24-00683-00-SC_Bid_Bond_BLR-12230.pdf
PDF 31 KB Posted
- Solicitation number
- FY2024-ITB-055
- Issued by
- Champaign County, Illinois
About this file
The document is a Local Public Agency Proposal Bid Bond for the City of Urbana in Champaign County, Illinois, associated with the Bituminous Surface Treatment Project 2024 (Section Number 24-00683-00-SC). The bid bond is a standard financial instrument that guarantees the bidder will enter into a contract if awarded, with a penal sum of 5% of the total bid price. The project involves constructing a bituminous surface treatment using crushed steel slag aggregate (CA 16 gradation) and emulsified asphalt, with all materials requiring approval from the Illinois Department of Transportation (IDOT).
The bid bond ensures the contractor's commitment to the project, specifying that within 15 days of award, the winning bidder must enter into a formal contract, provide performance surety, and furnish required insurance coverage. The contractor is responsible for material compatibility and must provide evidence of materials inspection according to IDOT's Project Procedures Guide. Any incompatible aggregate must be replaced at the contractor's expense. The document allows for both traditional and electronic bid bond submissions, providing flexibility in the bidding process for potential contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Local Public Agency Proposal Bid Bond
Page 1 of 2 BLR 12230 (Rev. 01/19/23)Completed
WE, as PRINCIPAL, and as SURETY, are held jointly, severally and firmly bound unto the above Local Public Agency (hereafter referred to as "LPA") in the penal sum of 5% of the total bid price, or for the amount specified in the proposal documents in effect on the date of invitation for bids, whichever is the lesser sum. We bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly pay to the LPA this sum under the conditions of this instrument.
WHEREAS THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that, the said PRINCIPAL is submitting a written proposal to the LPA acting through its awarding authority for the construction of the work designated as the above section.
THEREFORE if the proposal is accepted and a contract awarded to the PRINCIPAL by the LPA for the above designated section and the PRINCIPAL shall within fifteen (15) days after award enter into a formal contract, furnish surety guaranteeing the faithful performance of the work, and furnish evidence of the required insurance coverage, all as provided in the "Standard Specifications for Road and Bridge Construction" and applicable Supplemental Specifications, then this obligation shall become void; otherwise it shall remain in full force and effect.
IN THE EVENT the LPA determines the PRINCIPAL has failed to enter into a formal contract in compliance with any requirements set forth in the preceding paragraph, then the LPA acting through its awarding authority shall immediately be entitled to recover the full penal sum set out above, together with all court costs, all attorney fees, and any other expense of recovery.
IN TESTIMONY WHEREOF, the said PRINCIPAL and the said SURETY have caused this instrument to be signed by their respective officers this
Day of
Month and Year Principal
Company Name
Signature & Date
Company Name
Signature & Date By: By:
Title Title
(If Principal is a joint venture of two or more contractors, the company names, and authorized signatures of each contractor must be affixed.)
Surety Name of Surety
COUNTY OF
I , a Notary Public in and for said county do hereby certify that
(Insert names of individuals signing on behalf of PRINCIPAL & SURETY) who are each personally known to me to be the same persons whose names are subscribed to the foregoing instrument on behalf of PRINCIPAL and SURETY, appeared before me this day in person and acknowledged respectively, that they signed and delivered said instruments as their free and voluntary act for the uses and purposes therein set forth.
Given under my hand and notarial seal this day of Month and Year
Date commission expires
(SEAL, if required by the LPA)
Local Public Agency County Section Number
By:
Day
STATE OF
Signature of Attorney-in-Fact Signature & Date
Notary Public Signature & Date
04/02/24
City of Urbana Champaign 24-00683-00-SC
IL
Page 2 of 2 BLR 12230 (Rev. 01/19/23)
Local Public Agency County Section Number
Completed
ELECTRONIC BID BOND
Electronic bid bond is allowed (box must be checked by LPA if electronic bid bond is allowed) The Principal may submit an electronic bid bond, in lieu of completing the above section of the Proposal Bid Bond Form. By providing an electronic bid bond ID code and signing below, the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the LPA under the conditions of the bid bond as shown above. (If PRINCIPAL is a joint venture of two or more contractors, an electronic bid bond ID code, company/Bidder name title and date must be affixed for each contractor in the venture.)
Electronic Bid Bond ID Code Company/Bidder Name
Title
Signature & Date
City of Urbana Champaign 24-00683-00-SC
04/02/24