About this file

This document is a Bidder's Questions Response letter from Ayres Associates to Mr. Ryan Dennison, Parks & Recreation Director for the City of Craig, Colorado, dated March 22, 2024, regarding the Alice Pleasant Park renovation project. The document contains 10 detailed questions and answers from a pre-bid meeting held on March 7, 2024, addressing technical specifications, material requirements, warranty periods, and project logistics for the park improvement project.

Key details include a 1-year warranty requirement for all site construction improvements, including manufacturer warranties for shelters, restrooms, and site furnishings. The project involves specific technical specifications such as using CDOT Class B 4500psi concrete mix, including a seal coat for the asphalt parking lot, and using crushed 3/8" minus gray granite for crusher fines. The City will handle concrete cylinder testing through a third-party testing company, and contractors must obtain a street cut permit with minimal traffic control for sanitary line connections. A Geotechnical report was distributed via email on 03/11/24, and specific site furnishings like the Infinity Curved Bench require precise model specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3665 JFK Parkway, Bldg. 2, Suite 100 | Fort Collins, CO 80525-3152 | 720-235-7207 www.AyresAssociates.com

Mr. Ryan Dennison

Parks & Recrea on Director March 22, 2024

City of Craig

300 W 4th Street

Craig CO 81625

(970) 826-2000

RE: Alice Pleasant Park – Responses to Bidder’s Ques ons

The following are responses to ques ons received during and a er the pre-bid mee ng on March 7, 2024:

Ques on #1: The plans indicate field-locate the water point of connec on for the restroom, can it be located by the City:

Answer #1: The point of connec on is approximately one foot behind the sidewalk and has been verified using a locator by the City of Craig Water Department. The city will mark the loca on for contractor.

Ques on #2: Should we include demoli on and permi ng for the sidewalk and street pavement at Yampa

Ave. for the water connec on.

Answer #2: Contractors shall not include demo and permi ng for work related to water POC within Yampa Ave, refer to Answer #1.

Ques on #3: Detail 3/sheet L-200 references Model #INF24C1290R – Infinity Curved Bench, the manufacturer’s website notes the model # as PINF24C1290R, confirm that model # is correct.

Answer #3: Correct, please specify Model #PINF24C1290R – Infinity Curved Bench, the manufacturer has updated its catalog since the me the plans were issued.

Ques on #4: Would the City consider revising the concrete cylinder tes ng from a contractor supplied item to an Owner’s discre on item?

Answer #4: The City will contract with the 3rd party tes ng company for concrete and compac on tests as needed.

Ques on #5: For concrete mix, will CDOT Class B 4500psi be an acceptable mix?

Answer #5: Yes

Ques on #6: Will the asphalt parking lot require a seal coat a er restriping and patchwork completed?

Answer #6: Yes, please include a seal coat in your bid price.

Ques on #7: Is there a warranty period required for the project site work?

Answer #7: Yes, please provide a 1-year warranty for all site construc on improvements.

Manufacturer warranty’s (i.e. shelter / restroom / site furnishings) will also be included.

Ques on #8: Is there a Geotech report available?

Answer #8: Yes, the Geotech report was distributed by Ryan Dennison via email on 03/11/24

Ques on #9: For the crusher fines material, is the limestone fines from Moffat an acceptable subs tu on.

Answer #9: No, the fines will need to be a crushed 3/8” minus gray granite.

Ques on #10: For the sanitary connec on in the alley, will a Street Cut Permit and traffic control measures be required?

Answer #10: Yes, both the street cut permit and minimal traffic control will be required. The City will patch the asphalt a er the line connec on is made.

End of Responses.