About this file

This document is a cost worksheet for a state and local government contract opportunity for the purchase and installation of ViewSonic interactive panels. The contract is seeking pricing for the installation of these panels in 22-74 classrooms, as detailed in the attached specifications and room needs spreadsheet. Bidders must provide pricing for the full current project as well as a single classroom install, with options for different cable lengths and the inclusion of dry erase boards. Pricing must be guaranteed through June 30, 2023.

The pricing information includes both supply and labor costs. Bidders must provide the total cost for the current project as well as the cost for a single classroom installation. The RFP requires that all pricing, terms, and conditions be clearly stated in the response.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mandatory

24-19 VIEWSONIC INTERACTIVE PANELS
COST PROPOSAL WORKSHEET
COMPANY NAME:
COMPANY CONTACT INCLUDING EMAIL ADDRESS AND PHONE NUMBER:
PRICES QUOTED WILL INCLUDE ALL AREAS OF SPECIFICATIONS UNLESS OTHERWISE NOTED.
Questions per Proposal Factors/Categories
Proposal FactorsSUPPLIESLABORTOTAL COST
CURRENT PROJECT PRICE
THIS PRICE SHOULD BE THE TOTAL COMPLETED PROJECT, NOT EACH ROOM.
Pricing in this section is for all classroom installs as specified in the document (22-74 Specifications.docx) and spreadsheet (Room Needs-2023.xlsx) attached to the RFP posting.
FUTURE PROJECTS PRICE
Pricing in this section is for 1(one) classroom install as specified below following the guidelines within the RFP. Pricing should be guaranteed until 6/30/2023.
Full classroom install with 50ft cables and 2 dry erase boards.
Full classroom install with 50ft cables and 0 dry erase boards.