22L0081B-GREENVILLE_DEMOLITION_PLANS.pdf
PDF 7 MB Posted
- Solicitation number
- 2026-RFP-074
- Issued by
- Hood County, Texas
About this file
This demolition plans document, prepared by Hanson Professional Services Inc. for the City of Greenville, Texas, outlines the comprehensive demolition scope for the Greenville Wastewater Treatment Plant (re-bid). The project encompasses the demolition of wastewater treatment plant buildings and structures including buildings, concrete foundations, pump structures, trickling filters, chemical tanks, sedimentation basins, removal and grout filling of plant piping, light poles, disposal of demolition waste, erosion control, and earthwork. The plans include 11 sheets covering general notes, existing site survey, storm water pollution prevention plan, overall yard piping demolition plan layouts, and water realignment plans and profiles. Key project requirements include contractor responsibility for contacting Texas 811 and Lone Star 811 utility locating companies with four working days' notice prior to construction, field verification of existing conditions and benchmark elevations, securing all necessary construction permits and clearances prior to commencement, and confining all construction activity within designated limits of construction unless prior owner approval is obtained. The contractor must maintain a minimum of one copy of all contract documents, specifications, drawings, permits, and required local, state, and federal documents on-site during construction and is responsible for all coordination with the owner's representative regarding sequence of construction prior to commencement.
The contractor bears sole responsibility for damages to utilities, all costs associated with utility repairs, and for implementing a comprehensive safety program compliant with OSHA and local regulations, including appointment of a competent person for all trenching operations and submission of an excavation plan prepared by a Texas-registered engineer. Hazardous materials requiring removal prior to demolition include asbestos-containing material, PCB items, mercury, CFC units, batteries, radioactive sources, oil, pesticides, herbicides, cleaning chemicals, and lead-containing paint as documented in the project's hazardous materials report. The contractor must provide and maintain erosion and pollution control devices as indicated in the Storm Water Pollution Prevention Plan, obtain a Texas Commission on Environmental Quality (TCEQ) stormwater permit for construction, and implement traffic control measures meeting Texas Manual on Uniform Traffic Control Devices standards. Additionally, the contractor must coordinate with city personnel on wet well dewatering procedures, ensure the existing wastewater treatment plant remains in service and protected from demolition debris, remove all excess materials and construction debris upon project completion, and restore the site to the satisfaction of the owner's representative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION PLANS FOR
GREENVILLE WASTEWATER TREATMENT PLANT (RE-BID)
Corpus Christi, Texas 78411
Hanson Professional Services Inc.
4501 Gollihar Rd.
TBPE F-417 / TBPLS F-10039500 / TBPG F-50556
100% SUBMITTAL
NOTICE
1. ALL CONTRACTOR(S) AND SUBCONTRACTOR(S) ON THIS PROJECT ARE SOLELY
RESPONSIBLE FOR CONTACTING TEXAS 811, LONE STAR 811, AND OTHER UTILITY
LOCATING COMPANIES AS WELL AS LOCAL UTILITIES (WATER, STORM SEWER,
SANITARY SEWER, GAS, TRAFFIC, ETC.) BY ALL MEANS POSSIBLE FOR THE LOCATING
AND MARKING OF UNDERGROUND AND ABOVE GROUND UTILITIES PRIOR TO
CONSTRUCTION.
2. HANSON PROFESSIONAL SERVICES, INC. AND ITS REPRESENTATIVES MAKE NO
GUARANTEES THAT ALL UTILITIES WITHIN AND ADJACENT TO THE PROJECT SITE ARE
INDICATED ON THE CONSTRUCTION DRAWINGS.
3. DAMAGES TO UTILITIES WILL BE THE SOLE RESPONSIBILITY AND EXPENSE OF THE
CONTRACTOR TO REPAIR.
811 OR 1-800-344-8377 OR www.texas811.org
GIVE 4 WORKING DAYS (M-F) NOTICE
ABOVE IMAGE IS FROM www.texas811.org, TEXAS EXCAVATION SAFETY SYSTEM, INC., 11880 GREENVILLE AVENUE, SUITE 120, DALLAS, TEXAS 75243-3568 PH: (972) 231-5497
1-800-669-8344 OR www.lonestar811.com
GIVE 4 WORKING DAYS (M-F) NOTICE
ABOVE IMAGE IS FROM www.lonestar811.com, LONE STAR 811, 363 N. BELT E., SUITE 1100, HOUSTON, TEXAS 77060 PH: (713) 432-0365
CITY COUNCIL
JERRY RANSOM........................MAYOR
RAMON RODRIGUEZ................MEMBER PLACE 1
THOMAS J. GOSS......................MEMBER PLACE 2
PHILIP SPENCER.......................MEMBER PLACE 3
LARRY DAVIS.............................MEMBER PLACE 4
BEN COLLINS.............................MEMBER PLACE 5
KENNETH FREEMAN.................MEMBER PLACE 6
SUMMER SPURLOCK................CITY MANAGER PROJECT
LOCATION
LOCATION MAP
SCALE: N.T.S.
GREENVILLE
JULY 2026
N
Innovative engineering for a better planet.
SHEET INDEX
Sheet TITLE Sheet Title
1 COVER SHEET
2 GENERAL NOTES
3 EXISTING SITE SURVEY
4 STORM WATER POLLUTION PREVENTION PLAN
5 OVERALL YARD PIPING DEMOLITION PLAN
6 YARD PIPING DEMOLITION PLAN LAYOUT (1 OF 4)
7 YARD PIPING DEMOLITION PLAN LAYOUT (2 OF 4)
8 YARD PIPING DEMOLITION PLAN LAYOUT (3 OF 4)
9 YARD PIPING DEMOLITION PLAN LAYOUT (4 OF 4)
10 WATER REALIGNMENT PLAN & PROFILE (1 OF 2)
11 WATER REALIGNMENT PLAN & PROFILE (2 OF 2)
STATE OF TEXAS
L ICENSED
PROFESSIONAL ENGINEER
145006
LEE J. BLOOME
7/08/2026
G
EN
ER
AL
N O
TE
S
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
NOTICE: THIS PAGE DOES NOT CONTAIN ALL PROJECT NOTES OR PROJECT REQUIREMENTS. THIS PAGE MAY CONTAIN NOTES THAT ARE NOT PERTINENT TO THE PROJECT BUT ARE INCLUDED FOR REFERENCE. IT WILL BE THE RESPONSIBILITY OF ALL CONTRACTORS WORKING ON THIS PROJECT TO BE KNOWLEDGEABLE WITH ALL PROJECT CONTRACT DOCUMENTS, WHICH INCLUDES BUT NOT LIMITED TO THE PROJECT GENERAL REQUIREMENTS, SPECIFICATIONS, AND DRAWINGS. ANY AND ALL COSTS RELATED TO THE CONTRACTOR FAILURE OF BEING KNOWLEDGEABLE WITH THE CONTRACT DOCUMENTS WILL BE AT THE SOLE EXPENSE OF THE CONTRACTOR.
INTENT OF THE PROJECT
THE PROJECT WILL INCLUDE THE DEMOLITION OF WASTEWATER TREATMENT PLANT BUILDINGS AND STRUCTURES INCLUDING BUT NOT LIMITED TO: BUILDINGS, CONCRETE, FOUNDATIONS, PUMP STRUCTURES, TRICKLING FILTERS, CHEMICAL TANKS, SEDIMENTATION BASINS, REMOVAL AND GROUT FILLING OF PLANT PIPING, LIGHT POLES, DISPOSAL OF DEMOLITION WASTE FROM THE WASTEWATER TREATMENT
PLANT SITE, EROSION CONTROL, AND EARTHWORK.
GENERAL
1. A MINIMUM OF ONE (1) COPY OF THE LATEST VERSION OR EDITION OF THE FOLLOWING, BUT NOT LIMITED TO, MUST BE ON THE PROJECT
SITE WHEN CONSTRUCTION IS IN PROGRESS:
1.1 CONTRACT DOCUMENTS AND SPECIFICATIONS,
1.2 ALL CONSTRUCTION DRAWINGS,
1.3 ALL REQUIRED PERMITS,
1.4 ALL REQUIRED LOCAL, STATE, AND FEDERAL DOCUMENTS.
2. ALL WORK ON THIS PROJECT WILL BE REQUIRED TO BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS, THE
DRAWINGS, INDUSTRY STANDARDS, ALL PERMITS, AND ALL LAWS AND REGULATIONS.
2.1 NOTICE: THE CONTRACTOR SHALL KNOW THE ACTUAL SITE CONDITIONS AND SHALL BE RESPONSIBLE FOR FURNISHING A COMPLETED
PROJECT AS REPRESENTED IN THE CONTRACT DOCUMENTS, SPECIFICATIONS, AND IN THE DRAWINGS.
2.2 IN THE EVENT THAT A REGULATION, SPECIFICATION, DETAIL, NOTE, OR OTHER REQUIREMENT IS IN CONFLICT WITH ANOTHER
REGULATION, SPECIFICATION, DETAIL, NOTE, OR OTHER REQUIREMENT, THE MOST STRINGENT SHALL BE APPLICABLE, UNLESS
DIRECTED BY THE OWNER'S REPRESENTATIVE.
3. IF AT ANY POINT THAT SOMETHING IS NOT CLEAR FOR WHAT IS BEING REPRESENTED WITHIN THIS SET OF DRAWINGS, THE GENERAL CONTRACTOR SHALL CONTACT THE OWNER'S REPRESENTATIVE FOR CLARIFICATION PRIOR TO PROCEEDING WITH CONSTRUCTION.
4. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING CONDITIONS AND PROPOSED CONDITIONS, SHALL PERFORM FIELD MEASUREMENTS PRIOR TO CONSTRUCTION, FABRICATION, AND/OR PURCHASE OF ANY MATERIAL, AND SHALL CONTACT, PRIOR TO ORDERING MATERIALS, THE OWNER'S REPRESENTATIVE SHOULD CONDITIONS BE DIFFERENT FROM THE CONTRACT DOCUMENTS, SPECIFICATIONS, AND/OR THE DRAWINGS FOR THIS PROJECT.
4.1 THE CONTRACTOR SHALL FIELD VERIFY BENCHMARK AND CONTROL POINT ELEVATION(S) PRIOR TO COMMENCING ANY
CONSTRUCTION.
4.2 THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY, IN WRITING, OF ANY DISCREPANCIES OR OMISSIONS TO THE
TOPOGRAPHIC INFORMATION WITHIN THE DRAWINGS.
4.3 CONFLICTS ARISING DUE TO LACK OF COORDINATION AND VERIFICATION SHALL BE THE RESPONSIBILITY AND AT THE SOLE EXPENSE
OF THE CONTRACTOR.
5. THE CONTRACTOR IS RESPONSIBLE FOR SECURING ALL NECESSARY CONSTRUCTION PERMITS AND CLEARANCES PRIOR TO COMMENCING
CONSTRUCTION AND ANY FEES ASSOCIATED WITH THE PERMIT SHALL BE INCLUDED WITHIN THE BID ITEM(S) REQUIRING THE PERMIT.
6. THE CONTRACTOR SHALL CONFINE ALL CONSTRUCTION ACTIVITY TO WITHIN THE LIMITS OF CONSTRUCTION (LOC) OR PROPERTY LIMITS AS
INDICATED WITHIN THE DRAWINGS INCLUDING, BUT NOT LIMITED TO, JOB SITE FACILITIES, STAGING AREAS, STOCKPILES, EQUIPMENT, ETC., UNLESS PRIOR APPROVAL FROM THE OWNER'S REPRESENTATIVE IS GIVEN.
7. ALL QUANTITIES INDICATED WITHIN THE DRAWINGS ARE APPROXIMATE AND FOR REFERENCE USE; NOT ALL MATERIALS REQUIRED TO CONSTRUCT THE PROJECT MAY BE INDICATED AND IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INCLUDE ALL MATERIALS AND
APPURTENANCES TO CONSTRUCT THE PROJECT WITHIN THE AMOUNT BID.
8. A SEQUENCE OF CONSTRUCTION SHALL BE SCHEDULED AND COORDINATED WITH THE OWNER'S REPRESENTATIVE PRIOR TO COMMENCEMENT OF CONSTRUCTION AND CHANGES TO THE SEQUENCE SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE.
9. THE CONTRACTOR SHALL PRESERVE ALL CONSTRUCTION STAKES, MARKS, ETC. UNTIL FURTHER USE OF THE STAKES, MARKS, ETC. ARE NOT NEEDED. ANYTIME THAT CONSTRUCTION STAKES, MARKS, ETC. ARE TO BE REPLACED DUE TO BEING DAMAGED, DESTROYED, OR REMOVED AFTER PLACEMENT, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH REPLACEMENT.
LOCATION AND PROTECTION OF EXISTING UTILITIES, STRUCTURES, DITCHES, ROADS, AND OTHER IMPROVEMENTS NOTICE: THE LOCATION OF EXISTING ABOVE GROUND UTILITIES, UNDERGROUND FACILITIES, STRUCTURES, DITCHES, ROADS, AND OTHER
IMPROVEMENTS WITHIN THE DRAWINGS ARE APPROXIMATE IN BOTH HORIZONTAL AND VERTICAL LOCATION(S) AND NOT ALL EXISTING ABOVE GROUND UTILITIES, UNDERGROUND FACILITIES, STRUCTURES, DITCHES, ROADS, AND OTHER IMPROVEMENTS WITHIN AND ADJACENT TO THE SITE MAY BE INDICATED ON THE DRAWINGS. THE OWNER AND THE ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF ANY SUCH INFORMATION OR DATA AND THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR REVIEWING AND CHECKING ALL SUCH INFORMATION FOR THE SAFETY AND PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK; THE COST OF ALL OF WHICH WILL BE CONSIDERED AS HAVING
BEEN INCLUDED IN THE CONTRACT PRICE.
1. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL APPROPRIATE PUBLIC AND PRIVATE UTILITY COMPANIES, BY ALL MEANS POSSIBLE, PRIOR TO COMMENCING CONSTRUCTION TO DETERMINE UTILITY LOCATION(S) WITHIN AND ADJACENT TO THE PROJECT
SITE.
2. THE CONTRACTOR(S) SHALL VIDEO TAPE AND PHOTOGRAPH ALL PROPERTIES AND EXISTING IMPROVEMENTS THAT WILL BE AFFECTED BY CONSTRUCTION, WITH COPIES OF THE INFORMATION BEING SUPPLIED TO THE OWNER'S REPRESENTATIVE PRIOR TO COMMENCING
CONSTRUCTION .
3. THE CONTRACTOR(S) IS RESPONSIBLE FOR CONFIRMING THE LOCATION(S) HORIZONTALLY AND VERTICALLY OF ALL BURIED CABLES, CONDUITS, PIPES, AND UNDERGROUND FACILITIES (INCLUDING BUT NOT LIMITED TO STORM SEWER, SANITARY SEWER, WATER, GAS, TELEVISION, TELEPHONE, FIBER OPTIC, ETC.) WHICH ARE WITHIN AND ADJACENT TO THE SITE.
4. IN THE EVENT THAT A UTILITY LINE NEEDS TO BE ADJUSTED, THE CONTRACTOR SHALL COORDINATE CONSTRUCTION SO THAT THE
ADJUSTMENT CAN BE MADE.
WORK SITE SAFETY AND SECURITY
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IMPLEMENT A SAFETY PROGRAM THAT IS IN COMPLIANCE WITH LOCAL, STATE, AND
FEDERAL SAFETY REGULATIONS FOR ALL WORKERS AND VISITORS FOR THE ENTIRETY OF THE PROJECT.
2. THE CONTRACTOR SHALL POST ON-SITE ALL EMERGENCY PHONE NUMBERS FOR:
2.1. POLICE, FIRE, AND MEDICAL EMERGENCIES
2.2. PUBLIC UTILITY OPERATORS (FOR EACH OPERATOR WITHIN AND ADJACENT TO THE PROJECT SITE)
2.3. PRIVATE UTILITY OPERATORS (FOR EACH OPERATOR WITHIN AND ADJACENT TO THE PROJECT SITE)
2.4. STREET OPERATORS (FOR EACH OPERATOR WITHIN AND ADJACENT TO THE PROJECT SITE)
2.5. TRAFFIC SIGNAL OPERATORS (FOR EACH OPERATOR WITHIN AND ADJACENT TO THE PROJECT SITE)
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAINING ALL EMPLOYEES AND SUBCONTRACTORS IN THE RECOGNITION AND AVOIDANCE OF UNSAFE CONDITIONS AND IN THE REGULATIONS AND HAZARDS WHICH APPLY TO THE AREA IN WHICH THE WORK WILL TAKE PLACE.
4. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL EQUIPMENT AND MATERIALS FOR THE PROTECTION OF PERSONS AND PROPERTY AND FOR PROVIDING SAFE WORKING CONDITIONS THROUGHOUT THE WORK PROGRESS. ALL SAFETY EXPOSURES OR VIOLATIONS SHALL
BE RECTIFIED IMMEDIATELY BY THE CONTRACTOR.
5. THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS IN A MANNER SUCH THAT TRUCKS AND OTHER EQUIPMENT DO NOT CREATE A
SAFETY HAZARD ON ANY PUBLIC OR PRIVATE STREETS.
6. TRENCH SAFETY
6.1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF A TRENCH SAFETY PROGRAM WHICH
MEETS OR EXCEEDS THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA) AND ANY OTHER LOCAL, STATE, AND FEDERAL REGULATIONS THAT PERTAIN TO TRENCH SAFETY.
6.2. ALL EXCAVATIONS AND BACKFILL OPERATIONS SHALL BE IN ACCORDANCE WITH THE LATEST OSHA EXCAVATION SAFETY STANDARDS, STATE REGULATIONS, AND LOCAL REGULATIONS. THE CONTRACTOR SHALL PROVIDE AN EXCAVATION PLAN PREPARED BY AN ENGINEER REGISTERED IN THE STATE OF TEXAS PRIOR TO BEGINNING TRENCHING OPERATIONS.
6.3. THE CONTRACTOR SHALL APPOINT A "COMPETENT PERSON" AS DEFINED BY OSHA WHO WILL BE ON-SITE AT ALL TIMES WHILE TRENCHING, PERFORMING EXCAVATIONS, AND WHEN WORKERS ARE IN TRENCHES.
6.4. THE EXCAVATION PLAN SHALL INDICATE THE PROCEDURES TO BE USED BY THE CONTRACTOR TO COMPLY WITH THE OSHA, STATE, AND
LOCAL REQUIREMENTS.
6.5. THE TRENCH SAFETY PROGRAM AND EXCAVATION PLAN SHALL BE SUBMITTED TO THE OWNER'S REPRESENTATIVE FOR RECORD
PURPOSES ONLY AND NOT FOR APPROVAL OR VERIFICATION.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND CONTROLLING THE WORK SITE TO PREVENT ACCIDENTS, THEFT, AND VANDALISM. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR REPLACEMENT OR SATISFACTORY REPAIRS TO EXISTING AND NEW
IMPROVEMENTS DUE TO ACCIDENTS, THEFT, AND VANDALISM.
8. IT WILL NOT BE THE RESPONSIBILITY OF THE OWNER, OWNER'S REPRESENTATIVE, OR ENGINEER TO ENSURE THAT ALL SAFETY REGULATIONS ARE ABIDED BY. HOWEVER, IF THE OWNER, OWNER'S REPRESENTATIVE, OR ENGINEER RECOGNIZES OR IS NOTIFIED OF UNSAFE CONDITIONS, THE WORK BEING ACCOMPLISHED WILL BE STOPPED UNTIL THE CONTRACTOR INDICATES THAT IT IS NOT AN UNSAFE METHOD OR RECTIFIES THE SITUATION AT NO EXPENSE TO THE OWNER, OWNER'S REPRESENTATIVE, OR ENGINEER.
EROSION AND POLLUTION CONTROL DURING CONSTRUCTION
1. ALL CONSTRUCTION ACTIVITIES SHALL BE SUBJECT TO THE EROSION AND POLLUTION PREVENTION REQUIREMENTS OF THE CITY, COUNTY, TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ), ALL APPLICABLE PERMITS, AND ALL LAWS AND REGULATIONS. A TCEQ
STORMWATER PERMIT FOR CONSTRUCTION WILL BE REQUIRED FOR THIS PROJECT.
2. THE CONTRACTOR IS TO OBTAIN ALL REQUIRED PERMITS AND POST REQUIRED COPIES ON-SITE AT ALL ENTRANCES PRIOR TO
COMMENCING CONSTRUCTION.
3. THE CONTRACTOR WILL BE REQUIRED AT ALL TIMES DURING CONSTRUCTION TO PROVIDE AND MAINTAIN ALL REQUIRED CONTROL DEVICES THAT ARE INDICATED WITHIN THE DRAWINGS AND ALL REQUIRED DEVICES AS REQUIRED BY ANY PERMIT.
4. THE CONTRACTOR SHALL ENSURE THAT NO SEDIMENT OR CONSTRUCTION DEBRIS ENTERS AN AREA OFF THE CONSTRUCTION SITE.
5. SEE ALSO EROSION AND POLLUTION CONTROL NOTES AND PLAN(S) WITHIN THIS DRAWING SET. THESE SHEETS CAN BE USED AS A GUIDE
TO DEVELOP THE REQUIRED STORM WATER POLLUTION PREVENTION PLAN.
TRAFFIC CONTROL AND EXISTING PEDESTRIAN FACILITIES
1. THE CONTRACTOR IS SOLELY RESPONSIBLE TO PROVIDE, IMPLEMENT, AND COMPLY WITH A TRAFFIC CONTROL PLAN MEETING THE
REQUIREMENTS OF THE COUNTY OR CITY, TxDOT, THE OWNER'S REPRESENTATIVE, AND THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (TMUTCD) (LATEST EDITION) FOR ANY WORK ALONG THE ROAD AND ALL ADJACENT ROADS TO THE PROJECT SITE.
1.1. THE PLAN SHALL CONTAIN PROVISIONS FOR ALL PROJECT PHASES AND PROVIDE SUFFICIENT BARRICADES, WARNINGS, AND LIGHTING TO
WARN AND GUIDE MOTORISTS AND PEDESTRIANS THROUGH THE WORK AREA.
1.2. THIS PLAN IS TO BE SUBMITTED TO AND APPROVED BY ALL APPROPRIATE AGENCIES BEFORE CONSTRUCTION ALONG THE ROAD IS TO
COMMENCE.
1.3. HIS PLAN AND THE APPROVAL NOTIFICATION ARE TO BE SUBMITTED TO THE OWNER'S REPRESENTATIVE FOR RECORD KEEPING PURPOSES
ONLY BEFORE CONSTRUCTION ALONG THE ROAD IS TO COMMENCE.
1.4. IF A PLAN IS INCLUDED WITHIN THE DRAWINGS, IT SHOULD BE USED AS A GENERAL GUIDELINE.
2. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR MAINTAINING AND VERIFYING THAT ALL TRAFFIC CONTROL DEVICES ARE IN THE
PROPER POSITION, WORKING ORDER, AND MEET THE SPECIFICATIONS EACH DAY PRIOR TO COMMENCING WORK AND PRIOR TO LEAVING FOR THE DAY, AND VERIFYING AT LEAST ONCE PER DAY WHEN NO WORK IS DONE INCLUDING WEEKENDS, HOLIDAYS, AND WEATHER DAYS.
3. MAINTENANCE OF TRAFFIC CONTROL DEVICES ARE TO OCCUR IMMEDIATELY WHEN NOTICED THAT THE DEVICE DOES NOT MEET THE
TRAFFIC CONTROL PLAN AND SPECIFICATIONS.
4. PLACEMENT OF TEMPORARY AND PERMANENT PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE TMUTCD, THE DRAWINGS, AND
SHALL BE APPROVED BY THE GOVERNING ENTITY.
5. THE CONTRACTOR SHALL MAINTAIN EXISTING PEDESTRIAN FACILITIES DURING CONSTRUCTION.
6. THE CONTRACTOR SHALL FILL ANY HOLES LEFT WHEN BARRICADES AND SIGNS ARE REMOVED AND RESTORE THE AREA TO THE PREVIOUS
CONDITIONS.
DRAINAGE DURING CONSTRUCTION
1. THE CONTRACTOR SHALL MAINTAIN ADEQUATE DRAINAGE AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE
INTERIM DRAINAGE BY MEANS OF PUMPS AND TEMPORARY DITCHES DURING CONSTRUCTION AS REQUIRED TO MAINTAIN A WELL-DRAINED SITE FREE OF STANDING WATER AND WATER SOFTENED SOILS, UNLESS OTHERWISE INDICATED BY THE OWNER'S REPRESENTATIVE.
2. DRAINAGE FROM ADJACENT PROPERTIES SHALL NOT BE BLOCKED AT ANYTIME PRIOR, DURING, AND AFTER CONSTRUCTION AND WILL BE
HANDLED AS SHOWN ON THE DRAWINGS OR AS INDICATED BY THE OWNER'S REPRESENTATIVE.
SITE CLEARING AND EARTHWORK
1. TREES & SHRUBS SHALL REMAIN IN PLACE AND PROTECTED UNLESS OTHERWISE NOTED ON THE DRAWINGS OR INDICTED BY THE
OWNER'S REPRESENTATIVE IN ACCORDANCE WITH THE SPECIFICATIONS.
2. CONTRACTOR SHALL PERFORM ROUGH EARTHWORK (SITE GRADING, FILLING, HAULING, CUTTING, LOADING, ETC.) TO VERIFY ADEQUATE
EARTH QUANTITY ON-SITE TO ACHIEVE THE REQUIRED GRADES INDICATED WITHIN THIS DRAWING SET PRIOR TO ANY OTHER
CONSTRUCTION.
2.1. IF MATERIAL IS TO BE HAULED FROM OFF-SITE SOURCES THE MATERIAL SHALL BE OF LIKE MATERIAL COMPOSITION AS TO WHAT IS FOUND
CURRENTLY ON-SITE AND APPROVED BY THE OWNER'S REPRESENTATIVE.
3. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE VOLUME OF EARTH FILL TO COMPLETELY BACKFILL THE SITE TO MATCH EXISTING
GRADE.
4. GRADES NOT OTHERWISE INDICATED SHALL BE UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE GIVEN, OR BETWEEN SUCH POINTS AND EXISTING FINISH GRADES. ROUND OFF ABRUPT CHANGES IN SLOPE.
5. THE CONTRACTOR WILL BE REQUIRED TO LIMIT THE AMOUNT OF DUST AND WIND TRANSPORTED MATERIALS FROM OCCURRING ON AND OFF THE PROJECT SITE DURING AND AFTER WORKING HOURS SEVEN (7) DAYS A WEEK THROUGHOUT THE DURATION OF THE PROJECT.
5.1. THE CONTRACTOR SHALL PHASE WORK ON THE SITE AND USE WATER, TEMPORARY COVER, AND/OR DUST CONTROL AGENTS TO LIMIT THE
AMOUNT OF DUST AND OTHER WIND-BORNE MATERIALS FROM EXITING THE PROJECT SITE.
5.2. IF DUST FROM THE PROJECT SITE BECOMES EXCESSIVE, THE CONTRACTOR WILL BE REQUIRED TO TAKE ANY AND ALL MEASURES
POSSIBLE TO CONTROL THE POLLUTION.
6. CONTRACTOR SHALL LIMIT THE AMOUNT OF EROSION DUE TO STORM EVENTS AND ANY EROSION AREAS SHALL BE RESHAPED AND REPAIRED TO THE LINES AND GRADES SHOWN IN THE DRAWINGS IN A TIMELY MANNER WHEN CONDITIONS ALLOW.
SITE GRADING
1. THE CONTRACTOR SHALL CONSTRUCT THE SITE TO THE LINES, GRADES, AND ELEVATIONS AS SPECIFIED AND AS INDICATED WITHIN THE
DRAWINGS.
2. ANY ADJUSTMENTS TO THE LINES, GRADES, AND ELEVATIONS SHALL BE APPROVED BY THE OWNER'S REPRESENTATIVE.
3. IMPORT MATERIAL, WHEN REQUIRED, SHALL BE OF SIMILAR MATERIAL AS TO THE NATURAL OCCURRING MATERIAL ON-SITE AND APPROVED
OF BY THE OWNER'S REPRESENTATIVE
3.1. MATERIAL SHALL BE FREE OF LARGE CLODS, LARGE ROCKS, ORGANIC MATTER, CONSTRUCTION MATERIAL, TRASH, AND OTHER
OBJECTIONABLE MATERIAL.
3.2. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR VERIFICATION OF MATERIAL TYPE AND QUANTITY IMPORTED PER TRUCK. THE
OWNER'S REPRESENTATIVE SHALL BE PROVIDED TRIP TICKETS THAT INDICATE THE TRUCK NUMBER, DATE OF DELIVERY, MATERIAL DELIVERED, AND QUANTITY OF MATERIAL DELIVERED. TRIP TICKETS SHALL BE PROVIDED TO THE OWNER'S REPRESENTATIVE ON A
WEEKLY INTERVAL AND AS REQUESTED.
4. EXCESS SOIL MATERIAL FROM GRADING ACTIVITIES SHALL NOT BE REMOVED FROM THE SITE, UNLESS DIRECTED BY THE OWNER'S REPRESENTATIVE. EXCESS MATERIAL SHALL BE INCORPORATED INTO THE PROJECT OR STOCKPILED IN A MANNER TO PROMOTE POSITIVE
DRAINAGE.
5. NO FILL THAT IS PLACED BY DUMPING IN A PILE OR WINDROW SHALL BE INCORPORATED INTO A LAYER IN THAT POSITION; ALL SUCH PILES
AND WINDROWS SHALL BE MOVED BY BLADING OR SIMILAR METHOD.
6. ALL FILL SHALL BE PLACED IN LAYERS APPROXIMATELY PARALLEL TO THE FINISH GRADE AND IN LAYERS NOT IN EXCESS OF SIX-INCHES (6”)
OF UN-COMPACTED DEPTH, UNLESS INDICATED OTHERWISE BY THE OWNER'S REPRESENTATIVE.
7. FILL COMPACTION
7.1. COMPACT TO A DENSITY WHICH APPROXIMATES THAT OF THE EXISTING NATURAL GROUND, UNLESS OTHERWISE INDICATED BY THE
OWNER'S REPRESENTATIVE.
7.2. ALL IRREGULARITIES, DEPRESSIONS, AND SOFT SPOTS WHICH DEVELOP FROM COMPACTION SHALL BE CORRECTED BY THE CONTRACTOR.
8. ANY EARTHWORK QUANTITIES SHOWN WITHIN THE DRAWINGS ARE FOR INFORMATIONAL PURPOSES ONLY AND MAY NOT REFLECT THE ACTUAL AMOUNT THAT WILL BE REQUIRED TO COMPLETE THE WORK DUE TO CONSTRUCTION METHODS.
EXCAVATION AND TRENCHING FOR UTILITIES, ROADWAY, AND STRUCTURES
1. ALL EXCAVATION SHALL BE IN ACCORDANCE WITH THE TRENCH SAFETY PROGRAM THAT HAS BEEN DEVELOPED AND IMPLEMENTED BY THE
CONTRACTOR.
2. EXCAVATIONS SHALL NOT BE MADE DURING INCLEMENT WEATHER.
3. WATER ACCUMULATION IN EXCAVATIONS EXCEEDING ONE-INCH (1") SHALL BE PUMPED OUT PRIOR TO CONTINUING CONSTRUCTION OR AS
APPROVED BY THE OWNER'S REPRESENTATIVE.
4. TRENCH EXCAVATION SHALL NOT PRECEDE BACKFILL BY MORE THAN 200 FEET.
5. TRENCHES SHALL NOT BE LEFT OPEN OR UNSECURED AFTER NORMAL WORKING HOURS OR WHILE WORKERS ARE NOT PRESENT ON-SITE.
5.1. IF TRENCHES ARE LEFT OPEN, THEY SHALL BE COVERED AND APPROPRIATE AND ADEQUATE BARRICADES SHALL BE PLACED TO PREVENT
ACCESS INTO THE TRENCH AREA.
FINAL CLEAN-UP AND SITE PREPARATION
1. THE CONTRACTOR WILL BE REQUIRED TO REMOVE EXCESS MATERIALS AND CONSTRUCTION DEBRIS FROM THE PROJECT SITE, CLEAN ALL
ROADS AND SIDEWALKS, CLEAR THE STORM SEWER OF SILT AND DEBRIS, CLEAR THE SANITARY SEWER OF DEBRIS, BRING ALL MANHOLES, VALVE BOX COVERS, FIRE HYDRANTS TO PROPER GRADE, AND CLEAR THE SITE OF ALL EQUIPMENT TO THE SATISFACTION OF THE
OWNER'S REPRESENTATIVE.
2. MATERIALS LARGER THAN FOUR-INCHES (4") IN SIZE WITHIN THE CONSTRUCTION LIMITS AND NOT INCORPORATED INTO THE PROJECT SHALL BE REMOVED BY THE CONTRACTOR FROM THE PROJECT AND DISPOSED OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL
REGULATIONS, UNLESS OTHERWISE DIRECTED BY THE OWNER OR OWNER'S REPRESENTATIVE.
3. EROSION AND POLLUTION CONTROL DEVICES SUCH AS, BUT NOT LIMITED TO, REINFORCED SILT FENCE, INLET PROTECTION, HAY BALES, AND OTHER DEVICES AS DIRECTED BY THE OWNER'S REPRESENTATIVE SHALL BE VERIFIED AND REMEDIED TO MEET THE REQUIREMENTS
OF THE DEVICE AND OWNER'S REPRESENTATIVE.
3.1. THE CONSTRUCTION ENTRANCE SHALL BE REMOVED IN ITS ENTIRETY UNLESS OTHERWISE STATED BY THE ENGINEER.
3.2. ADDITIONAL EROSION AND POLLUTION CONTROL DEVICES MAY BE REQUIRED TO HAVE THE PROJECT SITE IN COMPLIANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
4. THE CONTRACTOR SHALL GRADE AND STABILIZE THE SITE TO PREPARE THE SITE FOR THE INTENDED USE TO THE SATISFACTION OF THE
OWNER'S REPRESENTATIVE.
5. ALL DISTURBED AREAS SHALL BE GRADED TO MATCH EXISTING GROUND AND FINISHED NOT TO IMPEDE FURTHER DEVELOPMENT.
DEMOLITION NOTES
1. CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE STORED AND PLACED SO AS TO NOT ENDANGER THE PUBLIC, THE WORKERS OR
ADJOINING PROPERTY FOR THE DURATION OF THE CONSTRUCTION PROJECT.
2. WASTE MATERIALS SHALL BE REMOVED IN A MANNER WHICH PREVENTS INJURY OR DAMAGE TO PERSONS, ADJOINING PROPERTIES AND
PUBLIC RIGHTS OF WAY.
3. THE WORK OF DEMOLISHING ANY BUILDING SHALL NOT COMMENCE UNTIL PEDESTRIAN PROTECTION IS IN PLACE AS REQUIRED BY
INTERNATIONAL BUILDING CODE (IBC) CHAPTER 33 2015 ISSUANCE. SIGNS SHALL BE PROVIDED TO DIRECT PEDESTRIAN TRAFFIC. IBC CHAPTER 33 INDICATES THE REQUIREMENTS FOR WALKWAYS, BARRICADES, RAILINGS AND ASSOCIATED BARRIERS.
4. WHERE A STRUCTURE HAS BEEN DEMOLISHED OR REMOVED, THE VACANT LOT SHALL BE FILLED AND MAINTAINED TO THE EXISTING
GRADE OR IN ACCORDANCE WITH THE CITY ORDINANCES.
5. COMPLETELY REMOVE BURIED PIPING AND PLANT PIPING CONNECTED TO STRUCTURES IN DEMOLITION AREAS UNLESS OTHERWISE
NOTED IN PLANS.
6. VALVES, FITTINGS, AND OTHER PIPING APPURTENANCES SHALL BE SEPARATED AND STOCKPILED ON SITE FOR SALVAGE EVALUATION BY
THE CITY OF GREENVILLE STAFF.
7. PRIOR TO BACKFILLING STRUCTURES TO REMAIN AND BELOW EXISTING GRADE, CUT HOLES AT LEAST 2 FEET IN DIAMETER EVERY 20 FEET ALONG THE BOTTOM OF THE STRUCTURES TO ALLOW FOR WATER TO DRAIN INTO THE SURROUNDING GROUND.
8. NO DEMOLITION DEBRIS, PLANT EQUIPMENT, PIPING, METAL, PUMPS, OR OTHER PROCESS EQUIPMENT SHALL BE USED AS FILL.
9. STRUCTURES THAT CONTAIN UNDERGROUND SPACES SHALL BE DEMOLISHED AND FILLED SUCH THAT NO VOIDS ARE REMAINING ONCE
COMPLETED.
10. PROVISIONS SHALL BE MADE TO PREVENT THE ACCUMULATION OF WATER ON THE PREMISES OR ADJOINING PROPERTY.
11. SERVICE UTILITY CONNECTIONS SHALL BE DISCONTINUED AND CAPPED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
12. SANITARY FACILITIES SHALL BE PROVIDED DURING DEMOLITION ACTIVITIES IN ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE
AND CITY REQUIREMENTS.
13. ADJOINING PUBLIC AND PRIVATE PROPERTY SHALL BE PROTECTED FROM DAMAGE DURING DEMOLITION WORK.
14. THE EXISTING WASTEWATER TREATMENT PLANT WILL REMAIN IN SERVICE AND SHALL BE PROTECTED FROM DEMOLITION DEBRIS OR
DAMAGE CAUSED BY DEMOLITION ACTIVITIES.
15. THE TEMPORARY USE OF STREETS OR PUBLIC PROPERTY FOR THE STORAGE OR HANDLING OF MATERIALS OR OF EQUIPMENTS
REQUIRED FOR CONSTRUCTION, AND THE PROTECTION PROVIDED TO THE PUBLIC SHALL COMPLY WITH THE PROVISIONS OF THE CITY
AND THE IBC CHAPTER 33.
16. ALL STRUCTURES UNDER CONSTRUCTION, OR DEMOLITION SHALL BE PROVIDED WITH NOT LESS THAN ONE APPROVED FIRE
EXTINGUISHER.
17. WATER SUPPLY FOR FIRE PROTECTION, EITHER TEMPORARY OR PERMANENT SHALL BE MADE AVAILABLE AS SOON AS COMBUSTIBLE
MATERIAL ACCUMULATES.
18. ANY LIQUIDS CONTENTS, GRIT, SAND, INORGANIC, OR SLUDGE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AS DESCRIBED IN
THE SPECIFICATIONS.
EQUIPMENT________________________
1. ONLY EQUIPMENT REQUIRED FOR PERFORMING THE WORK ON THE PROJECT WILL BE ALLOWED AT THE SITE.
2. THE EQUIPMENT USED ON THE PROJECT SHALL HAVE ALL OF THE REQUIRED PARTS FOR OPERATION INSTALLED AS RECOMMENDED BY
THE MANUFACTURER.
3. ALL EQUIPMENT REQUIRED TO PERFORM THE WORK ON THE PROJECT SHALL BE IN GOOD WORKING ORDER AND MAINTAINED
THROUGHOUT CONSTRUCTION.
4. ANY EQUIPMENT THAT IS TO BE STORED ON-SITE SHALL BE LOCATED IN AN AREA THAT IS PROTECTED TO PREVENT ACCIDENTS, DAMAGE TO MATERIALS, AND ANY ADVERSE ENVIRONMENTAL EFFECTS.
5. ANY EQUIPMENT THAT IS LEAKING FLUIDS SHALL BE FIXED PROMPTLY AND ANY FLUID CONTAMINATED SOIL SHALL BE REMOVED
PROMPTLY IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
6. THE CONTRACTOR SHALL PROTECT AGAINST SOIL/WATER CONTAMINATION BY UTILIZING CONTAINERS OR BARRIERS.
7. THE CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL FLUIDS,CLEANING MATERIALS, AND LIQUIDS IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
DEWATERING WET WELLS
1. THE EXISTING WET WELLS IN THE PRIMARY AND SECONDARY PUMP STATIONS ARE FULL OF UNTREATED WASTEWATER.
2. THE CONTRACTOR SHALL COORDINATE WITH CITY PERSONNEL ON A LOCATION TO PUMP THE WASTE TO FOR DISPOSAL.
3. THE CONTRACTOR SHALL WASH DOWN THE WET WELL WALLS AND REMOVE ANY ACCUMULATED SLUDGE IN THE WET WELLS. THE
ACCUMULATED SLUDGE SHALL BE REMOVED BY THE CONTRACTOR AND DISPOSED OF IN A LEGAL MANNER. THE REMOVAL WILL
INCLUDE PROCESSING REQUIRED TO DEWATER THE ACCUMULATED SLUDGE.
HAZARDOUS MATERIALS
1. CONTRACTOR TO REFER TO THE HAZARDOUS MATERIALS REPORT IN THE CONTRACT DOCUMENT.
2. THE PRIMARY PUMP STATION AND SECONDARY PUMP STATION BOTH HAVE HAZARDOUS MATERIALS THAT REQUIRE REMOVAL PRIOR TO
DEMOLITION OF THE STRUCTURES.
3. HAZARDOUS MATERIALS TO BE REMOVED INCLUDE.
A. ASBESTOS CONTAINING MATERIAL.
B. PCB ITEMS
C. MERCURY
D. CFC UNITS
E. BATTERIES
F. RADIOACTIVE SOURCES (SMOKE ALARMS)
G. OIL
H. PESTICIDES
I. HERBICIDES
J. CLEANING CHEMICALS
K. LEAD CONTAINING PAINT
L. NON-LEAD PAINT (IN CANS)
4. THE COMPLETE LIST OF ITEMS AND THEIR LOCATIONS ARE INCLUDED IN THE HAZARDOUS MATERIALS REPORT.
) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO
Y Y
Y Y
YYYY
Y
Y
Y Y
Y
Y Y
Y Y
Y Y
Y
Y Y Y
Y
YYYYYYYYYYYYYYYYYYY
Y Y
Y Y
Y Y
Y Y Y
Y Y
Y
Y Y
Y
Y Y
Y Y
Y
Y Y
Y Y Y Y Y Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y Y Y
Y
Y
YYY
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
OHE
OHE
OHE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
X X X X
X
X
X
X X X
X X
X X
X X
X
X X X
X X
X X
X X
X
X
X
XXXXXXXXXXXXXX
X X
X
X
E
BM#30002
BM#30006
PNT#51849
PNT#51848
BM#30000
BM#30005
BM#30003
BM#30001
BM#30004
FINE SCREEN & PRIMARY
LIFT STATION FACILITY
GENERATOR
TRANSFORMER
GENERATOR
TRANSFORMER
SEPTIC RECEIVING
STATION
UV DISINFECTION
FACILITY
CHLORINE
BLDG.
BLOWER
BUILDING
EFFLUENT
PUMP
STATION
ADMIN
BUILDING
PRIMARY
PUMP
STATION
SEQUENCING BATCH REACTOR
FACILITY & EFFLUENT
EQUALIZATION FACILITY
BUILDING
BUILDING
BUILDING
SECONDARY
PUMP
STATION
BLDG.
PRIMARY
SEDIMENTATION
UNIT 1
CONC. BASIN
PRIMARY
TRICKLING
FILTER 1
CONC. BASIN
FINAL
SEDIMENTATION
UNIT 2
CONC. BASIN
FINAL
SEDIMENTATION
UNIT 1
CONC. BASIN
CHEMICAL
BLDG.
SLUDGE
DEWATERING
FACILITY SLUDGE
DISPOSAL
BLDG.
S02 DOCK
CL2 DOCK
DEWATERED
SLUDGE
STORAGE
STRUCTURE
SITE ENTRANCE
CHLORINE
CONTACT
CHAMBERS
SHIPPING
CONTAINERS
1200 GALLON
FIBERGLASS
TANK
W
S
N
E
EX
IS
TI
N
G S
IT
E
SU
R
VE
Y
X X
LEGEND
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
Y Y
YYYY
Y
Y
Y Y
Y
Y Y
Y Y
Y Y
Y
Y Y Y
Y
YYYYYYYYYYYYYYYYYYY
Y Y
Y Y
Y Y
Y Y Y
Y Y
Y
Y Y
Y
Y Y
Y Y
Y
Y Y
Y Y Y Y Y Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y Y Y
Y
Y
YYY
Y
Y
Y Y
Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
OHE
OHE
OHE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
X X X X
X
X
X
X X X
X X
X X
X X
X
X X X
X X
X X
X X
X
X
X
XXXXXXXXXXXXXX
X X
X
X
E
ADMIN.
BUILDING
PRIMARY
PUMP
STATION
SECONDARY
PUMP
STATION
BLDG.
BLDG.
SEQUENCING BATCH REACTOR
FACILITY & EFFLUENT
EQUALIZATION FACILITY
SLUDGE
DEWATERING
FACILITY
PRIMARY
TRICKLING
FILTER 1
CONC. BASIN
FINAL
SEDIMENTATION
UNIT 2
CONC. BASIN
FINAL
SEDIMENTATION
UNIT 1
CONC. BASIN
CHEMICAL
BLDG.
SLUDGE
DISPOSAL
BLDG.
DEWATERED
SLUDGE STORAGE
STRUCTURE
CHLORINE
CONTACT
CHAMBERS
S02 DOCK
CL2 DOCK
PRIMARY SEDIMENTATION
UNIT 1 CONC. BASIN
UV DISINFECTION
FACILITY
SEPTIC RECEIVING
STATION
CHLORINE
BLDG.
BUILDING
BL
D
G
GENERATOR
TRANSFORMER
TRANSFORMER
GENERATOR
BLOWER
BLDG.
SC
F
SC
F
SC
F
SC
F
SCF SCF SC
F
SC
F
SC
F
SC
F
CONSTRUCTION
ENTRANCE
FINE SCREEN & PRIMARY
LIFT STATION FACILITY
SC
F
SCF
INLET PROTECTION
SEDIMENT
CONTROL FENCE
SC
F
SC
F
SC
F
SCF SCF
SCF
SC
F
SCF
SC
F
SC
F
SCF
SCF
SCF
SCF SCF
SCF SCF SCF
SEDIMENT
CONTROL FENCE
SEDIMENT
CONTROL FENCE
SC
F
SC
F
SC
F
SC
F
SC
F
SC
F
SC
F
SC
F
SCF
SCF
SCF
SC
F
SC
F
SEDIMENT
CONTROL FENCE
SHIPPING
CONTAINERS
1200 GALLON
FIBERGLASS
TANK
W
S
N
E
LEGEND
SCF
ST
O
R M
W
AT
ER
P
O
LL
U
TI
O N
PR
EV
EN
TI
O N
P
LA
N
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
Y Y
Y Y
Y
YY
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y Y Y Y
Y
Y Y
Y
YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y
Y
Y Y Y Y Y Y
Y Y
Y
Y
Y
Y Y
Y
YYYYYYY
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
YY
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
OHE
OHE
OHE
OHE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
X X X X X X X
X X
X
X
X
X
X
X
X
X
X
X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X
X X
X X
X X
X
X
X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
ST
Y Y
Y
Y Y
Y Y
Y Y
Y
YY
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y Y Y Y
Y
Y Y
Y
YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y
Y
Y Y Y Y Y Y
Y Y
Y
Y
Y
Y Y
Y
YYYYYYY
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
YY
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
OHE
OHE
OHE
OHE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
X X X X X X X
X X
X
X
X
X
X
X
X
X
X
X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X
X X
X X
X X
X
X
X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
ST
Y Y
Y
ADMIN.
BUILDING
FINAL
SEDIMENTATION
UNIT 2
CONC. BASIN
FINAL
SEDIMENTATION
UNIT 1
CONC. BASIN
SLUDGE
DISPOSAL
BLDG.
DEWATERED
SLUDGE
STORAGE
STRUCTURE
CHLORINE
CONTACT
CHAMBERS
CHLORINE
BLDG.
S02
DOCK
CL2
DOCK
UV
DISINFECTION
FACILITY
FINE SCREEN &
PRIMARY LIFT
STATION FACILITY
BLOWER
BLDG.
BUILDING
BL
D
G
GENERATOR
TRANSFORMER
SEPTIC
RECEIVING
STATION
TRANSFORMER
GENERATOR
EXIST. SEQUENCING
BATCH REACTOR (SBR)
FACILITY & EFFLUENT
EQUALIZATION FACILITY
EFFLUENT
PUMP
STATION
CHEMICAL BLDG.
SLUDGE
DEWATERING
FACILITY
PW PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
(SEE SHT. 9)
(SEE SHT. 6)
(SEE SHT. 8)
(SEE SHT. 7)
PRIMARY
TRICKLING
FILTER
PRIMARY
PUMP
STATION
SECONDARY
PUMP
STATION
PRIMARY
SEDIMENTATION
SHIPPING CONTAINERS
OWNER
RELOCATED
SHIPPING
CONTAINERS
WET WELLS IN THE
PRIMARY AND
SECONDARY PUMP
STATIONS WILL BE
PUMPED OUT PRIOR TO
DEMOLITION BY CITY
STAFF. CONTRACTOR TO
COORDINATE PRIOR TO
START OF DEMOLITION.
WET WELLS IN THE
PRIMARY AND
SECONDARY PUMP
STATIONS WILL BE
PUMPED OUT PRIOR TO
DEMOLITION BY CITY
STAFF. CONTRACTOR TO
COORDINATE PRIOR TO
START OF DEMOLITION.
O
VE
R
AL
L
YA
R D
P
IP
IN
G
D
EM
O
LI
TI
O
N P
LA
N
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
W
S
N
E
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
YOHE
OHE O
H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X
X
X X
X X
X X
X X X
X X
X X
X X
X
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
YOHE
OHE O
H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X
X
X X
X X
X X
X X X
X X
X X
X X
X
ADMIN.
BUILDING
BUILDING
TRANSFORMER
GENERATOR
EXIST. SEQUENCING BATCH REACTOR (SBR)
FACILITY & EFFLUENT EQUALIZATION FACILITY
PRIMARY
PUMP
STATION
SHIPPING CONTAINERS
WET WELLS IN THE PRIMARY AND SECONDARY
PUMP STATIONS WILL BE PUMPED OUT PRIOR TO
DEMOLITION BY CITY STAFF. CONTRACTOR TO
COORDINATE PRIOR TO START OF DEMOLITION.
YA
R
D P
IP
IN
G D
EM
O
LI
TI
O N
PL
AN
L
AY
O U
T (1
O F
4)
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
W
S
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
YYYYYY
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y
Y
YY
Y Y
Y
Y Y Y Y Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
Y
YYY
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
X X X X X X X X X X X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X
X X
X X
ST ST
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
YYYYYY
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y
Y
YY
Y Y
Y
Y Y Y Y Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
Y
YYY
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
X X X X X X X X X X X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X
X X
X X
ST ST
CHLORINE CONTACT
CHAMBERS
CHLORINE
BLDG.
S02
DOCK
CL2 DOCK
UV DISINFECTION
FACILITY
EFFLUENT
PUMP STATION
PW PW PW PW PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
SECONDARY
PUMP
STATION
WET WELLS IN THE PRIMARY AND SECONDARY
PUMP STATIONS WILL BE PUMPED OUT PRIOR TO
DEMOLITION BY CITY STAFF. CONTRACTOR TO
COORDINATE PRIOR TO START OF DEMOLITION.
YA
R
D P
IP
IN
G D
EM
O
LI
TI
O N
PL
AN
L
AY
O U
T (2
O F
4)
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
W
S
YYY
Y
YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y Y Y Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y Y
Y
Y Y
Y Y Y Y
Y
Y
Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
YYYYYYYYYYYYYY
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
Y Y Y
Y
Y
Y Y Y Y
OHE
OHE
OHE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
X X
X
X
X
X
X X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
Y Y
Y Y
YY
Y
YYY
Y
YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y Y Y Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y Y
Y
Y Y
Y Y Y Y
Y
Y
Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
YYYYYYYYYYYYYY
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
Y Y Y
Y
Y
Y Y Y Y
OHE
OHE
OHE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
X X
X
X
X
X
X X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
Y Y
Y Y
YY
FINE SCREEN & PRIMARY
LIFT STATION FACILITY
BL
D
G
GENERATOR
TRANSFORMER
SEPTIC
RECEIVING
STATION
PRIMARY TRICKLING
FILTER
PRIMARY
SEDIMENTATION
YA
R
D P
IP
IN
G D
EM
O
LI
TI
O N
PL
AN
L
AY
O U
T (3
O F
4)
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
W
S
YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
''S T
''S T
Y
Y
YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
''S T
''S T
FINAL
SEDIMENTATION
UNIT 2
CONC. BASIN
FINAL
SEDIMENTATION
UNIT 1
CONC. BASIN
SLUDGE
DISPOSAL BLDG.
DEWATERED
SLUDGE STORAGE
STRUCTURE
BLOWER
BLDG.
CHEMICAL BLDG.
SLUDGE DEWATERING
FACILITY
OWNER RELOCATED
SHIPPING CONTAINERS
YA
R
D P
IP
IN
G D
EM
O
LI
TI
O N
PL
AN
L
AY
O U
T (4
O F
4)
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
W
S
W
AT
ER
R
EA
LI
G N
M
EN
T
PL
AN
P R
O
FI
LE
(1
O F
2)
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
W
SN
E
PLAN - RW REALIGNMENT
PROFILE - RW REALIGNMENT
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
YYYYYYYYYYYYYYY
Y
Y Y
Y Y
Y Y
Y
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
YYYYYYYYYYYYYYY
Y
Y Y
Y Y
Y Y
Y
PW PW PW PW PW PW PW PW PW PW PW PW PW PW PW
PW
PW
PW
PW
PW
PW
PW
PW
PW
W
AT
ER
R
EA
LI
G N
M
EN
T
PL
AN
P R
O
FI
LE
(2
O F
2)
D
EM
O
LI
TI
O
N (R
E-
BI
D
W
AS
TE
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T C
IT
Y
O F
G R
EE
N
VI
LL
E, T
X
100% SUBMITTAL
STA
TE
OF
TE
XA
S
L I
CE
N
SE
D
PROFE
SS
IO
NA
L
EN
GI
NEER
LE
E J.
B
LO
O M
E7/
/2
RE
V
RE
VIS
IO
N
DA
TE
DR
AW
N
DE
SIG
NE
D
RE
VIE
WE
D
H an so n
Pr of es si on al
S er vi ce s In c.
G ol lih ar R oa d
C or pu s
C hr is ti, T X
Ph on e:
(3
) 8
-9
In no va tiv e en gi ne er in g fo r a b et te r p la ne t.
W
SN
E
PLAN - PW REALIGNMENT
PROFILE - PW REALIGNMENT
| Sheets and Views |
| 1 COVER SHEET |
| 2 GENERAL NOTES |
| 3 EXISTING SITE SURVEY |
| 4 STORM WATER POLLUTION PREVENTION PLAN |
| 5 OVERALL YARD PIPING DEMOLITION PLAN |
| 6 YARD PIPING DEMOLITION PLAN LAYOUT (1 OF 4) |
| 7 YARD PIPING DEMOLITION PLAN LAYOUT (2 OF 4) |
| 8 YARD PIPING DEMOLITION PLAN LAYOUT (3 OF 4) |
| 9 YARD PIPING DEMOLITION PLAN LAYOUT (4 OF 4) |
| 10 WATER REALIGNMENT PLAN & PROFILE (1 OF 2) |
| 11 WATER REALIGNMENT PLAN & PROFILE (2 OF 2) |
File details come from the government source that posted it. Updated .