23 05 90_Air balance.pdf

PDF 27 KB Posted

Attached to
21-701 ROSEBURG HIGH SCHOOL DUST COLLECTION SYSTEM
Solicitation number
S-P10100-00000407
Issued by
Douglas County, Oregon

About this file

This document is a section detailing the testing, adjusting, and balancing requirements for the air system components of the Roseburg High School Wood Shop project in Oregon. The work is to be performed by a qualified balancing firm that is a member of NEBB or AABC with at least 10 years of experience. The balancing firm must provide all necessary personnel, equipment, and services to verify air volumes and heating/cooling flow rates as indicated on the drawings. The document outlines the submittals required, installation tolerances, adjusting procedures, and schedules for equipment, air systems, and reporting.

The related state and local contract opportunity is for the 21-701 Roseburg High School Dust Collection System project, located in Douglas County, Oregon. This project involves the installation of a dust collection system at the Roseburg High School. The contract opportunity does not provide any additional details on the project scope, bid submission requirements, or contract terms.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 23 05 90

TESTING, ADJUSTING AND BALANCING

May 2021 Roseburg High School Wood Shop 23 05 90 - 1

PART 1 - GENERAL

1.01 DESCRIPTION

A. Work Included: After completion of the work of installation, test and regulate all components of the new heating, air conditioning and ventilating systems to verify air volumes and heating-cooling flow rates indicated on the Drawings.

B. Balancing Organization:

1. Balancing of the Heating and Air Conditioning Systems: Performed by a firm providing this service established in the State of Oregon.

2. Balancing Organization: Air Balancing Specialties, Neudorfer Engineers, Northwest Engineering Services or approved.

3. Provide all necessary personnel, equipment, and services.

1.02 QUALITY ASSURANCE

A. Balancing of the Heating and Air Conditioning Systems: Agency shall be a current member of NEBB or AABC specializing in the adjusting and balancing of systems specified with a minimum of 10 years documented experience.

B. Testing, adjusting, and balancing shall be performed under direct field supervision of a

Certified NEBB Supervisor or a Certified AABC Supervisor.

1.03 SUBMITTALS

A. See 23 05 00 for submittal procedures.

B. Submit name of adjusting and balancing agency for approval within 30 days after award of Contract.

C. Field Reports: Indicate deficiencies in systems that would prevent proper testing, adjusting, and balancing of systems and equipment to achieve specified performance.

1. Submit under provisions of Section 23 05 00.

2. Prior to commencing work, submit report forms or outlines indicating adjusting, balancing, and equipment data required.

3. Submit draft copies of report for review prior to final acceptance of Project.

Provide final copies for Architect and for inclusion in operating and maintenance manuals.

4. Provide reports in soft cover, letter size, 3-ring binder manuals, complete with index page and indexing tabs, with cover identification at front and side. Include set of reduced drawings with air outlets and equipment identified to correspond with data sheets, and indicating thermostat locations.

5. Include detailed procedures, agenda, sample report forms, and copy of AABC National Project Performance Guaranty or other certifying agency prior to commencing system balance.

6. Test Reports: Indicate data on AABC MN-1 forms, forms prepared following ASHRAE 111, NEBB forms, or forms containing information indicated in Schedules.

May 2021 Roseburg High School Wood Shop 23 05 90 - 2

7. Include the following on the title page of each report:

a. Name of testing, adjusting, and balancing agency.

b. Address of testing, adjusting, and balancing agency.

c. Telephone number of testing, adjusting, and balancing agency.

d. Project name.

e. Project location.

f. Project Architect and Owner.

g. Project Engineer.

h. Project Contractor.

i. Project altitude.

j. Report date.

D. Project Record Documents: Record actual locations of flow measuring stations and balancing valves and rough setting.

E. Provide a list of equipment, air supply and exhaust not in compliance with tolerances subsequently specified.

PART 2 - PRODUCTS

-- NOT USED --

PART 3 - EXECUTION

3.01 EXAMINATION

A. Verify that systems are complete and operable before commencing work. Ensure the following conditions:

1. Systems are started and operating in a safe and normal condition.

2. Proper thermal overload protection is in place for electrical equipment.

3. Filters are clean and in place.

4. Duct systems are clean of debris.

5. Fans are rotating correctly.

6. Fire and volume dampers are in place and open.

7. Access doors are closed and duct end caps are in place.

8. Air outlets are installed and connected.

9. Duct system leakage is minimized.

B. Submit field reports. Report defects and deficiencies noted during performance of services which prevent system balance.

C. Beginning of work means acceptance of existing conditions.

3.02 INSTALLATION TOLERANCES

A. Air Handling Systems: Adjust to within plus 10 percent or minus 5 percent of design for supply systems and +/- 10 percent of design for return and exhaust systems.

B. Air Outlets and Inlets: Adjust total to within plus 10 percent or minus 5 percent of design to space. Adjust outlets and inlets in space to within +/- 10 percent of design.

May 2021 Roseburg High School Wood Shop 23 05 90 - 3

3.03 ADJUSTING

A. Ensure recorded data represents actual measured or observed conditions.

B. Permanently mark settings of valves, dampers, and other adjustment devices allowing settings to be restored. Set and lock memory stops.

C. After adjustment, take measurements to verify balance has not been disrupted or that such disruption has been rectified.

D. Leave systems in proper working order, replacing belt guards, closing access doors, closing doors to electrical switch boxes, and restoring thermostats to specified settings.

E. At final inspection, recheck random selections of data recorded in report. Recheck points or areas as selected and witnessed by the Owner.

3.04 AIR SYSTEM PROCEDURE

A. Adjust air handling and distribution systems to provide required or design supply and exhaust air quantities.

B. Make air quantity measurements in ducts by Pitot tube traverse of entire cross sectional area of duct.

C. Measure air quantities at air inlets and outlets.

D. Use volume control devices to regulate air quantities only to the extent that adjustments do not create objectionable air motion or sound levels. Effect volume control by duct internal devices such as dampers and splitters.

E. Vary total system air quantities by adjustment of fan speeds. Vary branch air quantities by damper regulation.

F. Provide system schematic with required and actual air quantities recorded at each outlet or inlet.

G. Measure static air pressure conditions on air supply units, including filter and coil pressure drops, and total pressure across the fan. Make allowances for 50 percent loading of filters.

3.05 SCHEDULES

A. Equipment Requiring Testing, Adjusting, and Balancing:

1. Fans

2. Air filters

3. Air inlets and outlets

B. Report:

1. Summary Comments:

a. Design versus final performance

b. Notable characteristics of system

c. Description of systems operation sequence

d. Summary of outdoor and exhaust flows to indicate amount of building pressurization

May 2021 Roseburg High School Wood Shop 23 05 90 - 4

e. Nomenclature used throughout report

f. Test conditions

2. Instrument List:

a. Instrument

b. Manufacturer

c. Model number

d. Serial number

e. Range

f. Calibration date

C. Electric Motors:

1. Manufacturer

2. Model/frame

3. HP/BHP

4. Phase, voltage, amperage; nameplate, actual, no load

5. RPM

6. Service factor

7. Starter size, rating, heater elements

D. Exhaust Fans:

1. Location

2. Manufacturer

3. Model number

4. Serial number

5. Air flow, specified and tested

6. Total static pressure (total external), specified and tested

7. Inlet pressure

E. Duct Traverses:

1. System zone/branch

2. Duct size

3. Area

4. Design velocity

5. Design air flow

6. Test velocity

7. Test air flow

8. Duct static pressure

9. Air temperature

10. Air correction factor

F. Air Distribution Tests:

1. Air terminal number

2. Room number/location

3. Terminal type

4. Terminal size

May 2021 Roseburg High School Wood Shop 23 05 90 - 5

5. Area factor

6. Design velocity

7. Design air flow

8. Test (final) velocity

9. Test (final) air flow

10. Percent of design air flow

3.06 DETAILED REQUIREMENTS

A. Adjusting and Balancing:

1. Adjust and balance all portions of the mechanical systems to produce indicated results within limits of minus 5 or plus 10 percent or as subsequently directed by the Architect.

2. Balancing data may be spot checked with instruments similar to that used by the balancing firm.

3. If, in the judgment of the Architect, the discrepancies warrant additional adjustment, readjust and rebalance the systems at no additional project cost.

END OF SECTION