24-0107 Signed Emergency Purchase Final Cost Maintenance of Traffic Systems.pdf

PDF 1 MB Posted

Attached to
Emergency Final Cost Maintenance of Traffic Systems Repairs
Solicitation number
26-557THA-PROCU-B-48821
Issued by
Will County, Illinois

About this file

This document is an Emergency Purchase Final Cost and Term form from the State of Illinois Chief Procurement Office for General Services, involving the Illinois Tollway Division's Engineering - Construction unit and Roadsafe Traffic Systems. The emergency contract covers supplies and services with a final total cost of $613,498.58, spanning from 5/17/2024 to 1/14/2025, and is documented under reference numbers B-43219, B-43952, and B-48821.

The vendor, Roadsafe Traffic Systems, located in Romeoville, Illinois, will provide unspecified emergency services or supplies to the Illinois Tollway. The document is signed by Eric Occomy in the role of Chief of Contract Services and is being reported to the Chief Procurement Office (CPO) and the Auditor General. No additional details are provided about the specific nature of the emergency purchase or the goods and services being procured.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMERGENCY PURCHASE FINAL COST AND TERM

Page 1 of 1State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1

Zip: 60446State:IL City:RomeovilleAddress: 12225 Disk Drive

Vendor: Roadsafe Traffic Systems

Zip: 60515State: ILCity:Downers GroveAddress: 2700 Ogden Avenue

Division: Engineering - ConstructionAgency: Illinois Tollway

Final Costs and Term Reference #: B-43219 / B-43952 / B-48821

Final total cost of supplies and services: $613,498.58 Final total term of contract: 5/17/2024 to 1/14/2025

Title: Chief of Contract Services Date:

Printed Name: Eric Occomy Agency Signature:

I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.

Page of

EMERGENCY PURCHASE FINAL COST AND TERM

State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1

EMERGENCY PURCHASE FINAL COST AND TERM

Page of State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1 Final Costs and Term I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.

11.0.0.20130303.1.892433.887364

PageCount:
CurrentPage:
VendorZip: 60446
VendorState: IL
VendorCity: Romeoville
VendorAddress: 12225 Disk Drive
Vendor: Roadsafe Traffic Systems
AgencyZip: 60515
AgencyState: IL
AgencyCity: Downers Grove
AgencyAddress: 2700 Ogden Avenue
AgencyDivision: Engineering - Construction
AgencyUniversity: Illinois Tollway
CurrentMasterPage:
MasterPageCount:
ReferenceNumber: B-43219 / B-43952 / B-48821
FinalTotalCost: $613,498.58
FinalTotalTerm: 5/17/2024 to 1/14/2025
TitleField: Chief of Contract Services
Date:
PrintedName: Eric Occomy
AuthorizedSignature:

File details come from the government source that posted it. Updated .