23085.00 - Bid Pack 01 - Locker Package - Specs.pdf
PDF 456 KB Posted
- Attached to
- LOCKER REPLACEMENT PROJECT
- Solicitation number
- RFP-EJCS-250000002958-1
- Issued by
- Kalamazoo County, Huntington Woods City, Michigan
About this file
This document is a Specification Manual for the 2025 Bond Improvements Project, Bid Package #1 - Locker Replacement, prepared for East Jackson Community Schools in Jackson, Michigan. The project involves selective demolition, interior painting, and metal locker replacement at the school district's facilities. The specification manual, issued by Diekemahann (project number 23085.00), provides detailed technical requirements for contractors on August 6, 2025. The document outlines comprehensive specifications for demolition of existing structures, painting of various substrates including concrete masonry units, steel, and gypsum board, and installation of new welded corridor lockers.
The locker specifications detail precise technical requirements, including fabrication from 16-gauge steel, vented door designs, built-in combination locks, and powder-coated finishes. Manufacturers like Republic Storage Systems, LLC, ASI Storage Solutions, and LockersMFG are pre-approved for the project. The lockers will feature individual doors, frames, shelving, and accessories like identification plates and hooks. Installation instructions emphasize precise mounting, with lockers to be installed level, plumb, and anchored at specific intervals. The project includes a one-year warranty for welded metal lockers, with specific provisions for locks and equipment. The comprehensive specifications ensure a standardized, high-quality approach to the school's locker replacement initiative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification Manual
Project:
2025 Bond Improvements Bid Package #1 – Locker Replacement
Client:
East Jackson Community Schools 1404 North Sutton Road Jackson, Michigan 49202
DHAE Project No.: 23085.00 Issued for: Construction Documents Date: August 6, 2025
Copyright © 2025
EJCS 2025 Bond Improvements 000 - 1 Bid Package #1 – Locker Replacement 24047.01
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE (NOT USED)
DIVISION 04 – MASONRY (NOT USED)
DIVISION 05 - METALS (NOT USED)
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES (NOT USED)
DIVISION 07 - THERMAL AND MOISTURE PROTECTION (NOT USED)
DIVISION 08 - OPENINGS (NOT USED)
DIVISION 09 - FINISHES
099123 INTERIOR PAINTING
DIVISION 10 - FINISHES
105113 METAL LOCKERS
DIVISION 11 thru 27 (NOT USED)
END OF TABLE OF CONTENTS
EJCS 2025 Bond Improvements SELECTIVE DEMOLITION 024119-1
23085.00
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.5 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
3. Review areas where existing construction is to remain and requires protection.
EJCS 2025 Bond Improvements SELECTIVE DEMOLITION 024119-2
23085.00
1.6 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
1.7 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.8 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
EJCS 2025 Bond Improvements SELECTIVE DEMOLITION 024119-3
23085.00
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
B. Survey of Existing Conditions: Record existing conditions by use of measured drawings preconstruction photographs or video and templates.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain.
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
3. Cover and protect furniture, furnishings, and equipment that have not been removed.
B. Remove temporary barricades and protections where hazards no longer exist.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 2 hours after flame-cutting operations.
EJCS 2025 Bond Improvements SELECTIVE DEMOLITION 024119-4
23085.00
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch (19 mm) at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete. Neatly trim openings to dimensions indicated.
B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.
C. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings." Do not use methods requiring solvent-based adhesive strippers.
EJCS 2025 Bond Improvements SELECTIVE DEMOLITION 024119-5
23085.00
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn demolished materials.
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
ELCS 2025 Bond Improvements Interior Painting 099123-1
23085.00
SECTION 099123 - INTERIOR PAINTING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes surface preparation and the application of paint systems on the following interior substrates:
1. Concrete masonry units (CMU).
2. Steel.
3. Gypsum board.
4. Concrete.
1.3 DEFINITIONS
A. Gloss Level 1: Not more than 5 units at 60 degrees and 10 units at 85 degrees, according to
ASTM D 523.
B. Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to
ASTM D 523.
C. Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application instructions. Use Finish Key designations.
B. Samples for Verification: For each type of paint system and in each color and gloss of topcoat.
1. Submit Samples on rigid backing, 200 mm (8 inches) square.
2. Label each coat of each Sample.
3. Use Finish Key designations.
C. Product List: For each product indicated, include the following:
1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.
ELCS 2025 Bond Improvements Interior Painting 099123-2
23085.00
2. Printout of current "MPI Approved Products List" for each product category specified in Part 2, with the proposed product highlighted.
3. VOC content.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Paint: 5 percent, but not less than 3.8 L (1 gal.) of each material and color applied.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 7 deg C (45 deg F).
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste from storage areas daily.
1.7 FIELD CONDITIONS
A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 10 and 35 deg C (50 and 95 deg F).
B. Do not apply paints when relative humidity exceeds 85 percent; at temperatures less than 3 deg C (5 deg F) above the dew point; or to damp or wet surfaces.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
1. Refer to Finish Key and Schedule. No substitutions allowed.
B. Products: Subject to compliance with requirements, provide product listed in other Part 2 articles for the paint category indicated.
2.2 PAINT, GENERAL
A. MPI Standards: Provide products that comply with MPI standards indicated and that are listed in its "MPI Approved Products List."
http://www.specagent.com/LookUp/?ulid=544&mf=04&mf=95&src=wd&mf=04&src=wd
ELCS 2025 Bond Improvements Interior Painting 099123-3
23085.00
B. Material Compatibility:
1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.
C. VOC Content: Products shall comply with VOC limits of authorities having jurisdiction and, for interior paints and coatings applied at Project site, the following VOC limits, exclusive of colorants added to a tint base, when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
1. Flat Paints and Coatings: 50 g/L.
2. Nonflat Paints and Coatings: 150 g/L.
3. Primers, Sealers, and Undercoaters: 200 g/L.
4. Anticorrosive and Antirust Paints Applied to Ferrous Metals: 250 g/L.
D. Low-Emitting Materials: Interior paints and coatings shall comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."
E. Colors: Refer to Finish Key and Schedule.
2.3 BLOCK FILLERS
A. Block Filler, Latex, Interior/Exterior: MPI #4.
2.4 PRIMERS/SEALERS
A. Primer Sealer, Interior, Institutional Low Odor/VOC: MPI #149.
B. Primer Sealer, Interior, Kem Cati Coat HS Epoxy Filler
2.5 METAL PRIMERS
A. Primer, Rust-Inhibitive, Water Based: MPI #107.
2.6 WATER-BASED PAINTS
A. Latex, Interior, Institutional Low Odor/VOC, (Gloss Level 3): MPI #145.
B. Acrylic, Interior, High Performance, (Gloss Level 3): MPI #139.
C. Acrylic, Interior, High Performance, Semi-Gloss (Gloss Level 5): MPI #141.
D. Epoxy System.
ELCS 2025 Bond Improvements Interior Painting 099123-4
23085.00
2.7 OIL-BASED PAINTS
A. Macropoxy 646-100, Interior, Semi-Gloss (Gloss Level 5)
2.8 FLOOR COATINGS
A. Latex, Water Based for Concrete Floors: MPI #99
2.9 SOURCE QUALITY CONTROL
A. Testing of Paint Materials: Owner reserves the right to invoke the following procedure:
1. Owner will engage the services of a qualified testing agency to sample paint materials.
Contractor will be notified in advance and may be present when samples are taken. If paint materials have already been delivered to Project site, samples may be taken at Project site.
Samples will be identified, sealed, and certified by testing agency.
2. Testing agency will perform tests for compliance with product requirements.
3. Owner may direct Contractor to stop applying coatings if test results show materials being used do not comply with product requirements. Contractor shall remove noncomplying paint materials from Project site, pay for testing, and repaint surfaces painted with rejected materials. Contractor will be required to remove rejected materials from previously painted surfaces if, on repainting with complying materials, the two paints are incompatible.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:
1. Concrete: 12 percent.
2. Masonry (Clay and CMU): 12 percent.
3. Gypsum Board: 12 percent.
C. Gypsum Board Substrates: Verify that finishing compound is sanded smooth.
D. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
E. Proceed with coating application only after unsatisfactory conditions have been corrected.
ELCS 2025 Bond Improvements Interior Painting 099123-5
23085.00
1. Application of coating indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Manual" applicable to substrates indicated.
B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.
C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.
D. Concrete Substrates: Remove release agents, curing compounds, efflorescence, and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces to be painted exceeds that permitted in manufacturer's written instructions.
E. Masonry Substrates: Remove efflorescence and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces or mortar joints exceed that permitted in manufacturer's written instructions.
F. Steel Substrates: Remove rust, loose mill scale, and shop primer, if any. Clean using methods recommended in writing by paint manufacturer but not less than the following:
1. SSPC-SP 2, "Hand Tool Cleaning."
2. SSPC-SP 3, "Power Tool Cleaning."
3. SSPC-SP 7/NACE No. 4, "Brush-off Blast Cleaning."
4. SSPC-SP 11, "Power Tool Cleaning to Bare Metal."
G. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop priming to comply with SSPC-PA 1 for touching up shop-primed surfaces.
3.3 APPLICATION
A. Apply paints according to manufacturer's written instructions and to recommendations in "MPI Manual."
1. Use applicators and techniques suited for paint and substrate indicated.
2. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces.
Before final installation, paint surfaces behind permanently fixed equipment or furniture with prime coat only.
ELCS 2025 Bond Improvements Interior Painting 099123-6
23085.00
3. Paint front and backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.
4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
5. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.
B. Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of same material are to be applied. Tint undercoats to match color of topcoat, but provide sufficient difference in shade of undercoats to distinguish each separate coat.
C. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.
D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
E. Painting Fire Suppression, Plumbing, HVAC, Electrical, Communication, and Electronic Safety and Security Work:
1. Paint the following work where exposed in occupied spaces:
a. Equipment, including panelboards.
b. Uninsulated metal piping.
c. Uninsulated plastic piping.
d. Pipe hangers and supports.
e. Metal conduit.
f. Plastic conduit.
g. Duct, equipment, and pipe insulation having cotton or canvas insulation covering or other paintable jacket material.
h. Other items as directed by Architect.
3.4 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.
ELCS 2025 Bond Improvements Interior Painting 099123-7
23085.00
3.5 INTERIOR PAINTING SCHEDULE
A. CMU Substrates:
1. Institutional Low-Odor/VOC Latex System:
a. Block Filler: Block filler, latex, interior/exterior, MPI #4.
b. Intermediate Coat: Latex, interior, institutional low odor/VOC, matching topcoat.
c. Topcoat: Latex, interior, institutional low odor/VOC, (Gloss Level 3), MPI #145.
2. Waterbased Catalyzed Epoxy System:
a. Block Filler: Block filler, latex, interior/exterior, MPI #4.
b. Prime Coat: Primer sealer interior, institutional low odor/VOC, MPI #149.
c. Topcoat: Waterbased catalyzed epoxy, (Gloss Level 3), MPI #141
3. Oil based Epoxy System:
a. Block Filler: Block filler, latex, interior/exterior, MPI #4.
b. Prime Coat: Kem Cati Coat HS Epoxy Filler
c. Topcoat: Macropoxy 646-100
B. Steel Substrates:
1. Water-Based Acrylic High Performance Coating System:
a. Prime Coat: Primer, rust-inhibitive, water based MPI #107.
b. Intermediate Coat: Light industrial coating, interior, water based, matching topcoat.
c. Topcoat: Light industrial coating, interior, water based (Gloss Level 3), MPI #151.
d. Topcoat: Light industrial coating, interior, water based, semi-gloss (Gloss
Level 5), MPI #153.
C. Gypsum Board Substrates:
1. Institutional Low-Odor/VOC Latex System:
a. Prime Coat: Primer sealer, interior, institutional low odor/VOC, MPI #149.
b. Intermediate Coat: Latex, interior, institutional low odor/VOC, matching topcoat.
c. Topcoat: Latex, interior, institutional low odor/VOC, (Gloss Level 3), MPI #145.
D. Concrete Substrates, Traffic Surfaces:
1. Water-Based Clear Sealer System:
a. H&C Clarishield Water-Based Clear Sealer Wet Look
ELCS 2025 Bond Improvements Interior Painting 099123-8
23085.00
END OF SECTION 099123
EJCS 2025 Bond Improvements METAL LOCKERS 105113-1
23085.00
SECTION 105113 - METAL LOCKERS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Welded corridor lockers.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project Site.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: For metal lockers.
1. Include plans, elevations, sections, and attachment details.
2. Include locker identification system and numbering sequence.
C. Samples: For each color specified.
1.4 INFORMATIONAL SUBMITTALS
A. Sample warranty.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.6 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of metal lockers that fail in materials or workmanship, excluding finish, within specified warranty period.
1. Warranty Period for Welded Metal Lockers: One year from delivery date
2. Warranty Period for Locks: Limited based on lock manufacturer’s warranty and no warranty extension is available.
EJCS 2025 Bond Improvements METAL LOCKERS 105113-2
23085.00
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Accessibility Standard: For lockers indicated to be accessible, comply with applicable provisions in ICC A117.1
2.2 WELDED CORRIDOR LOCKERS
A. Manufacturers: Subject to compliance with requirements, provide products by the following:
1. Republic Storage Systems, LLC
2. ASI Storage Solutions.
3. LockersMFG.
4. Or Pre-Approved Equal. Substitutions must be submitted to Architect (1) week prior to bid due date to be considered.
B. Doors: One piece; fabricated from 16 gauge - 0.0598 inch nominal-thickness steel sheet;
formed into channel shape with double bend at vertical edges and with right-angle single bend at horizontal edges.
1. Reinforcement: Manufacturer's standard reinforcing angles, channels, or stiffeners for doors more than 15 inches (381 mm) wide; welded to inner face of doors.
2. Door Style: Vented panel as follows:
a. Louvered Vents: No fewer than six louver openings at top and bottom for single-tier lockers.
C. Body: Assembled by welding body components together. Fabricate from unperforated steel sheet with thicknesses as follows:
1. Tops, Bottoms, and Sides: 24 gauge 0.024-inch (0.61-mm) nominal thickness.
2. Backs: 24 gauge 0.024-inch (0.61-mm) nominal thickness.
3. Shelves: 24 gauge 0.024-inch (0.61-mm) nominal thickness, with double bend at front and single bend at sides and back.
D. Frames: Channel formed; fabricated from 16 gauge - 0.0598 inch (1.52-mm) nominal-thickness steel sheet; lapped and factory welded at corners; with top and bottom main frames factory welded into vertical main frames. Form continuous, integral, full-height door strikes on vertical main frames.
E. Hinges:
1. Knuckle Hinges: Steel, full loop, five knuckles, tight pin; minimum 2 inches (51 mm) high. Provide no fewer than three hinges for each door more than 42 inches (1067
mm) high.
http://www.specagent.com/Lookup?ulid=7285 http://www.specagent.com/Lookup?ulid=7285 http://www.specagent.com/Lookup?ulid=7285 http://www.specagent.com/Lookup?uid=123457220020 http://www.specagent.com/Lookup?uid=123457220020 http://www.specagent.com/Lookup?uid=123457220020 http://www.specagent.com/Lookup?uid=123457219993 http://www.specagent.com/Lookup?uid=123457219993 http://www.specagent.com/Lookup?uid=123457220012 http://www.specagent.com/Lookup?uid=123457220012
EJCS 2025 Bond Improvements METAL LOCKERS 105113-3
23085.00
F. Recessed Door Handle and Latch: Stainless steel cup with integral door pull, recessed so locking device does not protrude beyond door face; pry and vandal resistant.
1. Multipoint Latching: Finger-lift latch control designed for use with built-in combination locks; positive automatic latching and prelocking.
a. Latch Hooks: Equip doors 48 inches (1219 mm) and higher with three latch hooks and doors less than 48 inches (1219 mm) high with two latch hooks;
fabricated from 0.120-inch (3.04-mm) nominal-thickness steel sheet; welded to full-height door strikes; with resilient silencer on each latch hook.
b. Latching Mechanism: Manufacturer's standard, rattle-free latching mechanism.
G. Locks: Built-in combination locks
H. Identification Plates: Manufacturer's standard, etched, embossed, or stamped aluminum plates, with numbers and letters at least 3/8 inch (9 mm) high.
I. Hooks: Manufacturer's standard ball-pointed, aluminum or steel; zinc plated.
J. Coat Rods: Manufacturer's standard.
K. Continuous Sloping Tops: Fabricated from 0.048-inch (1.21-mm) nominal-thickness steel sheet, with a pitch of approximately 20 degrees.
1. Closures: Vertical-end type.
L. Filler Panels: Fabricated from 0.048-inch (1.21-mm) nominal-thickness steel sheet.
M. Finished End Panels: Fabricated from 0.024-inch (0.61-mm) nominal-thickness steel sheet to cover unused penetrations and fasteners, except for perimeter fasteners, at exposed ends of non-recessed metal lockers; finished to match lockers.
N. Materials:
1. Mild Cold-Rolled Steel Sheet: ASTM A1008/A1008M, Commercial Steel (CS), Type B, suitable for exposed applications.
O. Finish: Powder coat.
1. Color: As selected by Architect from manufacturer's full range.
2.3 LOCKS
A. Built-in Combination Lock: Key-controlled, three-number dialing combination locks; capable of at least five combination changes made automatically with a control key.
1. Bolt Operation: automatically locking spring bolt.
2. Designed for permanently assigned access via entry of user's four-digit code.
EJCS 2025 Bond Improvements METAL LOCKERS 105113-4
23085.00
2.4 FABRICATION
A. Fabricate metal lockers square, rigid, without warp, and with metal faces flat and free of dents or distortion. Make exposed metal edges safe to touch and free of sharp edges and burrs.
B. Fabricate each metal locker with an individual door and frame; individual top, bottom, and back; and common intermediate uprights separating compartments.
C. Equipment: Provide each locker with an identification plate and the following equipment:
1. Single-Tier Units: Shelf, one double-prong ceiling hook, and two single-prong wall hooks.
D. Welded Construction: Factory preassemble metal lockers by welding all joints, seams, and connections; with no bolts, nuts, screws, or rivets used in assembly of main locker groups.
Factory weld main locker groups into one-piece structures. Grind exposed welds smooth and flush.
E. Accessible Lockers: Fabricate as follows:
1. Locate bottom shelf no lower than 15 inches (381 mm) above the floor.
2. Where hooks, coat rods, or additional shelves are provided, locate no higher than 48 inches (1219 mm) above the floor.
F. Continuous Sloping Tops: Fabricated in lengths as long as practical, without visible fasteners at splice locations; finished to match lockers.
G. Individual Sloping Tops: Fabricated in width to fit one locker frame in lieu of flat locker tops;
with integral back; finished to match lockers. Provide wedge-shaped divider panels between lockers.
H. Recess Trim: Fabricated with minimum 2-1/2-inch (64-mm) face width and in lengths as long as practical; finished to match lockers.
I. Filler Panels: Fabricated in an unequal leg angle shape; finished to match lockers. Provide slip-joint filler angle formed to receive filler panel.
J. Boxed End Panels: Fabricated with 1-inch- (25-mm-) wide edge dimension and designed for concealing fasteners and holes at exposed ends of non-recessed metal lockers; finished to match lockers.
K. Finished End Panels: Fabricated to conceal unused penetrations and fasteners, except for perimeter fasteners, at exposed ends of non-recessed metal lockers; finished to match lockers.
L. Center Dividers: Full-depth, vertical partitions between bottom and shelf; finished to match lockers.
EJCS 2025 Bond Improvements METAL LOCKERS 105113-5
23085.00
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install lockers level, plumb, and true; shim as required, using concealed shims.
1. Anchor locker runs at ends and at intervals recommended by manufacturer, but not more than 36 inches (910 mm) o.c. Using concealed fasteners, install anchors through backup reinforcing plates, channels, or blocking as required to prevent metal distortion.
2. Anchor single rows of metal lockers to walls near top and bottom of lockers.
3. Anchor back-to-back metal lockers to floor.
B. Welded Lockers: Connect groups together with manufacturer's standard fasteners, with no exposed fasteners on face frames.
C. Trim: Fit exposed connections of trim, fillers, and closures accurately together to form tight, hairline joints, with concealed fasteners and splice plates.
1. Attach recess trim to recessed metal lockers with concealed clips.
2. Attach filler panels with concealed fasteners.
3. Attach sloping-top units to metal lockers, with closures at exposed ends.
4. Attach finished end panels using fasteners only at perimeter to conceal exposed ends of non-recessed metal lockers.
D. Fixed Benches: Provide no fewer than two pedestals for each bench, uniformly spaced not more than 72 inches (1830 mm) apart.
END OF SECTION 105113
File details come from the government source that posted it. Updated .