This document is a solicitation (Invitation for Bid 23-518-IFB) from the Greater Orlando Aviation Authority for Preconditioned Air (PCA) Units to be installed at Orlando International Airport. The Aviation Authority is seeking ten (10) Passenger Boarding Bridge mounted air conditioning units, specifically four (4) 60-ton refrigeration units and six (6) 90-ton refrigeration units. The PCA units must be designed to maintain a 68°F cabin temperature, mounted to the underside of passenger boarding bridges without exceeding structural or operational design limits, and include comprehensive specifications for design, electrical systems, testing, and performance.

The solicitation requires a minimum two-year warranty with all parts covered, and the units must be designed for a ten-year minimum life expectancy with spare parts guaranteed for fifteen years after the last supply instance. Each unit must include specific spare parts such as two filter sets, touch-up paint, Wi-Fi hardware, and variable frequency drive components. The units must have specific design characteristics including powder-coated frames, sealed motors, dual air outlets, and meet various electrical, safety, and performance standards. Programming upgrades and technical support must be provided throughout the lifetime of the units at no additional cost to the Aviation Authority.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

23-518-IFB

Preconditioned Air Units

Attachment C – Preconditioned Air Units

Attachment B – Preconditioned Air Units Specifications

The units shall be designed to conform to all applicable Federal, State and Local codes and regulations as applicable to the location of the installation. The units shall be designed and manufactured in compliance with the following requirements including but not limited to:

1. PCA Design:

• The design of the Aircraft Preconditioned air [PCA] unit shall provide for a self- contained, air-cooled, air- conditioning unit. All necessary controls and flexible air hose ducting shall be included in the design of the unit.

• The PCA units shall have Powder coated (arctic white) Galvaneal tube frame/powder coated Aluminum skin and panels or epoxy powder coated (arctic white) steel panels, all hardware stainless steel with approval/Ratings IEC, ETL, UL, CSA. Standard frame that is galvanized and powder coated is also acceptable.

• Sealed motors required.

• Variable Frequency Drive (VFD) driven blowers preferred.

• Dual outlet required. Each outlet shall be distinguished per airflow

(bridge pre-cool and aircraft). Airflow shall be dedicated to each mode when selected.

2. PCA specifications of the proposed unit(s) including, but not limited to the following:

• General Design

i. Summer Design & Performance Conditions: The PCA unit shall be designed to maintain a 68 'F ± cabin temperature in all aircraft for which it is designed to cool at Orlando International Airport

ii. Load & Mounting

iii. Refrigerants

iv. Air Conditioning Components

v. Air Moving Components

vi. Safety Provisions and Components

vii. Condensation Handling

viii. Airflow Controls

ix. Airflow Ducting

x. Air Filters (include alternates if available)

xi. Air Hose Handling System/Air Hoses

xii. Blower

xiii. Size and Weight

xiv. Noise and Vibration

xv. Access Panels, Doors and connections.

xvi. Bridge Pre-Cooling (duct and plenum currently mounted on PBB’s)

Attachment C – Preconditioned Air Units

• Electrical Design

i. General Description

ii. Controls

iii. Smoke Detector

iv. Electromagnetic Interference

v. Motor

• Programming Devices & Software (Include information about licensing, program version number, requirements and restrictions).

• Finishes / Markings

• Testing Protocols (Manufacturer’s site and Field)

• Do not include hose storage devices with your bid.

• Bridge pre-cool.

• A Maintenance Program is NOT requested under this solicitation.

However, the Vendor shall train and permit the Aviation Authority’s maintenance provider to perform all necessary maintenance aspects to ensure warranty remains in place.

• Operation and maintenance instructions for all electrical, mechanical, and instrumentation & controls equipment furnished. Furnish one (1) complete set of operation and maintenance manual covering all equipment furnished. One (1) electronic copy of the manual shall also be provided.

• Bound laminated quick reference sheets shall be placed inside each of the units:

i. Starting and stopping procedures

ii. Special operating instructions

iii. Trouble shooting procedures

iv. Routine maintenance procedures

v. Name, address, and telephone numbers of manufacturer’s service representative

• Major Component Listing – Quantity, Manufacturer, Model, Part Number, Specifications and Component Unit Pricing.

3. Load and Mounting Requirements:

• The PCA units shall be able to be mounted to the underside of the outermost tunnel on the Passenger Boarding Bridge (PBB) without exceeding the PBB design, both structural and operational, and without affecting maintenance access to the PBB.

• The PCA equipment shall not interfere with the operation of the PBB to its normal limits.

• Bridge mounting brackets shall be provided for all the units. See below for “Pedestrian Boarding Bridge Manufacturer, Model and Serial Numbers” chart.

4. Warranty:

• Minimum 2-year warranty is required commencing after commissioning and start-up testing by Vendor. All parts and components shall be covered under this warranty.

5. Life Expectancy:

• The PCA units shall be designed for a minimum life of ten (10) years with routine and periodic servicing.

• Spare parts shall be guaranteed for a minimum of fifteen (15) years after the last supply instance of the same make and model.

6. Special Tools & Equipment:

• Manufacturers of equipment and machinery shall furnish any special tools (including grease guns, monitoring devices, etc...) required for normal adjustment, operations and maintenance, together with instructions of use.

7. Testing and Commissioning

• Start-up testing must be performed for at least twelve (12) hours at a minimum of three (3) hour intervals constant running.

• Performance graph to be provided for each test run.

• The Manufacturer’s Representative shall certify that the installation of the equipment is satisfactory; that the unit has been satisfactorily tested; that the equipment is ready for operation; and, that the operating personnel have been suitably instructed in the operation, maintenance, care, and safe operation of the equipment.

8. Programming upgrades and technical support shall be included throughout the lifetime of the PCA units at no additional cost to the Authority.

9. Hardware such as Wi-Fi antennas or extenders and connection cables required for program installation and upgrades shall be included with each of the units.

10. Spare Parts – The following parts shall be provided with each of the units:

• Filters – 2 sets per unit

• Touch-up Paint – 1/4 gallon per unit

• Wi-Fi Antenna, extenders and connection cable (50 feet) (if applicable)

– 1 per unit

• VFD for condenser – 2 per unit

PEDESTRIAN BOARDING BRIDGE MANUFACTURER, MODEL

AND SERIAL NUMBERS

Gate PBB Model # PBB Serial # PBB Manufacturer

36 TB 37/18.5-3 05158TB3731446 Thyssenkrupp 23 A3-58/110-125R OG33851 JBT AeroTech 10 TB 25/14.5-3 05158TB2531443 Thyssenkrupp 26 TB 35/17.5-3 05158TB3531429 Thyssenkrupp 8 TB 43/20.5-3 05158TB4331489 Thyssenkrupp

17 TB 33/17.0-3 05158TB3331502 Thyssenkrupp 11 TB 35/17.5-3 05158TB3531514 Thyssenkrupp 22 TB 33/17.0-3 05158TB3331492 Thyssenkrupp 95 A3-58/110-125R OG36395 FMC Jetway 97 A3-60/119-125R OG34120 JBT AeroTech

Attachment C – Preconditioned Air Units Specifications