These are landscape and irrigation design plans for the Sunrise Park Improvements project for the City of Holly Hill, Florida, identified under Bid No. 22-BG-12. The project involves comprehensive landscape and irrigation installation for a 3.5-acre waterfront park site located adjacent to a river, with detailed technical drawings showing site layout, irrigation systems, planting details, and infrastructure improvements. The plans include a site irrigation plan with multiple irrigation zones, specific sprinkler and rotor details, comprehensive plant lists featuring various tree and ground cover species, and intricate planting and root barrier installation specifications.
The design documents reveal a sophisticated park improvement strategy that preserves existing landscape elements while introducing new plantings, irrigation infrastructure, and site amenities. The site plan incorporates multiple blue infrastructure elements, appears to include parking areas, and features a geometric layout with carefully planned irrigation loops and plant installation zones. The drawings provide technical specifications for tree planting, including root barrier details, guy wire installation, and specific planting techniques for different vegetation types such as palm trees, multi-trunk trees, and ground cover. The irrigation system design includes hybrid controller configurations, rain sensor mounting details, and specific irrigation notes addressing water conservation and optimal plant health strategies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid_Meeting_22-BG-12.m4a | M4A file | |
| Invitation_to_Bid_6.doc | DOC document | |
| ITB_Sunrise_Park_Improvements-Landscape_and_Irrigation_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE CITY'S PUBLIC UTILITIES DEPARTMENT (248-9463) SHALL BE GIVEN A MINIMUM OF 48 HOURS ADVANCE
NOTICE (NOT INCLUDING HOLIDAYS OR WEEKENDS) PRIOR TO BEGINNING ANY CONSTRUCTION.
2. THE CONTRACTOR SHALL AT ALL TIMES, DURING PIPE LAYING OPERATIONS, DEWATER THE GROUND SUFFICIENTLY TO KEEP THE GROUNDWATER ELEVATION A MINIMUM OF 6" BELOW THE PIPE BEING LAID
WITHIN THE AREA OF THE TRENCH.
3. ALL PIPES SHALL BE LAID ON A FIRM FOUNDATION. SOFT OR SPONGY BEDDING FOR PIPES IS NOT ACCEPTABLE. ANY UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH A DRY, COMPACTED, GRANULAR MATERIAL SATISFACTORY TO THE CITY.
4. ON ALL EXCAVATION AND BACKFILLING THE CONTRACTOR SHALL PROVIDE ADEQUATE SHEETING AND BRACING IN ORDER TO PROVIDE FOR THE SAFETY OF WORKMEN, AS WELL AS REPRESENTATIVES OF THE
CITY, THE DESIGN ENGINEER, AND THE DEVELOPER.
5. ALL TRENCHES SHALL BE BACKFILLED WITH CLEAN FILL AND COMPACTED TO THE SPECIFIED MINIMUM COMPACTION (95% IN UNPAVED AREAS AND 98% IN PAVED AREAS) OF THE OPTIMUM DENSITY OF THAT
MATERIAL BASED ON THE AASHTO T-180 MODIFIED PROCTOR TEST.
6. THE CONTRACTOR SHALL EMPLOY AN INDEPENDENT TESTING LABORATORY AT HIS OWN EXPENSE TO INSURE THAT COMPACTION OF ALL FILL MATERIAL IS COMPLETED PROPERLY. TESTS SHALL BE DONE ONE FOOT ABOVE THE PIPE AND THEN AT ONE FOOT VERTICAL INTERVALS UNTIL FINAL GRADE IS REACHED.
TESTING SHALL BE COMPLETED AND TEST DOCUMENTS SUBMITTED TO THE CITY AT A MINIMUM
FREQUENCY OF ONE SET OF TESTS BETWEEN EACH MANHOLE AND ONE ADDITIONAL SET OF TESTS AT EVERY MANHOLE. IDENTIFICATION OF TEST LOCATIONS SHALL BE CLEARLY INDICATED ON TEST
REPORTS. TEST RESULTS SHALL BE FORWARDED PROMPTLY TO THE CITY'S DESIGNATED SITE
INSPECTOR.
7. ALL TESTING REQUIRED BY THE CITY SHALL BE PAID FOR BY THE CONTRACTOR/DEVELOPER
8. ALL TAPPING OF MAINS AND CORING OF MANHOLES SHALL BE WITNESSED BY THE CITY AND BILLED IN ACCORDANCE WITH THE ADOPTED FEE RESOLUTION. SCHEDULING OF THESE CONNECTIONS SHALL REQUIRE A MINIMUM 48 HOUR NOTIFICATION (MEASURED ON NORMAL WORK DAYS) DIRECTED TO THE CITY'S DESIGNATED SITE INSPECTOR WHO SHALL COORDINATE THE WORK DIRECTLY WITH THE PUBLIC UTILITIES DEPARTMENT. SUBSEQUENTLY, THE CONNECTION SHALL BE SCHEDULED TO COMMENCE
BETWEEN 8:00 A.M. AND NOON ON THE APPROPRIATE DAY ESTABLISHED BY CITY.
9. WITH RESPECT TO TIE-IN CONNECTIONS AND CORING OPERATIONS, THE CITY RESERVES THE RIGHT TO REQUIRE CONNECTIONS TO BE PERFORMED DURING PERIODS OF LOW FLOW (MIDNIGHT TO 6:00 A.M.) IN
ORDER TO MINIMIZE SERVICE DISRUPTION TO EXISTING CUSTOMERS.
10. ALL PVC PIPE SHALL BE STORED IN SUCH A WAY AS TO PREVENT WARPING, DEFLECTION, OR DEFORMATION. ANY PIPE DEEMED TO BE MISSHAPED IN ANY WAY FOR ANY REASON SHALL BE REJECTED.
11. NO USED, RE-USED, RUSTED, SECOND HAND, OR ANY MATERIAL THAT IS NOT NEW SHALL BE USED IN ANY
UTILITY IMPROVEMENT PROJECTS WITHIN THE CITY'S SERVICE AREA.
Z:
\C ity o f H ol ly H ill \H ol ly
H ill
Su nr ise
P ar k
- 2
3-
\D W
Gs \2
3-
S un ris e
Pa rk
6.
.2
4.
dw g, /2 4/
1:
:4
AM
, A lle n' s-
PC
Au to
CA
D
P D
F (S m al le st
F ile
).p c3
Z:
\C ity o f H ol ly H ill \H ol ly
H ill
Su nr ise
P ar k
- 2
3-
\D W
Gs \2
3-
S un ris e
Pa rk
6.
.2
4.
dw g, /2 4/
1:
:4
AM
, A lle n' s-
PC
Au to
CA
D
P D
F (S m al le st
F ile
WATERING
SUSPENDED
BY SENSOR
SENSOR
ACTIVEOFF
WITH CYCLE + SOAK
MAN-
START
ADV.
PGMOFFON
STATION WATERING TIME
WATERING START TIME
MY PUMP START
PROGRAM OVERLAP
TIME
CALENDAR
EVENT DAY OFF
RAIN DELAY
MON
TUE
WED
THUFRISAT
SUN
AUTOOFF
MANUAL WATERING
TEST PROGRAM
CYCLE + SOAK
WATER
BUDGET
EVEN DAYS
ODD DAYS
CYCLICAL
CUSTOM
CUSTOM
DAY CYCLE
CYCLICAL
DAY CYCLE
LINKED TO
MAXICOM
STATION
STATUS
PUMP / MV
STATUS
EVEN DAY
CYCLE
ODD DAY
CYCLE
Z:
\C ity o f H ol ly H ill \H ol ly
H ill
Su nr ise
P ar k
- 2
3-
\D W
Gs \2
3-
S un ris e
Pa rk
6.
.2
4.
dw g, /2 4/
1:
:5
AM
, A lle n' s-
PC
Au to
CA
D
P D
F (S m al le st
F ile
Z:
\C ity o f H ol ly H ill \H ol ly
H ill
Su nr ise
P ar k
- 2
3-
\D W
Gs \2
3-
S un ris e
Pa rk
6.
.2
4.
dw g, /2 4/
1:
:5
AM
, A lle n' s-
PC
Au to
CA
D
P D
F (S m al le st
F ile
PLAN
3"
Z:
\C ity o f H ol ly H ill \H ol ly
H ill
Su nr ise
P ar k
- 2
3-
\D W
Gs \2
3-
S un ris e
Pa rk
6.
.2
4.
dw g, /2 4/
1:
:0
AM
, A lle n' s-
PC
Au to
CA
D
P D
F (S m al le st
F ile
File details come from the government source that posted it. Updated .