23-0057 SOW.pdf

PDF 117 KB Posted

Attached to
WC300 Grounds Renovations
Solicitation number
N4008525R2503
Issued by

About this file

This document is a Statement of Work (SOW) for the WC300 Grounds Renovation Project #23-0057. The SOW details the requirements for the contractor to repair the grounds around Wallace Creek Barracks WC300 on the Marine Corps Base Camp Lejeune. The key requirements include removing unmaintained landscaping elements, leveling the areas, and installing new sod. The contractor must coordinate with the government for access to storage and protect all existing utilities. The related federal contract opportunity is Solicitation Number N4008525R2503, which is limited to Civil/Paving MACC Contractors listed on the General Requirements cover page. The solicitation is being issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Amend 0001 230057.pdf PDF
23-0057 DM.NEPA.PDF PDF
230057 RFP 25R2503.pdf PDF
N4008523B0057 Specs.pdf PDF
N4008523B0057 Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work WC300 Grounds Renovation

Project # 23-0057

GENERAL DESCRIPTION:

Repair the grounds around Wallace Creek Barracks WC300. Remove unmaintained decorative berms, landscaping rows, decorative beds, concrete edging, metal gates, and metal/concrete bollards. Level all cleared areas and install sod.

DETAILED REQUIREMENTS:

1. The contractor shall clear all damaged area of any debris.

2. The contractor shall remove the following:

a. 5 grassy berms

b. 2 grassy landscaped areas and associated concrete edging

c. All landscaped areas surrounding WC300

d. 2 metal gates

e. 10 metal/concrete bollards

3. The government shall retain possession of the metal gates and bollards upon removal. Contractor must not damage the gates and bollards while removing them. Contact Frankie Winberry (910-451-0878) for access to storage lot S1028 off Ash Street near the car wash.

4. Level all disturbed areas and establish positive drainage.

5. Resod all disturbed areas with centipede sod. Contractor must water and maintain the sod for minimum of 30 days.

6. Provide temporary construction fencing around the project area to keep unauthorized personnel and vehicles off the newly placed sod. Remove fence after sod maintenance is completed.

7. All soils removed from the site must be disposed of off base.

GENERAL NOTES:

1. Contractor shall locate all underground utilities, including telecommunications and commercial cabling, prior to ground disturbing activities.

2. Contractor shall field verify all measurements.

3. Preserve and protect all existing utilities, including telecommunications and commercial cabling.

4. Contractor is responsible for any damage to utilities, including telecommunications and commercial cabling.

5. Contractor is responsible to coordinate commercial cabling with commercial cabling providers

6. All utility work shall be in accordance with applicable state and local codes.

7. Contractor shall coordinate all construction activities with ROICC

8. Sod any disturbed areas upon completion of construction.

9. Jobsite shall be kept clear of all debris and trash.

10. Contractor shall be responsible for all aspects of environmental, health and safety (EHS). Contractor shall be responsible for complying with its policies and procedures related to EHS matters.