above the SHW, and sumped 6” lower than the downstream ditch bottom to provide dry retention volume. The pipes are sumped 6” to ensure the pipes meet minimum cover criteria. Pond 23 provides water quality treatment and attenuation by being sumped 6” lower than the existing downstream ditch bottom. See Table 5 below for the maximum stage for the 25-year storm event.
Due to the low and flat nature of the project area, no freeboard is provided in the pond.
5.11 BASIN 24
The existing roadside swale in basin 24 currently conveys runoff to the east to the roadside swale that discharges to the GGMC directly. The existing driveway culverts vary in size from 15” to 18”. The swales are being regraded to provide positive drainage to the existing ditch bottom elevation at the end of the project.
The proposed driveway culverts will be 18”.
5.12 BASIN 25
The existing roadside swale in basin 25 generally conveys runoff to the west to the roadside swale that discharges to the OTC directly. The proposed project generally does not impact the existing roadside swale. The basin currently is connected to basin 26 with an existing 24” pipe. The existing culvert will be connected to a ditch bottom inlet with a concrete jacket and new pipe.
5.13 BASIN 26
The existing roadside swale in basin 26 currently conveys runoff to the east to the roadside swale that discharges directly to the GGMC. The basin currently is connected to basin 25 with an existing 24” pipe. The culvert end will be replaced with a manhole and connected to ditch bottom inlets to the east. The proposed project impacts the swales on the north of Randall, the proposed design regrades the swale to ditch bottom inlets before a bubble-up structure outfall to the roadside swale to convey to the east.
Table 4: Basin Station Ranges Basin Begin Station End Station Side
1 1003+00 1061+00 LT
2 1003+00 1061+00 RT
3 1063+00 1068+00 LT
4 1063+00 1068+00 RT
5A 1069+00 1075+50 LT
5B 1075+50 1081+50 LT
6 1068+50 1081+50 RT
7 1081+50 1095+00 LT
8 1081+50 1095+00 RT
9 1095+00 1108+20 LT
10 1095+00 1108+20 RT
11 1108+20 1114+80 LT
12 1108+20 1114+80 RT
13 1114+80 1121+50 LT
14 1114+80 1121+50 RT
15 1121+50 1134+50 LT
16 1121+50 1134+50 RT
17 1134+50 1147+80 LT
18 1134+50 1147+80 RT
19 1147+80 1161+00 LT
20 1147+80 1161+00 RT
21 1161+00 1174+50 LT
22 1161+00 1174+50 RT
23 504+00 514+00 RT
24 514+00 524+50 RT
25 504+00 514+00 LT
26 514+00 524+50 LT
Table 5: Basin Information
B as in
ICPR
Node
Existing Outfall
Proposed Control
Structure
Control Structure Top
El.
(ft-NAVD)
Pond Bottom El.(ft-
NAVD)
Seasonal High-Water Elevation
(ft-NAVD)
Pre 25-
YR
Peak El.
(ft-NAVD)
Post 25-
YR
Peak El.
(ft-NAVD)
Pond 1/ Swale 1
Roadside Swale
S-603 10.30 10.00 9.00 13.25 12.24
2 Swale 2 Roadside
Swale
- - - 9.00 13.23 13.26
Pond 3/ Swale 3
Roadside Swale
S-611 & Ditch block @
SD-150
10.30 (S-611) & 10.50
(SD-150)
10.00 9.00 12.45 12.42
4 Swale 4 Roadside
Swale
- - - 9.00 12.50 12.59
Pond 7/ Swale 7
Roadside Swale
Ditch block @
SD-161 & SD-
11.50 11.00 10.00 12.80 12.19
Pond 9/ Swale 9
Roadside Swale
Ditch block @
SD-177 & SD-
12.00 11.50 10.00 13.03 12.73
Pond 11/ Swale 11
Roadside Swale
Ditch block @
SD-195 & SD-
12.50 12.00 10.50 13.30 13.01
Pond 13/ Swale 13
Roadside Swale
Ditch block @
SD-205 & SD-
13.00 12.50 10.50 13.28 13.49
Pond 15/ Swale 15
Roadside Swale
Ditch block @
SD-209 & SD-
12.50 12.00 10.50 14.13 13.23
Pond 17/ Swale 17
Roadside Swale
Ditch block @
SD-223 & SD-
12.50 12.00 10.50 13.84 13.22
Pond 19/ Swale 19
Roadside Swale
Ditch block @
SD-231 & SD-
13.00 12.50 11.00 14.51 13.74
Pond 21/ Swale 21
Roadside Swale
Ditch block @
SD-247
13.00 12.50 11.00 15.17 14.06
Pond 23/ Swale 23
Roadside Swale
6" Ditch block
STA 504+50
13.20 12.80 11.00 15.62 14.22
6.0 SOILS
Tierra South Florida, Inc. prepared a geotechnical report including a roadway soil survey for 16th St. NE. Table 6 summarizes the hydrologic soil group (HSG) and depth to water table of the main soil types located within the project limits. Refer to Appendix D for
Geotechnical Report.
Table 6: Summary of Soils Map Unit Number
Map Unit Name Hydrologic
Group Depth to
SHGWT
102 Cypress Lake fine sand-Urban land complex A/D 0.3-1.5’
Chobee, limestone substratum-Dania, ponded-Urban land association
C/D 0.0’
113 Holopaw fine sand-Urban land complex A/D 0.3-1.5’ 125 Oldsmar fine sand-Urban land complex A/D 0.5-1.5’
Riviera fine sand, limestone substratum-Urban land complex
B/D 0.0’
Riviera, limestone substratum-Copeland fine sand-Urban land association
B/D 0.0’
7.0 BASE CLEARANCE WATER ELEVATION (BCWE)
The BCWE used for the design of the roadway profile grade is based on the highest elevation of standing water that is sustained for a 24-hour duration. The BCWE typically corresponds with the seasonal high water (SHW) elevation in close proximity to the proposed roadway. Section 210.10.3 of the FDOT Design Manual (FDM) specifies base clearance between the BCWE and the roadway base course. 16th Street SE has a required base clearance of 3 feet. A portion of the roadway does not meet the minimum base clearance requirement due to connecting to existing roadway and ROW constraints. The pavement structure has been modified to accommodate the reduced base clearance. These elevations were determined using the estimated SHW boring elevations provided by Tierra
South Florida, Inc. Refer to Table 7. Please Refer to Appendix D for Geotechnical Report.
Table 7: BCWE Summary
Roadway Station Geotechnical
Estimated Seasonal High Groundwater
Table El.
(ft)
Bottom of Base El.
(ft)
Provided Base
Clearance (ft)
Base Clearance
Met?
(Y/N) From To
1002+60 1011+80 9.50 12.13 2.63 N 1011+80 1024+60 9.50 12.73 3.23 Y 1024+60 1036+70 9.50 12.01 2.51 N 1036+70 1044+50 9.50 12.02 2.52 N 1044+50 1050+50 8.50 11.94 3.44 Y 1050+50 1057+50 8.50 11.74 3.24 Y 1057+50 1070+50 8.50 11.08 2.58 N 1070+50 1072+50 8.50 12.71 4.21 Y 1072+50 1082+00 9.00 11.46 2.46 N 1082+00 1087+20 9.00 11.56 2.56 N 1087+20 1101+50 9.00 11.58 2.58 N 1101+50 1132+40 8.50 12.17 3.67 Y 1132+40 1139+50 8.50 12.70 4.20 Y 1139+50 1146+80 9.00 13.03 4.03 Y 1146+80 1160+50 9.50 13.33 3.83 Y 1160+50 1171+60 10.50 13.58 3.08 Y 1171+60 1174+00 10.50 12.88 2.38 N 504+40 524+60 10.50 12.40 1.90 N
The pavement design has accounted for the potentially high groundwater table and utilized a reduced modulus for design since the project does not meet the required 3 feet of base clearance at all locations.
8.0 CONCLUSION
The proposed two lane bridge over the GGMC, roadway improvements and a sidewalk on the west side of 16th St NE from Golden Gate Boulevard to Randall Boulevard in Naples, Collier County will include maintaining stormwater conveyance elements such as swales and driveway culverts. This project was permitted as an Individual Environmental
Resource permit from the South Florida Water Management District, permit #: 11-108960-
P issued on December 1, 2023 (Appendix L).
APPENDIX A
PROJECT LOCATION MAP
PROJECT LOCATION
https://goo.gl/maps/8h4bPNnURfNHNu42A
R -2
-E
R -2
-E
T-47-S
T-48-S
T-48-S
T-49-S
N
CONTRACT PLANS
COLLIER COUNTY
16TH STREET NE
FROM GOLDEN GATE BOULEVARD TO RANDALL BOULEVARD
R -2
-E
R -2
-E
T-48-S
T-49-S
T-47-S
T-48-S
R -2
-E
R -2
-E
R -2
-E
R -2
-E
NAPLES BEACH
TO
IMMOKALEE
TO
DENNIS F. McCOY, P.E.
STRUCTURES PLANS
LIGHTING PLANS
SIGNALIZATION PLANS
SIGNING AND PAVEMENT MARKINGS PLANS
ROADWAY PLANS
PROJECT MANAGER:
COLLIER COUNTY
AVE MARIA
TO
COLLIER COUNTY PROJECT NO. 60212.1
T H
E
O F
F I
C I
A L
R
C O
D
T
I
S
E E
T
E C
T R
O N
C
G I
T A
L
Y
G N
A L
U
D
L E
G
A
C
VENDOR NO.: F59-1677145
CONTRACT NO.: 22-7944
PHONE: (239) 278-5999
FORT MYERS, FLORIDA 33912
13461 PARKER COMMONS BLVD., STE. 104
KISINGER CAMPO AND ASSOCIATES CORP.
P.E. NO.: 80442
JESSE E. GILL, P.E.
SHEET DESCRIPTIONSHEET NO.
INDEX OF ROADWAY PLANS
GOVERNING STANDARD SPECIFICATIONS:
CONTRACT PLANS COMPONENTS
ENGINEER OF RECORD:
ROADWAY PLANS
http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website:
Florida Department of Transportation, FY 2023-24 Standard Specifications
GOVERNING STANDARD PLANS:
Component
Standard Plans for Bridge Construction are included in the Structures Plans following website: http://www.fdot.gov/design/standardplans
Standard Plans for Road Construction and associated IRs are available at the
Bridge Construction and applicable Interim Revisions (IRs).
Florida Department of Transportation, FY 2023-24 Standard Plans for Road and
(FEDERAL FUNDS)
FINANCIAL PROJECT ID 451283-1-58-01
EXPRESSWAY
T U
R N P
IK
E
PENSACOLA FORT WALTON
BEACH
PANAMA
CITY
CHIPLEY
TALLAHASSEE
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND
NEW PORT RICHEY
TAMPA
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
SARASOTA -
BRADENTON
FT PIERCE
FT MYERS
WEST PALM
BEACH
FT LAUDERDALE
MIAMI
NAPLES
KEY WEST
CITY
LAKE
F
LO
R
ID
A 'S
BEACH LINE
COLLIER COUNTY (03000302)
transportation management services department
STA. 524+56.74
¡ CONST. RANDALL BLVD.
END CONSTRUCTION
STA. 1080+81.87
¡ CONST. 16TH ST.
BEGIN ROADWAY CONST.
PROJECT NO. 60212.1
BEGIN COUNTY
END FPID 451283-1-58-01
STA. 1002+68.39
¡ CONST. 16TH ST.
BEGIN FPID 451283-1-58-01
BEGIN CONSTRUCTION
BEGIN PROJECT
STA. 514+00.00 AH.
STA. 514+01.00 BK. =
EQUATION:
¡ CONST. RANDALL BLVD.
STA. 1175+10.66
¡ CONST. 16TH ST.
END CONSTRUCTION
END PROJECT
PROJECT NO. 60212.1
END COUNTY
STA. 1069+81.87
¡ CONST. 16TH ST.
END ROADWAY CONST.
STA. 1060+96.75
¡ CONST. 16TH ST.
BEGIN BRIDGE NO. 034186
STA. 504+41.00
¡ CONST. RANDALL BLVD.
BEGIN CONSTRUCTION
NO.
SHEET
YEAR
FISCAL
CONTRACT NO.
CONSTRUCTION
TBD
c:\pwworkingdir\kca-pw.bentley.com_kca-pw-01\courtney richards\dms38688\KEYSRD01.dgncrichards 11/14/2023 9:55:01 AM Default
STA. 1062+43.79
¡ CONST. 16TH ST.
END BRIDGE NO. 034186
SUMMARY OF QUANTITIES
UTILITY ADJUSTMENTS
TEMPORARY TRAFFIC CONTROL PLANS
EROSION CONTROL
STORMWATER POLLUTION PREVENTION PLAN
CANAL CROSS SECTIONS
CANAL DETAIL SHEET
DRIVEWAY HALF-SECTIONS
CROSS SECTIONS
ROADWAY SOIL PROFILES
ROADWAY SOIL SURVEY
DRAINAGE DETAILS
DRAINAGE STRUCTURES
INTERSECTION DETAIL
DITCH PROFILE RT
ROADWAY PLAN PROFILE
GENERAL NOTES
PROJECT CONTROL
PROJECT LAYOUT
OPTIONAL MATERIALS TABULATION
SUMMARY OF DRAINAGE STRUCTURES
CROSS SLOPE CORRECTION TABLES
TYPICAL SECTION
EXISTING DRAINAGE STRUCTURES
DRAINAGE MAP
SUMMARY OF PAY ITEMS
SIGNATURE SHEET
NOTES TO REVIEWERS
KEY SHEET
R -2
-E
R -2
-E
R -2
-E
R -2
-E
- SQ-48SQ-1
- 314284
- 283280
- 279265
- 264262
- 261258
- 256209
- 208103
- 10290
- 8780
- 7869
- 6839
- 3732
29 - 31
- 2726
22 - 25
14 - 21
12 - 13
8 - 11
3 - 7
NTR
APPENDIX B
TYPICAL SECTION
& ASSOCIATES
KISINGER CAMPO
Fort Myers, Florida 33912
13461 Parker Commons Blvd, Suite 104
P.E. No.: 80442
Engineer of Record: Jesse E. Gill
8/7/2023rdevonish c:\pwworkingdir\kca-pw.bentley.com_kca-pw-01\rafael devonish\dms38688\TYPSRD01.dgn4:57:09 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
NO.
SHEET
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
ROAD NAME
16TH. ST. NE
COUNTY
COLLIER
451283-1-58-01
COLLIER COUNTY TRANSPORTATION
MANAGEMENT SERVICES DEPARTMENT
FINANCIAL PROJECT ID
11'11'
0.06
:4
M A X
(MAX.)
0.02
R1L1
6'
SHLDR.
4'
PAVT.
SHLDR.
4"
STANDARD CLEARING AND GRUBBING
VARIES (1' MIN.)
SOD SWK.
6'
SHLDR.
4'
PAVT.
SHLDR.
4"
19'50' R/W
VARIES*
± 17'
2' SOD
NATURAL GROUND
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
¡ CONST. 16TH ST.£ SURVEY 16TH ST.EXIST. R/W LINE
LIMITS OF CONSTRUCTION
LBR 40
TYPE B STABILIZATION
POINT
CONTROL
MILLING
LBR 40
TYPE B STABILIZATION
MILLED SURFACE
LBR 40
TYPE B STABILIZATION
MILLING & RESURFACING
RESURFACING
MILLING
PAVT.
SHLDR.
4'
OPTIONAL BASE
6" CONC. SWK.
4"
4"
4"4" 4"4"
ASPH. PAVT.
TYPICAL SECTION (1)
0.06 1 :4 (M
A X
OVERBUILD
TYPE SP OVERBUILD (TRAFFIC B) THICKNESS VARIES
MILLING
(SEE CROSS SECTIONS FOR CROSS SLOPE)
MILL EXIST. ASPH. PAVT. FOR AVG. DEPTH (2 ƀ")
EXIST. BASE
OPTIONAL BASE
WIDENING
± 2'-3'**
0.06
:4
M A X
MILLED SURFACE
VARIES*
WITH SPECS
PLACE LIFT IN ACCORDANCE
TYPE SP (TRAFFIC B) OVERBUILD
AT NO ADDITIONAL COMPENSATION
OF OPTIONAL BASE MATERIAL
THIS AREA MAY BE CONSTRUCTED
RESURFACING
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 6 (TYPE B-12.5 ONLY) WITH
V A
R I E
S
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
N.T.S.
N.T.S.
STA. 1003+82.94 TO STA. 1054+91.91
TYPICAL SECTION
16TH ST. NE
VARIES*
MAX. DEPTH OF OVERBUILD (SEE TABLE 1)
:3 M
A X
:4 T
Y P
3' WIDENING 3' WIDENING
WIDENING
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 6 (TYPE B-12.5 ONLY) WITH
VARIES
TURF
VARIES
TURF
CONTEXT CLASSIFICATION = C2T
DESIGN SPEED = 30 MPH
DESIGN HOUR T = 6.35%
K = 9.5% D = 56.70% T = 12.70% (24 HOUR)
ESTIMATED DESIGN YEAR = 2045 AADT = 7300
ESTIMATED OPENING YEAR = 2025 AADT = 3600
CURRENT YEAR = 2021 AADT = 3300
TRAFFIC DATA
STA. 1002+98.78 TO STA. 1054+91.91 RT.
STA. 1002+82.94 TO STA. 1054+91.91 LT.
WIDENING & SHOULDER PAVEMENT DETAIL
6'
1:6 (MAX.)
0.02 (MAX.)
V A
R I E
S
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
:3 M
A X
:4 T
Y P
NATURAL GROUND
STANDARD CLEARING & GRUBBING
R/W VARIES (31' MIN.)
EXIST. R/W LINE
LIMITS OF CONSTRUCTION
SHOULDER PAVEMENT
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
OPTIONAL BASE GROUP 1 (TYPE B-12.5 ONLY) WITH
EXIST. BASE
MORE INFORMATION.
TO DEWATER. SEE GENERAL NOTES #20 FOR
LIMESTONE/CAPROCK IS POROUS AND WILL BE DIFFICULT
TECHNIQUES AND SPECIALIZED EQUIPMENT.
AND MAY REQUIRE NONCONVENTIONAL CONSTRUCTION
THROUGH LIMESTONE/CAPROCK WILL BE DIFFICULT
AT SHALLOW DEPTHS. EXCAVATION INTO AND/OR
3) WEATHERED LIMESTONE/CAPROCK WAS ENCOUNTERED
OF SP STRUCTURAL COURSE (TRAFFIC B).
PRIME/TACKED COATED PRIOR TO PLACEMENT
DURING MILLING OPERATIONS MUST BE
2) EXISTING LIMEROCK BASE THAT IS EXPOSED
DUE TO THE ACTUAL PAVT. WIDTH.
1) ACTUAL WIDTH OF BASE WIDENING MAY VARY
NOTE:
SHLDR.
6'
POINT
GRADE
# PROFILE
# PROPOSED PROFILE FROM STA. 1003+82.94 TO STA. 1005+00.00
AVOID A VERTICAL JOINT.
WIDENING ON THE SAME LIFT AS THE MILLED SECTION TO
** PLACE BASE, STRUCTURAL AND FRICTION COURSES FOR THE
OVERBUILD TO OBTAIN CROSS SLOPE (0.015 -0.03).
* MILL EXIST. ASPH. (AVG. 2 ƀ" DEPTH) AT CONTROL POINT.
Fort Myers, Florida 33912
13461 Parker Commons Blvd, Suite 104
P.E. No.: 80442
Engineer of Record: Jesse E. Gill
8/7/2023rdevonish c:\pwworkingdir\kca-pw.bentley.com_kca-pw-01\rafael devonish\dms38688\TYPSRD01.dgn4:57:10 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
MANAGEMENT SERVICES DEPARTMENT
FINANCIAL PROJECT ID
:4 (M
A X
0.06
:4
M A X
(MAX.)
0.02
6'
SHLDR.
P A
V T
S H
L D
R
6'
SOD SWK.
6'
SHLDR.
0.02
0.06
VARIES*
PAVT.
SHLDR.
PAVT.
SHLDR.
& GRUBBING
STANDARD CLEARING
SOD
VARIES
TURF
SWK.
0'-19'50' R/W
STANDARD CLEARING AND GRUBBING
TURF
11'-12'11'-12'
4'
4" 4"
4' TURF
VARIES (1' MIN.)
NATURAL GROUND
POINT
GRADE
PROFILE
4" 4"
¡ CONST. 16TH ST.£ SURVEY 16TH ST. EXIST. R/W LINE
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
EXIST. R/W LINE
LIMITS OF CONSTRUCTION
6" CONC. SWK.
NATURAL GROUND
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
2' SOD
P A
V T
S H
L D
R
6'
2' SOD
VARIE
S*
6" CONC. SWK.
LBR 40
TYPE B STABILIZATION
EXIST. R/W LINE
NATURAL GROUND
& GRUBBING
STANDARD CLEARING
EXIST. R/W LINE
CONSTRUCTION
LIMITS OF
LBR 40
TYPE B STABILIZATION
SHLDR. GUTTER
AND FROM (-) 0.02 TO (-) 0.06
* SUPERELEVATION TRANSITION FROM (-) 0.06 TO (-) 0.02
0.06
TYPICAL SECTION (2)
SHOULDER CONSTRUCTION
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
OPTIONAL BASE GROUP 1 (TYPE B-12.5 ONLY) WITH
SHOULDER CONSTRUCTION
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 1 (TYPE B-12.5 ONLY) WITH
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
V A
R I E
S
N.T.S. N.T.S.
N.T.S.
STA. 1062+43.79 TO STA 1068+34.00
STA. 1054+91.91 TO STA. 1060+96.75
TYPICAL SECTION
16TH ST. NE
4'-6'
PAVEMENT
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 6 (TYPE B-12.5 ONLY) WITH
0.02
:3 M
A X
:4 T
Y P
:3
M
A X
:4
T
Y P
NATURAL GROUND
:3 M
A X
:4 T
Y P
4'-12'
LBR 40
TYPE B STABILIZATION
CONSTRUCTION
LIMITS OF
3' SOD
TYPE F CURB & GUTTER
LIMITS OF CONSTRUCTION
0.06
PAVT.
SHLDR.
SOD
VARIES
& GRUBBING
STANDARD CLEARING
EXIST. R/W LINE
CONSTRUCTION
LIMITS OF
LBR 40
TYPE B STABILIZATION
SHOULDER CONSTRUCTION
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 1 (TYPE B-12.5 ONLY) WITH
N.T.S.
NATURAL GROUND
:3 M
A X
:4 T
Y P
3' SOD
VARIES*
12'
CONTEXT CLASSIFICATION = C2T
DESIGN SPEED = 30 MPH
DESIGN HOUR T = 6.35%
K = 9.5% D = 56.70% T = 12.70% (24 HOUR)
ESTIMATED DESIGN YEAR = 2045 AADT = 7300
ESTIMATED OPENING YEAR = 2025 AADT = 3600
CURRENT YEAR = 2021 AADT = 3300
TRAFFIC DATA
STA. 1062+43.79 LT. TO STA. 1063+60.00 LT.
STA. 1059+69.55 LT. TO STA. 1060+66.75 LT.
INDEX 521-001
CONC. SHOULDER BARRIER WALL
STA. 1062+83.79 TO STA. 1063+60.00 RT.
STA. 1059+50.00 TO STA 1060+41.75 RT.
STA. 1062+43.79 TO STA. 1062+83.79 RT.
STA. 1060+41.75 TO STA. 1060+66.75 RT.
1:6 (MAX.)
0.02 (MAX.)
SHOULDER PAVEMENT
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
OPTIONAL BASE GROUP 1 (TYPE B-12.5 ONLY) WITH
31' - 50' R/W
(MAX)
0.02
V A
R I E
S
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
:3 M
A X
:4 T
Y P
MORE INFORMATION.
TO DEWATER. SEE GENERAL NOTES #20 FOR
LIMESTONE/CAPROCK IS POROUS AND WILL BE DIFFICULT
TECHNIQUES AND SPECIALIZED EQUIPMENT.
AND MAY REQUIRE NONCONVENTIONAL CONSTRUCTION
THROUGH LIMESTONE/CAPROCK WILL BE DIFFICULT
AT SHALLOW DEPTHS. EXCAVATION INTO AND/OR
2) WEATHERED LIMESTONE/CAPROCK WAS ENCOUNTERED
OF SP STRUCTURAL COURSE (TRAFFIC B).
PRIME/TACKED COATED PRIOR TO PLACEMENT
DURING MILLING OPERATIONS MUST BE
1) EXISTING LIMEROCK BASE THAT IS EXPOSED
NOTE:
APPROACH SLABPAVEMENT
ROADWAY
PG 76-22
1.75" FC-12.5
12" CONC SLAB
AT APPROACH SLABS
PAVEMENT PROFILE DETAIL
STA. 1062+43.79 TO STA. 1062+73.79.
STA. 1060+66.75 TO STA. 1060+96.75
BRIDGE
B-12.5 ONLY)
OBG 6 (TYPE
Fort Myers, Florida 33912
13461 Parker Commons Blvd, Suite 104
P.E. No.: 80442
Engineer of Record: Jesse E. Gill
8/7/2023rdevonish c:\pwworkingdir\kca-pw.bentley.com_kca-pw-01\rafael devonish\dms38688\TYPSRD01.dgn4:57:10 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
MANAGEMENT SERVICES DEPARTMENT
FINANCIAL PROJECT ID
TYPICAL SECTION (3)
12'12'
0.02
6' 12'6'
SWK. SHLDR. SHLDR.
BARRIER (INDEX 521-427)
36" SINGLE SLOPE TRAFFIC
1'-1" 1'-4"
EXIST. R/W LINE
LIMITS OF CONSTRUCTION
EXIST. R/W LINE
50' R/W 50' R/W
LIMITS OF CONSTRUCTION
STANDARD CLEARING AND GRUBBING
POST C1)
RAILING (INDEX 515-022,
W/ PEDESTRIAN BULLET
RAILING (INDEX 521-423)
32" VERTICAL TRAFFIC
¡ CONST. 16TH ST.
£ SURVEY 16TH ST.
N.T.S.
STA. 1060+96.75 TO STA. 1062+43.79
BRIDGE TYPICAL SECTION
16TH ST. NE
0.02
0.02 0.02
CONTEXT CLASSIFICATION = C2T
DESIGN SPEED = 30 MPH
DESIGN HOUR T = 6.35%
K = 9.5% D = 56.70% T = 12.70% (24 HOUR)
ESTIMATED DESIGN YEAR = 2045 AADT = 7300
ESTIMATED OPENING YEAR = 2025 AADT = 3600
CURRENT YEAR = 2021 AADT = 3300
TRAFFIC DATA
REQUIRED
CONST. JOINT
(MAX)
0.02
Fort Myers, Florida 33912
13461 Parker Commons Blvd, Suite 104
P.E. No.: 80442
Engineer of Record: Jesse E. Gill
8/7/2023rdevonish c:\pwworkingdir\kca-pw.bentley.com_kca-pw-01\rafael devonish\dms38688\TYPSRD01.dgn4:57:10 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
MANAGEMENT SERVICES DEPARTMENT
FINANCIAL PROJECT ID
11'11'
:4 (M
A X
0.060.06
:4
M A X
(MAX.)
0.02
6'
SHLDR.
4'
PAVT.
SHLDR.
4"
STANDARD CLEARING AND GRUBBING
6'VARIES (1' MIN.)
SOD SWK.
6'
SHLDR.
4'
PAVT.
19'50' R/W
2' SOD
NATURAL GROUND
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
¡ CONST. 16TH ST.£ SURVEY 16TH ST.EXIST. R/W LINE EXIST. R/W LINE
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
MILLING & RESURFACING
6" CONC. SWK.
POINT
CONTROL
MILLING
TYPICAL SECTION (4)
MILLED SURFACE
LBR 40
TYPE B STABILIZATION
EXIST. BASE
ASPH. PAVT.
OPTIONAL BASE
LBR 40
TYPE B STABILIZATION
OVERBUILD
TYPE SP OVERBUILD (TRAFFIC B) THICKNESS VARIES
MILLING
(SEE CROSS SECTIONS FOR CROSS SLOPE)
MILL EXIST. ASPH. PAVT. FOR AVG. DEPTH (3 ƀ")
R1L1
WITH SPECS
PLACE LIFT IN ACCORDANCE
TYPE SP (TRAFFIC B) OVERBUILD
RESURFACING
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 6 (TYPE B-12.5 ONLY) WITH
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
V A
R I E
S
N.T.S.
VARIES*VARIES*
MAX. DEPTH OF OVERBUILD (SEE TABLE 3)
:3 M
A X
:4 T
Y P
CONTEXT CLASSIFICATION = C2T
DESIGN SPEED = 30 MPH
DESIGN HOUR T = 6.35%
K = 9.5% D = 56.70% T = 12.70% (24 HOUR)
ESTIMATED DESIGN YEAR = 2045 AADT = 7300
ESTIMATED OPENING YEAR = 2025 AADT = 3600
CURRENT YEAR = 2021 AADT = 3300
TRAFFIC DATA
STA. 1080+81.87 TO STA. 1167+96.40
STA. 1068+34.00 TO STA. 1069+81.87
TYPICAL SECTION
16TH ST. NE
R/W VARIES (31' MIN.)
STANDARD CLEARING & GRUBBING
VARIES
TURF
1:6 (MAX.)
0.02 (MAX.)
TURF
NATURAL GROUND
SHOULDER PAVEMENT
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
OPTIONAL BASE GROUP 1 (TYPE B-12.5 ONLY) WITH
MORE INFORMATION.
TO DEWATER. SEE GENERAL NOTES #20 FOR
LIMESTONE/CAPROCK IS POROUS AND WILL BE DIFFICULT
TECHNIQUES AND SPECIALIZED EQUIPMENT.
AND MAY REQUIRE NONCONVENTIONAL CONSTRUCTION
THROUGH LIMESTONE/CAPROCK WILL BE DIFFICULT
AT SHALLOW DEPTHS. EXCAVATION INTO AND/OR
3) WEATHERED LIMESTONE/CAPROCK WAS ENCOUNTERED
OF SP STRUCTURAL COURSE (TRAFFIC B).
PRIME/TACKED COATED PRIOR TO PLACEMENT
DURING MILLING OPERATIONS MUST BE
2) EXISTING LIMEROCK BASE THAT IS EXPOSED
DUE TO THE ACTUAL PAVT. WIDTH.
1) ACTUAL WIDTH OF BASE WIDENING MAY VARY
NOTE:
LBR 40
TYPE B STABILIZATION
RESURFACING
MILLING
PAVT.
SHLDR.
OPTIONAL BASE
4"
4"
EXIST. BASE
WIDENING
± 2'-5'**
0.06
:4
M A X
MILLED SURFACE
VARIES*
AT NO ADDITIONAL COMPENSATION
OF OPTIONAL BASE MATERIAL
THIS AREA MAY BE CONSTRUCTED
N.T.S.
WIDENING
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 6 (TYPE B-12.5 ONLY) WITH
STA. 1114+88.50 TO STA. 1115+30.50 RT.
STA. 1114+32.83 TO STA. 1114+74.83 LT.
STA. 1114+31.80 TO STA. 1114+73.82 RT.
STA. 1108+28.04 TO STA. 1108+70.40 RT.
STA. 1107+72.08 TO STA. 1108+14.08 RT.
STA. 1081+88.82 TO STA. 1082+30.82 LT.
STA. 1081+86.69 TO STA. 1082+30.70 RT.
STA. 1081+32.07 TO STA. 1081+75.07 RT.
STA. 1081+25.00 TO STA. 1081+52.31 LT.
STA. 1161+08.86 TO STA. 1161+50.86 LT.
STA. 1160+49.73 TO STA. 1160+93.27 RT.
STA. 1160+47.58 TO STA. 1160+94.58 LT.
STA. 1147+90.36 TO STA. 1148+32.38 RT.
STA. 1147+34.44 TO STA. 1147+77.43 RT.
STA. 1134+70.62 TO STA. 1135+17.63 LT.
STA. 1134+06.33 TO STA. 1134+57.31 LT.
STA. 1121+53.05 TO STA. 1121+95.05 RT.
STA. 1120+91.19 TO STA. 1121+36.18 RT.
WIDENING & SHOULDER PAVEMENT DETAIL
0-4'
SHLDR.
0'-6'
POINT
GRADE
# PROFILE
AND STA. 1080+81.87 TO STA. 1082+40.00
# PROPOSED PROFILE FROM STA. 1068+34.00 TO STA. 1069+81.87
AVOID A VERTICAL JOINT.
WIDENING ON THE SAME LIFT AS THE MILLED SECTION TO
** PLACE BASE, STRUCTURAL AND FRICTION COURSES FOR THE
OVERBUILD TO OBTAIN CROSS SLOPE (0.015 -0.03).
* MILL EXIST. ASPH. (AVG. 3 ƀ" DEPTH) AT CONTROL POINT.
Fort Myers, Florida 33912
13461 Parker Commons Blvd, Suite 104
P.E. No.: 80442
Engineer of Record: Jesse E. Gill
8/7/2023rdevonish c:\pwworkingdir\kca-pw.bentley.com_kca-pw-01\rafael devonish\dms38688\TYPSRD01.dgn4:57:11 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
MANAGEMENT SERVICES DEPARTMENT
FINANCIAL PROJECT ID
TYPICAL SECTION (5)
STA. 1069+81.87 TO STA. 1080+81.87
TYPICAL SECTION
16TH ST. NE
11' 11' 11'11' 5' 2'5'2'
¡ CONST.
3'VARIES
V A
R I E
S
3' VARIES
V A
R I E
S
EXISTING R/W
VARIES
EXISTING R/W
VARIES
0.02 0.02 0.020.02
0.06 0.06
PGL
:4
:3
:3
:4
GROUND
NATURAL
12"
SHOULDER
UNPAVED
PAVED SHOULDER
SHOULDER
UNPAVED
PAVED SHOULDER
TYPE B STABILIZATION LBR 40
GROUND
NATURAL
0.02
0.02 (MAX.)
6" CONC. SWK.
GROUND
NATURAL
6'
SWK.
2' SOD2' SOD
14.25'
EXISTING R/W
STA. 1068+78.06 TO STA. 1080+81.87 LT.
EDGE OF UNPAVED SHLDR.
6.25'
ROADWAY WORK BY OTHERS (PROJECT NUMBER 60168) UNDER CONSTRUCTION .
1) SIDEWALK CONSTRUCTION ONLY FROM STA. 1069+81.87 TO STA. 1080+81.87
NOTE:
AND GRUBBING
STANDARD CLEARING
Fort Myers, Florida 33912
13461 Parker Commons Blvd, Suite 104
P.E. No.: 80442
Engineer of Record: Jesse E. Gill
8/7/2023rdevonish c:\pwworkingdir\kca-pw.bentley.com_kca-pw-01\rafael devonish\dms38688\TYPSRD01.dgn4:57:11 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
MANAGEMENT SERVICES DEPARTMENT
FINANCIAL PROJECT ID
6'
SHLDR.
4'
PAVT.
SHLDR.
4"
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
:4
M A X
(MAX.)
0.02NATURAL GROUND
6" CONC. SWK.
6'VARIES (1' MIN.)
SOD SWK.
2' SOD
11'
0.06
(M A X
:4
0'-3.6' 11' 6'
4'
PAVT.
SHLDR.
4"
TURF
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
POINT
CONTROL
MILLING
MILLING & RESURFACING
& GRUBBING
STANDARD CLEARING STANDARD CLEARING AND GRUBBING
19'50' R/W 31' R/W
¡ CONST. 16TH ST.£ SURVEY 16TH ST. EXIST. R/W LINEEXIST. R/W LINE
LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION
TYPICAL SECTION (6)
TYPE B STABILIZATION
GORETURN LANE
VARIES*VARIES*
LBR 40
TYPE B STABILIZATION
EXIST. BASE
ASPH. PAVT.
OPTIONAL BASE
OVERBUILD
TYPE SP OVERBUILD (TRAFFIC B) THICKNESS VARIES
MILLING
(SEE CROSS SECTIONS FOR CROSS SLOPE)
MILL EXIST. ASPH. PAVT. FOR AVG. DEPTH (3 ƀ")
4"
NATURAL GROUND
R1
RL1
WITH SPECS
PLACE LIFT IN ACCORDANCE
TYPE SP (TRAFFIC B) OVERBUILD
WIDENING
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 6 (TYPE B-12.5 ONLY) WITH
RESURFACING
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 6 (TYPE B-12.5 ONLY) WITH
V A
R I E
S
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
V A
R I E
S
N.T.S.
0'-11'
STA. 1167+96.40 TO STA. 1175+10.66
TYPICAL SECTION
16TH ST. NE
0.02
PROPOSED BASE
6"-12"
1 ƀ" FRICTION COURSE
2" SP STRUCTURAL COURSE
N.T.S.
WIDENING PAVEMENT JOINT DETAIL
EXIST. BASE
PAVEMENT WIDENING JOINT
:3 M
A X
:4 T
Y P
MAX. DEPTH OF OVERBUILD (SEE TABLE 4)
M
A X
:4 T
Y P
CONTEXT CLASSIFICATION = C2T
DESIGN SPEED = 30 MPH
DESIGN HOUR T = 6.35%
K = 9.5% D = 56.70% T = 12.70% (24 HOUR)
ESTIMATED DESIGN YEAR = 2045 AADT = 7300
ESTIMATED OPENING YEAR = 2025 AADT = 3600
CURRENT YEAR = 2021 AADT = 3300
TRAFFIC DATA
MILLED SURFACE
LBR 40
TYPE B STABILIZATION
11'
VARIES*VARIES*
1:6 (MAX.)
0.02 (MAX.)
TURF
SHOULDER PAVEMENT
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
OPTIONAL BASE GROUP 1 (TYPE B-12.5 ONLY) WITH
MORE INFORMATION.
TO DEWATER. SEE GENERAL NOTES #20 FOR
LIMESTONE/CAPROCK IS POROUS AND WILL BE DIFFICULT
TECHNIQUES AND SPECIALIZED EQUIPMENT.
AND MAY REQUIRE NONCONVENTIONAL CONSTRUCTION
THROUGH LIMESTONE/CAPROCK WILL BE DIFFICULT
AT SHALLOW DEPTHS. EXCAVATION INTO AND/OR
3) WEATHERED LIMESTONE/CAPROCK WAS ENCOUNTERED
OF SP STRUCTURAL COURSE (TRAFFIC B).
PRIME/TACKED COATED PRIOR TO PLACEMENT
DURING MILLING OPERATIONS MUST BE
2) EXISTING LIMEROCK BASE THAT IS EXPOSED
DUE TO THE ACTUAL PAVT. WIDTH.
1) ACTUAL WIDTH OF BASE WIDENING MAY VARY
NOTE:
WIDENING
0'-5'
2'-15' WIDENING
STA. 1172+66.00 TO STA. 1174+53.66
NEW CONSTRUCTION
FRICTION COURSE FC-12.5 (TRAFFIC B) (1 ƀ") (PG 76-22)
TYPE SP STRUCTURAL COURSE (TRAFFIC B) (2")
OPTIONAL BASE GROUP 6 (TYPE B-12.5 ONLY) WITH
RL1
R1
12.6'-14.3'
16TH ST.
¡ CONST.
POINT
GRADE
# PROFILE
POINT
GRADE
# PROFILE
# PROPOSED PROFILE FROM STA. 1172+10.00 TO STA. 1174+63.16
AVOID A VERTICAL JOINT.
WIDENING ON THE SAME LIFT AS THE MILLED SECTION TO
** PLACE BASE, STRUCTURAL AND FRICTION COURSES FOR THE
OVERBUILD TO OBTAIN CROSS SLOPE (0.015 -0.03).
* MILL EXIST. ASPH. (AVG. 3 ƀ" DEPTH) AT CONTROL POINT.
4'
& GRUBBING
STANDARD CLEARING
Fort Myers, Florida 33912
13461 Parker Commons Blvd, Suite 104
P.E. No.: 80442
Engineer of Record: Jesse E. Gill
8/7/2023rdevonish c:\pwworkingdir\kca-pw.bentley.com_kca-pw-01\rafael devonish\dms38688\TYPSRD01.dgn4:57:11 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
MANAGEMENT SERVICES DEPARTMENT
FINANCIAL PROJECT ID
0'-12'
:4 (M
A X
MILLING & RESURFACING
22'
¡ CONST. RANDALL BLVD. £ SURVEY RANDALL BLVD. EXIST. R/W LINEEXIST. R/W LINE
0'-12'12'
28' R/W 50' R/W
6'
PAVT.
SHLDR.
4"
TURF
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
4'
4"
SHLDR.
CONSTRUCTION
LIMITS OF
POINT
CONTROL
MILLING
TYPICAL SECTION (7)
TURN LANETURN LANE
OVERBUILD
TYPE SP OVERBUILD (TRAFFIC C) THICKNESS VARIES
MILLING
(SEE CROSS SECTIONS FOR CROSS SLOPE)
MILL EXIST. ASPH. PAVT. FOR AVG. DEPTH (1 ƀ")
WIDENING
FRICTION COURSE FC-12.5 (TRAFFIC C) (1 ƀ") (PG 76-22) TYPE SP STRUCTURAL COURSE (TRAFFIC C) (2 ƀ")
OPTIONAL BASE GROUP 10 (TYPE B-12.5 ONLY) WITH
RESURFACING
FRICTION COURSE FC-12.5 (TRAFFIC C) (1 ƀ") (PG 76-22)
0.02 0.03
EXIST. BASE
AL1
AR1
WITH SPECS
PLACE LIFT IN ACCORDANCE
TYPE SP (TRAFFIC C) OVERBUILD
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
V A
R I E
S
STANDARD CLEARING AND GRUBBING
N.T.S.
STA. 504+41.00 TO STA. 514+00.00
TYPICAL SECTION
RANDALL BLVD.
VARIES* VARIES*
6"-12"
OVERBUILD
MILLED SURFACE
1 ƀ" FRICTION COURSE
PROPOSED BASE
EXIST. BASE
N.T.S.
2 ƀ" SP STRUCTURAL COURSE
WIDENING PAVEMENT JOINT DETAIL
OVERBUILD TO OBTAIN CROSS SLOPE (0.015 -0.03).
* MILL EXIST. ASPH. (1 ƀ" DEPTH) AT CONTROL POINT.
PAVEMENT WIDENING JOINT
(SEE TABLE 5)
OVERBUILD
MAX. DEPTH OF
:3 M
A X
:4 T
Y P
NATURAL GROUND
CONTEXT CLASSIFICATION = C3R
DESIGN SPEED = 45 MPH
DESIGN HOUR T = 3.35%
K = 9.0% D = 56.70% T = 6.70 % (24 HOUR)
ESTIMATED DESIGN YEAR = 2045 AADT = 28500
ESTIMATED OPENING YEAR = 2025 AADT = 17400
CURRENT YEAR = 2021 AADT = 16300
TRAFFIC DATA
SHOULDER PAVEMENT
FRICTION COURSE FC-12.5 (TRAFFIC C) (1 ƀ") (PG 76-22)
OPTIONAL BASE GROUP 1 (TYPE B-12.5 ONLY) WITH
MORE INFORMATION.
TO DEWATER. SEE GENERAL NOTES #20 FOR
LIMESTONE/CAPROCK IS POROUS AND WILL BE DIFFICULT
TECHNIQUES AND SPECIALIZED EQUIPMENT.
AND MAY REQUIRE NONCONVENTIONAL CONSTRUCTION
THROUGH LIMESTONE/CAPROCK WILL BE DIFFICULT
AT SHALLOW DEPTHS. EXCAVATION INTO AND/OR
3) WEATHERED LIMESTONE/CAPROCK WAS ENCOUNTERED
OF SP STRUCTURAL COURSE (TRAFFIC C)
PRIME/TACKED COATED PRIOR TO PLACEMENT
DURING MILLING OPERATIONS MUST BE
2) EXISTING LIMEROCK BASE THAT IS EXPOSED
DUE TO THE ACTUAL PAVT. WIDTH.
1) ACTUAL WIDTH OF BASE WIDENING MAY VARY
NOTE:
CONSTRUCTION
LIMITS OF
0'-20'
NATURAL GROUND
PROPOSED R/W LINE
11'-13'
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
0.061:4 (MAX.)
TURF VARIES
Fort Myers, Florida 33912
13461 Parker Commons Blvd, Suite 104
P.E. No.: 80442
Engineer of Record: Jesse E. Gill
8/7/2023rdevonish c:\pwworkingdir\kca-pw.bentley.com_kca-pw-01\rafael devonish\dms38688\TYPSRD01.dgn4:57:11 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
MANAGEMENT SERVICES DEPARTMENT
FINANCIAL PROJECT ID
12' 12'0'-12' 0'-12'
:4 (M
A X
NATURAL GROUND
MILLING & RESURFACING
6'
PAVT.
SHLDR.
4"
TURF
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
4"4"
4'
LIMITS OF CONSTRUCTION
STANDARD CLEARING AND GRUBBING
50' R/W23'27' R/W
¡ CONST. RANDALL BLVD.
£ SURVEY RANDALL BLVD.
EXIST. R/W LINE
EXIST. R/W LINELIMITS OF CONSTRUCTION
SHLDR.
POINT
CONTROL
MILLING
LBR 40
TURN LANE TURN LANE
TYPICAL SECTION (8)
RR1
AL1
OVERBUILD
TYPE SP OVERBUILD (TRAFFIC C) THICKNESS VARIES
MILLING
(SEE CROSS SECTIONS FOR CROSS SLOPE)
MILL EXIST. ASPH. PAVT. FOR AVG. DEPTH (1 ƀ")
WIDENING
FRICTION COURSE FC-12.5 (TRAFFIC C) (1 ƀ") (PG 76-22) TYPE SP STRUCTURAL COURSE (TRAFFIC C) (2 ƀ")
OPTIONAL BASE GROUP 10 (TYPE B-12.5 ONLY) WITH
RESURFACING
FRICTION COURSE FC-12.5 (TRAFFIC C) (1 ƀ") (PG 76-22)
0.06
0.020.02
EXIST. BASE
WITH SPECS
PLACE LIFT IN ACCORDANCE
TYPE SP (TRAFFIC C) OVERBUILD
STANDARD CLEARING AND GRUBBING
V A
R I E
S
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
N.T.S.
STA. 514+00.00 TO STA. 524+56.74
TYPICAL SECTION
RANDALL BLVD.
TO AVOID A VERTICAL JOINT.
COURSES 6" TO 12" BETWEEN WIDENING AND MILLED SECTIONS
*** STAGGER THE PLACEMENT OF THE STRUCTURAL AND FRICTION
OVERBUILD TO OBTAIN CROSS SLOPE (0.015 -0.03).
* MILL EXIST. ASPH. (1 ƀ" DEPTH) AT CONTROL POINT.
VARIES*VARIES*
PROPOSED R/W LINE
0'-20'
(SEE TABLE 6)
OVERBUILD
MAX. DEPTH OF
:3 M
A X
:4 T
Y P
NATURAL GROUND
0.06
SHLDR.
4'
PAVT.
SHLDR.
4"4"
(INDEX 570-010)
TREATMENT 1
2'-8" SOD
6'
:4
M A X
:3 M
A X
:4 T
Y P
V A
R I E
S
FOR DEPTH AND WIDTH
SEE CROSS SECTIONS
CONTEXT CLASSIFICATION = C3R
DESIGN SPEED = 45 MPH
DESIGN HOUR T = 3.35%
K = 9.0% D = 56.70% T = 6.70 % (24 HOUR)
ESTIMATED DESIGN YEAR = 2045 AADT = 28500
ESTIMATED OPENING YEAR = 2025 AADT = 17400
CURRENT YEAR = 2021 AADT = 16300
TRAFFIC DATA
SHOULDER PAVEMENT
FRICTION COURSE FC-12.5 (TRAFFIC C) (1 ƀ") (PG 76-22)
OPTIONAL BASE GROUP 1 (TYPE B-12.5 ONLY) WITH
MORE INFORMATION.
TO DEWATER. SEE GENERAL NOTES #20 FOR
LIMESTONE/CAPROCK IS POROUS AND WILL BE DIFFICULT
TECHNIQUES AND SPECIALIZED EQUIPMENT.
AND MAY REQUIRE NONCONVENTIONAL CONSTRUCTION
THROUGH LIMESTONE/CAPROCK WILL BE DIFFICULT
AT SHALLOW DEPTHS. EXCAVATION INTO AND/OR
3) WEATHERED LIMESTONE/CAPROCK WAS ENCOUNTERED
OF SP STRUCTURAL COURSE (TRAFFIC C).
PRIME/TACKED COATED PRIOR TO PLACEMENT
DURING MILLING OPERATIONS MUST BE
2) EXISTING LIMEROCK BASE THAT IS EXPOSED
DUE TO THE ACTUAL PAVT. WIDTH.
1) ACTUAL WIDTH OF BASE WIDENING MAY VARY
NOTE:
APPENDIX C
FLOODPLAIN MAP
BEGIN
PROJECT
PROJECT
AREA
BEGIN
PROJECT
PROJECT
AREA
APPENDIX D
SOIL SURVEY REPORT
APPENDIX D
GEOTECHNICAL REPORT
6011 Benjamin Road, Suite 106 Tampa, Florida 33634 813-993-0093 www.TSFGeo.com
State of Florida Registration No. 28073
January 16, 2023
Kisinger Campo & Associates 13461 Parker Commons Blvd, Suite 104 Ft. Myers, FL 33912
Attn: Jesse E. Gill, PE Project Manager
RE: Roadway Geotechnical Report 16th Street NE Bridge Collier County, Florida
FPID: 431895-3-52-01
TSF Project No. 7511-22-279
TIERRA SOUTH FLORIDA, Inc. (TSF) performed a geotechnical exploration and soil survey for the subject project. This study is performed in accordance with our Subconsultant Agreement. The results of the exploration program and subsequent geotechnical recommendations are presented in this report.
If you have any questions or comments regarding this report, please contact our office at your earliest convenience.
Sincerely
TSF, INC.
This document has been digitally signed and sealed by:
Amy L. Guisinger, P.E. Esvard Janvier Principal Engineer Staff…
This is the start of the file's text. The full file is on GovTribe.