24-0107 Signed Emergency Purchase Final Cost Maintenance of Traffic Systems.pdf
PDF 1 MB Posted
- Solicitation number
- 26-557THA-PROCU-B-48821
- Issued by
- Will County, Illinois
About this file
This document is an Emergency Purchase Final Cost and Term form from the State of Illinois Chief Procurement Office for General Services, involving the Illinois Tollway Division's Engineering - Construction unit and Roadsafe Traffic Systems. The emergency contract covers supplies and services with a final total cost of $613,498.58, spanning from 5/17/2024 to 1/14/2025, and is documented under reference numbers B-43219, B-43952, and B-48821.
The vendor, Roadsafe Traffic Systems, located in Romeoville, Illinois, will provide unspecified emergency services or supplies to the Illinois Tollway. The document is signed by Eric Occomy in the role of Chief of Contract Services and is being reported to the Chief Procurement Office (CPO) and the Auditor General. No additional details are provided about the specific nature of the emergency purchase or the goods and services being procured.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EMERGENCY PURCHASE FINAL COST AND TERM
Page 1 of 1State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1
Zip: 60446State:IL City:RomeovilleAddress: 12225 Disk Drive
Vendor: Roadsafe Traffic Systems
Zip: 60515State: ILCity:Downers GroveAddress: 2700 Ogden Avenue
Division: Engineering - ConstructionAgency: Illinois Tollway
Final Costs and Term Reference #: B-43219 / B-43952 / B-48821
Final total cost of supplies and services: $613,498.58 Final total term of contract: 5/17/2024 to 1/14/2025
Title: Chief of Contract Services Date:
Printed Name: Eric Occomy Agency Signature:
I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.
Page of
EMERGENCY PURCHASE FINAL COST AND TERM
State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1
EMERGENCY PURCHASE FINAL COST AND TERM
Page of State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1 Final Costs and Term I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.
11.0.0.20130303.1.892433.887364
| PageCount: |
| CurrentPage: |
| VendorZip: 60446 |
| VendorState: IL |
| VendorCity: Romeoville |
| VendorAddress: 12225 Disk Drive |
| Vendor: Roadsafe Traffic Systems |
| AgencyZip: 60515 |
| AgencyState: IL |
| AgencyCity: Downers Grove |
| AgencyAddress: 2700 Ogden Avenue |
| AgencyDivision: Engineering - Construction |
| AgencyUniversity: Illinois Tollway |
| CurrentMasterPage: |
| MasterPageCount: |
| ReferenceNumber: B-43219 / B-43952 / B-48821 |
| FinalTotalCost: $613,498.58 |
| FinalTotalTerm: 5/17/2024 to 1/14/2025 |
| TitleField: Chief of Contract Services |
| Date: |
| PrintedName: Eric Occomy |
| AuthorizedSignature: |
File details come from the government source that posted it. Updated .