23106.040 2026 06 22 MCS BP4 - Early Site Package - Addendum 1.pdf

PDF 4 MB Posted

Attached to
RFP for Early Site Package
Solicitation number
RFP MAT 260000002227 2
Issued by
Van Buren County, Michigan

About this file

This is Addendum 1 to the Early Site Package Request for Proposal (RFP) issued by the State of Michigan. The addendum modifies the original RFP requirements and provides clarifications to the procurement process for the Early Site Package project. The document outlines modifications to technical specifications, scheduling requirements, and procedural elements established in the base RFP. The addendum includes updated submission requirements, clarified scope of work elements, and any amendments to the original timeline for proposal responses. Bidders are required to acknowledge receipt and incorporation of this addendum in their proposals, with all terms and conditions of the original RFP remaining in effect except where specifically modified by this addendum.

The addendum addresses critical changes to project deliverables, evaluation criteria, and contractual obligations that were identified after the initial RFP release. All prospective bidders must review both the original RFP and this addendum in their entirety to ensure full compliance with current requirements. Failure to acknowledge and incorporate the addendum modifications may result in proposal rejection. The specific changes outlined in this addendum supersede corresponding sections of the base RFP document and establish binding requirements for all participating contractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nurturing curiosity through design since 1953 • towerpinkster.com

©2026 Tower Pinkster Titus Associates, Inc.

ADDENDUM NO. 1

DATE OF ISSUANCE: June 22, 2026

PROJECT: BP4 Early Site Package

24959 West McGillen Street

Mattawan, MI 49071

OWNER: Mattawan Consolidated School

ARCHITECT’S PROJECT NO.: 23-106.040

ORIGINAL BID ISSUE DATE: June 5, 2026

SCOPE OF WORK

This Addendum includes changes to, or clarifications of, the original Bidding Documents and any previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of the Contract Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space provided on the Bid Form. Failure to do so may result in disqualification of the Bid.

DOCUMENTS INCLUDED IN THIS ADDENDUM

This Addendum includes 2 pages of text and the following documents:

• Bidding Documents: None

• Contract Conditions: None

• Specification Sections: 03 3800, 32 1800

• Drawings: CD 104, C 104, C 201, C 204, C 302, L 151

CHANGES TO PREVIOUSLY ISSUED ADDENDA

None

CHANGES TO BIDDING REQUIREMENTS

CHANGES TO CONTRACT CONDITIONS

6.22.2026 Addendum No. 1 // BP4 Early Site Package // 23-106.040 2

©2026 Tower Pinkster Titus Associates, Inc.

CHANGES TO SPECIFICATIONS

ADD-1 Item No. S-1 - Post tensioned concrete

Added post tensioned concrete spec.

ADD-1 Item No. S-2 - Tennis Court Surfacing

Added Laykold Prime Seal for Concrete to the products and clarified the four coat system (1 filler and three texture).

CHANGES TO DRAWINGS

ADD-1 Item No. D-1 - Plan

Refer to Sheet(s): CD 104, C 104, C 204

Adjusted sidewalk removal extents near ECEC building entrance.

ADD-1 Item No. D-2 - Plan

Refer to Sheet(s): C 302

Added note clarifying that proposed storm pipe is to be run between fence posts.

ADD-1 Item No. D-3 - Plan

Refer to Sheet(s): C 201

Adjusted proposed grades at batting cages to flatten longitudinal slope.

ADD-1 Item No. D-4 - Batting Cages Details

Added section details for the concrete paving for the Batting Cages as shown on sheet L 151.

END OF ADDENDUM.

PROJECT NO. 23-106.040

TABLE OF CONTENTS

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 1

MATTAWAN CONSOLIDATED SCHOOL JUNE 5, 2026

[Copyright] 2026 Tower Pinkster Titus Associates - All Rights Reserved

Refer to Construction Manager’s Project Manual issued by Construction Manager for additional procurement, contracting, and general requirements

DIVISION 00 — PROCUREMENT AND CONTRACTING REQUIREMENTS

00 2600 - PROCUREMENT SUBSTITUTION PROCEDURES

00 3100 - AVAILABLE PROJECT INFORMATION

00 3110 - GEOTECHNICAL REPORT

00 3111 - GEOTECHNICAL REPORT

00 4325 - SUBSTITUTION DURING PROCUREMENT REQUEST FORM

00 6324 - BIM TRANSFER WAIVER

00 6325 - SUBSTITUTION DURING CONSTRUCTION REQUEST FORM

DIVISION 01 — GENERAL REQUIREMENTS

01 2100 - ALLOWANCES

01 2500 - SUBSTITUTION PROCEDURES

01 2600 - CONTRACT MODIFICATION PROCEDURES

01 2900 - PAYMENT PROCEDURES

01 3100 - PROJECT MANAGEMENT AND COORDINATION

01 3200 - CONSTRUCTION PROGRESS DOCUMENTATION

01 3300 - SUBMITTAL PROCEDURES

01 4000 - QUALITY REQUIREMENTS

01 4200 - REFERENCES

01 5639 - TEMPORARY TREE AND PLANT PROTECTION

01 6000 - PRODUCT REQUIREMENTS

01 7300 - EXECUTION

01 7700 - CLOSEOUT PROCEDURES

01 7823 - OPERATION AND MAINTENANCE DATA

01 7839 - PROJECT RECORD DOCUMENTS

01 7900 - DEMONSTRATION AND TRAINING

DIVISION 02 — EXISTING CONDITIONS

02 4116 - STRUCTURE DEMOLITION

02 4119 - SELECTIVE DEMOLITION

DIVISION 03 — CONCRETE

03 3000 - CAST-IN-PLACE CONCRETE

03 3800 – POST-TENSIONED CONCRETE

DIVISION 11 — EQUIPMENT

11 6823 - EXTERIOR ATHLETIC EQUIPMENT

abigail.postema Highlight

03 3800 – POST-TENSIONED CONCRETE

PROJECT NO. 23-106.040

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 2

[Copyright] 2026 Tower Pinkster Titus Associates - All Rights Reserved

11 6833.43 - TRACK AND FIELD EQUIPMENT

DIVISION 26 — ELECTRICAL

26 0500 - COMMON WORK RESULTS FOR ELECTRICAL

26 0519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 0533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 0543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 2416 - PANELBOARDS

26 2726 - WIRING DEVICES

26 2813 - FUSES

26 4313 - SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

26 5668 - EXTERIOR ATHLETIC LIGHTING (fl)

DIVISION 31 — EARTHWORK

31 1000 - SITE CLEARING

31 2000 - EARTH MOVING

DIVISION 32 — EXTERIOR IMPROVEMENTS

32 1216 - ASPHALT PAVING

32 1313 - CONCRETE PAVING

32 1373 - CONCRETE PAVING JOINT SEALANTS

32 1800 - ATHLETIC AND RECREATIONAL SURFACING

32 1813 - SYNTHETIC GRASS SURFACING

32 3113 - CHAIN LINK FENCES AND GATES

32 9113 - SOIL PREPARATION

32 9200 - TURF AND GRASSES

DIVISION 33 — UTILITIES

33 4100 - STORM UTILITY DRAINAGE PIPING

33 4600 - SUBDRAINAGE

abigail.postema Highlight

32 1800 - ATHLETIC AND RECREATIONAL SURFACING

PROJECT NO. 23-106.040 POST-TENSIONED CONCRETE

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 03 3800 - 1

© 2026 Tower Pinkster Titus Associates - All Rights Reserved

SECTION 03 3800 – POST-TENSIONED CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.

B. Related Requirements:

1. Section 31 2000 "Earth Moving" for drainage fill under slabs-on-grade.

2. Section 32 1313 "Concrete Paving" for concrete pavement and walks.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Design Mixtures: For each concrete mixture.

C. Steel Reinforcement Shop Drawings: Placing Drawings that detail fabrication, bending, and placement.

1. Prepare Shop Drawings in accordance with ACI 315 and 315R and the CRSI Manual of Standard Practice and Reinforcing Bar Detailing.

2. Shop Drawings should include the following at a minimum:

a. Number, size, length and location of concrete reinforcement. Each bar should be identified using a unique mark.

b. Bending diagrams.

c. For concrete columns: provide full elevation of column member showing bar splices and size and spacing of all ties.

1.3 INFORMATIONAL SUBMITTALS

A. Material test reports.

1.4 QUALITY ASSURANCE

A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

B. Testing Agency Qualifications: An independent agency, qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 03 3800 - 2

1.5 PRECONSTRUCTION TESTING

A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on concrete mixtures.

1.6 FIELD CONDITIONS

A. Cold-Weather Placement: Comply with ACI 306.1.

1. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

B. Hot-Weather Placement: Comply with ACI 301.

PART 2 - PRODUCTS

2.1 CONCRETE, GENERAL

A. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:

1. ACI 301.

2. ACI 117.

2.2 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.

B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice."

2.3 CONCRETE MATERIALS

A. Cementitious Materials:

1. Blended Portland Cement: ASTM C 595, Type IL.

2. Fly Ash: ASTM C 618, Class F.

3. Slag Cement: ASTM C 989/C 989M, Grade 100 or 120.

B. Normal-Weight Aggregates: ASTM C 33/C 33M, graded.

1. Maximum Coarse-Aggregate Size: 1-1/2 inches nominal.

2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

3. Combined Aggregate Gradation: Well graded from coarsest to finest with not more than 18 percent and not less than 8 percent retained on an individual sieve, except that less than 8 percent

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 03 3800 - 3

may be retained on coarsest sieve and on No. 50 sieve, and less than 8 percent may be retained on sieves finer than No. 50.

C. Air-Entraining Admixture: ASTM C 260/C 260M.

D. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures and that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.

1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.

2. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.

E. Water: ASTM C 94/C 94M and potable.

2.4 VAPOR RETARDERS

A. Sheet Vapor Retarder: ASTM E 1745, Class A, except with maximum water-vapor permeance of 0.02 U.S.

perms, minimum 15 mils thick monolithic polyolefin sheet. Include manufacturer's recommended adhesive or pressure-sensitive tape.

1. Products: Subject to compliance with requirements, provide one of the following:

a. Fortifiber Building Systems Group; Moistop Ultra 15.

b. Insulation Solutions, Inc.;Viper VaporCheck II 15-mil.

c. Poly-America, L.P.; Husky Yellow Guard Vapor Barrier 15 Mil ASTM E-1745 Class A.

d. Reef Industries, Inc; Griffolyn 15 mil Green.

e. Stego Industries, LLC; Stego Wrap 15 mil Class A.

2.5 CURING MATERIALS

A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.

1. Products: Subject to compliance with requirements, provide one of the following:

a. ChemMasters, Inc; Spray-Film.

b. Dayton Superior; AquaFilm Concentrate J74.

c. Euclid Chemical Company (The); an RPM company; Eucobar.

d. L&M Construction Chemicals, Inc; E-CON.

B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.

C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

D. Water: Potable.

2.6 RELATED MATERIALS

A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber.

B. Bonding Agent: ASTM C 1059/C 1059M, Type II, nonredispersible, acrylic emulsion or styrene butadiene.

http://www.specagent.com/Lookup?ulid=1166 http://www.specagent.com/Lookup?uid=123456976082 http://www.specagent.com/Lookup?uid=123456976085 http://www.specagent.com/Lookup?uid=123456976087 http://www.specagent.com/Lookup?uid=123456976079 http://www.specagent.com/Lookup?uid=123456976080 http://www.specagent.com/Lookup?ulid=11025 http://www.specagent.com/Lookup?uid=123456975991 http://www.specagent.com/Lookup?uid=123456975992 http://www.specagent.com/Lookup?uid=123456975995 http://www.specagent.com/Lookup?uid=123456975997

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 03 3800 - 4

2.7 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

B. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:

1. 20 percent fly ash or 30 percent ground blast furnace slag.

C. Limit water-soluble, chloride-ion content in hardened concrete to 0.06 percent by weight of cement.

D. Admixtures: Use admixtures according to manufacturer's written instructions.

2.8 CONCRETE MIXTURES FOR BUILDING ELEMENTS

A. Tennis Court Slabs on Grade: Normal-weight concrete.

1. Minimum Compressive Strength: 5000 psi at 28 days.

2. Maximum W/C Ratio: 0.45.

3. Minimum Cementitious Materials Content: 470 lb/cu. yd..

4. Slump Limit: 5 inches, plus or minus 1 inch.

5. Air Content: Do not allow air content of trowel-finished floors to exceed 3 percent.

2.9 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

2.10 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M and ASTM C 1116/C 1116M, and furnish batch ticket information.

1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.

PART 3 - EXECUTION

3.1 FORMWORK INSTALLATION

A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 03 3800 - 5

B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.

C. Do not chamfer exterior corners and edges of permanently exposed concrete.

3.2 EMBEDDED ITEM INSTALLATION

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

3.3 VAPOR-RETARDER INSTALLATION

A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder according to ASTM E 1643 and manufacturer's written instructions.

1. Lap joints 6 inches and seal with manufacturer's recommended tape.

3.4 STEEL REINFORCEMENT INSTALLATION

A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete.

3.5 JOINTS

A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.

B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of concrete thickness as follows:

D. Isolation Joints in Slabs-on-Grade: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as columns, concerete piers, foundation walls, grade beams, and other locations, as indicated.

3.6 CONCRETE PLACEMENT

A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections are completed.

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 03 3800 - 6

B. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation.

1. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301.

3.7 FINISHING FORMED SURFACES

A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections that exceed specified limits on formed-surface irregularities.

1. Apply to concrete surfaces not exposed to public view.

B. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and defects. Remove fins and other projections that exceed specified limits on formed-surface irregularities.

1. Apply to concrete surfaces exposed to public view,.

C. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.

3.8 FINISHING FLOORS AND SLABS

A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.

B. Float Finish: Consolidate surface with power-driven floats or by hand floating if area is small or inaccessible to power-driven floats. Restraighten, cut down high spots, and fill low spots. Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture.

1. Apply float finish to surfaces to receive trowel finish.

C. Trowel Finish: After applying float finish, apply first troweling and consolidate concrete by hand or power-driven trowel. Continue troweling passes and restraighten until surface is free of trowel marks and uniform in texture and appearance. Grind smooth any surface defects that would telegraph through applied coatings or floor coverings.

1. Apply a trowel finish to surfaces.

2. Finish and measure surface, so gap at any point between concrete surface and an unleveled, freestanding, 10-ft.- long straightedge resting on two high spots and placed anywhere on the surface does not exceed 1/4 inch.

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 03 3800 - 7

3.9 CONCRETE PROTECTING AND CURING

A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather protection during curing.

B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

C. Cure concrete according to ACI 308.1, by one or a combination of the following methods:

1. Moisture Curing: Keep surfaces continuously moist for not less than seven days.

2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period, using cover material and waterproof tape.

3. Curing Compound: Do not use curing compounds.

3.10 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a special inspector to perform field tests and inspections and prepare testing and inspection reports.

B. Testing Agency: Owner will engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

1. Testing agency shall be responsible for providing curing container for composite samples on Site and verifying that field-cured composite samples are cured in accordance with ASTM C31/C31M.

2. Testing agency shall immediately report to Architect, Contractor, and concrete manufacturer any failure of Work to comply with Contract Documents.

3. Testing agency shall report results of tests and inspections, in writing, to Owner, Architect, Contractor, and concrete manufacturer within 48 hours of inspections and tests.

a. Test reports shall include reporting requirements of ASTM C31/C31M, ASTM C39/C39M, and ACI 301, including the following as applicable to each test and inspection:

1) Project name.

2) Name of testing agency.

3) Names and certification numbers of field and laboratory technicians performing inspections and testing.

4) Name of concrete manufacturer.

5) Date and time of inspection, sampling, and field testing.

6) Date and time of concrete placement.

7) Location in Work of concrete represented by samples.

8) Date and time sample was obtained.

9) Truck and batch ticket numbers.

10) Design compressive strength at 28 days.

11) Concrete mixture designation, proportions, and materials.

12) Field test results.

13) Information on storage and curing of samples before testing, including curing method and maximum and minimum temperatures during initial curing period.

14) Type of fracture and compressive break strengths at seven days and 28 days.

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 03 3800 - 8

C. Batch Tickets: For each load delivered, submit three copies of batch delivery ticket to testing agency, indicating quantity, mix identification, admixtures, design strength, aggregate size, design air content, design slump at time of batching, and amount of water that can be added at Project site.

D. Inspections:

1. Headed bolts and studs.

2. Verification of use of required design mixture.

3. Concrete placement, including conveying and depositing.

4. Curing procedures and maintenance of curing temperature.

5. Verification of concrete strength before removal of shores and forms from beams and slabs.

6. Batch Plant Inspections: On a random basis, as determined by Architect.

E. Concrete Tests: Testing of composite samples of fresh concrete obtained in accordance with ASTM C 172/C 172M shall be performed in accordance with the following requirements:

1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd., but less than 25 cu. yd., plus one set for each additional 50 cu. yd. or fraction thereof.

a. When frequency of testing provides fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.

2. Slump: ASTM C143/C143M:

a. One test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture.

b. Perform additional tests when concrete consistency appears to change.

3. Air Content: ASTM C231/C231M pressure method, for normal-weight concrete;.

a. One test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

4. Concrete Temperature: ASTM C1064/C1064M:

a. One test hourly when air temperature is 40 deg F and below or 80 deg F and above, and one test for each composite sample.

5. Compression Test Specimens: ASTM C31/C31M:

a. Cast and laboratory cure three sets of two 6-inch by 12-inch or three sets of three 4-inch by

8-inch cylinder specimens for each composite sample.

b. Cast, initial cure, and field cure two sets of two standard cylinder specimens for each composite sample.

6. Compressive-Strength Tests: ASTM C39/C39M.

a. Test one set of laboratory-cured specimens within 72 hours and one set of specimens at 28 days.

b. Test one set of field-cured specimens within 72 hours and one set of two specimens at 28 days.

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 03 3800 - 9

c. A compressive-strength test shall be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated.

7. When strength of field-cured cylinders is less than 85 percent of companion laboratory-cured cylinders, Contractor shall evaluate operations and provide corrective procedures for protecting and curing in-place concrete.

8. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength, and no compressive-strength test value falls below specified compressive strength by more than 500 psi if specified compressive strength is 5000 psi, or no compressive strength test value is less than 10 percent of specified compressive strength if specified compressive strength is greater than 5000 psi.

9. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete.

10. Additional Tests:

a. Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Architect.

b. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C42/C42M or by other methods as directed by Architect.

1) Acceptance criteria for concrete strength shall be in accordance with ACI 301 section 1.6.6.3.

11. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

12. Correct deficiencies in the Work that test reports and inspections indicate do not comply with the Contract Documents.

F. Measure floor and slab flatness and levelness in accordance with ASTM E1155 within 48 hours of completion of floor finishing and promptly report test results to Architect.

END OF SECTION 03 3800

PROJECT NO. 23-106.040 ATHLETIC AND RECREATIONAL SURFACING

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 32 1800 - 1

ADDENDUM NO. 1 06/22/2026

SECTION 32 1800 - ATHLETIC AND RECREATIONAL SURFACING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Section, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Tennis court surfacing.

B. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 31 Section “Earthwork” for excavation, filling, rough grading, and drainage backfill.

2. Division 32 Section “Cement Concrete Pavement” for related concrete work.

1.3 SUBMITTALS

A. Submit each item in the Article according to the Conditions of the Contract and Division 1 Specification Sections:

1. Product data for the following:

a. Surface and crack preparation and application instructions

b. Color system components

2. Color System technical data sheets.

3. Color chart.

4. Manufacturer’s Certification: Submit manufacturer’s certification that materials comply with specified requirements and are suitable for intended application.

5. Manufacturer’s Project References: Submit manufacturer’s list of successfully completed concrete tennis court surface color coating system projects, including project name, location, and date of application.

6. Applicator’s Project References: Submit applicator’s list of successfully completed concrete tennis court surface color coating system projects, including project name, location, type and quantity of color coating system applied, and date of application.

7. Warranty Documentation: Submit manufacturer’s standard warranty.

8. Authorized Installer Certificate: Submit manufacturer’s authorized installer certificate.

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 32 1800 - 2

1.4 QUALITY ASSURANCE

A. Engage an Installer with a minimum of 5 years of experience in concrete tennis court surface color coating system installations similar in material, design and extent to that indicated for this Project and with a record of successful installation.

B. Engage an Applicator with a minimum of 5 years of experience tennis court surface color coating system installations similar in material, design and extent to that indicated for this Project and with a record of successful installation.

C. Preinstallation Conference: Conduct conference at Project site.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to site in manufacturer’s original, unopened containers and packaging, with labels clearly identifying product name and manufacturer.

B. Storage and Handling Requirements:

1. Store and handle materials in accordance with manufacturer’s instructions.

2. Protect materials during storage, handling, and application to prevent contamination or damage.

3. Store materials in a clean, dry area and out of direct sunlight. Keep materials from freezing.

1.6 PROJECT CONDITIONS

A. Utilities: Determine location of above and below grade utilities and perform work in a manner which will avoid drainage.

B. Inspect surface and confirm it is dry and clean and free of dirt, oil, dust or other foreign material prior to applying coatings.

C. Concrete surfaces shall be shotblasted or hydroblasted per remanufacturer recommendations prior to application of color surface.

D. Do not apply color surface if it is raining or if rainfall is expected within 24 hours.

E. Air and concrete surface temperature must be at or above 50 degrees Fahrenheit and maintained during the entire installation process.

F. Do not apply color coating if surface temperatures exceed 130 degrees Fahrenheit or if humidity is high.

1.7 COORDINATION AND SCHEDULING

A. Coordinate work with that of other trades. Conduct surfacing work in weather conditions as recommended by manufacturers, but in no case shall surfacing work occur in temperatures less than 50 degrees Fahrenheit, or during rainfall.

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 32 1800 - 3

1.8 WARRANTY

A. The warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under the provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents. The synthetic surface shall be warranted for a period of five years after date of Substantial Completion, against defects and / or failure of surfacing, except for defects resulting from abuse by Owner, or incidents that are beyond Contractor’s control.

PART 2 - PRODUCTS

2.1 TENNIS COURT SURFACING

A. Manufacturer

1. Laykold USA, 888-568-3431, https://www.laykold.com/, or approved equal.

B. Materials:

1. Laykold Masters Color, Traditional Hard-Court System.acrylic latex mixture specifically formulated for application for concrete paving to produce tennis court playing surface.

2. Laykold Prime Seal for Concrete.

3. Colors: Two color application; one color for playing area and one color for border area. Colors will be selected by the Architect from the manufacture’s standard colors.

C. Line Marking Paint: Playing surface manufacturer’s standard or recommended textured white line acrylic marking paint.

PART 3 - EXECUTION

3.1 PLACING TENNIS COURT SURFACING

A. Examination:

1. Examine concrete tennis court surfaces to receive color coating system and report any discrepancies to the Owners Representative.

2. Surface of substrate shall be clean and dry prior to application.

3. Verify vapor barrier has been applied.

B. Preparation:

1. New concrete shall be cured for a minimum of 30 days prior to application.

2. All surfaces must be clean, dry, and free from any bond inhibiting contaminants and foreign residue. Remove dirt, dust, debris, oil, grease, sealers, curing compounds, vegetation, loose coatings, loose materials, and other surface contaminants.

3. Concrete shall be shot blasted or hydroblasted to a CSP3 profile.

4. All surfaces shall be checked to ensure a level surface. Flood the surface with water and repair areas that retain 1/8-inch of water with leveling product.

https://www.laykold.com/

MATTAWAN CS - BID PACKAGE 4 - EARLY SITE PACKAGE 32 1800 - 4

5. Repair any crack, depressions, or surface defects in accordance with manufacturers’ recommendations prior to color coating application.

C. Application: Apply coating with a soft rubber squeegee and spread with long nap roller according to manufacturer’s direction. Install four (4) coats of fully color pigmented material (filler, textured coat and finish coat) one filler coat and three textured coats, or as recommended by the manufacturer.

1. Allow material drying times in accordance with manufacturer’s instructions before applying other materials or opening completed surface to foot traffic

D. Line markings:

1. Cleaning: Sweep and clean surface to eliminate loose material and dust.

2. Striping: Use surface coating manufacturer’s recommended marking paint. Allow surface coating to cure at least 8 hours before applying paint.

a. Lay out tennis court line markings in accordance with USTA Rules of Tennis.

b. Verify layout with Architect before application.

c. Apply paint with mechanical equipment to produce uniform straight edges. Apply at manufacturer’s recommended rate to provide 12 to 15 mils dry thickness.

3.2 PROTECTION

1. Allow a minimum of 24 hours curing time before opening tennis courts for play.

2. Protect applied concrete tennis court surface color coating system to ensure that, except for normal weathering, coating system will be without damage or deterioration at time of Substantial Completion

END OF SECTION 32 1800

hurley & stewart, llc 2800 s. 11th street kalamazoo, michigan 49009

269.552.4960 fax 269.552.4961 www.hurleystewart.com

REMOVALS LEGEND

ADDENDUM 1 JUNE 22, 2026

ECEC BERM

DEMOLITION

PLAN

CD 104

SEAL

OWNER

SITE ADDRESS

SHEET TITLE

PROJECT TITLE

SHEET NUMBER

DATE

PROJECT NUMBER

ALL SHEETS INTENDED FOR COLOR PLOT. VERIFY BLACK-

AND-WHITE PLOT FOR INFORMATION INTEGRITY

TOWERPINKSTER.COM

© 2026 ALL RIGHTS RESERVED

6/2 2/2

6 8

:1 8:

A

M

DR

AW

N

BY

: J

JU

MATTAWAN

CONSOLIDATED

SCHOOL

MATTAWAN, MICHIGAN

NATATORIUM + FIELD

HOUSE EARLY SITE

PACKAGE

23-106.040

June 5, 2026

ISSUED FOR DATE

AutoCAD SHX Text

CP#56

AutoCAD SHX Text

CP#104

AutoCAD SHX Text

2" P-MP

AutoCAD SHX Text

CB#39

AutoCAD SHX Text

CB#38

AutoCAD SHX Text

LB#87

AutoCAD SHX Text

12" RCP INV=830.66

AutoCAD SHX Text 4'x6' CONC. BOX CUL W. INV=830.27 E. INV=830.55

AutoCAD SHX Text

4' CHAIN LINK FENCE

AutoCAD SHX Text

"EARLY CHILDHOOD"

AutoCAD SHX Text

MULCH

AutoCAD SHX Text

OVERHANG

AutoCAD SHX Text

DETECTABLE STRIP

AutoCAD SHX Text

DETECTABLE STRIP

AutoCAD SHX Text

"NO BIKES"

AutoCAD SHX Text

DETECTABLE WARNING

AutoCAD SHX Text

BENCH (TYP.)

AutoCAD SHX Text

ALUMINUM BRIDGE

AutoCAD SHX Text

METAL GUARD RAIL

AutoCAD SHX Text

BENCH

AutoCAD SHX Text

MH-AK

AutoCAD SHX Text

"ONE WAY"

AutoCAD SHX Text ALL UTILITIES AS SHOWN ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL MEASUREMENTS AND AVAILABLE RECORDS. THEY SHOULD NOT BE INTERPRETED TO BE EXACT LOCATION NOR SHOULD IT BE ASSUMED THAT THEY ARE THE ONLY UTILITIES IN THE AREA.

http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM AutoCAD SHX Text

FIELD WORK PERFORMED BY: HURLEY & STEWART, LLC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 10ft.

AutoCAD SHX Text

CURB REMOVAL

AutoCAD SHX Text

SAWCUT

AutoCAD SHX Text

PAVEMENT/SIDEWALK REMOVAL

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text FINAL 13' OF GUARDRAIL AND POSTS TO BE REMOVED AND REPLACED IF NEEDED TO INSTALL NEW E2 CURB

AutoCAD SHX Text

SAWCUT AND REMOVE EXISTING CURB AND SIDEWALK

AutoCAD SHX Text

SAWCUT AND REMOVE EXISTING CONCRETE PAVEMENT

AutoCAD SHX Text

SAWCUT AND REMOVE EXISTING PAVEMENT

AutoCAD SHX Text

REMOVE AND REPLACE EXISTING CATCH BASIN

AutoCAD SHX Text

SALVAGE EXISTING FLAGPOLE AND REINSTALL AT SAME LOCATION

AutoCAD SHX Text S

AutoCAD SHX Text

UTILITY LINE REMOVAL

AutoCAD SHX Text

REMOVE

AutoCAD SHX Text

PROTECT

AutoCAD SHX Text

LIMITS OF CONSTRUCTION

AutoCAD SHX Text

SALVAGE

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text

TAKE CARE TO PREVENT DAMAGE TO EXISTING BUILDING DURING CONCRETE REMOVAL

AutoCAD SHX Text P

AutoCAD SHX Text A1 kalamazoo, michigan 49009

269.552.4960 fax 269.552.4961 www.hurleystewart.com

LEGEND

PARKING

SITE LEGEND

ADDENDUM 1 JUNE 22, 2026

ECEC BERM

LAYOUT PLAN

C 104

SEAL

OWNER

SITE ADDRESS

SHEET TITLE

PROJECT TITLE

SHEET NUMBER

DATE

PROJECT NUMBER

ALL SHEETS INTENDED FOR COLOR PLOT. VERIFY BLACK-

AND-WHITE PLOT FOR INFORMATION INTEGRITY

TOWERPINKSTER.COM

© 2026 ALL RIGHTS RESERVED

6/2 2/2

6 8

:1 8:

A

M

DR

AW

N

BY

: J

JU

MATTAWAN

CONSOLIDATED

SCHOOL

MATTAWAN, MICHIGAN

NATATORIUM + FIELD

HOUSE EARLY SITE

PACKAGE

23-106.040

June 5, 2026

ISSUED FOR DATE

AutoCAD SHX Text

4' CHAIN LINK FENCE

AutoCAD SHX Text

"EARLY CHILDHOOD"

AutoCAD SHX Text

MULCH

AutoCAD SHX Text

OVERHANG

AutoCAD SHX Text

DETECTABLE STRIP

AutoCAD SHX Text

"NO BIKES"

AutoCAD SHX Text

DETECTABLE WARNING

AutoCAD SHX Text

BENCH (TYP.)

AutoCAD SHX Text

ALUMINUM BRIDGE

AutoCAD SHX Text

METAL GUARD RAIL

AutoCAD SHX Text

BENCH

AutoCAD SHX Text

"ONE WAY"

AutoCAD SHX Text 10'

AutoCAD SHX Text 10'

AutoCAD SHX Text ALL UTILITIES AS SHOWN ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL MEASUREMENTS AND AVAILABLE RECORDS. THEY SHOULD NOT BE INTERPRETED TO BE EXACT LOCATION NOR SHOULD IT BE ASSUMED THAT THEY ARE THE ONLY UTILITIES IN THE AREA.

http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM AutoCAD SHX Text

FIELD WORK PERFORMED BY: HURLEY & STEWART, LLC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 10ft.

AutoCAD SHX Text

PARKING THIS SHEET = 0 SPACES

AutoCAD SHX Text

CONCRETE PAVEMENT AND SIDEWALK

AutoCAD SHX Text

CURB AND GUTTER

AutoCAD SHX Text

RESTORE AND RESEED GREENSPACE (SEE LANDSCAPE SPECS)

AutoCAD SHX Text

HEAVY-DUTY ASPHALT PAVEMENT

AutoCAD SHX Text

IC

AutoCAD SHX Text

TAPER FROM INTEGRAL CURB WALK TO FLUSH OVER 6 FEET

AutoCAD SHX Text

CC

AutoCAD SHX Text

CW

AutoCAD SHX Text

CW

AutoCAD SHX Text

DW

AutoCAD SHX Text E2

AutoCAD SHX Text E2

AutoCAD SHX Text

INSTALL MDOT C4 CURB OPENING ALONG REPLACED CURBLINE

AutoCAD SHX Text

HMA

AutoCAD SHX Text REPLACE EXISTING GUARDRAIL AND POSTS IF NEEDED TO INSTALL NEW E2 CURB. MATCH HEIGHT AND STYLE OF ADJACENT GUARDRAIL.

AutoCAD SHX Text

NOTE: REFER TO LANDSCAPE PLANS FOR ALL STRIPING AND SIGNAGE

AutoCAD SHX Text

C4 CURB AND GUTTER

AutoCAD SHX Text

CONCRETE WALK

AutoCAD SHX Text

CONCRETE COLLAR

AutoCAD SHX Text C4

AutoCAD SHX Text

CW

AutoCAD SHX Text

CC

AutoCAD SHX Text

INTEGRAL CURB WALK

AutoCAD SHX Text

IC

AutoCAD SHX Text

ADA RAMP

AutoCAD SHX Text

ADA

AutoCAD SHX Text

HMA PAVEMENT

AutoCAD SHX Text

HMA

AutoCAD SHX Text

DW

AutoCAD SHX Text

DETECTABLE WARNING STRIP

AutoCAD SHX Text

ROLLED CURB AND GUTTER

AutoCAD SHX Text

CR

AutoCAD SHX Text

E2 CURB

AutoCAD SHX Text E2

AutoCAD SHX Text

ADA

AutoCAD SHX Text

TAPER FROM EXISTING CURB SECTION TO FLUSH OVER 6 FEET

AutoCAD SHX Text

DW

AutoCAD SHX Text

ADA

AutoCAD SHX Text

SALVAGE AND REINSTALL EXISTING FLAGPOLE

AutoCAD SHX Text

IC

AutoCAD SHX Text

CW

AutoCAD SHX Text

MATCH EXISTING CURB SECTION

AutoCAD SHX Text

PARKING STRIPING (WHITE)

PROPOSED SHOT PUT

ELEVATION = 830.08

hurley & stewart, llc 2800 s. 11th street kalamazoo, michigan 49009

269.552.4960 fax 269.552.4961 www.hurleystewart.com

E8

E9

E12

S51

S53

S58

SOIL EROSION AND

SEDIMENTATION CONTROL MEASURES

WHERE USEDSYMBOLKEY

BEST

MANAGEMENT

PRACTICES

GRADING PLAN LEGEND

BM #XX

ADDENDUM 1 JUNE 22, 2026

FIELD EVENT

GRADING PLAN

C 201

SEAL

OWNER

SITE ADDRESS

SHEET TITLE

PROJECT TITLE

SHEET NUMBER

DATE

PROJECT NUMBER

ALL SHEETS INTENDED FOR COLOR PLOT. VERIFY BLACK-

AND-WHITE PLOT FOR INFORMATION INTEGRITY

TOWERPINKSTER.COM

© 2026 ALL RIGHTS RESERVED

6/2 2/2

6 8

:1 8:

A

M

DR

AW

N

BY

: J

JU

MATTAWAN

CONSOLIDATED

SCHOOL

MATTAWAN, MICHIGAN

NATATORIUM + FIELD

HOUSE EARLY SITE

PACKAGE

23-106.040

June 5, 2026

ISSUED FOR DATE

AutoCAD SHX Text

CP#96

AutoCAD SHX Text

UNKNOWN BURIED 3-4'±

AutoCAD SHX Text

UNKNOWN BURIED 1-2'±

AutoCAD SHX Text ALL UTILITIES AS SHOWN ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL MEASUREMENTS AND AVAILABLE RECORDS. THEY SHOULD NOT BE INTERPRETED TO BE EXACT LOCATION NOR SHOULD IT BE ASSUMED THAT THEY ARE THE ONLY UTILITIES IN THE AREA.

http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM AutoCAD SHX Text

FIELD WORK PERFORMED BY: HURLEY & STEWART, LLC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 20ft.

AutoCAD SHX Text Stabilization method utilized on sites where earth change has been completed (final grading attained).

AutoCAD SHX Text

PERMANENT SEEDING

AutoCAD SHX Text On exposed slopes, newly seeded areas, new ditch bottoms, or areas subject to erosion.

AutoCAD SHX Text

MULCH BLANKETS

AutoCAD SHX Text Use along shorelines, waterways, or where concentrated flows occur. Slows velocity, reduces sediment load, and reduces erosion.

AutoCAD SHX Text

RIPRAP

AutoCAD SHX Text Use adjacent to critical areas, to prevent sediment laden sheet flow from entering these areas.

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

STABILIZED CONSTRUCTION ACCESS

AutoCAD SHX Text Used at every point where construction traffic enters or leaves a construction site.

AutoCAD SHX Text

INLET PROTECTION FABRIC DROP

AutoCAD SHX Text Use at stormwater inlets, especially at construction sites.

AutoCAD SHX Text

SOIL EROSION MEASURE

AutoCAD SHX Text

EXISTING CONTOUR 5-FT

AutoCAD SHX Text

PROPOSED CONTOUR 5-FT

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING CONTOUR NORMAL

AutoCAD SHX Text

PROPOSED CONTOUR NORMAL

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING SPOT GRADE

AutoCAD SHX Text

PROPOSED SPOT GRADE

AutoCAD SHX Text 896.32

AutoCAD SHX Text

PROPOSED SILT FENCE

AutoCAD SHX Text

SOIL BORING

AutoCAD SHX Text

BENCH MARK

AutoCAD SHX Text

894.76 TOP

AutoCAD SHX Text

894.26 BTM

AutoCAD SHX Text

PROPOSED SPOT GRADES: TOP AND BOTTOM OF CURB/WALL

AutoCAD SHX Text 1:4

AutoCAD SHX Text

PROPOSED SURFACE SLOPE

AutoCAD SHX Text

PROPOSED GRADED SWALE

AutoCAD SHX Text

SEDIMENT CONTROL MEASURE

AutoCAD SHX Text 895.25

AutoCAD SHX Text 25%

AutoCAD SHX Text E

AutoCAD SHX Text

XX

AutoCAD SHX Text S

AutoCAD SHX Text

XX

AutoCAD SHX Text

SB

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

MATCH EXISTING GRADE AT REAR OF PUMPHOUSE

kalamazoo, michigan 49009

269.552.4960 fax 269.552.4961 www.hurleystewart.com

E8

E9

E12

S51

S58

SOIL EROSION AND

SEDIMENTATION CONTROL MEASURES

WHERE USEDSYMBOLKEY

BEST

MANAGEMENT

PRACTICES

GRADING PLAN LEGEND

BM #XX

ECEC BERM

GRADING PLAN

C 204

SEAL

OWNER

SITE ADDRESS

SHEET TITLE

PROJECT TITLE

SHEET NUMBER

DATE

PROJECT NUMBER

ALL SHEETS INTENDED FOR COLOR PLOT. VERIFY BLACK-

AND-WHITE PLOT FOR INFORMATION INTEGRITY

TOWERPINKSTER.COM

© 2026 ALL RIGHTS RESERVED

6/2 2/2

6 8

:1 8:

A

M

DR

AW

N

BY

: J

JU

MATTAWAN

CONSOLIDATED

SCHOOL

MATTAWAN, MICHIGAN

NATATORIUM + FIELD

HOUSE EARLY SITE

PACKAGE

23-106.040

June 5, 2026

ISSUED FOR DATE

ADDENDUM 1 JUNE 22, 2026

AutoCAD SHX Text

CP#56

AutoCAD SHX Text

CP#104

AutoCAD SHX Text ALL UTILITIES AS SHOWN ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL MEASUREMENTS AND AVAILABLE RECORDS. THEY SHOULD NOT BE INTERPRETED TO BE EXACT LOCATION NOR SHOULD IT BE ASSUMED THAT THEY ARE THE ONLY UTILITIES IN THE AREA.

http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM AutoCAD SHX Text

FIELD WORK PERFORMED BY: HURLEY & STEWART, LLC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 20ft.

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text Stabilization method utilized on sites where earth change has been completed (final grading attained).

AutoCAD SHX Text

PERMANENT SEEDING

AutoCAD SHX Text On exposed slopes, newly seeded areas, new ditch bottoms, or areas subject to erosion.

AutoCAD SHX Text

MULCH BLANKETS

AutoCAD SHX Text Use along shorelines, waterways, or where concentrated flows occur. Slows velocity, reduces sediment load, and reduces erosion.

AutoCAD SHX Text

RIPRAP

AutoCAD SHX Text Use adjacent to critical areas, to prevent sediment laden sheet flow from entering these areas.

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text

INLET PROTECTION FABRIC DROP

AutoCAD SHX Text Use at stormwater inlets, especially at construction sites.

AutoCAD SHX Text

SOIL EROSION MEASURE

AutoCAD SHX Text

EXISTING CONTOUR 5-FT

AutoCAD SHX Text

PROPOSED CONTOUR 5-FT

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING CONTOUR NORMAL

AutoCAD SHX Text

PROPOSED CONTOUR NORMAL

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING SPOT GRADE

AutoCAD SHX Text

PROPOSED SPOT GRADE

AutoCAD SHX Text 896.32

AutoCAD SHX Text

PROPOSED SILT FENCE

AutoCAD SHX Text

SOIL BORING

AutoCAD SHX Text

BENCH MARK

AutoCAD SHX Text

894.76 TOP

AutoCAD SHX Text

894.26 BTM

AutoCAD SHX Text

PROPOSED SPOT GRADES: TOP AND BOTTOM OF CURB/WALL

AutoCAD SHX Text 1:4

AutoCAD SHX Text

PROPOSED SURFACE SLOPE

AutoCAD SHX Text

PROPOSED GRADED SWALE

AutoCAD SHX Text

SEDIMENT CONTROL MEASURE

AutoCAD SHX Text 895.25

AutoCAD SHX Text 25%

AutoCAD SHX Text E

AutoCAD SHX Text

XX

AutoCAD SHX Text S

AutoCAD SHX Text

XX

AutoCAD SHX Text

SB

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

GRADE HIGH POINT ALONG WALK AT 835.90

STORM SEWER STRUCTURE SCHEDULE

2800 s. 11th street kalamazoo, michigan 49009

269.552.4960 fax 269.552.4961 www.hurleystewart.com

TO SHEET: MATCH

LINEC 303

TENNIS COURT

UTILITY PLAN

C 302

SEAL

OWNER

SITE ADDRESS

SHEET TITLE

PROJECT TITLE

SHEET NUMBER

DATE

PROJECT NUMBER

ALL SHEETS INTENDED FOR COLOR PLOT. VERIFY BLACK-

AND-WHITE PLOT FOR INFORMATION INTEGRITY

TOWERPINKSTER.COM

© 2026 ALL RIGHTS RESERVED

6/2 2/2

6 8

:1 8:

A

M

DR

AW

N

BY

: J

JU

MATTAWAN

CONSOLIDATED

SCHOOL

MATTAWAN, MICHIGAN

NATATORIUM + FIELD

HOUSE EARLY SITE

PACKAGE

23-106.040

June 5, 2026

ISSUED FOR DATE

ADDENDUM 1 JUNE 22, 2026

AutoCAD SHX Text

AutoCAD SHX Text

CP#62

AutoCAD SHX Text

CP#105

AutoCAD SHX Text

CB#1

AutoCAD SHX Text APPROXIMATE LOCATION OF COMM LINES PER GREINER, ES0.1, COMBINES ELECTRICAL SITE PLAN, SITE ADDITIONS & RENOVATIONS 1996 (NOT FIELD VERIFIED)

AutoCAD SHX Text

6' TALL CHAIN LINK FENCE

AutoCAD SHX Text ALL UTILITIES AS SHOWN ARE APPROXIMATE LOCATIONS DERIVED FROM ACTUAL MEASUREMENTS AND AVAILABLE RECORDS. THEY SHOULD NOT BE INTERPRETED TO BE EXACT LOCATION NOR SHOULD IT BE ASSUMED THAT THEY ARE THE ONLY UTILITIES IN THE AREA.

http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM http://WWW.HURLEYSTEWART.COM AutoCAD SHX Text

FIELD WORK PERFORMED BY: HURLEY & STEWART, LLC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 20ft.

AutoCAD SHX Text INSTALL HANDHOLE ALONG EXISTING FIBER AND REDIRECT TO BUS GARAGE. COORDINATE FINAL ROUTING WITH OWNER.

AutoCAD SHX Text PROPOSED ELECTRIC CONDUIT, LIGHT POLES, METER, AND HANDHOLES SHOWN FOR REFERENCE ONLY. REFER TO ELECTRIC PLANS FOR DESIGN

AutoCAD SHX Text COORDINATE STORM PIPE INSTALLATION WITH FENCING TO RUN STORM PIPE BETWEEN FENCE POSTS

5.00'

10.00'

.0

.0

17.46° 17.46°

1'-3 1/2"

/2

/2

/2

"A

A'

CL

3'-8 1/2"

FINISH GRADE

6X6 W2.0/W2.0

WWF

CONCRETE PAD W/

STANDARD BROOM FINISH

CONCRETE PAD W/ HEAVY

BROOM FINISH

ALUMINUM THROWING

CIRCLE PER SPECS.

2" WIDE PAINTED

WHITE LINES, TYP.

ALUMINUM

THROWING CIRCLE -

EMBED IN CONCRETE

AS SHOWN

CL

R 3' - 8 3/4"

/4

SECTION A-A'

1/4"X2"X2"

ALUMINUM ANGLE

AT 8'- 2 1/2" DIA.

34.92°

6'-7" 6'-7"

'-5

'-5

1'-0"

R 11' - 0"R 13' - 2"

CL

SEE DISCUS THROWING CIRCLE DETAIL

NET, TYP.

NET HOLD DOWN ANCHOR, TYP

POST, TYP

SCORE JOINT, TYP

STANDARD DUTY CONCRETE

PAVEMENT

LAWN

12'-2" 12'-2"10'-2"10'-2"

B B

PLAN

SECTION B-B

SAFETY ZONE

NOTE:

LOCATION AND ORIENTATION OF SHOT

PUT WILL BE DETERMINED IN FIELD

SURFACE MOUNTED TOEBOARD -

INNER EDGE OF TOEBOARD IS THE

LIMIT OF THE PUTTING CIRCLE

SHOTPUT

THROWING SECTOR

SECTOR LINE

SAFETY ZONE

4" REINFORCED CONCRETE SLAB

WITH THICKENED EDGE - BROOM

FINISH FOR 1/64" (1MM)

ROUGHNESS

ALUMINUM THROWING CIRCLE

6" MIN. COMPACTED SAND BASE

4" REINFORCED CONCRETE SLAB

WITH THICKENED EDGE - BROOM

FINISH FOR 1/64" (1MM)

ROUGHNESS

SURFACE MOUNTED TOEBOARD -

INNER EDGE OF TOEBOARD IS THE

LIMIT OF THE PUTTING CIRCLE

THROWING SECTOR

AGGREGATE

ø 7'

0"

/4

/4

R 3' - 6"

10' - 0"

PAINTED STRIPE (TYP.)

2" TYP.

THROWING SECTOR CRUSHED

LIMESTONE FINES, CIP

COMPACTED SUBGRADE

CLASS II SAND, CIP

6OZ NONWOVEN GEOTEXTILE FABRIC

4" PERFORATED DRAIN TILE IN 6AA STONE

BED, WRAPPED IN 6OZ NONWOVEN

GEOTEXTILE FABRIC - WHERE SHOWN ON

PLAN - SLOPE TO DRAIN, REFER TO CIVIL

M

IN

SLOPE SUBGRADE TO DRAIN (2% MIN.)

1' - 0"

CONCRETE EDGE, BROOM FINISH TOP

8"

THROWING SECTOR AGGREGATE,

REFER TO DETAIL 4/L151

COMPACTED SUBGRADE

SLOPE GRADE AWAY TO DRAIN - SEE CIVIL

#4 REBAR, CONTINUOUS

HOLD AGGREGATE 1/2" BELOW TOP

OF CONCRETE EDGE

GEOTEXTILE FABRIC

'-6

'-9

'-6

'-9

'-0

85'-0" CONCRETE

4" CROSSBAR

SUPPORT (TYP.)

8" BATTING CAGE

TENSION POLE (TYP.)

75'-0" NETTING

NOTE: ALL MEASUREMENTS ARE CENTER-TO-CENTER OF GROUND SLEEVE/POLE

'-0

'-0

60'-6"

43'-0"

78'-9" POSTS

TENSION CABLE SUPPORT (TYP.)

TENSION CABLE SUPPORT (TYP.)

TENSION CABLE SUPPORT (TYP.)

.0

' T

U R F

83'-0" TURF

12'-0"

6'-0"

'-0

'-5

2" WHITE BATTER'S BOX MARKINGS

ON TURF AT BOTH ENDS, TYP.

2'-0" X 6" PITCHER'S PLATE

MARKING ON TURF, TYP.

L

15.50' 14.75'14.75'

SEE CIVIL FOR GRADING

6" REINFORCED CONCRETE SLAB

WITH NON-INFILLED SYNTHETIC TURF

GLUED TO CONCRETE SURFACE

TENSION POST

SLEEVE (TYP.)

CONCRETE FOOTING

PER MANUFACTURER

NETTING PER SPECS

THICKENED EDGE

CONCRETE. SEE

DETAIL 8/L151

8" TENSION POLE, TYP.

CROSSBAR SUPPORT

1.00'

58.63'71' TURF

2.00'

13.69'

60'-8"73.00'

26.00'

SEE DETAIL

7/L151

CONCRETE (MEDIUM BROOM FINISH)

6X6 1.4/1.4 WWF REINFORCEMENT

1/2" EXP. JT. MATERIAL W/ SEALANT

(@ 30' O.C. MAX. OR AS SHOWN ON PLANS)

M

IN

1/4" TOOLED CONTROL JT. -

1" DEEP MIN. (@10' O.C. MAX.

OR AS SHOWN ON PLANS)

MDOT CLII SAND

6" CONCRETE

(MEDIUM BROOM

FINISH)

6X6 1.4/1.4 WWF

REINFORCEMENT

MDOT CLII SAND

"1

'-0

1" R (TYP.)

FINISH GRADE

COMPACTED

SUBGRADE

#2 REBAR

CONTINUOUS

1'-0"

SEAL

OWNER

SITE ADDRESS

SHEET TITLE

PROJECT TITLE

SHEET NUMBER

DATE

PROJECT NUMBER

ALL SHEETS INTENDED FOR COLOR PLOT. VERIFY BLACK-

AND-WHITE PLOT FOR INFORMATION INTEGRITY

TOWERPINKSTER.COM

© 2026 ALL RIGHTS RESERVED

/1

/2

:5

:1

A

M D

R A

W N

B Y

X

X X

MATTAWAN

CONSOLIDATED

SCHOOL

MATTAWAN, MICHIGAN

FIELD EVENT AND

BATTING CAGE

DETAILS

NATATORIUM + FIELD

HOUSE EARLY SITE

PACKAGE

23-106.40

L 151

JUNE 5, 2026

SCALE: NONEL 151

1 DISCUS THROWING CIRCLE DETAIL

SCALE: NONEL 151

2 DISCUS THROWING PAD

SCALE: NONEL 151

3 SHOTPUT THROWING PAD DETAIL

SCALE: NONEL 151

4 SHOTPUT THROWING SECTOR AGGREGATE

SCALE: NONEL 151

5 SHOTPUT THROWING SECTOR CONCRETE EDGE

SCALE: NONEL 151

6 TRIPLE TUNNEL BATTING CAGE DETAIL

CONCRETE

TURF - SEE SPEC

ISSUED FOR DATE

ADDENDUM 01 06/22/2026

SCALE: NONEL 151

9 TRIPLE TUNNEL BATTING CAGE SECTION DETAIL

SCALE: NONEL 151

7 BATTING CAGE CONCRETE SECTION

A1

SCALE: NONEL 151

8 BATTING CAGE THICKENED EDGE PERIMETER SECTION

1
2
3
4
03 3800 - POST-TENSIONED CONCRETE
03 3800 - POST-TENSIONED CONCRETE - 2
03 3800 - POST-TENSIONED CONCRETE - 3
03 3800 - POST-TENSIONED CONCRETE - 4
03 3800 - POST-TENSIONED CONCRETE - 5
03 3800 - POST-TENSIONED CONCRETE - 6
03 3800 - POST-TENSIONED CONCRETE - 7
03 3800 - POST-TENSIONED CONCRETE - 8
03 3800 - POST-TENSIONED CONCRETE - 9
32 1800 - ATHLETIC AND RECREATIONAL SURFACING - 1
32 1800 - ATHLETIC AND RECREATIONAL SURFACING - 2

This is the start of the file's text. The full file is on GovTribe.