24-8250_Supplemental_Qualifications_of_Bidders.pdf

PDF 122 KB Posted

Attached to
Golden Gate Golf Course Outfall Swale
Solicitation number
24-8250
Issued by
Collier County, Florida

About this file

This document is a Supplemental Qualifications of Bidders specification for the Palm River Public Utilities Renewal, specifically for the 24-8250 Golden Gate Golf Course Outfall Swale project. The document outlines specific technical qualifications and experience requirements for potential contractors bidding on the project. Bidders must demonstrate previous experience with stormwater conveyance systems and meet three key project requirements: (1) constructing a minimum of 2,000 linear feet of swale at least 30 feet wide, (2) installing concrete mitered end sections and piping, and (3) installing an impermeable liner. Additionally, the reference projects submitted must be no more than 10 years old.

The document allows contractors to submit qualifying projects as part of the five references required on Form 5 - Statement of Experience of Bidders. This approach provides flexibility for bidders to demonstrate their technical capabilities and recent experience in similar infrastructure projects. The specifications are designed to ensure that only contractors with proven expertise in large-scale stormwater management and infrastructure construction are considered for the project.

View the file

Other files

File Type Posted
24-8250_Exhibit_M_-_Plans_GGGC_Swale_R1.pdf PDF
24-8250_Exhibit_M_-_Plans_GGGC_Swale_R1.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
24-8250_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
Construction_Services_Agreement_2024.pdf PDF
24-8250_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
Construction_Services_Agreement_2024.pdf PDF
24-8250_Supplemental_Qualifications_of_Bidders.pdf PDF
24-8250_Bid_Schedule.xlsx XLSX spreadsheet
24-8250_Bid_Schedule.xlsx XLSX spreadsheet
24-8250_Exhibit_M_-_SOIL_MNGT_PLAN.pdf PDF
24-8250_Exhibit_L_-_Bid_Memo.pdf PDF
24-8250_Exhibit_M_-_Geotechnical_Report_GES_Renaissance_Hall_at_Old_Course___Langan.pdf PDF
24-8250_Solicitation.pdf PDF
24-8250_Exhibit_M_-_GGGC_Culvert_Alternative.pdf PDF
Construction_Bid_Instructions_Form.pdf PDF
Construction_Bid_Instructions_Form.pdf PDF
24-8250_Exhibit_M_-_Geotechnical_Report_GES_Renaissance_Hall_at_Old_Course___Langan.pdf PDF
24-8250_Exhibit_J_-_Special_Specification_Imper._Liner.pdf PDF
24-8250_Exhibit_M_-_GGGC_Culvert_Alternative.pdf PDF
24-8250_Exhibit_J_-_Special_Specification_Imper._Liner.pdf PDF
24-8250_Exhibit_L_-_Bid_Memo.pdf PDF
24-8250_Solicitation.pdf PDF
24-8250_Exhibit_M_-_SOIL_MNGT_PLAN.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Palm River Public Utilities Renewal

24-8250 Golden Gate Golf Course Outfall Swale

SUPPLEMENTAL QUALIFICATIONS OF BIDDERS

The reference projects submitted by the Contractor shall clearly demonstrate experience to meet the qualifications listed below. It is acceptable for the Contractor to submit projects regarding Supplemental Qualifications as part of the 5 references required per Form 5 – Statement of Experience of Bidders.

Bidders/Contractors must show experience with stormwater conveyance systems and successful completion of projects with the following minimum qualifications as listed below.

a. Construct a minimum of two thousand (2,000) linear feet (LF) of swale at least 30’ wide.

b. Installation of concrete mitered end section and piping.

c. Installation of impermeable liner.

• No more than 10 years in age

File details come from the government source that posted it. Updated .