24-8250_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf

PDF 130 KB Posted

Attached to
Golden Gate Golf Course Outfall Swale
Solicitation number
24-8250
Issued by
Collier County, Florida

About this file

This document is an Environmental, Health and Safety (EHS) Contractor Requirements document issued by Collier County for all BCC Construction Projects. The document outlines comprehensive safety, health, and environmental compliance requirements for contractors working on Collier County projects, specifically detailed for the upcoming Golden Gate Golf Course Outfall Swale project (Bid No. 24-8250). Contractors are required to comply with multiple governmental regulations from agencies like OSHA, DOT, EPA, and FDEP, and must adhere to specific safety standards including wearing vendor badges, maintaining proper certifications for industrial vehicles, reporting incidents, using personal protective equipment, and following electrical and fall protection protocols.

The document mandates contractors develop multiple site-specific plans, including safety, security, hurricane, pandemic, silica, confined space, asbestos, and environmental protection plans as applicable. When working in rights-of-way, contractors must follow FDOT and MUTCD requirements, use high-visibility safety garments, and implement appropriate work zone signage and traffic management. Contractors must also safeguard construction sites by protecting pedestrian access, securing excavations, and ensuring no dangerous conditions remain when work is not active. All work must meet or exceed Collier County's Vertical Construction Standards, with potential for written exemptions from specific county directors.

View the file

Other files

File Type Posted
PO_Terms_and_Conditions_Rev.3.pdf PDF
24-8250_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
Construction_Services_Agreement_2024.pdf PDF
24-8250_Exhibit_M_-_Plans_GGGC_Swale_R1.pdf PDF
24-8250_Exhibit_M_-_Plans_GGGC_Swale_R1.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
Construction_Services_Agreement_2024.pdf PDF
24-8250_Supplemental_Qualifications_of_Bidders.pdf PDF
24-8250_Supplemental_Qualifications_of_Bidders.pdf PDF
24-8250_Bid_Schedule.xlsx XLSX spreadsheet
24-8250_Bid_Schedule.xlsx XLSX spreadsheet
24-8250_Exhibit_M_-_GGGC_Culvert_Alternative.pdf PDF
Construction_Bid_Instructions_Form.pdf PDF
Construction_Bid_Instructions_Form.pdf PDF
24-8250_Exhibit_M_-_Geotechnical_Report_GES_Renaissance_Hall_at_Old_Course___Langan.pdf PDF
24-8250_Exhibit_J_-_Special_Specification_Imper._Liner.pdf PDF
24-8250_Exhibit_M_-_GGGC_Culvert_Alternative.pdf PDF
24-8250_Exhibit_M_-_SOIL_MNGT_PLAN.pdf PDF
24-8250_Exhibit_L_-_Bid_Memo.pdf PDF
24-8250_Exhibit_M_-_Geotechnical_Report_GES_Renaissance_Hall_at_Old_Course___Langan.pdf PDF
24-8250_Solicitation.pdf PDF
24-8250_Exhibit_J_-_Special_Specification_Imper._Liner.pdf PDF
24-8250_Exhibit_L_-_Bid_Memo.pdf PDF
24-8250_Solicitation.pdf PDF
24-8250_Exhibit_M_-_SOIL_MNGT_PLAN.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental, Health and Safety

Contractor Requirements for all BCC Construction Projects

1. Contractors will be required to understand and comply with all applicable laws and regulations of any governmental entity (OSHA, DOT, EPA, DHS, ANSI, FDEP. NFPA, etc.) and

Collier County CMA’s, EHS Standard Operating Procedures (SOP’s) or Job Safety Analysis

(JSA’s) that that pertain to environmental, health and safety standards and/or work practices applicable to the activities they perform for Collier County. These include but are not limited to:

• Must wear a BCC provided Vendor Badge at all times while on BCC property.

• Powered Industrial Vehicle Certifications (Heavy Equipment, Cranes, etc.)

• Storage, handling, and use of flammable liquids and hazardous materials, including fuels and compressed gas cylinders.

• Daily reporting of any incidents/accidents or any OSHA safety inspections of equipment and worksites.

• Weekly reporting of at least one internal safety inspection of equipment and worksite.

• Use of Personal Fall Protection Devices while working at heights above 6 feet.

• Following Electrical Safety Practices, Arc Flash and Lockout/Tagout procedures.

• Proper use of Personal Protective Equipment. (PPE)

• Proper maintenance and use of ladders and other equipment.

• Guarding of wall and floor openings, open trenches, and excavations.

• Environmental Requirements (Permitting, Tanks, etc.)

2. Required Site EHS Plans for:

• Site Specific Safety Plan

• Site Specific Security Plan

• Site Specific Hurricane Plan

• Site Specific Pandemic Safety Plan (COVID-19) (If Applicable)

• Site Specific Respirable Crystalline Silica Plan (If Applicable)

• Site Specific Confined Space Entry Plan (If Applicable)

• Site Specific Asbestos Management Plan (If Applicable)

• Site Specific Mold Testing and Remediation Management Plan (If Applicable)

• Site Specific Environmental Protection Plan (Spill Cleanup, SPCC, etc.) (If

Applicable)

3. When working within a right-of-way (i.e. roads, sidewalks, bike paths, etc) – All applicable

FDOT and/or MUTCD requirements are to be followed at all times. Specifics include but are not limited to:

• ANSI/ISEA 107-2010 Compliant Class 2 or 3 Hi-Visibility Safety Garments.

• Applicable work zone signage, cones, barricades or barrels, arrow panels, flagging personnel and Stop/Slow Paddles, where necessary, required by law or the BCC.

• An applicable work zone (Maintenance of traffic) plan based on FDOT and/or

MUTCD designs on site.

4. Risk Management is included in all Pre-Activity/Construction, Activity/Construction and

Post Activity/Construction Meetings.

5. Safeguarding construction sites – Protecting the jobsite and preventing or inhibiting public access after activities are finished for the day is equally important. Therefore, all hazardous locations within construction sites and rights-of-ways are to be adequately protected.

Specifics include but are not limited to:

• Damaged, blocked, or missing sections of sidewalks, bike paths or other pedestrian access zones shall be protected with orange barricade fencing, barricades with yellow or red tape (depending on the hazard) or an equivalent means of protection. Sidewalks must also be posted as being closed on both sides with a white sign with black letters.

• Excavations must be protected in a similar manner as listed above if they must be left open overnight, during weekend hours, etc.

• All other hazards shall be evaluated by the contractor to ensure there are no dangerous conditions remaining that could be inadvertently encountered by collier county employees and/or the public while the construction site is not active (i.e., when no construction work is taking place).

6. Contractor must agree that all work must meet or exceed the standards set forth in the

Collier County Vertical Construction Standards and Collier County IT Construction Standards

(if applicable) unless specifically exempted in writing by Facilities Management Division

Director and Risk Management Director.

File details come from the government source that posted it. Updated .