This document is a detailed financial spreadsheet for the Pinellas County Road Resurfacing & Rehabilitation Program, covering two primary funding sources: Project Number 004192A (Road Resurfacing & Rehabilitation PIV) and Project Number 005700A (Transportation Millage Capital Resurfacing Program). The spreadsheet tracks fiscal year 2023 and 2024 expenditures, encumbrances, and estimated budgets for numerous road resurfacing and rehabilitation projects across Pinellas County. Projects range from major roadways like 49th Street and Park Boulevard to local neighborhood group resurfacing efforts, encompassing streets, avenues, and drives throughout the county. The document shows a FY24 budget of $22,584,000.00 and a proposed FY25 budget of $13,000,000.00 for the primary resurfacing program.

The financial breakdown demonstrates a comprehensive approach to infrastructure maintenance, with projects categorized by specific street segments, local group areas, and geographical zones. Funding appears to be allocated from transportation millage and capital improvement funds, with expenditures ranging from small local street repairs to larger roadway rehabilitation efforts. The spreadsheet includes detailed financial tracking, showing previous year spending, current year estimates, and proposed future budgets. Notable aspects include subprojects, encumbrance tracking, and a focus on systematic road maintenance across different areas of Pinellas County. The ending balances for both funding sources are positive, with the 004192A project showing a $4,413,605.36 balance and the 005700A project showing a $307,602.35 balance as of May 23, 2024.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

004192A Road Resurfacing & Rehabilitation PIV FY24 Budget FY25 Proposed 22,584,000.00 13,000,000.00

Project Number Project Name FY23 Expenditures FY24 Expenditures FY24 Encumberances FY24 Estimates FY25 Estimates

004208A 49th St‐Ulmerton to Rsvlt Overpass 756,323.11$ -$ 83,778.31$ ‐$ ‐$ 004164A Old Keystone Rd Resurfacing from Keystone Rd to Keystone Rd 1,606.18$ -$ -$ ‐$ ‐$ 004191A 54th Ave N Resurfacing from 22nd St N to 4th St N 1,276.92$ -$ -$ ‐$ ‐$ 004223A Virginia Ave / Pennsylvania Resurfacing from Orange St to Omaha St 596.12$ -$ 15,138.25$ ‐$ ‐$ 004225A West Lake Blvd Resurfacing from Nebraska Ave to Alderman Rd 670.86$ -$ 53,045.47$ ‐$ ‐$ 004592A 8th Ave SW (Resurfacing) from Indian Rocks Rd to Donegan 702.43$ -$ -$ ‐$ ‐$ 004606A Dunedin Causeway (Resurfacing) 18,409.33$ -$ 2,500.20$ ‐$ ‐$ 004608A Local Group 109 (Resurfacing) East of Duhme Rd and South of 54th Ave (526,291.58)$ -$ -$ ‐$ ‐$ 004676A San Martin Blvd (Resurfacing) from 4th St N to Gandy Blvd 2,369.19$ 1,436.12$ 911,357.42$ 912,000.00$ ‐$ 004680A 102nd Ave (Resurfacing) from 113th St to Seminole Blvd 656.99$ -$ 39,511.12$ ‐$ ‐$ 005014A Local Group 112 Resurfacing (Forest Dr & 131st St) (313,890.63)$ -$ -$ ‐$ ‐$ 004199A 58th St N Resurfacing from 110th Ave N to 117th Ave N 3,394.64$ 136,135.86$ 2,700.00$ 136,135.86$ ‐$ 004201A 78th St Resurfacing from 40th Ave N to Just North of 44th Ave N 1,606.25$ 90,344.87$ 3,150.00$ 91,000.00$ ‐$ 004202A 83rd St N Resurfacing from Park Blvd to Jacaranda Avenue 8,439.85$ 90,791.95$ 14,381.95$ 90,791.95$ ‐$ 002234A 98th St Resurfacing from 86th Ave to 102nd Ave 1,445.51$ 1,232.69$ 416,475.51$ 416,000.00$ ‐$ 004467A Local Group 98 Resurfacing (Somerset Phase 2) 13.26$ -$ 43,421.25$ ‐$ ‐$ 004600A 113th St (Resurfacing) from 66th Ave to Park Blvd 1,021,830.14$ -$ -$ ‐$ ‐$ 004602A Belcher Rd (Resurfacing) from Palmetto St to Sunset Rd 441,005.89$ -$ 94,225.74$ ‐$ ‐$ 004674A Belcher Rd (Resurfacing) from Curlew Rd to Nebraska Ave 550,016.57$ -$ 98,412.81$ ‐$ ‐$ 004669A Feather Sound Dr Resurfacing 4,849.26$ 1,908.17$ 1,565,774.46$ 1,566,000.00$ ‐$ 004670A Hermosa Dr (Resurfacing) from Belted Kingfisher Dr to Belcher Rd 131,682.41$ -$ 5,747.92$ ‐$ ‐$ 005096A Indian Bluff Island Resurfacing (005700A) 3,600.73$ 863.24$ -$ 1,000.00$ ‐$ 004673A Laura Anne Dr (Resurfacing), Laura Ct, Anne Ct (005700A) 2,001.88$ -$ -$ ‐$ 005118A Park Blvd Resurfacing (Seminole Blvd ‐ 66th St N) 1,728,930.34$ 31,871.09$ 124,485.71$ 31,871.09$ ‐$ 004226A Winding Willow Dr Resurfacing from CR 39 to Tampa Rd (005700A) 3,681.03$ -$ -$ ‐$ 004215A Local Group 49 Resurfacing (121St Way‐124th Dt‐Barry Ct‐Savoy Ct‐Pescador Pl‐‐No 3,407.58$ -$ -$ ‐$ 005093A Local Group 59 Resurfacing Southpointe Dr & Glenbrook Dr (005700A Sub) 2,836.67$ 1,047.39$ -$ 1,047.39$ ‐$ 005091A Local Group 61 Resurfacing Kingfisher Dr & Belcher Rd (005700A Sub) 3,296.19$ 1,233.35$ -$ 1,233.35$ ‐$ 005092A Local Group 64 Resurfacing Terrace Rd & Highland Rd (005700A Sub) 1,743.38$ -$ -$ ‐$ 005094A Local Group 67 Resurfacing 45th Ave N & 39th St N (005700A Sub) 3,094.88$ -$ -$ ‐$ 005095A Local Group 68 Resurfacing 52nd Ave N & 39th St N 605,165.82$ -$ 7,478.64$ ‐$ ‐$ 004595A 58th St N (Resurfacing) from 41st Ave (Joe's Creek) to 62nd Ave N 20,773.07$ -$ 394,036.48$ ‐$ 400,000.00$ 005617A Trinity Blvd Resurfacing (East Lake Rd ‐ County Line) 953,139.17$ -$ -$ ‐$ ‐$ 005618A Local Group 57 Resurfacing (Emerald Dr & S Duncan Ave) 2,648.46$ -$ -$ ‐$ ‐$ 006102A Local Group 58 North Resurfacing (South Pasadena) 12,877.60$ -$ 0.01$ ‐$ ‐$ 005619A Local Group 58 South Resurfacing (South Pasadena) 3,218.42$ -$ -$ ‐$ ‐$ 005620A Local Group 65 Resurfacing (46th Ave N & 47th Way N) 4,003.10$ -$ -$ ‐$ ‐$ 005621A Local Group 70 Resurfacing (US 19 & 298th Ave N) 2,234.83$ -$ -$ ‐$ ‐$ 005622A Local Group 72 Resurfacing (81st Pl N & Ridge Rd) 2,174.75$ -$ -$ ‐$ ‐$ 005623A Local Group 83 Resurfacing (Winfield Rd S & Dexter Dr) 2,642.27$ -$ -$ ‐$ ‐$ 005624A Local Group 124 (Local Road)‐8th St & Nebraska Ave 1,910.83$ -$ -$ ‐$ ‐$ 005625A Local Group 125 Resurfacing (Ozona) 2,941.84$ -$ -$ ‐$ ‐$ 005626A Local Group 126 Resurfacing (Brewster Dr & Dorothy Ln) 1,584.00$ -$ -$ ‐$ ‐$ as of 5.23.24

Project Number Project Name FY23 Expenditures FY24 Expenditures FY24 Encumberances FY24 Estimates FY25 Estimates 005627A Local Group 127 Resurfacing (Bayview Dr & Betty Ln) 2,158.31$ -$ -$ ‐$ ‐$ 005628A Local Group 128 Resurfacing (Walsingham & 113th St) 2,275.37$ -$ -$ ‐$ ‐$ 005686A 38th Ave N Resurfacing (49th St N ‐ I275) 8,894.50$ 2,757.63$ 1,543,992.62$ 1,311,872.84$ ‐$ 005687A 38th Ave N Resurfacing (Haines Rd ‐ 4th St N) 11,641.90$ 996.93$ -$ 996.93$ 678,096.00$ 005688A 38th Ave Resurfacing (Tyrone Blvd ‐ 66th St N) 13,193.87$ 1,601.14$ -$ 1,322,742.71$ ‐$ 005648A 49th St Resurfacing (Roosevelt Overpass ‐ Bayside Bridge 10,385.11$ -$ -$ ‐$ 779,004.00$ 004599A Belcher Rd (Resurfacing) from 54th Ave N to 78th Ave N 18,789.84$ 469.73$ 1,508,218.37$ 1,508,218.37$ ‐$ 004603A Bryan Dairy (Resurfacing) from 72nd St N to US Hwy 19 8,742.14$ 646.89$ 1,799,960.90$ 1,799,960.90$ ‐$ 004605A Drew St (Resurfacing) from N. Starcrest Dr to US Hwy 19 4,464.38$ 4,181.27$ 796,142.45$ 888,393.58$ ‐$ 004671A Keene Rd (Resurfacing) from Gulf to Bay to Sunset Point Rd 10,633.36$ 4,913.15$ -$ 2,017,801.09$ ‐$ 004672A Belcher Rd (Resurfacing) from Countryside Blvd to Main St 13.26$ -$ 14,962.11$ ‐$ ‐$ 005540A Fisher Rd Roadway Improvement from Curlew Rd to CR 39 (Subproject 004192A) 30,092.12$ 78,278.55$ 42,078.15$ 78,278.55$ 1,200,000.00$ 005630A Lake St. George Resurfacing (Countryside Blvd ‐ Lakeshore Dr) 5,199.18$ 3,593.78$ 572,241.30$ 567,855.60$ ‐$ 005654A Park Blvd Resurfacing (Oakhurst Rd ‐ Seminole Blvd) 7,956.84$ 776.42$ 2,028,333.32$ 1,985,917.31$ ‐$ 005659A Point Seaside Dr Resurfacing (S Dead End ‐ Florida Blvd) (005700A Sub) 2,322.18$ -$ -$ ‐$ ‐$ 005631A Tampa Rd Resurfacing (Belcher Rd ‐ US 19/Lake St George St ‐ Curlew Rd) 8,172.54$ 1,234.01$ 2,223,035.60$ 2,172,775.60$ ‐$ 004193A 58th Ave N Resurf from 66th St N to 62nd St N 78,180.69$ 127,824.02$ 20,715.12$ 127,824.02$ 390,493.00$ 005689A Local Group 53 Resurfacing (005700A Sub) 2,389.70$ 1,319.80$ -$ 1,319.80$ 005675A Oleander Way Resurfacing (South Dead End ‐ Date Palm Ave) (JPA) 6,401.68$ -$ -$ 100,873.00$ ‐$ 005690A Local Group 54 Resurfacing (005700A sub) 15,115.19$ 2,028.21$ -$ 2,028.21$ ‐$ 005691A Local Group 60 Resurfacing (005700A) 12,207.74$ 2,761.51$ -$ 2,761.51$ ‐$ 005632A Local Group 62 Resurfacing (Foxboro Dr & Hammock Dr) (005700A) 13,019.03$ -$ -$ ‐$ 005692A Local Group 63 Resurfacing (005700A) 18,043.56$ -$ 1,452,514.40$ ‐$ 005693A Local Group 66 Resurfacing (005700A) 14,341.16$ -$ -$ ‐$ 005633A Local Group 69 Resurfacing (Westwinds Dr & Cardinal Trl) 19,032.30$ 3,624.59$ -$ 1,430,135.00$ ‐$ 005694A Local Group 71 Resurfacing 9,391.25$ 3,023.42$ -$ 545,708.94$ ‐$ 005639A Local Group 73 Resurfacing (Julia St & 124th St N) 3,807.29$ 352.82$ -$ ‐$ ‐$ 005655A Local Group 78 Resurfacing (58th Ave N & 28th St N) 10,004.67$ -$ -$ ‐$ 662,227.00$ 005658A Local Group 84 Resurfacing (Lime St & S Lake Dr) (sub 005700A) 2,522.97$ -$ -$ ‐$ 005634A Local Group 86 Resurfacing (Wexford Dr & Oxford Rd) (005700A Sub) 4,651.58$ -$ 427,492.25$ 427,000.00$ ‐$ 004594A Local Group 93 (Resurfacing) (sub of 005700A) 10,207.53$ -$ -$ ‐$ 005695A Local Group 94 Resurfacing (sub 005700A) 4,321.09$ -$ -$ ‐$ 005696A Local Group 97 Resurfacing (005700A) 5,214.87$ 286.80$ -$ 286.80$ 005697A Local Group 99 Resurfacing (005700A) 7,817.42$ -$ 328,744.75$ 328,000.00$ ‐$ 005682A Local Group 116 Resurfacing (Palm Dr & N Hercules Ave) 3,282.20$ -$ -$ ‐$ 457,070.00$ 005683A Local Group 130 Resurfacing (David Ct & Curlew Rd) 117.07$ -$ -$ ‐$ ‐$ 005635A Local Group 121 Resurfacing (Cobb's Landing A) 11,845.72$ 4,822.82$ -$ ‐$ 904,805.00$ 005638A Local Group 129 Resurfacing (64th Ave & 29th Way) 2,881.47$ 8,632.69$ 5,041.57$ ‐$ ‐$ 005684A Local Group 131 Resurfacing (Walker Ave & Duhme Rd) 2,094.63$ 6,687.78$ 3,878.91$ ‐$ 1,081,533.00$ 005636A Local Group 132 Resurfacing Upgrade (Sail Harbor) 4,280.69$ 2,951.53$ -$ ‐$ 552,257.00$ 005685A Local Group 133 Resurfacing (54th Ave N & 71st Way N) 2,272.46$ 2,636.72$ -$ ‐$ 568,225.00$ 005637A Local Group 145 Resurfacing (91st St N & 85th Ave N) 3,084.51$ 116.92$ -$ ‐$ ‐$ 001732A LG19 Highland/Cambgd‐Resurf -$ -$ -$ ‐$ ‐$ 001733A LG 19 ADA Clearwater‐Cambridge -$ -$ -$ ‐$ ‐$

Project Number Project Name FY23 Expenditures FY24 Expenditures FY24 Encumberances FY24 Estimates FY25 Estimates 001987A LG 33 Resurf Kylemont/Lynwood -$ -$ -$ ‐$ ‐$ 001988A LG 32 Resurf Juniper Bay -$ -$ -$ ‐$ ‐$ 001997A LG 41 Dunedin Resurfacing -$ -$ -$ ‐$ ‐$ 001998A LG 35 Palm Harbor (Pav't ADA) -$ -$ -$ ‐$ ‐$ 003310A 110th Rd Rehab Ridge Rd‐102 St -$ -$ -$ ‐$ ‐$ 003320A Ridge Rd Rd Rehab‐Old Oakhurst -$ -$ -$ ‐$ ‐$ 003322A Sunset Pt ‐Kings‐Keene Rd -$ -$ -$ ‐$ ‐$ 003326A Nursey Rd Rehab Sunny Pk US19 -$ -$ -$ ‐$ ‐$ 003916A 49th St N Rd Rehab 86 Av Ulmer -$ -$ -$ ‐$ ‐$ 003917A 49th St N Rehab 118th Av -$ -$ -$ ‐$ ‐$ 003918A Local Group 52 Rd Rehab -$ -$ -$ ‐$ ‐$ 003919A Local Group 74 Rd Rehab 3,007.35$ -$ -$ ‐$ ‐$ 004219A Pennsylvania Ave Resurfac -$ -$ -$ ‐$ ‐$ 004220A Local Group 106 Resurfacing (Queen Ann Dr ‐ Westlake Rd to Highland Blvd and all -$ -$ -$ ‐$ ‐$

004246A 46TH AVE N RW ADA SW 62‐49 -$ -$ -$ ‐$ ‐$

006194A Belcher Rd Resurf Neb‐Klo 181.64$ 10,029.01$ 3,055.40$ ‐$ ‐$ 006195A Dr MLK Jr St N Resurfacing (Roosevelt Blvd ‐ I275) (Subproject 004192A) 293.04$ 5,407.52$ 7,116.60$ 751,770.29$ ‐$ 006209A Highlands Blvd Resurf -$ 2,741.89$ 3,332.60$ ‐$ 1,752,000.00$ 006210A Local Group 56 Resurf -$ 3,789.61$ 14,876.53$ 20,000.00$ ‐$ 006213A Local Group 91 Resurf -$ 6,140.06$ 6,006.46$ 800,000.00$ ‐$ 006214A Local Group 95 Resurf -$ 4,339.81$ 3,959.61$ 300,000.00$ ‐$ 006215A Local Group 113 Resurf -$ 2,530.45$ 3,035.60$ 5,000.00$ ‐$ 006216A Local Group 114 Resurf -$ 116.89$ 1,752.00$ 116.89$ ‐$ 006217A Local Group 115 Resurf -$ -$ 1,306.60$ ‐$ ‐$ 006226A Local Group 134 Resurf -$ 5,162.65$ 6,646.30$ 10,000.00$ ‐$ 006227A Local Group 136 Resurf -$ 3,506.23$ 12,143.85$ 15,000.00$ ‐$ 006228A Local Group 138 Resurf -$ 176.38$ 13,732.72$ 176.38$ ‐$ 006229A Local Group 139 Resurf -$ 701.48$ 11,714.90$ 12,000.00$ ‐$ 006230A Local Group 140 Resurf -$ -$ 1,613.40$ ‐$ ‐$ 006231A Local Group 142 Resurf -$ 176.38$ 2,758.40$ 176.38$ ‐$ 006232A Local Group 144 Resurf -$ -$ 2,313.00$ ‐$ 006240A Local Group 55 Resurf -$ 6,411.93$ 7,675.35$ 6,411.93$ ‐$ 006294A Local Group 79 Resurf -$ -$ 2,313.00$ ‐$ ‐$ 006295A Local Group 80 Resurf -$ -$ 2,451.60$ ‐$ ‐$ 006296A Local Group 81 & 82 Resur -$ 877.86$ 3,596.60$ 877.86$ 2,155,000.00$ 006297A Local Group 87 Resurf -$ -$ 1,590.40$ ‐$ ‐$ 006298A Local Group 88 Resurf -$ 516.44$ 2,313.00$ 516.44$ 855,000.00$ 006299A Local Group 96 Resurf -$ -$ 2,897.00$ ‐$ ‐$ 006300A Local Group 101 Resurf -$ -$ 3,035.60$ ‐$ ‐$ 006301A Local Group 103 Resurf -$ -$ 3,197.20$ ‐$ ‐$ 006302A Local Group 104 Resurf -$ -$ 2,174.40$ ‐$ ‐$ 006303A Local Group 107 Resurf -$ -$ 1,168.00$ ‐$ ‐$ 006304A Local Group 108 Resurf -$ -$ 1,306.60$ ‐$ ‐$ 006305A Local Group 117 Resurf -$ -$ 4,348.80$ ‐$ ‐$

Project Number Project Name FY23 Expenditures FY24 Expenditures FY24 Encumberances FY24 Estimates FY25 Estimates 006306A Local Group 118 Resurf -$ -$ 2,474.60$ ‐$ ‐$ 006307A Local Group 119 Resurf -$ -$ 1,168.00$ ‐$ ‐$ 006308A Local Group 120 Resurf -$ 4,939.98$ 3,935.33$ 4,939.98$ ‐$ 006309A Local Group 122 Resurf -$ -$ 1,168.00$ ‐$ ‐$ 006310A Local Group 135 Resurf -$ -$ 2,035.80$ ‐$ ‐$ 006334A City of Largo Lancaster Dr Right of Way transfer -$ 25,000.00$ -$ 25,000.00$ ‐$ 001177B Lakeshore Estates Phase 2 Roadway and Drainage Improvements 359,630.46$ 68.88$ -$ 68.88$ ‐$ 001743A Mehlenbacher Rd Resurfacing from Indian Rocks Rd to Clearwater/Largo Rd (Subpr -$ 11,829.34$ 653,908.47$ 600,000.00$ ‐$ 000192A Road Resurf & Rehab -$ -$ 11,453.20$ ‐$ ‐$

6,275,322.78$ 717,846.65$ 17,452,547.99$ 22,419,885.43$ 12,435,710.00$

Ending Balance 4,413,605.36$ 164,114.57$ 564,290.00$

005700A Transportation Millage Capital Resurfacing Program FY24 Budget FY25 Proposed 18,398,000.00$ 16,626,000.00$

Project Number Project Name FY23 Expenditures FY24 Expenditures FY24 Encumbered FY24 Estimates FY25 Estimates 004595A 58th St N (Resurfacing) from 41st Ave (Joe's Creek) to 62nd Ave N (004192A) 10,418.93$ 3,219.62$ -$ 3,219.62$ -$ 005617A Trinity Blvd Resurfacing (East Lake Rd ‐ County Line) 17,505.67$ -$ 91,310.56$ -$ -$ 005618A Local Group 57 Resurfacing (Emerald Dr & S Duncan Ave) 886.83$ 988,810.23$ 104,950.30$ 1,036,681.27$ -$ 006102A Local Group 58 North Resurfacing (South Pasadena) 722,600.04$ -$ 280,869.03$ -$ -$ 005619A Local Group 58 South Resurfacing (South Pasadena) 866,908.96$ -$ 700.00$ -$ -$ 005620A Local Group 65 Resurfacing (46th Ave N & 47th Way N) 675,601.87$ 2,738.16$ 22,691.68$ 2,738.16$ -$ 005621A Local Group 70 Resurfacing (US 19 & 298th Ave N) 739.75$ 708,712.41$ 3,900.00$ 712,000.00$ -$ 005622A Local Group 72 Resurfacing (81st Pl N & Ridge Rd) 438,497.65$ -$ 37,389.55$ -$ -$ 005623A Local Group 83 Resurfacing (Winfield Rd S & Dexter Dr) 231,959.80$ 115,411.19$ 2,300.00$ 316,242.66$ -$ 005624A Local Group 124 (Local Road)‐8th St & Nebraska Ave 739.18$ 355,251.67$ 4,200.00$ 357,000.00$ -$ 005625A Local Group 125 Resurfacing (Ozona) 919.57$ 1,211,212.12$ 62,710.13$ 1,300,000.00$ -$ 005626A Local Group 126 Resurfacing (Brewster Dr & Dorothy Ln) 1,195,707.49$ -$ 6,750.00$ -$ -$ 005627A Local Group 127 Resurfacing (Bayview Dr & Betty Ln) 1,492,139.37$ 6,332.30$ 131,458.87$ 6,332.30$ -$ 005628A Local Group 128 Resurfacing (Walsingham & 113th St) 2,640,011.40$ 1,072.72$ 36,952.92$ 1,072.72$ -$ 005630B Lake St. George ADA & Sidewalk Upgrade (Countryside Blvd ‐ Lake Shore Dr) (004144A) 299,277.99$ -$ -$ -$ -$ 005631B Tampa Rd ADA & Sidewalk Upgrade (Belcher Rd ‐ US 19/Lake St George St ‐ Curlew Rd) (004144A 392,092.81$ -$ -$ -$ -$ 005634B Local Group 86 ADA & Sidewalk Upgrade (Wexford Dr & Oxford Rd) 618,238.85$ -$ -$ -$ -$ 005639B Local Group 73 ADA & Sidewalk Upgrade (Julia St & 124th St N) 185,173.27$ -$ -$ -$ -$ 005686A 38th Ave N Resurfacing (49th St N ‐ I275) (Subproject ‐ 004192A) 97.68$ 2,737.04$ -$ -$ -$ 004603A Bryan Dairy (Resurfacing) from 72nd St N to US Hwy 19 (Subproject ‐ 004192A) -$ -$ -$ -$ -$ 005654A Park Blvd Resurfacing (Oakhurst Rd ‐ Seminole Blvd) (Subproject ‐ 004192A) -$ -$ -$ -$ -$ 005659A Point Seaside Dr Resurfacing (S Dead End ‐ Florida Blvd) (Subproject ‐ 005700A) 181.64$ 108,692.27$ 4,775.48$ 106,009.93$ -$ 005689A Local Group 53 Resurfacing (Subproject ‐ 005700A) -$ -$ -$ -$ 450,987.00$ 005694A Local Group 71 Resurfacing (Subproject ‐ 005700A) -$ -$ -$ -$ -$ 005639A Local Group 73 Resurfacing (Julia St & 124th St N) (Subproject ‐ 005700A) -$ 20,196.37$ 987,682.44$ 1,007,000.00$ -$ 005658A Local Group 84 Resurfacing (Lime St & S Lake Dr) (Subproject ‐ 005700A) -$ -$ -$ -$ 606,820.00$ 005693A Local Group 66 Resurfacing (005700A) -$ 49,676.07$ 1,044,539.00$ 973,757.09$ -$ 005634A Local Group 86 Resurfacing (Wexford Dr & Oxford Rd) (Subproject ‐ 005700A) -$ 378.37$ 16,620.00$ 20,000.00$ -$ 005696A Local Group 97 Resurfacing (Subproject ‐ 005700A) -$ 467.70$ -$ -$ 299,303.00$ 005682A Local Group 116 Resurfacing (Palm Dr & N Hercules Ave) (Subproject ‐ 005700A) -$ -$ -$ -$ 457,070.00$ 005636A Local Group 132 Resurfacing Upgrade (Sail Harbor) (Subproject ‐ 005700A) -$ -$ -$ -$ -$ 005685A Local Group 133 Resurfacing (54th Ave N & 71st Way N) (Subproject ‐ 005700A) -$ -$ -$ -$ -$ 005637A Local Group 145 Resurfacing (91st St N & 85th Ave N) (Subproject ‐ 005700A) -$ -$ 337,870.90$ 337,870.90$ -$ 005637B Local Group 145 ADA & Sidewalk Upgrade (91st St N & 85th Ave N) (Subproject ‐ 005700A) 173,062.05$ -$ -$ -$ -$ 005697A Local Group 99 Resurfacing (005700A) -$ 202.00$ 50,260.00$ 50,000.00$ -$ 005632A Local Group 62 Resurfacing (Foxboro Dr & Hammock Dr) (005700A) -$ 17,610.48$ 826,577.60$ 814,577.60$ -$ 005692A Local Group 63 Resurfacing (005700A) -$ 25,470.73$ 26,940.00$ 1,452,517.40$ -$ 006210B Local Group 56 (ADA Prep sub of 005700A) -$ 1,624.36$ 402,462.00$ 297,272.00$ 006211B Local Group 81 & 82 (ADA Prep sub of 005700A) -$ 45,518.59$ 695,149.00$ 725,563.00$ 006212B Local Group 88 (ADA Prep sub of 005700A) -$ 165,815.12$ 7,510.38$ 160,210.00$ -$ 006213B Local Group 91 (ADA Prep sub of 005700A) -$ -$ -$ -$ 006214B Local Group 95 (ADA Prep sub of 005700A) -$ 1,348.66$ 107,468.00$ 107,468.00$ 006215B Local Group 113 (ADA Prep sub of 005700A) -$ 16,113.50$ 229,220.00$ 222,220.00$ 006216B Local Group 114 (ADA Prep sub of 005700A) -$ 116.92$ -$ 116.92$ -$ 006217B Local Group 115 (ADA Prep sub of 005700A) -$ 351.87$ -$ 351.87$ 113,500.00$

As of 5.23.24

Project Number Project Name FY23 Expenditures FY24 Expenditures FY24 Encumbered FY24 Estimates FY25 Estimates As of 5.23.24

006218B Local Group 120 (ADA Prep sub of 005700A) -$ 162,938.87$ 30,831.06$ 172,155.00$ 006226B Local Group 134 (ADA Prep sub of 005700A) -$ 1,584.61$ 121,122.00$ 121,122.00$ 006227B Local Group 136 (ADA Prep sub of 005700A) -$ 196,246.69$ 101,137.30$ 256,870.00$ 006228B Local Group 138 (ADA Prep sub of 005700A) -$ 312,581.33$ 8,037.99$ 306,406.00$ -$ 006229B Local Group 139 (ADA Prep sub of 005700A) -$ 44,063.88$ 214,276.35$ 256,035.00$ 006230B Local Group 140 (ADA Prep sub of 005700A) -$ 528.25$ -$ -$ 315,896.00$ 006231B Local Group 142 (ADA Prep sub of 005700A) -$ 1,390.51$ -$ -$ 469,817.00$ 006232B Local Group 144 (ADA Prep sub of 005700A) -$ 872.55$ -$ -$ 194,922.00$ 004215A Local Group 49 Resurfacing (121St Way‐124th Dt‐Barry Ct‐Savoy Ct‐Pescador Pl‐‐Normandy‐Rose -$ 467,192.80$ 34,527.09$ 473,526.35$ -$ 005093A Local Group 59 Resurfacing Southpointe Dr & Glenbrook Dr (005700A Sub) -$ 429,781.49$ 49,400.01$ 457,187.00$ -$ 005091A Local Group 61 Resurfacing Kingfisher Dr & Belcher Rd (005700A Sub) -$ 44,838.15$ 702,380.52$ 702,850.80$ -$ 005092A Local Group 64 Resurfacing Terrace Rd & Highland Rd (005700A Sub) -$ 130,358.32$ 1,500.00$ 104,588.10$ -$ 005094A Local Group 67 Resurfacing 45th Ave N & 39th St N (005700A Sub) -$ 499,257.07$ 77,548.15$ 545,280.29$ -$ 004675A Local Group 85 (Resurfacing) Greenbriar Blvd S to Indigo Dr SW (005700A Sub) 146.51$ 443,333.37$ 369,497.44$ 434,516.14$ -$ 005690A Local Group 54 Resurfacing (005700A sub) -$ 1,920.48$ 1,150,463.32$ 1,140,388.42$ -$ 004594A Local Group 93 (Resurfacing) (sub of 005700A) -$ 293.28$ 401,086.15$ 388,216.15$ -$ 005695A Local Group 94 Resurfacing (sub 005700A) -$ 939.37$ 568,763.60$ 568,763.60$ -$ 005096A Indian Bluff Island Resurfacing (005700A) -$ 262,990.97$ 4,200.00$ 234,525.59$ -$ 004673A Laura Anne Dr (Resurfacing), Laura Ct, Anne Ct (005700A) -$ 120,435.07$ 145,224.66$ 251,006.08$ -$ 004226A Winding Willow Dr Resurfacing from CR 39 to Tampa Rd (005700A) 97.68$ 260,792.49$ 7,815.63$ 251,709.45$ -$ 002234A 98th St Resurfacing from 86th Ave to 102nd Ave (Subproject ‐ 004192A) 97.68$ 522.76$ -$ 522.76$ -$ 004199A 58th St N Resurfacing from 110th Ave N to 117th Ave N (Subproject ‐ 005700A) 195.46$ 532.66$ -$ 125,985.12$ -$ 004201A 78th St Resurfacing from 40th Ave N to Just North of 44th Ave N (Subproject ‐ 005700A)) 97.68$ 639.68$ -$ 70,896.70$ -$ 004211A Local Group 111 (Resurfacing) from S Dead End to 102nd Ave & 143rd St from 86th Ave to Comm 97.68$ 556,730.76$ 30,018.27$ 557,155.19$ -$ 004599A Belcher Rd (Resurfacing) from 54th Ave N to 78th Ave N (Subproject ‐ 004192A) 181.64$ 1,099.32$ -$ 1,099.32$ -$ 005675A Oleander Way Resurfacing (South Dead End ‐ Date Palm Ave) (Subproject 005700A) -$ 186,333.66$ -$ 100,873.00$ -$ 005691A Local Group 60 Resurfacing (Subproject ‐ 005700A) -$ 652,705.16$ 5,097.62$ 596,318.83$ -$ 006215A Local Group 113 (Allard Dr to Cypress Point) -$ -$ -$ -$ 1,353,639.00$ 006216A Local Group 114 (Severs Landing to Old Oak Circle) -$ -$ -$ -$ -$ 006217A Local Group 115 (Orangewood Court to Riviere Ridge Drive) -$ -$ -$ -$ -$ 006305A Local Group 117 (Cinnamon Hill Blvd to Lake Side Drive) -$ -$ -$ -$ -$ 006306A Local Group 118 (Sugar Bear Trail to Bentley Drive) -$ -$ -$ -$ -$ 006307A Local Group 119 (Catalina Pointe Drive to Landmark Trail) -$ -$ -$ -$ -$ 006308A Local Group 120 (Valley View Circle to EdgeHill Drive) -$ -$ -$ -$ 451,648.00$ 006309A Local Group 122‐Cobb's landing B* (Shoreline Drive to Waterview Court) -$ -$ -$ -$ -$ 006226A Local Group 134 (69th Ave N to 61st Ave N) -$ -$ -$ -$ 983,489.00$ 006240A Local Group 55 Resurf -$ -$ -$ -$ 1,244,632.00$ 006296A Local Group 81 & 82 Resur -$ -$ -$ -$ 1,786,836.65$ 006209A Highlands Blvd Resurf -$ -$ -$ -$ 2,380,715.00$ 006210A Local Group 56 Resurf -$ -$ -$ -$ 2,329,213.00$ 006310A Local Group 135 (Bryan Dairy Road to 102nd Ave N) -$ -$ -$ -$ -$ 006227A Local Group 136 (14th Ave SE to 126th Ave N) -$ -$ -$ -$ 1,748,853.00$ 006228A Local Group 138 (127th St N to 116th Lane N) -$ -$ -$ -$ -$ 006229A Local Group 139 (Egret blvd to Feather Cove Lane) -$ -$ -$ -$ 1,131,057.00$ 006230A Local Group 140 (Lakeview Road from S Missouri to Woodcrest Ave) -$ -$ -$ -$ -$

Project Number Project Name FY23 Expenditures FY24 Expenditures FY24 Encumbered FY24 Estimates FY25 Estimates As of 5.23.24

006231A Local Group 142 (86th Ave N to Oak Forest Blvd S) -$ -$ -$ -$ -$ 006232A Local Group 144 ( Georgia Ave to Ohio Ave) -$ -$ -$ -$ -$

Total 10,581,482.03$ 8,629,984.02$ 9,546,185.00$ 18,128,218.33$ 16,318,397.65$

Ending Balance 221,830.98 269,781.67 307,602.35