2357_B Tally Sheet revised.pdf

PDF 137 KB Posted

Attached to
2357-B Ridge Way Culvert Replacement
Solicitation number
PE-65600-NONST-2024-000000033
Issued by
Dodge County, Georgia

About this file

This document is a bid tally sheet for Invitation to Bid (ITB) 2357-B: Ridge Way Culvert Replacement, issued by the State of Georgia. The project involves various construction tasks such as traffic control, grading, drainage, paving, and landscaping. The bid includes a base bid as well as several alternate bid items. The estimated quantities for the line items are provided, along with unit prices and total amounts from multiple bidders. The bid closing date and time, as well as the bid opening date, are not explicitly stated in the document.

The bid tally sheet shows the unit prices and total amounts submitted by five bidding contractors: HelixSite Engineering, Inc., RDJE, Inc., Redland Grading Company, Inc., Crawford Grading, and F.S. Scarbrough LLC. The bids include both the base bid items as well as the alternate bid items. The document also indicates that one bidder, Piedmont Paving, Inc., was disqualified due to performance issues under a previous contract. No additional information is provided regarding the project budget, funding sources, or the incumbent contractor, if any.

View the file

Other files

File Type Posted
2357_B Addendum 1.pdf PDF
2357_B ITB Exhibit 1 Plans.pdf PDF
2357_B ITB.pdf PDF
2357_B Tally Sheet.pdf PDF
2357_B Bid Price Sheet _ Excel Format.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM DESCRIPTION EST QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT TRAFFIC CONTROL 1.00 LS $ 30,000.34 $ 30,000.34 $ 10,000.00 $ 10,000.00 $ 19,190.00 $ 19,190.00 $ 21,767.33 $ 21,767.33 TEMPORARY GRASSING 0.08 AC $ 4,397.00 $ 351.76 $ 100.00 $ 8.00 $ 7,440.00 $ 595.20 $ 6,185.63 $ 494.85 MULCH 1.00 TN 1,407.00$ $ 1,407.00 200.00$ $ 200.00 928.00$ $ 928.00 583.21$ $ 583.21 CONSTRUCT AND REMOVE CONSTRUCTION EXITS 1.00 EA 5,079.00$ $ 5,079.00 3,000.00$ $ 3,000.00 4,720.00$ $ 4,720.00 1.00$ $ 1.00 MAINTENANCE OF TEMPORARY SILT FENCE, TP C 280.00 LF 3.00$ $ 840.00 1.00$ $ 280.00 3.43$ $ 960.40 2.36$ $ 660.80 TEMPOARY SILT FENCE, TP C 280.00 LF 4.00$ $ 1,120.00 4.00$ $ 1,120.00 8.87$ $ 2,483.60 5.80$ $ 1,624.00 CLEARING & GRUBBING 1.00 LS 70,000.00$ $ 70,000.00 40,000.00$ $ 40,000.00 39,730.00$ $ 39,730.00 12,010.75$ $ 12,010.75 FOUND BKFILL MATL, TP II 137.36 CY 179.00$ $ 24,587.44 50.00$ $ 6,868.00 65.11$ $ 8,943.51 98.02$ $ 13,464.03 GRADING COMPLETE- 1.00 LS 40,000.00$ $ 40,000.00 25,000.00$ $ 25,000.00 56,565.00$ $ 56,565.00 81,375.76$ $ 81,375.76 GR AGGR BASE CRS, 6 INCH, INCL MATL 160.61 SY 31.00$ $ 4,978.91 30.00$ $ 4,818.30 31.00$ $ 4,978.91 44.28$ $ 7,111.81

9.5 MM SUPERPAVE, TYPE II, GP 2 ONLY, INCL BITUM MATL

& H LIME

13.72 TN 430.00$ $ 5,899.60 500.00$ $ 6,860.00 248.18$ $ 3,405.03 700.65$ $ 9,612.92

19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H

LIME

18.30 TN 697.00$ $ 12,755.10 500.00$ $ 9,150.00 246.16$ $ 4,504.73 639.69$ $ 11,706.33

TACK COAT 8.13 GL 107.00$ $ 869.91 40.00$ $ 325.20 41.18$ $ 334.79 17.08$ $ 138.86 CONCRETE HEADWALLS 2.00 EA 38,777.00$ $ 77,554.00 5,000.00$ $ 10,000.00 5,133.00$ $ 10,266.00 7,003.03$ $ 14,006.06 CONC CURB & GUTTER, 6 IN X 24 IN, TP 2 122.00 LF 89.00$ $ 10,858.00 80.00$ $ 9,760.00 32.16$ $ 3,923.52 70.77$ $ 8,633.94 STORM DRAIN PIPE, HDPE, 36 IN, H 1-10 181.00 LF 400.00$ $ 72,400.00 335.00$ $ 60,635.00 162.87$ $ 29,479.47 127.41$ $ 23,061.21 STORM DRAIN PIPE, RCP, 42 IN, H 1-10 32.00 LF 1,036.00$ $ 33,152.00 370.00$ $ 11,840.00 361.18$ $ 11,557.76 564.24$ $ 18,055.68 STORM DRAIN PIPE, HDPE, 42 IN, H 1-10 121.00 LF 818.00$ $ 98,978.00 370.00$ $ 44,770.00 209.57$ $ 25,357.97 142.62$ $ 17,257.02 STN DUMPED RIP RAP, TP 3, 12 IN 196.78 SY 55.00$ $ 10,822.90 100.00$ $ 19,678.00 139.92$ $ 27,533.46 131.76$ $ 25,927.73 PLASTIC FILTER FABRIC 196.78 SY 18.00$ $ 3,542.04 10.00$ $ 1,967.80 9.41$ $ 1,851.70 5.42$ $ 1,066.55 CATCH BASIN, GP 2 2.00 EA 31,532.00$ $ 63,064.00 15,000.00$ $ 30,000.00 10,650.00$ $ 21,300.00 6,592.71$ $ 13,185.42 CATCH BASIN, GP 2, ADDL DEPTH 5.00 LF 1,678.00$ $ 8,390.00 800.00$ $ 4,000.00 790.00$ $ 3,950.00 326.65$ $ 1,633.25 DROP INLET, GP 1, TYPE C WITH WEIR 2.00 EA 26,491.00$ $ 52,982.00 12,000.00$ $ 24,000.00 8,960.00$ $ 17,920.00 4,988.28$ $ 9,976.56 DROP INLET, GP 1, TYPE C WITH WEIR, ADDL DEPTH 5.00 LF 959.00$ $ 4,795.00 800.00$ $ 4,000.00 778.00$ $ 3,890.00 755.67$ $ 3,778.35 SOD 1,536.00 SY 18.00$ $ 27,648.00 25.00$ $ 38,400.00 13.15$ $ 20,198.40 23.56$ $ 36,188.16 ALLOWANCE 1.00 LS 25,000.00$ $ 25,000.00 25,000.00$ $ 25,000.00 25,000.00$ $ 25,000.00 25,000.00$ $ 25,000.00

687,075.00$ 391,680.30$ 349,567.45$ 358,321.57$

ALTERNATES EST QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

REMOVE WATER MAIN, 6 IN 40.00 LF 300.00$ $ 12,000.00 100.00$ $ 4,000.00 61.05$ $ 2,442.00 126.50$ $ 5,060.00 WATER MAIN, 6 IN, DIP 40.00 LF 485.00$ $ 19,400.00 200.00$ $ 8,000.00 791.80$ $ 31,672.00 169.68$ $ 6,787.20 VALVE MARKER 2.00 EA 2,050.00$ $ 4,100.00 100.00$ $ 200.00 350.00$ $ 700.00 90.48$ $ 180.96 GATE VALVE, 6 IN 2.00 EA 6,600.00$ $ 13,200.00 5,000.00$ $ 10,000.00 3,165.00$ $ 6,330.00 2,347.71$ $ 4,695.42 STEEL CASING, 12 IN 16.00 LF 1,110.00$ $ 17,760.00 400.00$ $ 6,400.00 414.00$ $ 6,624.00 324.32$ $ 5,189.12 Total Alternate 66,460.00$ 28,600.00$ 47,768.00$ 21,912.70$ Total bid including alternate 753,535.00$ 420,280.30$ 397,335.45$ 380,234.27$ Red font indicates calculation error that has been corrected.

Tally Sheet ITB 2357-B: Ridge Way Culvert Replacement

HelixSite Engineering, Inc.RDJE, Inc. Redland Grading Company, Inc.

Tally Sheet

ITEM DESCRIPTION EST QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT TRAFFIC CONTROL 1.00 LS $ 19,750.00 $ 19,750.00 $ 22,500.00 $ 22,500.00 $ 20,812.63 $ 20,812.63 $ 21,778.19 $ 21,778.19 TEMPORARY GRASSING 0.08 AC $ 5,500.00 $ 440.00 $ 100.00 $ 8.00 $ 2,173.50 $ 173.88 $ 1,219.58 $ 97.57

MULCH 1.00 TN 250.00$ $ 250.00 1.00$ $ 1.00 434.70$ $ 434.70 718.69$ $ 718.69

CONSTRUCT AND REMOVE CONSTRUCTION EXITS 1.00 EA 500.00$ $ 500.00 3,500.00$ $ 3,500.00 3,764.47$ $ 3,764.47 4,119.32$ $ 4,119.32 MAINTENANCE OF TEMPORARY SILT FENCE, TP C 280.00 LF 0.20$ $ 56.00 1.00$ $ 280.00 0.01$ $ 2.80 2.91$ $ 814.80 TEMPOARY SILT FENCE, TP C 280.00 LF 4.50$ $ 1,260.00 12.00$ $ 3,360.00 3.73$ $ 1,044.40 7.12$ $ 1,993.60 CLEARING & GRUBBING 1.00 LS 21,500.00$ $ 21,500.00 15,650.00$ $ 15,650.00 23,671.72$ $ 23,671.72 12,404.86$ $ 12,404.86 FOUND BKFILL MATL, TP II 137.36 CY 84.00$ $ 11,538.24 2.00$ $ 274.72 155.10$ $ 21,304.54 59.12$ $ 8,120.72 GRADING COMPLETE- 1.00 LS 110,361.94$ $ 110,361.94 18,400.00$ $ 18,400.00 39,696.44$ $ 39,696.44 22,699.69$ $ 22,699.69 GR AGGR BASE CRS, 6 INCH, INCL MATL 160.61 SY 18.50$ $ 2,971.29 30.00$ $ 4,818.30 26.74$ $ 4,294.71 50.96$ $ 8,184.69

9.5 MM SUPERPAVE, TYPE II, GP 2 ONLY, INCL BITUM MATL

& H LIME

13.72 TN 380.00$ $ 5,213.60 820.00$ $ 11,250.40 352.27$ $ 4,833.14 729.51$ $ 10,008.88

19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H

LIME

18.30 TN 300.00$ $ 5,490.00 850.00$ $ 15,555.00 479.41$ $ 8,773.20 1,535.26$ $ 28,095.26

TACK COAT 8.13 GL 80.00$ $ 650.40 500.00$ $ 4,065.00 4.34$ $ 35.28 8.97$ $ 72.93

CONCRETE HEADWALLS 2.00 EA 3,400.00$ $ 6,800.00 5,155.00$ $ 10,310.00 10,285.57$ $ 20,571.14 6,287.94$ $ 12,575.88 CONC CURB & GUTTER, 6 IN X 24 IN, TP 2 122.00 LF 30.00$ $ 3,660.00 60.00$ $ 7,320.00 42.17$ $ 5,144.74 31.94$ $ 3,896.68 STORM DRAIN PIPE, HDPE, 36 IN, H 1-10 181.00 LF 140.00$ $ 25,340.00 230.00$ $ 41,630.00 170.10$ $ 30,788.10 108.33$ $ 19,607.73 STORM DRAIN PIPE, RCP, 42 IN, H 1-10 32.00 LF 320.00$ $ 10,240.00 820.00$ $ 26,240.00 275.28$ $ 8,808.96 383.73$ $ 12,279.36 STORM DRAIN PIPE, HDPE, 42 IN, H 1-10 121.00 LF 280.00$ $ 33,880.00 310.00$ $ 37,510.00 192.25$ $ 23,262.25 149.65$ $ 18,107.65 STN DUMPED RIP RAP, TP 3, 12 IN 196.78 SY 60.00$ $ 11,806.80 65.00$ $ 12,790.70 106.72$ $ 21,000.36 67.70$ $ 13,322.01 PLASTIC FILTER FABRIC 196.78 SY 3.50$ $ 688.73 25.00$ $ 4,919.50 13.08$ $ 2,573.88 8.93$ $ 1,757.25 CATCH BASIN, GP 2 2.00 EA 12,500.00$ $ 25,000.00 13,500.00$ $ 27,000.00 12,779.13$ $ 25,558.26 10,777.68$ $ 21,555.36 CATCH BASIN, GP 2, ADDL DEPTH 5.00 LF 150.00$ $ 750.00 500.00$ $ 2,500.00 1.24$ $ 6.20 433.09$ $ 2,165.45 DROP INLET, GP 1, TYPE C WITH WEIR 2.00 EA 6,500.00$ $ 13,000.00 8,750.00$ $ 17,500.00 10,165.71$ $ 20,331.42 10,557.03$ $ 21,114.06 DROP INLET, GP 1, TYPE C WITH WEIR, ADDL DEPTH 5.00 LF 150.00$ $ 750.00 500.00$ $ 2,500.00 1.24$ $ 6.20 433.09$ $ 2,165.45 SOD 1,536.00 SY 12.50$ $ 19,200.00 14.00$ $ 21,504.00 14.90$ $ 22,886.40 23.01$ $ 35,343.36 ALLOWANCE 1.00 LS 25,000.00$ $ 25,000.00 25,000.00$ $ 25,000.00 25,000.00$ $ 25,000.00 25,000.00$ $ 25,000.00

356,097.00$ 336,386.62$ 334,779.83$ 307,999.42$

ALTERNATES EST QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT REMOVE WATER MAIN, 6 IN 40.00 LF 25.00$ $ 1,000.00 50.00$ $ 2,000.00 13.04$ $ 521.60 12.43$ $ 497.20 WATER MAIN, 6 IN, DIP 40.00 LF 120.00$ $ 4,800.00 320.00$ $ 12,800.00 106.26$ $ 4,250.40 416.25$ $ 16,650.00 VALVE MARKER 2.00 EA 300.00$ $ 600.00 125.00$ $ 250.00 853.98$ $ 1,707.96 217.34$ $ 434.68 GATE VALVE, 6 IN 2.00 EA 3,200.00$ $ 6,400.00 3,000.00$ $ 6,000.00 1,731.10$ $ 3,462.20 3,607.77$ $ 7,215.54 STEEL CASING, 12 IN 16.00 LF 350.00$ $ 5,600.00 250.00$ $ 4,000.00 278.70$ $ 4,459.20 359.70$ $ 5,755.20 Total Alternate 18,400.00$ 25,050.00$ 14,401.36$ 30,552.62$ Total bid including alternate 374,497.00$ 361,436.62$ 349,181.19$ 338,552.04$ Red font indicates calculation error that has been corrected.

Crawford Grading F. S. Scarbrough LLCSummit Construction & Development

McLeRoy, Inc.

Tally Sheet

ITEM DESCRIPTION EST QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

TRAFFIC CONTROL 1.00 LS $ 43,002.75 $ 43,002.75 $ 8,474.80 $ 8,474.80

TEMPORARY GRASSING 0.08 AC $ 5,150.00 $ 412.00 $ 8,250.00 $ 660.00

MULCH 1.00 TN 772.50$ $ 772.50 440.00$ $ 440.00

CONSTRUCT AND REMOVE CONSTRUCTION EXITS 1.00 EA 3,249.24$ $ 3,249.24 3,434.49$ $ 3,434.49 MAINTENANCE OF TEMPORARY SILT FENCE, TP C 280.00 LF 1.96$ $ 548.80 2.11$ $ 590.80

TEMPOARY SILT FENCE, TP C 280.00 LF 3.61$ $ 1,010.80 6.94$ $ 1,943.20

CLEARING & GRUBBING 1.00 LS 34,079.39$ $ 34,079.39 27,006.84$ $ 27,006.84

FOUND BKFILL MATL, TP II 137.36 CY 129.21$ $ 17,748.29 110.67$ $ 15,201.63

GRADING COMPLETE- 1.00 LS 20,391.00$ $ 20,391.00 56,156.24$ $ 56,156.24

GR AGGR BASE CRS, 6 INCH, INCL MATL 160.61 SY 27.26$ $ 4,378.23 37.38$ $ 6,003.60

9.5 MM SUPERPAVE, TYPE II, GP 2 ONLY, INCL BITUM MATL

& H LIME

13.72 TN 431.57$ $ 5,921.14 382.14$ $ 5,242.96

19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H

LIME

18.30 TN 426.42$ $ 7,803.49 281.26$ $ 5,147.06

TACK COAT 8.13 GL 22.66$ $ 184.23 38.42$ $ 312.35

CONCRETE HEADWALLS 2.00 EA 4,023.26$ $ 8,046.52 3,763.73$ $ 7,527.46

CONC CURB & GUTTER, 6 IN X 24 IN, TP 2 122.00 LF 66.08$ $ 8,061.76 51.79$ $ 6,318.38 STORM DRAIN PIPE, HDPE, 36 IN, H 1-10 181.00 LF 98.60$ $ 17,846.60 130.32$ $ 23,587.92 STORM DRAIN PIPE, RCP, 42 IN, H 1-10 32.00 LF 478.60$ $ 15,315.20 342.82$ $ 10,970.24 STORM DRAIN PIPE, HDPE, 42 IN, H 1-10 121.00 LF 130.83$ $ 15,830.43 144.93$ $ 17,536.53

STN DUMPED RIP RAP, TP 3, 12 IN 196.78 SY 40.28$ $ 7,926.30 45.19$ $ 8,892.49

PLASTIC FILTER FABRIC 196.78 SY 6.42$ $ 1,263.33 7.06$ $ 1,389.27

CATCH BASIN, GP 2 2.00 EA 8,961.26$ $ 17,922.52 8,204.95$ $ 16,409.90

CATCH BASIN, GP 2, ADDL DEPTH 5.00 LF 779.73$ $ 3,898.65 487.61$ $ 2,438.05

DROP INLET, GP 1, TYPE C WITH WEIR 2.00 EA 6,156.92$ $ 12,313.84 8,170.94$ $ 16,341.88 DROP INLET, GP 1, TYPE C WITH WEIR, ADDL DEPTH 5.00 LF 779.73$ $ 3,898.65 487.61$ $ 2,438.05

SOD 1,536.00 SY 11.00$ $ 16,896.00 16.50$ $ 25,344.00

ALLOWANCE 1.00 LS 25,000.00$ $ 25,000.00 25,000.00$ $ 25,000.00

293,721.64$ 294,808.14$

ALTERNATES EST QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

REMOVE WATER MAIN, 6 IN 40.00 LF 41.20$ $ 1,648.00 20.00$ $ 800.00

WATER MAIN, 6 IN, DIP 40.00 LF 154.50$ $ 6,180.00 50.00$ $ 2,000.00

VALVE MARKER 2.00 EA 309.00$ $ 618.00 75.00$ $ 150.00

GATE VALVE, 6 IN 2.00 EA 8,240.00$ $ 16,480.00 950.00$ $ 1,900.00

STEEL CASING, 12 IN 16.00 LF 206.00$ $ 3,296.00 81.25$ $ 1,300.00

Total Alternate 28,222.00$ 6,150.00$ Total bid including alternate 321,943.64$ 300,958.14$ Red font indicates calculation error that has been corrected.

*Disqualified due to work performance under Contract 1516-B Broom Blvd. Culvert Replacement and references provided with bid.

D i s q u a l i f i e d

Disqualified

Blount Construction Ryde Grading, Inc.*Piedmond Paving, Inc.

Sheet1

File details come from the government source that posted it. Updated .