GENERAL CONSTRUCTION IDIQ JOB ORDER CONTRACT FOR NRDE COMMANDS AT NAS PATUXENT RIVER, NSF INDIAN HEAD AND NSF DAHLGREN

The Government has a NEW Requirement for a General Construction Indefinite Delivery Indefinite Quality Contract (IDIQ) Job Order Contract (JOC) for General Construction projects and related services valued betw een $2,000 and $2,000,000 for the Naval Research & Development Establishment (NRDE) supported Commands at the Naval Air Station Patuxent River and Naval Support Facility Indian Head, MD; and Naval Support Facility Dahlgren, VA.

The solicitation w ill result in a single aw ard of a General Construction IDIQ JOC contract. The period of performance is for a one (1) year base, and four (4) 1-year option periods. The estimated maximum value for all periods is $100M. This procurement is 100% set-aside for eligible 8(a) Small Disadvantaged businesses. The North American Industrial Classif ication System (NAICS) is 236220 – Commercial and Institutional Building Construction w ith a size standard of $39.5M.

Proposals are due electronically no later than 10:00 am EST on 16 June 2022. Requests for Information (RFIs) are due no later than 6 June 2022.

TONJA JENKINS 202-685-3222

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

16-May-2022

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVAL FACILITIES ENGINEERING SYS COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: (202) 685-3192 TEL: FAX:

N4008022R0042 202

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 00 00 - Procurement and Contracting Requirements

GENERAL CONDITIONS

GENERAL CONDITIONS

1. GENERAL INTENT

The Government intends to evaluate offers and award a contract without discussions (except clarifications, as described in FAR 15.306(a)). Therefore, your initial offer should contain your best terms from a price and technical standpoint. The Government reserves the right to conduct discussions in the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition, among the most highly rated proposals. Information regarding the source selection process, content of proposals, evaluation of proposals, and best value source selection evaluation criteria to be used is located in Section 00 21 16 Instructions to Proposers.

2. BASIS FOR AWARD

The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

The Lowest Price Technically Acceptable process is appropriate for this acquisition. The best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. Proposals will be evaluated in the following order:

a. Evaluated for completeness, per responsiveness to the RFP;

b. Ranked in price order (coefficient totals), from lowest to highest;

c. Evaluated against the criteria, starting with the lowest priced proposal;

d. This process will be repeated until the first Technically Acceptable proposal is reached. That

Offer will be selected for award;

e. No other Offers will be evaluated after identification of the Lowest Priced Technically

Acceptable Offer.

An overall non-price factors/subfactors rating must be at least “ACCEPTABLE” in order to be eligible for award.

An “UNACCEPTABLE” rating in any factor/subfactor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.

The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with Offerors in the competitive range; and to award the contract to the Offeror submitting the lowest priced, technically acceptable offer.

3. CONTRACT TYPE

This is a Firm Fixed Price Indefinite Delivery/Indefinite Quantity (IDIQ) Job Order Contract (JOC), in accordance with FAR 52.216-1. The period of performance will be for a 1-year Base period and four (4) 1-year Option periods.

4. SET ASIDE DETERMINATION

In accordance with FAR Subpart 19.8, it has been determined that competition for this procurement will be limited to SBA-certified 8(a) Disadvantaged Small Business (DSB) Program participants, with the assigned NAICS - 236220, Commercial and Institutional Building Construction; that has a size standard of $39.5 million. Offers are solicited only from 8(a) concerns eligible under the 8(a) Program. Offers received from concerns that are not 8(a) concerns shall not be considered.

5. STANDARD EXECUTION PROCEDURES

NAVFAC Washington NRDE Contract Optimization Cell is the procuring office and is responsible for all contractual matters related to the basic contract. Individual task orders will be issued and administered by Contracting Officers at the NRDE Contract Optimization Cell.

6. OPTIONS

The contract will have a one (1) year Base and four (4) 1-year Option periods. The Government has the option to extend the term of the contract in accordance with FAR Clauses 52.217-8 and 52.217-9.

A. In accordance with FAR Part 17.202, the Government reserves the right to exercise this option if it is the most advantageous method of fulfilling the Government’s need, price and other factors considered.

B. In accordance with FAR 52.217-5 Evaluation of Options (JUL 1990), the Government will evaluate Options in conjunction with the offers for award.

C. In accordance with FAR 52.217-8 Option to Extend Services (NOV 1999), the Government has the option to extend the services for up to 6 months.

D. The Government has the option to extend the term of the contract in accordance with Clause 52.217-9, Option to Extend the Term of the Contract - Services (MAR 2000).

7. MINIMUM GUARANTEE

During the period specified in the ordering clause FAR Clause 52.216-18 (August 2020), the total value of the contract, including option years, shall not exceed $100,000,000. Individual task orders may not exceed $2,000,000;

unless the Contractor accepts. The minimum guarantee is $2,000. The awarded Offeror will be awarded the minimum guarantee. When the first Task Order is awarded, the minimum guarantee value will be deducted from the award amount of the first Task Order.

8. PLACE OF PERFORMANCE

The place of performance for this contract will be at Naval Air Station Patuxent River, Naval Support Activity U.S.

Naval Academy, and Naval Support Facility Indian Head, Maryland; and Naval Support Facility Dahlgren, Virginia.

9. TECHNICAL/CONTRACTUAL INQUIRIES

Technical/contractual inquiries shall be directed electronically to the Contract Specialist and the Contracting Officer at least fifteen (15) days prior to closing date for receipt of proposals. Those received afterwards may not be considered timely and may not receive a response.

10. POINTS OF CONTACT

NAVFAC Washington NRDE Contract Optimization Cell is the procuring office for this basic contract and is responsible for all contractual matters related to the basic contract. All proposals are to be delivered electronically.

All inquiries shall be submitted in writing via email.

NAVFAC Washington NRDE Contract Optimization Cell

Primary POC: Janine Queen, Contract Specialist Email: janine.queen@navy.mil Phone: (202)685-8002

Alternate POC: Cynthia Y. Crowder, Contracting Officer Email: cynthia.y.crowder.civ@us.navy.mil Phone: (202) 685-3157

11. POST-AWARD LIMITATIONS ON SUBCONTRACTING CERTIFICATION

In accordance with the provisions of FAR 52.219-14 (DEV 2021-O0008) Limitations on Subcontracting, by submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned under NAICS code 238220-Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 75 percent subcontract amount that cannot be exceeded. At least 25% of the cost of the contract performance to be incurred for personnel will be spent on the 8(a) prime contractor’s employees.

12. POST-AWARD TRAINING REQUIREMENTS

AT Level I Training. In accordance with 252.204-7004 Antiterrorism Awareness Training (FEB 2019), all contractor employees, to include subcontractor employees, requiring access to Navy installations, facilities and controlled access areas shall complete AT Level I Awareness Training within 90 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Government Representative or to the Contracting Officer, if a Government Representative is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://jkodirect.iten.mil/Atlas2/page/login/Login.jsf [On the log-in page, use JS-US007 Level 1 Antiterrorism Awareness Training for Non-CAC users. Click on the link.]

End Of General Conditions

STATEMENT OF WORK

STATEMENT OF WORK

Naval Research & Development Establishment (NRDE) Support Office Job Order Contract (JOC) for Locations:

Naval Air Station (NAS) Patuxent River, Naval Support Facility (NSF) Dahlgren & NSF Indian Head

1. Purpose: The purpose of this General Construction JOC (as defined under NAICS Code 236220) is to provide commercial, industrial and institutional construction services with minimal design information (i.e. work plans) for new construction, repairs, rehabilitation, renovation and alterations for a broad range of facilities. This JOC is intended to provide rapid response for NRDE supported commands at specific installations within the National Capital Region, in a cost effective manner. Each Task Order (TO) issued under this contract will have specific information such as guide specifications, criteria, and scope. Design-Build is not allowed on this contract. TO’s for design only shall not be placed against the contract. However, minimal design services (i.e. work plans, shop drawings) related to construction may be required. Firm-fixed-price TO’s for construction will be placed against the contract. Work locations include:

• NAS Patuxent River

• NSF Dahlgren

• NSF Indian Head

• NSA U.S. Naval Academy

This contract will be used as one of many tools for a contracting method available to the Government for the types of construction services as referenced above that may be required by the agency. All TO’s issued under this contract will be reviewed and deemed appropriate for this acquisition method.

2. Description: The Contractor shall provide, upon receipt of a TO, all labor, materials, supplies, parts (to include system components), plant, supervision, tools, transportation, equipment, and related services, (except when specified as Government furnished), for projects including, but not limited to, commercial, industrial and institutional construction services for new construction, repairs, rehabilitation, renovation and alterations for a broad range of facilities. Work shall be performed in strict accordance with all terms, conditions, special contract requirements, specifications, drawings, attachments, and exhibits contained in the Request for Proposal (RFP) for the TO or incorporated by reference.

Work and responsibility shall include all TO planning, scoping meetings, programming, administration, and management necessary to provide support for TO(s) awarded. Conduct the work in strict accordance with the basic contract and all applicable Federal, State, and local laws, regulations, codes, or directives. Provide related services such as preparing and submitting required reports, perform administrative work, and submit necessary information as specified under this contract and within each TO. Ensure that all work provided meets the scope of work for each TO and any special specifications included with the individual TO or included in any applicable documents.

The Government will provide the scope of work, detailing the work to be accomplished. Depending on the complexity of the project, the detail provided may vary from a general idea of what is required, with no drawings, to complete design documents. The Contractor shall use the information provided by the Government and submit a complete proposal. The contractor is responsible for verification of all existing conditions. The Contractor shall not rely on information provided by the Government, such as drawings, work plans, for dimensions or existing conditions. The Contractor is responsible for taking measurements as needed to submit proposals and complete project scope. For TO’s where the Government provides no drawings, the Contractor shall provide a work plan description in their proposal to clearly show an understanding of what work is to be included in the contract.

Complete all work and services under this contract in accordance with schedules established in each TO. Submittal dates will be included in the TO. These dates identify when submittals are due in the issuing office and other addresses identified in the TO. Types and numbers of submittals and dates and places for review meetings shall be established by each TO.

3. Definitions: The following terms apply to this contract (the list is not all inclusive):

Abbreviations, Plural Words – Abbreviations, where not defined in Contract Documents, will be interpreted to mean the normal construction industry terminology, determined by recognized grammatical rules, by the Contracting Officer Representative or Contracting Officer. Plural words will be interpreted as singular and singular words will be interpreted as plural where applicable for context of contract documents.

• Contracting Officer (KO) - The official given authority to bind the Government to contracts. They have authority to enter into, administer, or terminate contracts and make related determinations and findings.

• Contracting Officer’s Representative (COR) - For the purposes of this contract, the Contracting Officer’s Representative is anyone with authority delegated by the Contracting Officer to manage day-to-day contract operations and inspect Contractor work, and who represents the Government.

• Contractor - A corporation, partnership, joint-venture, business association, firm, individual or association that has entered into a contract with United States for the purpose of providing supplies, materials, equipment, or services. The Contractor provides similar supplies and services contemporaneously to the general public under terms and conditions similar to those offered to the Government. Herein, the term Contractor is used to describe the successful offeror, awarded the JOC contract described by this document.

• Construction - The action taken to accomplish construction; i.e., repair, renovation, minor new construction.

• Directed, Requested, Approved, Accepted, etc. - These terms imply "by the Contracting Officer", unless otherwise indicated. Approved by COR or Contracting Officer in no way releases the Contractor from responsibility to fulfill requirements of the Contract Documents.

• Furnish - Supply and deliver to project site, ready for unloading, unpacking, assembly, installation, and similar subsequent requirements.

• Incidental (work, waste, etc.) - Items that are minor in nature, necessary to perform the work as described, but not of such magnitude as to require a line item in a cost proposal. Examples include: preparation necessary to perform the work as described but that is not typically accounted for by a line item cost, waste of 15% or less on installed materials, small amounts of fasteners and fittings that are not typically tracked individually, hand tools that are not exhausted in a single use, pick up or delivery of incidental items, etc.

• Independent Review - The Government may, at its expense, obtain an independent review of the Contractor’s work. The independent reviewer shall be a person or business qualified to perform the work the Contractor is performing. The person designated to conduct the independent review should not have had previous personal involvement in the project. The Government may have the TO reviewed by the local jurisdiction, an Engineering firm not involved in the contract, or by others.

• Independent Testing Laboratory - An independent (from the Contractor) entity engaged to provide inspections, tests, interpretations, reports and similar services.

• Indicated - Shown on drawings by notes, graphics or schedules, or written into their portions of Contract Documents. Terms such as "shown", "noted", "scheduled", and specified" have the same meaning as "indicated", and are used to assist the reader in locating particular information.

• Install - Operations at project site, including unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, and protecting, cleaning, and similar requirements.

• Installer - Entity (firm or person) engaged to install work, by Contractor, Sub-Contractor or Sub-Sub- Contractor. Installers are required to be skilled experts in work they are engaged to install.

• Minimum Requirements - Indicated requirements are for a specific minimum acceptable level of quality/quantity, as recognized in the industry. Actual work must comply (within specified tolerances), or may exceed minimums within reasonable limits. Refer uncertainties to the KO or COR before proceeding.

• Overlapping/Conflicting Requirements - Where compliance with two or more standards that establish different or conflicting requirements for minimum quantities or quality levels is specified, the most stringent requirement written directly into the Contract Documents is intended and will be enforced (generally), unless specifically detailed language written into the Contract Documents clearly indicates that a less stringent requirement is acceptable. Refer uncertainties to the KO or COR for a decision before proceeding.

• Project Site or Site - Location for performance of the work for a specific TO.

• Provide - Furnish and install, complete and ready for intended use.

• Site Survey - An inspection of a facility required to accomplish a design/build construction action and normally part of the work plan.

• Task Order (TO) - An individual requisition for construction services ordered against this contract, as described within the scope of work, specifications, drawings, sketches or other TO documentation issued with the request for proposal for the TO. Each TO is solicited, proposed, negotiated, and awarded individually.

• Transportation - Movement, typically by motor vehicle, of personnel, material or equipment to, from or within the job site, necessary to assemble the work, receive materials/equipment on the site, or provide labor for the work. Does not include pulling waste dumpsters, which is included in the TO line item for trash disposal.

Does not include transportation associated with mobilization/demobilization, such as moving large equipment (e.g., for earthmoving), trailers, etc. Does not include cranes, concrete pump trucks, or other means of moving materials on site that are typically charged for separately, as dictated by industry standard.

• Work Plan (Minimum Design) - A detailed package consisting of diagrams, manufacturers’ data/cut sheets, specifications, estimates, shop drawings, etc., suitable to provide details to repair or construct a facility.

4. Overall Responsibility: The Contractor shall be responsible for all site surveys, calculations, work plans, construction actions, equipment startups, and testing, repair, and/or training required for satisfactory completion of the work as required by each individual TO. This shall include, but not be limited to, providing labor, equipment, materials, applicable engineering documentation, and other necessary services and/or products for the construction, implementation, or testing that may be required by the individual TO. The contractor is responsible for verification and documentation of existing conditions and dimensions. The contractor is responsible for verification of all drawings/work plans provided by the Government. The Contractor will provide all grounds maintenance in the space provided for the project site, project storage, and Contractor’s office facilities.

5. Project Manager (PM): The Contractor shall provide a responsible PM to represent all matters pertaining to work under this contract. The PM shall have the responsibility of overall supervisor, estimator and be responsible for management of all the ongoing, completed and proposed projects. The PM shall provide a regular status report of all awarded projects no less than monthly to the KO. At a minimum, the report shall indicate TO title, value, location, milestones, and names of individuals assigned to Superintendent, Site Safety and Health Officer, and Quality Control Manager. The report will be used to evaluate the need for supervision of individual TO at the time of negotiation. The PM shall be available in person, by telephone, or radio to respond to any and all problems during normal working hours. The Contractor shall provide a detailed resume of the proposed PM for review and approval by the KO. If during the life of this contract, the Contractor changes or replaces the PM, approval by the KO is required. The cost of project management is included in the Contractor’s coefficient and will not be compensated separately unless directed by the KO.

6. Superintendent: Unless specified otherwise in the individual TOs, the Contractor shall provide supervision in accordance with FAR Clause 52.236-6 Superintendence by the Contractor (APR 1984). A Superintendent is the Contractor’s representative at the site who is responsible for continuous field supervision, coordination, completion of work and, unless another person is designated, for prevention of accidents. The Superintendent needs at least five

(5) years of construction superintendent experience. The Superintendent shall be able to converse in and understand the English language. If any TO involves non-English speaking workers, the Contractor shall provide the ability to translate instructions to the entire work force. The Contractor shall provide to the KO for approval the names and qualifications of the proposed responsible Superintendent(s) authorized to act for the Contractor. The Superintendent(s) shall be authorized by the Contractor to maintain sufficient civilian personnel to accomplish all phases of the work in a satisfactory and acceptable manner and to discharge for cause unsatisfactory employees. It shall be the responsibility of the Contractor to provide a responsible official of the company to represent him in all matters pertaining to work under this contract. He/she shall be available, in person, by telephone, to respond to any and all problems to the Contracting Officer at all times when work is being performed. The Superintendent is included in the Contractor’s coefficient and will not be compensated separately unless directed by the KO.

*Consult with the local construction office to determine the ability for the Superintendent to perform multiple roles on the specific TO based on the hazards of the project, job complexity, size, and any other pertinent factors.

7. Site Safety and Health Officer (SSHO): Provide an SSHO that meets the requirements of EM 385-1-1 Section

1. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one person at each project site to function as the SSHO. The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times to implement and administer the Contractor’s safety program and Government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs. If the SSHO is off-site for a period longer than 24 hours, an equally-qualified alternate SSHO must be provided and must fulfill the same roles and responsibilities as the primary SSHO. When the SSHO is temporarily (up to 24 hours) off-site, a Designated Representative (DR), as identified in the Activity Hazard

Analysis (AHA) may be used in lieu of an Alternate SSHO, and must be on the project site at all times when work is being performed. Note that the DR is a collateral duty safety position, with safety duties in addition to their full time occupation. The Contractor shall provide a detailed resume of the proposed SSHO for review and approval by the KO. The SSHO should hold certificates for OSHA 30, EM 385-1-1 Construction Safety Hazard Awareness for Contractors and current 1st Aid/CPR/AED training. SSHO should have at least 3 years’ experience in a site safety role. If during the life of this contract, the Contractor changes or replaces the SSHO, approval by the KO is required.

The SSHO is included in the Contractor’s coefficient and will not be compensated separately unless directed by the KO.

*Consult with the local construction office to determine the ability for the SSHO to perform multiple roles on the specific TO based on the hazards of the project, job complexity, size, and any other pertinent factors.

8. Quality Control Manager (QCM): The Contractor shall provide a competent QCM at the work site to implement and manage the QC program. The QCM is the manager of all QC activities. The QCM needs at least five

(5) years of construction experience. The QCM will need to complete the Construction Quality Management for Contractors Class (CQM-C). This course must be taken and the final test must be passed by any person aspiring to be the QCM or alternate. The QCM is included in the Contractor’s coefficient and will not be compensated separately unless directed by the KO.

*Consult with the local construction office to determine the ability for the assigned QCM to perform multiple roles on the specific TO based on the hazards of the project, job complexity, size, and any other pertinent factors.

9. Minimum Supervision / Additional Oversight Directed by the Government: The Government recognizes that in order for the Contractor to most efficiently manage TOs, the Contractor will typically request to provide the minimum amount of supervision required. Depending on the complexity/location/value/volume of the TO(s), and/or the existing workload of the Contractor’s staff, the Government will decide at the time of TO negotiations on the appropriate supervision for a specific TO. The Government may allow for a single individual to perform multiple roles (Superintendent, SSHO, QC) on multiple TO’s at multiple sites. A single individual will not be allowed to perform an unreasonable number of roles at multiple sites and/or for multiple TOs. Alternatively, the Government may require additional oversight (distinct individuals performing distinct roles) on a specific TO. The costs for SSHO, QCM, and Superintendent shall be included in the Contractor’s proposal and negotiated for each

TO.

10. Specifications, Codes and Standards: The current DOD Unified Facilities Guide Specifications (UFGS) consisting of Divisions 01 through 48 of specifications in the Construction Specifications Institute’s (CSI) Master format are incorporated by reference into this solicitation. References in this section are for Contractor informational purposes only. Specifications will be agreed upon at the task order level. The intent of these specifications is to furnish industrial and/or commercial standards for design, construction, alteration, maintenance and repair of Government facilities. Special requirements or/and edited specifications that are indicated in TO requests shall supersede any similar requirements noted in the reference guide or other specifications. The current UFGS can be found at the following website: http://www.wbdg.org/ccb/browse_org.php?o=70 All work performed shall conform to the UFGS, standard industry work practices, and the provisions of this contract. Unless otherwise directed by the KO all work shall be performed in accordance with the current National Fire Protection Association (NFPA) codes and standards, International Building Code, International Plumbing Code and International Mechanical Code. These Codes take precedence over all other direction that may be provided herein or with individual TO(s) UNLESS more stringent requirements are indicated on the TO.

The publications listed below are additional reference documents that may be cited as applicable in individual TO statements of work:

• UFC-1-200-01, General Building Requirements

• UFC-3-301-01, Architecture

• UFC-3-201-01, Civil Engineering

• UFC-3-301-01, Structural Engineering

• UFC-3-401-01, Mechanical Engineering

• UFC-3-501-01, Electrical Engineering

• UFC-3-600-01, Fire Protection

• NFPA 101, Life Safety Code

• NFPA 70, National Electric Code (NEC)

• NAVSEA OP5, Ammunition and Explosives Ashore Safety Regulations for Handling, Storage, Production, Renovation & Shipping

11. Safety Requirements and Reports: The Contractor shall conduct all work in a safe manner and shall comply with the requirements described in UFGS specification section 01 35 26 Governmental Safety Requirements and FAR 52.236-13, ACCIDENT PREVENTION (NOV 1991). The Contractor is subject to the safety and health standards of Occupational Safety & Health Act (OSHA), the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM-385-1-1). Implementation of OSHA provisions rests in the statutory requirement while compliance with EM 385-1-1 and the specification is a Contractual matter. The most stringent requirement shall be followed where the documents are not consistent.

The Contractor is responsible to follow all local, state, and federal guidelines for COVID-19 procedures. The Contractor must follow OSHA Guidance for the Construction Workforce as published on OSHA.GOV.

Prior to commencing work on the contract and/or individual TOs, the Contractor shall meet with the KO or designated representative to discuss and develop mutual understandings concerning the Contractor’s administration of a Safety Program. Contractors shall comply with the latest version of EM 385-1-1 (including interim changes) that is in effect on the date of solicitation. Preconstruction submittals shall include an Accident Prevention Plan (APP) as specified in EM-385-1-1, Appendix A – Minimum Basic Outline for Accident Prevention Plan. This plan shall include applicable AHAs as required. The Government may inspect the construction site for safety violations.

Abatement of violations shall be the responsibility of the Contractor. The Contractor shall assist inspectors from the Safety Office and Federal or State OSHA offices if a complaint is filed. The Contractor shall pay promptly any fines levied by Federal and/or State OSHA offices.

The Contractor shall identify all safety-related issues for each TO. These items shall be monitored at all times while the TO is underway and the results documented on the Supervisor’s Daily Job-site Inspection Checklist form.

Submit the Supervisor’s Daily Job-site Inspection Checklist for approval as part of the Contractor’s Safety Plan prior to the start of work on each TO. Completed inspection forms shall be kept on file in the Contractor’s office and shall be made available to the Government upon request. The Contractor shall be responsible for the compliance of its Sub-Contractor(s).

12. Quality Control Plan: The Contractor shall establish and maintain a complete Quality Control Program in accordance with specification section 01 45 00.10 20 “Quality Control for Minor Construction” and FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996). This Quality Control Plan shall be submitted to the KO for approval within 30 days, or an agreed to shorter period, after contract award. This plan shall be capable of being adapted by means of a supplement to the main plan as required by individual TOs. The Quality Control Plan shall include the NAVFAC Contractor Quality Control Program & Plan Assessment Checklist.

13. Permits and Responsibilities: The Contractor shall obtain all appointments, licenses, and permits required to perform work under this contract. The Contractor shall comply with all applicable Federal, State, and local laws.

Evidence of such permits and licenses shall be provided to the KO and/or his designated representative before work commences and at other times as requested by the KO and/or his designated representative. All Contractor employees operating vehicles on Government property shall possess a valid state motor vehicle operator's license.

The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. All electrical work must be performed by a licensed electrician. All work performed under trades requiring certification shall be up to date. Projects performed at NSF Dahlgren and NSF Indian Head require coordination with the local Government Project Manager to ensure the Comprehensive Work Approval Process (CWAP) is initiated. Requirements derived from the CWAP process will be identified in the task order. All Road closures, outages, crane oversight plans, and excavation permits will be coordinated and approved by the local Government Project Manager prior to the execution of work.

Maryland’s erosion/sediment control and storm water management programs – The Contractor shall obtain any erosion/sediment control (E&S) and storm water management (SWM) permits prior to construction for a TO that disturbs 5,000 square feet/100 Cubic yards or more of land from the Maryland Department of the Environment (MDE). The Contractor is responsible for confirming the following criteria with the MDE for E&S and SWM permits.

• If the limit of disturbance is less than 5,000 SF and dirt movement is less than 100 CY, both E&S or SWM permit are not required.

• If the limit of disturbance is less than 5,000 SF and dirt movement is equal or more than 100 CY, only E&S permit required.

• If the limit of disturbance is more than 5,000 SF, both E&S and SWM are permit required.

• If the limit of disturbance is more than 5,000 SF for a maintenance project, only E&S permit is required.

For SWM, need to file waiver.

• If the limit of disturbance is less than 5,000 SF and dirt movement is less or more than 100 CY on existing

MDE facility, both E&S and SWM permit are not required.

Virginia’s erosion/sediment control and storm water management programs- The Contractor must submit erosion and sediment control plans and obtain approval from the Virginia Erosion and Sediment Control Program (VESCP) authority, which is usually the local Government, for any land-disturbing activity totaling 10,000 square feet or greater.

For any land disturbance or land disturbance activity that disturbs one acre or more the Contractor must submit a storm water management plan to the Virginia Storm Water Management Program (VSMP) authority for review and approval in order to obtain coverage under the Construction General Permit.

The Contractor is responsible for confirming the following criteria with the Virginia Department of Environmental Quality (DEQ) for E&S and SWM permits.

• If the limit of disturbance is less than 10,000 SF, both E&S or SWM permit are not required.

• If the limit of disturbance is equal or more than 10,000 SF to or less than 1 Acre, Only E&S permit is required.

• If the limit of disturbance is equal to 1 Acre, both E&S and SWM permit is required.

• For any maintenance project, if the limit of disturbance is equal to or more than 1 Acre, may exempt from

SWM.

14. Multiple Task Order Performance: The Contractor shall have the ability to perform multiple TO’s in multiple locations, simultaneously, in accordance with the terms and conditions of this contract. A single individual will not be allowed to perform an unreasonable number of roles at multiple sites and/or for multiple TOs.

15. Documentation: The Contractor shall implement, maintain, and control a system for identification, preparation, reproduction, distribution, and maintenance of all documentation, dates and information necessary for its internal management as well as for Government management of the individual projects and the total program.

Refer to eCMS requirements elsewhere in this solicitation.

16. Joint Scoping, Presentations and Meetings: The Contractor shall attend all progress meetings, provide presentations as necessary, and attend/conduct other meetings as requested by the KO to execute the work. The use of Joint Scoping between the Contractor and the Government is encouraged to fully identify the work needed to fulfill the requirement. If requested by the KO, or their authorized representative, Joint Scoping shall be accomplished as described herein. When requested, a Joint Scoping Review shall be conducted to enable the Contractor to detail the project based on: information provided by the Government in writing (the scope of work);

the conditions observed at the site; and discussion with the Government’s authorized representatives. Any deficiencies, omissions, or conflicts in the Government’s scope of work that are identified during the site visit shall immediately be brought to the attention of the KO, in writing, for resolution prior to submission of the Contractor’s proposal. The Contractor may submit written recommendations for changes, deviations or value engineering alternatives to the Government’s original project scope that will provide better quality, maintainability, constructability, operability, or price to the Government. The recommended changes to the Government’s scope shall be clearly identified in the form of a narrative description, with drawings or sketches as necessary, and shall reference the technical specification requirements. The Contractor shall submit the proposed Joint Scope to the Ordering Officer for review within three (3) days after the site visit (or longer for large [over $250K] and more complex projects, as allowed by the KO). Upon establishment of the final scope of the individual task order, the Contractor shall then prepare his proposal for accomplishment of the task.

17. Station Regulations: The Contractor shall furnish a list of contact personnel of the Contractor and Sub- Contractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

Identification badges, if required, will be furnished based on the individual installation security procedures.

Contactor is responsible for all costs associated with obtaining proper credentials, including participation in the Defense Biometric Identification System (DBIDS) program. The Contractor must immediately report instances of lost or stolen badges to the KO.

Failure of Contractor personnel to obtain entry approval will not affect the contract price or time of completion. All Contractor personnel shall become familiar with and obey all Government regulations including fire, traffic, and security regulations. Refer to individual TO or Station requirements provided at the preconstruction conference.

Contractor’s personnel will not be admitted to the work site without approval. Access requirements will be as identified in station policy for each location. Some facilities, or areas within some facilities, restrict access to U.S.

Citizens only.

18. Security Requirements: In addition to other provisions of this contract, the following security requirements apply to all work performed under this contract: The Contractor shall, after award of the contract, submit the following information for all employees (on letterhead signed by the Contractor): Contract number, completion date, type of work being performed, area(s) of access, names of employees working on contract including their social security number, date and place of birth, citizenship (alien registration number must be included for registered aliens), any vehicle (including license plate number) to be used. The Contractor shall also have the employees fill out any questionnaires and other forms required by Security. See below for additional site specific information.

Neither the Contractor nor any of its employees shall disclose or cause to be disseminated any information concerning the operations of the activity which could result in or increase the likelihood of the possibility of a breach of the activity’s security or interrupt the continuity of its operations. Disclosure of information to any person not entitled to receive it, or failure to safeguard any classified information that may come to the Contractor or any person under his control, may subject the Contractor, his agents or employees to criminal liability under 18 U.S.C.

Sections 793 and 798.

All inquiries, comments or complaints arising from any matter observed, experienced, or learned as a result of or in connection with the performance of this contract, the resolution of which may require the dissemination of official information will be directed to the activity Commander. Deviations from or violations of any of the provisions of this paragraph will, in addition to all other criminal and civil remedies provided by law, subject the Contractor to immediate termination for default and/or the individuals involved to a withdrawal of the Government’s acceptance and approval of employment.

19. Passes and Badges: Security badges will be issued, if required, to the Contractor and employees in accordance with station regulations. Badges shall be issued as explained at the preconstruction meeting of the individual TO.

The Contractor shall provide a minimum of 72 hour notice for employees needing passes/badges. Processing of badges could take up to 10 working days. A copy of the Station Security Regulations will be made available at that time. All badges must be returned or otherwise accounted for upon badge expiration or contract completion or upon termination of the employee. Lost or stolen badges shall be reported to the KO immediately. All Contractor and Sub-Contractor personnel shall be required to possess and wear identification badges at all times when working within the confines of the individual military bases or other job site location under this contract. Only bona fide Contractor employees with Government issued passes and/or badges that perform duties authorized by the Contractor specifically for this contract shall be allowed at the work site. The presence of unauthorized personnel including guests, minor children, and other family members of Contractor personnel is strictly prohibited.

20. Access to Buildings: It shall be the Contractor’s responsibility to obtain access to buildings and facilities, and arrange for them to be opened and closed. Initial arrangements will be coordinated through the KO or his/her authorized representative. If the Contractor cannot gain access to a work site, the Contractor shall notify the KO and/or his designated representative to reschedule a time with the building occupant.

Keys, when necessary, will be issued to the Contractor; however, it shall be the Contractor’s responsibility to arrange for adequate security of those buildings and facilities at all times during the performance of his duties. The Contractor shall be responsible for the cost of any keys lost by his employees that were furnished by the Government. If the KO determines a lock must be replaced because of the loss of a key by Contractor employees, the Contractor shall pay the cost of replacement. Similarly, the Contractor shall pay the cost of changing a combination or combination lock if the KO determines that the combination may have been compromised.

21. Energy Conservation: The Contractor shall participate in the local installation’s Energy Conservation program and all local utilities Energy Rebate Programs established by the installation. The Contractor shall comply with the base energy conservation program as defined in local base regulations. Use of high energy consuming tools or equipment shall be approved by the KO and/or a designated representative prior to use.

22. Water Conservation: The Contractor shall participate actively in the activity's Water Conservation Program.

The Contractor shall comply with the base Water Conservation Program as defined in local base regulations. The Contractor may represent his interest at all meetings of the Activity's Energy Conservation and Resource Management Committee.