23B Construction Estimate Form.xlsx

XLSX spreadsheet 135 KB Posted

Attached to
Design Roof Replacement - Route 23B
Solicitation number
2124321
Issued by
Greene County, New York

About this file

This document is a Pre-Bid Estimate Form for a state construction project issued by the New York State Office of Professionals with Developmental Disabilities (OPWDD), specifically for the Taconic DDSO (Developmental Disabilities Service Office). The project involves a roof replacement design for Hostel 8994, located at 707 Main St in Cairo, NY 12413, situated in Greene County. The estimate form is a comprehensive breakdown of potential construction costs across multiple divisions, including general conditions, existing conditions, concrete, masonry, metals, woods, thermal protection, openings, finishes, specialties, equipment, and various technical systems like electrical, plumbing, and HVAC.

The estimate form provides a detailed template for contractors to itemize material and labor costs, with specific instructions to round costs to the nearest whole dollar and include supervision expenses. The document requires a 12% contingency allowance and mandates that contract closeout costs should be 3% of the total contract amount. While the specific total project cost is not fully populated in this draft estimate, the form is designed to help OPWDD track and manage potential project expenses across multiple construction divisions. The project appears to be funded through state capital services, with oversight from the OPWDD Capital Services Project Manager, and is part of a broader facilities maintenance and improvement initiative.

View the file

Other files

File Type Posted
OPWDD ROOF DESIGN STANDARDS_master.pdf PDF
CR #2124321 RFQ Results Route 23B.pdf PDF
707 Main St - RFQ.pdf PDF
707 Main St - Design Scope.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Estimate Instructions

Pre-Bid Estimate Instructions
Completed Pre-Bid Estimate must be submitted to the OPWDD PSES Project Manager and the CMU Contracts Management Specialist.

All specification sections should be represented in the Contractors Bid Breakdown or noted "included with section ______" or "not required per PSES/CMU".

Confirm Total Cost equals the Contract Award amount.

Confirm Allowances (Field Order and other specific allowances) to be 12% of the Total Cost.

Include known Division 00 items in estimate. Reference 'Estimate Worksheet' tab.

No lump sum items are allowed.

Include quantities for each item where applicable.

Supervision costs must be included.

Contract Closeout (017716) should be 3% of the contract amount or a reasonable value for the
work of this section. It should also be broken down into its various parts (Cleaning/Inspections, etc.).

Enter total Material Cost and Labor Cost for each line item and allow the computer to calculate the Unit Costs.

Round total Material and Labor costs to the nearest whole dollar.

For help or questions with this form, contact the PSES Capital Services PM.
division line items in the estimate worksheet will automatically copy to the BID breakdown line items tab

Estimator Info For OPWDD Property Supports (PSES) Center Use Only:

CMM/SFE Project NO.: TA25052

Project Title: Provide Xxxx

Facility Name: Bldg or Hostel number

Location: City, NY 12345

County: Xxxx County

Contingency Allowances (dollars): ERROR:#REF!

Estimator Information

Date Prepared <Insert Date>

Estimator Name: <Insert Name>

Estimator Address Line 1: <Insert Address Line 1>

Estimator Address (City, State ZIP): <Insert City, State ZIP>

Estimator's Federal ID Number: <Insert Estimator's Federal ID Number>

Estimator's NYS Vendor ID: <Insert Estimator's NYS Vendor ID>

Preparer's Name: <Insert Preparer's Name>

Phone Number: ###-###-####

Email: <Insert Preparer's Email Address>

OPWDD Information

DDSOO: Taconic

DDSOO Department ID: 026000

PSES Capital Services Project Manager Email: Xxx.x.Xxxx@opwdd.ny.gov

Section Number and Title (CSI Masterformat)Included in Estimate? (Select YES or NO from drop-down)
Division 02 - Existing Conditions------------
Division 03 - Concrete------------
Division 04 - Masonry------------
Division 05 - Metals------------
Division 06 - Woods, Plastics, and Composites------------
Division 07 - Thermal and Moisture Protection------------
Division 08 - Openings------------
Division 09 - Finishes------------
Division 10 - Specialties------------
Division 11 - Equipment------------
Division 12 - Furnishings------------
Division 13 - Special Construction------------
Division 14 - Conveying Equipment------------
Division 21 - Fire Suppression------------
Division 22 - Plumbing------------
Division 23 - HVAC------------
Division 25 - Integrated Automation------------
Division 26 - Electrical------------
Division 27 - Communications------------
Division 28 - Electronic Safety and Security------------
Division 31 - Earthwork------------
Division 32 - Exterior Improvements------------

mailto:stephen.e.vanhoose@opwdd.ny.govmailto:stephen.e.vanhoose@opwdd.ny.gov Estimate Worksheet

Notes:Enter Material Cost and Labor Cost for each line item and allow the computer to figure the Unit Costs.
Insert additional General Conditions rows between Equipment and Tools and Mobilization.

PROJECT COST BREAKDOWN CMM/SFE Project No.: TA25052

ESTIMATOR Name and Address:DDSO:Date Prepared:
<Insert Name>Taconic DDSO<Insert Date>
<Insert Address Line 1>
<Insert City, State ZIP>Project Description: (Project Title, Facility Name and Location)
Roof Replacement Design
707 Main St - Hostel 8994
Cairo, NY 12413

Telephone No.: ###-###-#### County: Greene

Division 01GENERAL CONDITIONS AND ADMINISTRATION
Div. 1Bondsna
Supervision
Permitsna
Insurance
Home Office Overhead
Profit
Equipment and Tools
Mobilization0SUM OF GENERAL CONDITIONS
015000Construction Facilities & Temporary Controls
017716Contract Closeout
Inspections/Cleaning
Project Record Documents
Operation & Maintenance Data
012100Field Order ALLOWANCE12%$0% 0F GENERAL CONDITIONS
Section NumberSection Title/Item DescriptionQuantityUnitMATERIALLABORTOTALS
MaterialTotal MaterialLaborTotal LaborTotalTotal
Cost/UnitCostCost/UnitCostUnit CostCost
Division 02Existing Conditions
000000Asbestos abatementUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALExisting Conditions0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 03Concrete
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALConcrete0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 04Masonry
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALMasonry0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 05Metals
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALMetals0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 06Woods, Plastics, and Composites
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALWoods, Plastics, and Composites0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 07Thermal and Moisture Protection
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALThermal and Moisture Protection0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 08Openings
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALOpenings0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 09Finishes
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALFinishes0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 10Specialties
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALSpecialties0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 11Equipment
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALEquipment0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 12Furnishings
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALFurnishings0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 13Special Construction
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALSpecial Construction0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 14Conveying Equipment
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALConveying Equipment0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 21Fire Suppression
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALFire Suppression0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 22Plumbing
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALPlumbing0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 23HVAC
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALHVAC0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 25Integrated Automation
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALIntegrated Automation0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 26Electrical
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALElectrical0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 27Communications
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALCommunications0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 28Electronic Safey and Security
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALElectronic Safey and Security0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 31Earthwork
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALEarthwork0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Division 32Exterior Improvements
000000xxxxxxxUnit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Unit$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBTOTALExterior Improvements0.000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

SUBTOTALS (DIV 02 - 32 ) 0 Materials $ - 0 Labor $ - 0 Cost $ - 0

SUMMARYFOR PSES/CMU USE ONLY
Gen. Conditions$ - 0PSES Capital Services PM:
Allowance$ - 0
Total Materials$ - 0Reviewed By:Date:
Total Labor$ - 0Dan Kelly
Total Project Cost$ - 0

&"Arial,Bold"&8Pre-Bid Estimate Form Page &P of &N

BID breakdown totals

Section Number
Total MaterialTotal LaborTotal
CostCostCost
Division 01GENERAL CONDITIONS AND ADMINISTRATION
Div. 1ERROR:#REF!
0ERROR:#REF!
0Bonds
0Supervision
0Permits
0Insurance
0Home Office Overhead
0Profit
012100Equipment and Tools
ERROR:#REF!Mobilization
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
ERROR:#REF!ERROR:#REF!
Division 02Existing Conditions
000000Asbestos abatement0$ -$0
00$ -$ -$0
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
SUBTOTALExisting Conditions000
Division 03Concrete
000000xxxxxxx$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
SUBTOTALConcrete000
Division 04Masonry
000000xxxxxxx$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
00$ -$ -$ -
SUBTOTALMasonry000
Division 05Metals
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALMetals000
Division 06Woods, Plastics, and Composites
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALWoods, Plastics, and Composites000
Division 07Thermal and Moisture Protection
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALThermal and Moisture Protection000
Division 08Openings
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALOpenings000
Division 09Finishes
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALFinishes000
Division 10Specialties
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALSpecialties000
Division 11Equipment
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALEquipment000
Division 12Furnishings
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALFurnishings000
Division 13Special Construction
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALSpecial Construction000
Division 14Conveying Equipment
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALConveying Equipment000
Division 21Fire Suppression
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALFire Suppression000
Division 22Plumbing
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALPlumbing000
Division 23HVAC
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALHVAC000
Division 25Integrated Automation
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALIntegrated Automation000
Division 26Electrical
000000xxxxxxx
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALElectrical000
Division 27Communications
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALCommunications000
Division 28Electronic Safey and Security
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALElectronic Safey and Security000
Division 31Earthwork
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALEarthwork000
Division 32Exterior Improvements
000000xxxxxxx000
00000
00000
00000
00000
00000
00000
00000
00000
00000
SUBTOTALExterior Improvements000
TOTALMaterialsLaborTotal
000

Data_for_DropDowns

------------<Select DDSO>
YESBernard Fineson
NOBrooklyn
Broome
Capital District
Central NY
Finger Lakes
Hudson Valley
Institute for Basic Research (IBR)
Long Island
Metro NY
Staten Island
Sunmount
Taconic
Western NY

Approval

New York State Office of General Services
Design and Construction Group

TO: JOHN LEWYCKYJ

APPROVAL OF DETAILED ESTIMATE
FOR PROGRESS PAYMENTS

PROJECT NO. CONTRACT AMOUNT DATE

ERROR:#REF! ERROR:#REF! ERROR:#REF!

PROJECT TITLE & FACILITY

ERROR:#REF!
ERROR:#REF!
ERROR:#REF!
CONTRACTOR
ERROR:#REF!
ERROR:#REF!
ERROR:#REF!

FIRE INSURANCE REQUIREMENT

Estimator:ERROR:#REF!Jane S. Oswald, R.A.
Cost Control Support
DISTRIBUTION
Contract Performance (w/8 copies Detailed Estimate)
Estimating File

G:\costfile\data\forms\detest cover sheet

Module1 image1.jpeg