24-218_Written_Questions_and_Responses.pdf
PDF 74 KB Posted
- Attached to
- 24-218 Interior and Exterior Painting, Dry Rot, and Stucco Repair Services at the Modesto DMV Field Office
- Solicitation number
- 24-218
- Issued by
- Stanislaus County, California
About this file
This is a Written Questions and Responses document for Project 24-218, which contains 14 questions from potential bidders and their corresponding answers. The project involves painting, staining, and refinishing work including sanding and re-staining with clear coat, exterior wall painting, perimeter wall painting (both sides and top for surrounding walls, inside and top only for North wall), and replacement of all cove base throughout the interior paint project. Working hours are specified in Exhibit A, Scope of Work, which is referenced but not included in this document.
The project has an estimated cost/budget of $109,000.00. This is designated as a Small Business solicitation with no DVBE (Disabled Veteran Business Enterprise) requirements. No bid bond is required as the total estimated cost falls below the threshold. The project appears to have had a mandatory pre-bid meeting and job walk (sign-in sheet referenced but not included). The document clarifies that there is no wallpaper removal needed as no wallpaper is present on existing walls, and interested parties must contact the solicitation representative to arrange attendance at the public bid opening.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24-218_Pre-Bid_Conference_Sign_In_Sheet.pdf | ||
| 24-218_SB_Solicitation.pdf | ||
| 24-218_Addendum_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24-218 – Written Questions and Responses
1. Is there a cost estimate or budget associated with this project? $109,000.00
2. Are they going to be just sanded and clear varnish, or sand, restain, and varnish? The process will be sand, re-stain and clear coat.
3. What is the engineering Cost for this project. See estimated cost. $109,000.00.
4. List of contractors attending the Job Walk. See released listing of mandatory pre-bid sign in sheet.
5. Are there any DVBE requirement for this project? This is a Small Business solicitation. There are no DVBE requirements.
6. Was this job back into re-bid que? No.
7. Can you please provide a copy of the sign in sheet from the mandatory pre-bid meeting? See released listing of mandatory pre-bid sign in sheet.
8. What hours can we work Monday to Sunday? See Exhibit A, Scope of Work.
9. Do we need to paint or seal coat any of the exterior building walls? Yes. See Exhibit A, Scope of Work.
10. Do we need to paint the entire fence block wall (both sides) which surrounds the parking lot? The surrounding perimeter wall needs to be painted on both side and top, the North wall only gets painted on the inside and top.
11. Do we need to paint or replace the wall cove base? All cove base gets replaced through out the Interior paint project.
12. Can you provide any floor plan and /or wall elevations which show the exact location of wallpaper that needs to be removed? There is no wallpaper present on existing walls.
13. Is there a bid bond requirement upon submission of bids? No, there is not a bid bond requirement for this project. The total estimated cost is below the threshold required for a bid bond.
14. Are you going to Open the bids in Public? Please contact the person for the solicitation regarding making arrangements to attend the bid opening.