23230501 - Soil Sheets.pdf
PDF 2 MB Posted
- Solicitation number
- 23-071
- Issued by
- Clinton County, Iowa
About this file
This document is related to a state and local contract opportunity for the relocation of existing Iowa Communications Network (ICN) fiber along Manufacturing Drive just north of Valley West Drive to S 17th Street in Clinton, Iowa. ICN, which operates the Iowa Communications Network, is seeking bids from vendors to perform this work. The project overview indicates that ICN is relocating an existing 4-fiber cable along this route. The contract opportunity is located in Clinton County, Iowa. No specific response dates, due dates, site visits, bidder's meetings, award dates, or contract term were provided in the document.
The document provides detailed soil information, boring logs, and laboratory test results related to the construction area. It includes color-coded plan view and profile view drawings with information on soil types, stabilization requirements, and subgrade preparation. No pricing terms, set asides, incumbent information, funding requirements, or other salient financial details were included in the provided documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GEOTECHNICAL DESIGN
DateSignature
Printed or Typed Name
My license renewal date is December 31, 20
Pages or sheets covered by this seal:
I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I the State of Iowa.
am a duly licensed Professional Engineer under the laws of
LI
C E N S
ED
PR
OFESSIONAL
EN
G
IN
E E R
IOWA
Bhooshan
A. Karnik
16921
Bhooshan A. Karnik
Q.1-Q.10, SPS.1-SPS.4
11/16/20 - 3/2/21
Q.1FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q01.dgnjch10/27/202111:54:35 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
INFORMATION SHEET
LEGEND AND SYMBOL
Core Out
Backslope Drains
Loam
Class 10
Sand
Unsuitable A
Unsuitable B
Unsuitable C
Shale
Waste
Broken and Weathered Rock
Rock
Boulders
Existing Ground Line Profile
PLAN VIEW COLOR LEGEND OF SOILS SHEETS
Pink, Dark (13)
(3)
(11) Pink
(238) Brown, Dark
Red
Brown, Med (237)
(80) Gray, Med
Red
Red (3)
Gray, Light (48)
(3)
(1)
(1) Blue
Brown, Light (236)
Green (2)
Blue
Orange (6)
(227)
Green (2)
Purple (Halo) (15)
Existing Topographic Features and Labels
Proposed Alignment, Stationing, Tic Marks, and Alignment Annotation
PROFILE VIEW COLOR LEGEND OF SOILS SHEETS
(128) Gray, V.Dark
Proposed Alignment, Stationing, and Alignment Annotation
Water
Sample
Plugged
Moisture
Shelby
Dens. Core
Select Soil
Select Sand
Rock
Unsuitable A
Unsuitable B
Unsuitable C
PATTERN AND SYMBOL LEGEND OF SOILS SHEETS
SOILS
M
S
H O
Pavement Removal
Clearing & Grubbing Area
A/C
X
Station
Easement
Easement (Temporary)
Excess
Access Control
Proposed Right-of-Way
Existing and Proposed Right-of-Way
Borrow
Easement and Existing Right-of-Way
Section Corner
Reference Point
Survey Line
RIGHT-OF-WAY LEGEND
Ground Line Intercept
Saw Cut
Guardrail
Date(s) Drilled
DryDRY Sand Blanket
Soil Remediation Area
Sandstone
Sandy Soil
Boulders
Design Color No.LINEWORK
SHADING Design Color No.
LINEWORK Design Color No.
Blow Count
Green, Med structure construction.
elsewhere shall be used for roadway and will be encountered. Details and notes shown that conditions other than those indicated on the plans does not constitute a guarantee and estimating purposes. Their appearance in the plans were accumulated for designing
NOTE: Sounding and test boring data shown
Topsoil
Green, Med (227)
Broken and Weathered Rock
Drill Dig/Core
Shale
Slope Dressing Only
Slope Dressing Only
Subgrade Preparation
(COVERS SHEET SERIES Q)
B B
B
B
B B
B
B
B
B
B
B B B
B B
B
B
B
B B
B
B
B
M B
M
BM
B
B B
ELEV. 593.9
B-0001
ELEV. 594.4
B-0003
ELEV. 593.0
B-0002
ELEV. 593.9
B-0005 ELEV. 594.2
B-0007
ELEV. 593.9
B-0008
ELEV. 594.6
B-0009
ELEV. 593.7
B-0011
ELEV. 594.0
B-0012
MANUFACTURING DRIVE
H A R T 'S
M
IL
L
C R E E
K
M
IL
L
C R E E
K
570570
1943 1944 1945 1946 1947 1948 1949 1950 1951 1952 1953 1954 1955 1956 1957 1958
BLOW COUNT
5B
- NO. BLOWS
NUMBER
SAMPLE
Q.2FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q02.dgnjch10/27/202111:02:50 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
THIS SHEET IS INCLUDED TO SHOW
SOIL INFORMATION.
DETAILS AND NOTES SHOWN ELSEWHERE
IN THESE PLANS SHALL BE USED FOR
ROAD AND STRUCTURE CONSTRUCTION.
BORINGS B-0001 THROUGH B-0012.
INFORMATION FOR STRUCTURAL
BORING AND LABORATORY TESTING
REFER TO SPS SHEETS FOR SOIL
DRIVE
MANUFACTURINGO
FEET
5O
SUBGRADE PREPARATION1.0' 1.0' 1.0' 1.0' 1.0' 1.0'
PREPARATION
SUBGRADE
SUBGRADE PREPARATION
12" SUBGRADE PREPARATION
MANUFACTURING DRIVE
PROPOSED GRADE ALONG |
BORINGS
EXISTING GROUND BETWEEN
MANUFACTURING DRIVE
EXISTING GROUND ALONG |
FP
B
.4
C I
.16
C I
.9
J4
P J3
M B
ELEV. 591.4
B-0013
ELEV. 589.4
B-0014
ELEV. 587.9
B-0017
MANUFACTURING DRIVE
1960 1965 19701959 1961 1962 1963 1964 1966 1967 1968 1969 1971 1972 1973 1974
Boring No. Date Drilled Level (Ft.)
GroundWater
B-0013
B-0014
B-0017
11/16/2020
11/16/2020
11/18/2020
CORE NO.
TRIAXIAL COMPRESSION
COHESION - PSF
FRICTION COEFF.
MOISTURE CONTENT %
UU-UNCONSOLIDATED & UNDRAINED
CU-CONSOLIDATED & UNDRAINED
CLASSIFICATION [AASHTO]
DRY DENSITY - PCF
COEFF.CONSOL. SQ. FT /DAY
DEPTH
847294
B-0013 D2 B-0014 C2 B-0014 C4 B-0017 C1 B-0017 D2 B-0017 D4
11.0 - 13.0
27.9
6.0 - 8.0 11.0 - 13.0
42.8 44.0
3.0 - 5.0
28.3
8.0 - 10.0 16.0 - 18.0
43.2 38.3
Q.3
BLOW COUNT
5B
- NO. BLOWS
NUMBER
SAMPLE
FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q03.dgnjch10/27/202111:04:35 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
H O
H O
H O
THIS SHEET IS INCLUDED TO SHOW
SOIL INFORMATION.
DETAILS AND NOTES SHOWN ELSEWHERE
IN THESE PLANS SHALL BE USED FOR
ROAD AND STRUCTURE CONSTRUCTION. B SHEETS FOR DETAILS.
STABILIZATION. REFER TO DETAIL ON
CONSTRUCT GEOTEXTILE SUBGRADE
1991+00, OVEREXCAVATE AND
FROM STATION 1970+00 TO STATION
DRIVE
MANUFACTURINGO
FEET
5O
A-ACC PAVEMENT
B-PCC PAVEMENT
C-DARK GRAY SILTY CLAY
CLAY
D-GRAY AND BROWN SILTY
GRADED SAND
E-GRAY TO BROWN POORLY
C1
C2
D1
E1
A-TOPSOIL
SILT
B-DARK GRAY TO BLACK
CLAY
C-GRAY BROWN SILTY FAT
D-GRAY SANDY LEAN CLAY
B1 8
C1 5
C3 4
D1 3
A-TOPSOIL
SILTY CLAY WITH GRAVEL
B-DARK GRAY TO BLACK
LEAN CLAY
C-GRAY TO BROWN SILTY
CLAY
D-GRAY BROWN SILTY FAT
B1 4
D1 0
D3 0
D5 5
4.4' LT
B-0013
20.0' RT
B-0014
64.3' LT
B-0017
B-0014 C2
B-0014 C4
B-0017 C1
B-0017 D4
B-0017 D2D2
B-0013
MANUFACTURING DRIVE
PROPOSED GRADE ALONG | MANUFACTURING DRIVE
EXISTING GROUND ALONG |
BORINGS
EXISTING GROUND BETWEEN
24" SOIL REMEDIATION
12" SUBGRADE PREPARATION
1.0' 2.0'SUBGRADE PREPARATION SOIL REMEDIATION AREA 2.0'1.0'
M B
M B
M B
M B
M B
M B
FP
FP
M
BM
BM
B
M B
M B
M B
.9
M H
.5
C H E C K
.2
B K
LS
.8
B K
LS
E
.7
B K
LS
B
.6
B K
LS
E
.5
C I
ELEV. 587.8
B-0018
ELEV. 586.1
B-0019
ELEV. 584.7
B-0020
ELEV. 589.5
B-0021
MANUFACTURING DRIVE
1974 1975 1980 19851976 1977 1978 1979 1981 1982 1983 1984 1986 1987 1988 1989
CORE NO.
TRIAXIAL COMPRESSION
COHESION - PSF
FRICTION COEFF.
MOISTURE CONTENT %
UU-UNCONSOLIDATED & UNDRAINED
CU-CONSOLIDATED & UNDRAINED
CLASSIFICATION [AASHTO]
DRY DENSITY - PCF
COEFF.CONSOL. SQ. FT /DAY
DEPTH
--90
73--
----64
B-0018 B3 B-0018 C2 B-0019 B2 B-0019 B4 B-0020 C1 B-0020 D2 B-0020 E2 B-0021 C3 B-0021 E2
6.0 - 8.0
93.1
32.2 32.3
11.0 - 13.0 3.0 - 5.0 8.0 - 10.0
32.6 45.4
3.0 - 5.0 8.0 - 10.0 16.0 - 18.0
38.5
80.7
42.2 47.1 32.7 30.5
Boring No. Date Drilled Level (Ft.)
GroundWater
B-0018
B-0019
B-0020
B-0021 10
11/17/2020
11/17/2020
11/17/2020
11/16/2020
1.5
Q.4
BLOW COUNT
5B
- NO. BLOWS
NUMBER
SAMPLE
FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q04.dgnjch10/27/202111:05:59 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
H O
H O
H O2
H O
H O
THIS SHEET IS INCLUDED TO SHOW
SOIL INFORMATION.
DETAILS AND NOTES SHOWN ELSEWHERE
IN THESE PLANS SHALL BE USED FOR
ROAD AND STRUCTURE CONSTRUCTION. B SHEETS FOR DETAILS.
STABILIZATION. REFER TO DETAIL ON
CONSTRUCT GEOTEXTILE SUBGRADE
1991+00, OVEREXCAVATE AND
FROM STATION 1970+00 TO STATION
DRIVE
MANUFACTURINGO
FEET
5O
A-TOPSOIL
B-BROWN SILTY LEAN CLAY
C-GRAY SILTY LEAN CLAY
B1 5
B2 2
C1 0
C3 0
C4 0
A-TOPSOIL
CLAY
B-DARK GRAY SILTY LEAN
C-GRAY SILTY FAT CLAY
B1 4
B3 0
C1 1
A-TOPSOIL
B1 1
D1 1
E1 0
E3 0
C1 4
C2 4
D1 3
F1 3
A-ACC PAVEMENT
B-PCC PAVEMENT
LEAN CLAY
GRAY, AND GRAY SANDY
C-GRAY TO BROWN, DARK
D-GRAY SILTY LEAN CLAY
E-SILTY SAND
SAND
F-GRAY POORLY GRADED
60.7' LT
B-0018
77.8' LT
B-0019
141.2' RT
B-0020
14.8' LT
B-0021
SANDY FAT CLAY
B-DARK GRAY
LEAN CLAY
BROWN SILTY
D-REDDISH
CLAY
E-GRAY SILTY
B-0018 B3
B-0018 C2
B-0019 B2
B-0019 B4
B-0020 C1
B-0020 D2
B-0020 E2
B-0021 C3
B-0021 E2
WITH GRAVEL
C-SILTY CLAY
MANUFACTURING DRIVE
PROPOSED GRADE ALONG |
MANUFACTURING DRIVE
EXISTING GROUND ALONG |
BORINGS
EXISTING GROUND BETWEEN
24" SOIL REMEDIATION
2.0'SOIL REMEDIATION AREA2.0'
D Y
H
D Y
H
M
BM
B
M B
M B
M B
M B
M B
M B
M
BM
B
M B
M B
FP
M B
M B M
B
M B
M B
M B
M B
M B
ELEV. 591.8
B-0022
MANUFACTURING DRIVE
1990 1995 20001989 1991 1992 1993 1994 1996 1997 1998 1999 2001
Boring No. Date Drilled Level (Ft.)
GroundWater
7B-0022 11/17/2020
CORE NO.
TRIAXIAL COMPRESSION
COHESION - PSF
FRICTION COEFF.
MOISTURE CONTENT %
UU-UNCONSOLIDATED & UNDRAINED
CU-CONSOLIDATED & UNDRAINED
CLASSIFICATION [AASHTO]
DRY DENSITY - PCF
COEFF.CONSOL. SQ. FT /DAY
DEPTH
B-0022 B2
3.0 - 5.0
24.1
Q.5
BLOW COUNT
5B
- NO. BLOWS
NUMBER
SAMPLE
FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q05.dgnjch10/27/202111:07:40 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
H O
THIS SHEET IS INCLUDED TO SHOW
SOIL INFORMATION.
DETAILS AND NOTES SHOWN ELSEWHERE
IN THESE PLANS SHALL BE USED FOR
ROAD AND STRUCTURE CONSTRUCTION. B SHEETS FOR DETAILS.
STABILIZATION. REFER TO DETAIL ON
CONSTRUCT GEOTEXTILE SUBGRADE
1991+00, OVEREXCAVATE AND
FROM STATION 1970+00 TO STATION
DRIVE
MANUFACTURINGO
FEET
5O
A-TOPSOIL
WITH GRAVEL
B-BLACK SANDY FAT CLAY
C-GRAY SANDY LEAN CLAY
GRADED SAND
D-BROWN TO GRAY POORLY
B1 4
C1 4
D1 3
D2 2
51.5' RT
B-0022
B-0022 B2
1.0' 1.0'SUBGRADE PREPARATION2.0'2.0' AREA
SOIL REMEDIATION
BORINGS
EXISTING GROUND BETWEEN
MANUFACTURING DRIVE
PROPOSED GRADE ALONG |
MANUFACTURING DRIVE
EXISTING GROUND ALONG |
24" SOIL REMEDIATION
DY
H
MB
MB
MB
FP
MB
FP
M B
FP
M B
MB
MBMB MBMBMB
MB
MBMBMB
MB
MB
MB
MB
40938
590.50
CHECK 1302
50451
589.20
BKLS
50452
589.83
BKLS E
ELEV. 595.6
B-0025
ELEV. 592.9
B-0026
14TH AVE
101 102 103 104 105 106 107 108 109 110 111 112
Boring No. Date Drilled Level (Ft.)
GroundWater
B-0025
B-0026
11/16/2020
11/16/2020
Not Encountered
CORE NO.
TRIAXIAL COMPRESSION
COHESION - PSF
FRICTION COEFF.
MOISTURE CONTENT %
UU-UNCONSOLIDATED & UNDRAINED
CU-CONSOLIDATED & UNDRAINED
CLASSIFICATION [AASHTO]
DRY DENSITY - PCF
COEFF.CONSOL. SQ. FT /DAY
DEPTH
B-0026 C1
3.0 - 5.0
20.5
Q.6
BLOW COUNT
5B
- NO. BLOWS
NUMBER
SAMPLE
FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q06.dgnjch10/27/202111:46:44 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
H O
THIS SHEET IS INCLUDED TO SHOW
SOIL INFORMATION.
DETAILS AND NOTES SHOWN ELSEWHERE
IN THESE PLANS SHALL BE USED FOR
ROAD AND STRUCTURE CONSTRUCTION.
14TH AVENUE (SW)
O
FEET
5O
4.1' RT
B-0026
A-AGGREGATE BASE COURSE
B-SILTY CLAY
TRACE SAND
C-GRAY SILTY LEAN CLAY,
SAND
D-GRAY POORLY GRADED
E-GRAY SILTY LEAN CLAY
B1
D1
D2
D3
E1
26.1' RT
B-0025
A-TOPSOIL
CLAYEY SAND
B-BROWN TO DARK BROWN
C-LIMESTONE
B1 9
C2 50/0"
C1 50/2"
B-0026 C112" SUBGRADE PREPARATION
1.0' SUBGRADE PREPARATION 1.0'
14TH AVE
EXISTING GROUND ALONG |
14TH AVE
PROPOSED GRADE ALONG |
MBMB
M B
M B
M B
MBMB
MB MB
MB
MB
MB
MB
MB
MB
MB
MBMBMB
MB
MB
MB
MB
FP
MB
MB
13TH AVE
ELEV. 601.2
B-0027
FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q07.dgnjch10/27/202111:49:18 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
H O
500 501 502 503 504 505 506
Boring No. Date Drilled Level (Ft.)
GroundWater
B-0027 1211/16/2020
Q.7
BLOW COUNT
5B
- NO. BLOWS
NUMBER
SAMPLE
THIS SHEET IS INCLUDED TO SHOW
SOIL INFORMATION.
DETAILS AND NOTES SHOWN ELSEWHERE
IN THESE PLANS SHALL BE USED FOR
ROAD AND STRUCTURE CONSTRUCTION.
13TH AVENUE (SW)
O
FEET
5O
D-BROWN LIMESTONE
SAND
C-BROWN POORLY GRADED
B-BLACK SANDY SILT
A-AGGREGATE BASE COURSE
B1
B1
B1
B1
B1
50/3"
50/0"
0.2' RT
B-0027
SUBGRADE PREPARATION1.0' 1.0'
12" SUBGRADE PREPARATION
13TH AVE
EXISTING GROUND ALONG |
13TH AVE
MB
MB
MB
MBMB MBMB
M B
M B
M B
MBMB
FP
MB MB
MB
MB
MB
MB
MB
FP
ELEV. 616.0
B-0028
ELEV. 604.3
B-0023
ELEV. 596.3
B-0029
13TH AVE
700 701 702 703 704 705 706 707 708 709
CORE NO.
TRIAXIAL COMPRESSION
COHESION - PSF
FRICTION COEFF.
MOISTURE CONTENT %
UU-UNCONSOLIDATED & UNDRAINED
CU-CONSOLIDATED & UNDRAINED
CLASSIFICATION [AASHTO]
DRY DENSITY - PCF
COEFF.CONSOL. SQ. FT /DAY
DEPTH
B-0023 B2 B-0029 C2
3.0 - 5.0 6.0 - 8.0
16.4 10.5
Boring No. Date Drilled Level (Ft.)
GroundWater
B-0028
B-0023
B-0029
11/16/2020
11/17/2020
11/17/2020
Not Encountered
9.5
8.5
Q.8
BLOW COUNT
5B
- NO. BLOWS
NUMBER
SAMPLE
FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q08.dgnjch10/27/202111:50:56 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
H O2
H O
THIS SHEET IS INCLUDED TO SHOW
SOIL INFORMATION.
DETAILS AND NOTES SHOWN ELSEWHERE
IN THESE PLANS SHALL BE USED FOR
ROAD AND STRUCTURE CONSTRUCTION.
13TH AVENUE (SE)
O
FEET
5O
B-AGGREGATE BASE COURSE
A-PCC PAVEMENT
SAND
C-BROWN POORLY GRADED
D-BROWN SILTY LEAN CLAY
C1
C2
C3
D1
D2
B1 4
C1 19
D1 25
D2 15
E1
E2
50/0"
50/0"
A-TOPSOIL
B1 11
C1 7
D1 0
E1 2
A-TOPSOIL
SAND AND GRAVEL
SILTY LEAN CLAY WITH
B-GRAY TO DARK GRAY
C-DARK GRAY SANDY SILT
CLAY WITH GRAVEL
D-GRAY MOIST SANDY LEAN
E-GRAY SILTY LEAN CLAY
GRAVEL
LEAN CLAY WITH
B-BLACK SANDY
CLAY
SANDY LEAN
C-GRAY BROWN
GRADED SAND
D-BROWN POORLY
LIMESTONE
E-WEATHERED
16.2' LT
B-0028
43.3' LT
B-0023
10.8' RT
B-0029
B-0023 B2
B-0029 C2
SUBGRADE PREPARATION1.0' 1.0'
12" SUBGRADE PREPARATION
BORINGS
EXISTING GROUND BETWEEN
13TH AVE
EXISTING GROUND ALONG |
13TH AVE
M B
M B
M B
M B
M B
M B
F P
M B
M B
M B
M B
F P
M B
M B
ELEV. 591.7
B-0030
ELEV. 598.0
B-0031
17TH ST
605600 601 602 603 604 606 607
CORE NO.
TRIAXIAL COMPRESSION
COHESION - PSF
FRICTION COEFF.
MOISTURE CONTENT %
UU-UNCONSOLIDATED & UNDRAINED
CU-CONSOLIDATED & UNDRAINED
CLASSIFICATION [AASHTO]
DRY DENSITY - PCF
COEFF.CONSOL. SQ. FT /DAY --
DEPTH
B-0031 C2
6.0 - 8.0
30.7
Boring No. Date Drilled Level (Ft.)
GroundWater
B-0030
B-0031
4.511/17/2020
11/17/2020
Q.9
BLOW COUNT
5B
- NO. BLOWS
NUMBER
SAMPLE
FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q09.dgnjch10/27/202111:52:03 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
H O
H O
THIS SHEET IS INCLUDED TO SHOW
SOIL INFORMATION.
DETAILS AND NOTES SHOWN ELSEWHERE
IN THESE PLANS SHALL BE USED FOR
ROAD AND STRUCTURE CONSTRUCTION.
17TH STREET
O
FEET
5O
0.2' RT
B-0030
C-WOOD
E-GRAY SAND
B1 19
B2
D1
E1
0.2' RT
B-0031
LEAN CLAY
B-GRAY SILTY
C-BLACK SILT
GRADED SAND
D-BROWN POORLY
E-LIMESTONE
A-GRAVEL ROADWAY
A-GRAVEL ROADWAY
CLAY
B-GRAY SANDY LEAN
D-GRAY SILTY SAND
B1 11
C1
D1
D2
B-0031 C2
17TH STREET
PROPOSED GRADE ALONG |
17TH STREET
EXISTING GROUND ALONG |
1.0' SUBGRADE PREPARATION 1.0'
5 1
ELEV. 585.5
B-0016
ELEV. 584.1
B-0015
5 10
CORE NO.
TRIAXIAL COMPRESSION
COHESION - PSF
FRICTION COEFF.
MOISTURE CONTENT %
UU-UNCONSOLIDATED & UNDRAINED
CU-CONSOLIDATED & UNDRAINED
CLASSIFICATION [AASHTO]
DRY DENSITY - PCF
COEFF.CONSOL. SQ. FT /DAY
DEPTH
B-0015 B2
3.0 - 5.0
B-0015 D1
11.0 - 13.0
B-0015 E2
16.0 - 18.0
43.6
22.9
34.2
B-0016 B2
3.0 - 5.0
32.1
Q.10
BLOW COUNT
5B
- NO. BLOWS
NUMBER
SAMPLE
Boring No. Date Drilled Level (Ft.)
GroundWater
B-0015
B-0016
11/18/2020
11/18/2020
565565
FILE NO. ENGLISH DESIGN TEAM
P:\30618011-001\06-Drawings\Civil\Dgns\30618011_Q10.dgnjch10/27/202111:53:22 AM
COUNTY PROJECT NUMBER SHEET NUMBER STBG-SWAP-1415(634)--SG-23McClure CITY OF CLINTON / CLINTON
H O
H O
THIS SHEET IS INCLUDED TO SHOW
SOIL INFORMATION.
DETAILS AND NOTES SHOWN ELSEWHERE
IN THESE PLANS SHALL BE USED FOR
ROAD AND STRUCTURE CONSTRUCTION.
STORM OUTLET
O
FEET
5O
22.4' RT
B-0015
13.2' LT
B-0016
B1 4
B3
C1
E1
E3
A-TOPSOIL
GRAY FAT CLAY
B-GRAY TO DARK
SILTY CLAY
C-GRAY AND BROWN
SANDY LEAN CLAY
D-GRAY AND BROWN
CLAY
GRAY SANDY LEAN
E-DARK BROWN TO
B1 8
B3
C1
D1
D2
A-TOPSOIL
GRAY ROCK
C-WHITE TO LIGHT
50/0"
SANDY LEAN CLAY
B-DARK GRAY
SAND
POORLY GRADED
D-LIGHT GRAY
B-0015 B2
B-0015 D1
B-0015 E2
B-0016 B2
DRAINAGE PIPE
PROPOSED
SURFACE ALONG
EXISTING GROUND BETWEEN BORINGS
EXISTING GROUND
File details come from the government source that posted it. Updated .