22B0105E Schedule of Price.xlsx
XLSX spreadsheet 90 KB Posted
- Attached to
- ASBESTOS REMOVAL IDIQ AT VARIOUS AREA, JAPAN
- Solicitation number
- N4008422B0105
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22B0105D PPI Form.docx | DOCX document | |
| 22B0105A.pdf | ||
| 22B0105C Notice.pdf | ||
| 22B0105B_1702673-SD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE_COVER
SCHEDULE OF PRICE
| NAME OF OFFEROR OR CONTRACTOR: | ||||
| ITEM NO. | ITEM | Q'TY | UNIT | AMOUNT |
| CLIN 0001 | Base Period | 1 | LS | ¥ | 10,000,000 |
| 1 year from the date of award or when the NOT-TO-EXCEED (NTE) amount is met whichever comes first. CLIN 0001 is the summation of the total prices for exhibit line item number ELINs A001 through A113. |
| CLIN 0002 | First Option Period | 1 | LS | ¥ | 10,000,000 |
| 1 year from the completion date of the Base Period or when the NOT-TO-EXCEED (NTE) amount is met whichever comes first. CLIN 0002 is the summation of the total prices for exhibit line item number ELINs B001 through B113. |
| CLIN 0003 | Second Option Period | 1 | LS | ¥ | 10,000,000 |
| 1 year from the completion date of the First Option Period or when the NOT-TO-EXCEED (NTE) amount is met whichever comes first. CLIN 0003 is the summation of the total prices for exhibit line item number ELINs C001 through C113. |
| CLIN 0004 | Third Option Period | 1 | LS | ¥ | 10,000,000 |
| 1 year from the completion date of the Second Option Period or when the NOT-TO-EXCEED (NTE) amount is met whichever comes first. CLIN 0004 is the summation of the total prices for exhibit line item number ELINs D001 through D113. |
| CLIN 0005 | Fourth Option Period | 1 | LS | ¥ | 0 |
| 1 year from the completion date of the Third Option Period or when the NOT-TO-EXCEED (NTE) amount is met whichever comes first. CLIN 0005 is the summation of the total prices for exhibit line item number ELINs E001 through E113. |
| GRAND TOTAL, NTE AMOUNT | ¥ | 40,000,000 |
| (CLIN 0001 THROUGHT CLIN 0005) |
| Abbreviations: |
| CLIN = Contract Line Item Number |
| ELIN = Exhibit Line Item Number |
| LS = Lump Sum |
&"Courier New,Regular"&8IDIQ Asbestos Removal Contract for Various Areas &"Courier New,Regular"
CUI//FEDCON [when filled in] SOURCE SELECTION SENSITIVE INFORMATION -- See FAR 2.101 3.104 [when filled in] &"Courier New,Regular"&8eProject No. 1702673
&"Courier New,Regular" SCHEDULE Page &P CUI//FEDCON [when filled in] SOURCE SELECTION SENSITIVE INFORMATION -- See FAR 2.101 3.104 [when filled in]
IGE
| SCHEDULE OF INDEFINITE QUANTITY WORK - "A" | |||||
| EXHIBIT A Base Period 1 | |||||
| ITEM NO | DESCRIPTION | EST QTY | UT | UNIT PRICE | EST AMT TOTAL |
A001 Remove existing asbestos ceiling / wall board / tile. (More than 5 SM / per location) 200 SM ¥ ¥ 0
A002 Remove existing asbestos ceiling / wall board / tile. (5 SM or less / per location) 50 SM ¥ ¥ 0
A003 Remove existing asbestos ceiling / wall board / tile with underlayer. (More than 5 SM / per location) 100 SM ¥ ¥ 0
A004 Remove existing asbestos ceiling / wall board / tile with underlayer. (5 SM or less / per location) 30 SM ¥ ¥ 0
A005 Remove existing non-asbestos wall board / ceiling board. 50 SM ¥ ¥ 0
A006 Provide non-asbestos gypsum wall / ceiling board. 200 SM ¥ ¥ 0
A007 Provide non-asbestos cement wall / ceiling board. 200 SM ¥ ¥ 0
A008 Provide non-asbestos acoustic ceiling / wall tile. 200 SM ¥ ¥ 0
A009 Remove existing metal / wood ceiling frame. 100 SM ¥ ¥ 0
A010 Provide metal ceiling frame including hanger rod. 100 SM ¥ ¥ 0
A011 Provide wood ceiling frame including hanger frame. 50 SM ¥ ¥ 0
A012 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (More than 5 SM / per location) 100 SM ¥ ¥ 0
A013 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (5 SM or less / per location) 30 SM ¥ ¥ 0
A014 Provide metal wall stud system, any size, and pitch is 300 mm ~ 455 mm. 100 SM ¥ ¥ 0
A015 Provide wood wall stud, any size, any pitch. 50 SM ¥ ¥ 0
A016 Remove existing asbestos floor tile / sheet / carpet with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
A017 Remove existing asbestos floor tile / sheet / carpet with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
A018 Remove existing asbestos underlayer or sub-flooring with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
A019 Remove existing asbestos underlayer or sub-flooring with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
A020 Provide non-asbestos vinyl floor tile / vinyl sheet with adhesive. 50 SM ¥ ¥ 0
A021 Provide non-asbestos carpet floor tile with adhesive. 30 SM ¥ ¥ 0
A022 Provide underlayer or sub-flooring with fastener / adhesive. 50 SM ¥ ¥ 0
A023 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (More than 5 LM / per location) 100 LM ¥ ¥ 0
A024 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (5 LM or less / per location) 50 LM ¥ ¥ 0
A025 Remove non-asbestos wood base board / vinyl base board / molding / casing on asbestos wall / ceiling board. 50 LM ¥ ¥ 0
A026 Provide non-asbestos base board / molding / casing on wall / ceiling board. 100 LM ¥ ¥ 0
A027 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (More than 5 SM / per location) 30 SM ¥ ¥ 0
A028 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (5 SM or less / per location) 30 SM ¥ ¥ 0
A029 Provide non-asbestos cementitious material (board, mortar, plaster, or etc.), with metal reinforcing. 10 SM ¥ ¥ 0
A030 Remove existing asbestos contaminated soil including material handling. 10 CM ¥ ¥ 0
A031 Remove existing asbestos containing roofing / siding board. (More than 5 SM / per location) 50 SM ¥ ¥ 0
A032 Remove existing asbestos containing roofing / siding board. (5 SM or less / per location) 50 SM ¥ ¥ 0
A033 Provide non-asbestos pre-coated steel sheet or fiber reinforced plastic sheet roofing or siding. 100 SM ¥ ¥ 0
A034 Provide non-asbestos cement roofing or siding board. 100 SM ¥ ¥ 0
A035 Provide pre-coated galvanized steel sheet flashing up to 300 mm width. 50 LM ¥ ¥ 0
A036 Patch and repair hole of asbestos siding. Unit of measurement shall be by up to 0.5 SM hole/each. 50 EA ¥ ¥ 0
A037 Prepare and paint interior wall / ceiling board / base board / molding / casing. 300 SM ¥ ¥ 0
A038 Prepare and paint galvanized iron steel siding. 100 SM ¥ ¥ 0
A039 Prepare and paint cementitious wall. 50 SM ¥ ¥ 0
A040 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (More than 20 SM / per location) 50 SM ¥ ¥ 0
A041 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (20 SM or less / per location) 50 SM ¥ ¥ 0
A042 Provide non-asbestos sprayed insulation on metal roofing, steel structure and tank. 50 SM ¥ ¥ 0
A043 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (More than 5 SM / per location) 50 SM ¥ ¥ 0
A044 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (5 SM or less / per location) 50 SM ¥ ¥ 0
A045 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (More than 5 SM / per location) 30 SM ¥ ¥ 0
A046 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (5 SM or less / per location) 30 SM ¥ ¥ 0
A047 Provide non-asbestos, non-sprayed insulation on ceiling or wall. 50 SM ¥ ¥ 0
A048 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller. 30 SM ¥ ¥ 0
A049 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller, including metal jacket. 30 SM ¥ ¥ 0
A050 Remove existing asbestos containing up to 300 mm outside diameter pipe insulation and covering by glovebag method. 20 LM ¥ ¥ 0
A051 Remove existing asbestos containing over 300 mm outside diameter pipe insulation and covering by glovebag method. 20 LM ¥ ¥ 0
A052 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (More than 5 LM / per location) 50 LM ¥ ¥ 0
A053 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (5 LM or less / per location) 50 LM ¥ ¥ 0
A054 Remove asbestos duct flange gasket and provide non-asbestos duct flange gasket. 10 EA ¥ ¥ 0
A055 Remove asbestos pipe joint gasket and provide non-asbestos pipe joint gasket. 10 EA ¥ ¥ 0
A056 Dismantle and clean-up existing fastened cabinet / shelf / sink on asbestos containing material. 20 EA ¥ ¥ 0
A057 Reinstall cabinet / shelf / sink with fastener. 20 EA ¥ ¥ 0
A058 Dismantle of and clean-up existing sign board on asbestos containing material. 30 EA ¥ ¥ 0
A059 Reinstall sign board with fastener. 30 EA ¥ ¥ 0
A060 Provide new sign board with fastener. 10 EA ¥ ¥ 0
A061 Dismantle of and clean-up existing switch / outlet on asbestos containing material. 30 EA ¥ ¥ 0
A062 Reinstall switch / outlet with fastener. 30 EA ¥ ¥ 0
A063 Provide new switch, switch cover and outlet cover with new fastener on non-asbestos wall board. 20 EA ¥ ¥ 0
A064 Dismantle of and clean-up existing light / exit light / emergency light / sensor / mortion sensor / speaker / electronics clock / fire detector / air conditioner equipment. 40 EA ¥ ¥ 0
A065 Dismantle and clean-up exist fire control panel. 10 EA ¥ ¥ 0
A066 Reinstall lighting (mounted) / exit light / emergency light with fastener. 20 EA ¥ ¥ 0
A067 Reinstall lighting (recessed) with fastener. 20 EA ¥ ¥ 0
A068 Reinstall sensor / motion sensor / speaker / electronics clock / fire detector with fastener. 40 EA ¥ ¥ 0
A069 Reinstall fire control panel with fastener. 10 EA ¥ ¥ 0
A070 Dismantle and clean-up exist A/C inside unit / diffuser / return air grille. 20 EA ¥ ¥ 0
A071 Reinstall diffuser / return air grille with fastener. 10 EA ¥ ¥ 0
A072 Reinstall A/C inside unit. 10 EA ¥ ¥ 0
A073 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (More than 5 LM / per location) 30 LM ¥ ¥ 0
A074 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (5 LM or less / per location) 30 LM ¥ ¥ 0
A075 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location) 30 LM ¥ ¥ 0
A076 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location) 30 LM ¥ ¥ 0
A077 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location) 30 LM ¥ ¥ 0
A078 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location) 30 LM ¥ ¥ 0
A079 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (More than 5 LM / per location) 100 LM ¥ ¥ 0
A080 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (5 LM or less / per location) 100 LM ¥ ¥ 0
A081 Dismantle of and clean-up existing sanitary ware on asbestos containing material. 10 EA ¥ ¥ 0
A082 Reinstall sanitary ware with fastener. 10 EA ¥ ¥ 0
A083 Stop and restore splinkler system. 5 LS ¥ ¥ 0
A084 Provide plug for sprinkler. 20 EA ¥ ¥ 0
A085 Remove and provide ceiling plate of concealed type sprinkler head. 100 EA ¥ ¥ 0
A086 Provide cleaning asbestos contaminated area and asbestos contaminated dust area. 1,000 SM ¥ ¥ 0
A087 Provide plastic sheet enclosure system. (More than 50 SM / per location) 1,000 SM ¥ ¥ 0
A088 Provide plastic sheet enclosure system. (50 SM or less / per location) 1,000 SM ¥ ¥ 0
A089 Provide and remove temporary framing system as separation barrier for enclosure. 300 SM ¥ ¥ 0
A090 Provide PCM area air and personal sampling test. 500 EA ¥ ¥ 0
A091 Provide aggressive PCM air sampling test for clearance. 100 EA ¥ ¥ 0
A092 Provide TEM area air and personal sampling test. 50 EA ¥ ¥ 0
A093 Provide aggressive TEM air sampling test for clearance. 10 EA ¥ ¥ 0
A094 Provide negative pressure system, large type. 20 EA ¥ ¥ 0
A095 Provide negative pressure system, small type. 20 EA ¥ ¥ 0
A096 Provide glovebag system. 100 EA ¥ ¥ 0
A097 Provide Decon-unit with water shower system. 5 EA ¥ ¥ 0
A098 Provide Single Stage Decon-unit. 30 EA ¥ ¥ 0
A099 Provide double-pole scaffolding and/or prefabricated scaffolding. (More than 20 SM / per location) 100 SM ¥ ¥ 0
A100 Provide double-pole scaffolding and/or prefabricated scaffolding. (20 SM or less / per location) 50 SM ¥ ¥ 0
A101 Provide step-ladder scaffolding. (More than 20 SM / per location) 300 SM ¥ ¥ 0
A102 Provide step-ladder scaffolding. (20 SM or less / per location) 150 SM ¥ ¥ 0
A103 Provide transfer scaffolding “Rolling Tower”. 10 EA ¥ ¥ 0
A104 Remove and reinstall heavy weight office equipment. 10 EA ¥ ¥ 0
A105 Transport friable asbestos contaminated material. 50 CM ¥ ¥ 0
A106 Dispose friable asbestos contaminated material. 50 CM ¥ ¥ 0
A107 Transport non-friable asbestos contaminated material. 50 CM ¥ ¥ 0
A108 Dispose non-friable asbestos contaminated material. 50 CM ¥ ¥ 0
A109 Transport non-asbestos material. 20 CM ¥ ¥ 0
A110 Dispose non-asbestos material. 20 CM ¥ ¥ 0
A111 Provide Qualified Person service. 400 HR ¥ ¥ 0
A112 Provide Construction special worker service. 400 HR ¥ ¥ 0
| A113 | Other related miscelaneous work. | 1 | LS | ¥ | - | ¥ | 10,000,000 |
| (Not-to-exceed) |
TOTAL (A001 through A113) Not-To-Exceed ¥ 10,000,000
| Abbreviations: |
| EST AMT = Estimated Amount |
| EST QTY = Estimated Quantity |
| SM = Square Meter |
| LM = Linear Meter |
| CM = Cubic Meter |
| EA = Each |
| HR = Hour |
| LS = Lump Sum |
| PCM = Phase Contrast Microscopy |
| TEM = Transmission Electron Microscopy |
| SCHEDULE OF INDEFINITE QUANTITY WORK - "B" | ||||||||
| EXHIBIT B First Option Period | ||||||||
| ITEM NO | DESCRIPTION | EST QTY | UT | 0 | UNIT PRICE | 0 | 0 | EST AMT TOTAL |
B001 Remove existing asbestos ceiling / wall board / tile. (More than 5 SM / per location) 200 SM ¥ ¥ 0
B002 Remove existing asbestos ceiling / wall board / tile. (5 SM or less / per location) 50 SM ¥ ¥ 0
B003 Remove existing asbestos ceiling / wall board / tile with underlayer. (More than 5 SM / per location) 100 SM ¥ ¥ 0
B004 Remove existing asbestos ceiling / wall board / tile with underlayer. (5 SM or less / per location) 30 SM ¥ ¥ 0
B005 Remove existing non-asbestos wall board / ceiling board. 50 SM ¥ ¥ 0
B006 Provide non-asbestos gypsum wall / ceiling board. 200 SM ¥ ¥ 0
B007 Provide non-asbestos cement wall / ceiling board. 200 SM ¥ ¥ 0
B008 Provide non-asbestos acoustic ceiling / wall tile. 200 SM ¥ ¥ 0
B009 Remove existing metal / wood ceiling frame. 100 SM ¥ ¥ 0
B010 Provide metal ceiling frame including hanger rod. 100 SM ¥ ¥ 0
B011 Provide wood ceiling frame including hanger frame. 50 SM ¥ ¥ 0
B012 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (More than 5 SM / per location) 100 SM ¥ ¥ 0
B013 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (5 SM or less / per location) 30 SM ¥ ¥ 0
B014 Provide metal wall stud system, any size, and pitch is 300 mm ~ 455 mm. 100 SM ¥ ¥ 0
B015 Provide wood wall stud, any size, any pitch. 50 SM ¥ ¥ 0
B016 Remove existing asbestos floor tile / sheet / carpet with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
B017 Remove existing asbestos floor tile / sheet / carpet with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
B018 Remove existing asbestos underlayer or sub-flooring with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
B019 Remove existing asbestos underlayer or sub-flooring with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
B020 Provide non-asbestos vinyl floor tile / vinyl sheet with adhesive. 50 SM ¥ ¥ 0
B021 Provide non-asbestos carpet floor tile with adhesive. 30 SM ¥ ¥ 0
B022 Provide underlayer or sub-flooring with fastener / adhesive. 50 SM ¥ ¥ 0
B023 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (More than 5 LM / per location) 100 LM ¥ ¥ 0
B024 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (5 LM or less / per location) 50 LM ¥ ¥ 0
B025 Remove non-asbestos wood base board / vinyl base board / molding / casing on asbestos wall / ceiling board. 50 LM ¥ ¥ 0
B026 Provide non-asbestos base board / molding / casing on wall / ceiling board. 100 LM ¥ ¥ 0
B027 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (More than 5 SM / per location) 30 SM ¥ ¥ 0
B028 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (5 SM or less / per location) 30 SM ¥ ¥ 0
B029 Provide non-asbestos cementitious material (board, mortar, plaster, or etc.), with metal reinforcing. 10 SM ¥ ¥ 0
B030 Remove existing asbestos contaminated soil including material handling. 10 CM ¥ ¥ 0
B031 Remove existing asbestos containing roofing / siding board. (More than 5 SM / per location) 50 SM ¥ ¥ 0
B032 Remove existing asbestos containing roofing / siding board. (5 SM or less / per location) 50 SM ¥ ¥ 0
B033 Provide non-asbestos pre-coated steel sheet or fiber reinforced plastic sheet roofing or siding. 100 SM ¥ ¥ 0
B034 Provide non-asbestos cement roofing or siding board. 100 SM ¥ ¥ 0
B035 Provide pre-coated galvanized steel sheet flashing up to 300 mm width. 50 LM ¥ ¥ 0
B036 Patch and repair hole of asbestos siding. Unit of measurement shall be by up to 0.5 SM hole/each. 50 EA ¥ ¥ 0
B037 Prepare and paint interior wall / ceiling board / base board / molding / casing. 300 SM ¥ ¥ 0
B038 Prepare and paint galvanized iron steel siding. 100 SM ¥ ¥ 0
B039 Prepare and paint cementitious wall. 50 SM ¥ ¥ 0
B040 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (More than 20 SM / per location) 50 SM ¥ ¥ 0
B041 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (20 SM or less / per location) 50 SM ¥ ¥ 0
B042 Provide non-asbestos sprayed insulation on metal roofing, steel structure and tank. 50 SM ¥ ¥ 0
B043 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (More than 5 SM / per location) 50 SM ¥ ¥ 0
B044 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (5 SM or less / per location) 50 SM ¥ ¥ 0
B045 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (More than 5 SM / per location) 30 SM ¥ ¥ 0
B046 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (5 SM or less / per location) 30 SM ¥ ¥ 0
B047 Provide non-asbestos, non-sprayed insulation on ceiling or wall. 50 SM ¥ ¥ 0
B048 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller. 30 SM ¥ ¥ 0
B049 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller, including metal jacket. 30 SM ¥ ¥ 0
B050 Remove existing asbestos containing up to 300 mm outside diameter pipe insulation and covering by glovebag method. 20 LM ¥ ¥ 0
B051 Remove existing asbestos containing over 300 mm outside diameter pipe insulation and covering by glovebag method. 20 LM ¥ ¥ 0
B052 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (More than 5 LM / per location) 50 LM ¥ ¥ 0
B053 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (5 LM or less / per location) 50 LM ¥ ¥ 0
B054 Remove asbestos duct flange gasket and provide non-asbestos duct flange gasket. 10 EA ¥ ¥ 0
B055 Remove asbestos pipe joint gasket and provide non-asbestos pipe joint gasket. 10 EA ¥ ¥ 0
B056 Dismantle and clean-up existing fastened cabinet / shelf / sink on asbestos containing material. 20 EA ¥ ¥ 0
B057 Reinstall cabinet / shelf / sink with fastener. 20 EA ¥ ¥ 0
B058 Dismantle of and clean-up existing sign board on asbestos containing material. 30 EA ¥ ¥ 0
B059 Reinstall sign board with fastener. 30 EA ¥ ¥ 0
B060 Provide new sign board with fastener. 10 EA ¥ ¥ 0
B061 Dismantle of and clean-up existing switch / outlet on asbestos containing material. 30 EA ¥ ¥ 0
B062 Reinstall switch / outlet with fastener. 30 EA ¥ ¥ 0
B063 Provide new switch, switch cover and outlet cover with new fastener on non-asbestos wall board. 20 EA ¥ ¥ 0
B064 Dismantle of and clean-up existing light / exit light / emergency light / sensor / mortion sensor / speaker / electronics clock / fire detector / air conditioner equipment. 40 EA ¥ ¥ 0
B065 Dismantle and clean-up exist fire control panel. 10 EA ¥ ¥ 0
B066 Reinstall lighting (mounted) / exit light / emergency light with fastener. 20 EA ¥ ¥ 0
B067 Reinstall lighting (recessed) with fastener. 20 EA ¥ ¥ 0
B068 Reinstall sensor / motion sensor / speaker / electronics clock / fire detector with fastener. 40 EA ¥ ¥ 0
B069 Reinstall fire control panel with fastener. 10 EA ¥ ¥ 0
B070 Dismantle and clean-up exist A/C inside unit / diffuser / return air grille. 20 EA ¥ ¥ 0
B071 Reinstall diffuser / return air grille with fastener. 10 EA ¥ ¥ 0
B072 Reinstall A/C inside unit. 10 EA ¥ ¥ 0
B073 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (More than 5 LM / per location) 30 LM ¥ ¥ 0
B074 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (5 LM or less / per location) 30 LM ¥ ¥ 0
B075 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location) 30 LM ¥ ¥ 0
B076 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location) 30 LM ¥ ¥ 0
B077 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location) 30 LM ¥ ¥ 0
B078 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location) 30 LM ¥ ¥ 0
B079 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (More than 5 LM / per location) 100 LM ¥ ¥ 0
B080 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (5 LM or less / per location) 100 LM ¥ ¥ 0
B081 Dismantle of and clean-up existing sanitary ware on asbestos containing material. 10 EA ¥ ¥ 0
B082 Reinstall sanitary ware with fastener. 10 EA ¥ ¥ 0
B083 Stop and restore splinkler system. 5 LS ¥ ¥ 0
B084 Provide plug for sprinkler. 20 EA ¥ ¥ 0
B085 Remove and provide ceiling plate of concealed type sprinkler head. 100 EA ¥ ¥ 0
B086 Provide cleaning asbestos contaminated area and asbestos contaminated dust area. 1,000 SM ¥ ¥ 0
B087 Provide plastic sheet enclosure system. (More than 50 SM / per location) 1,000 SM ¥ ¥ 0
B088 Provide plastic sheet enclosure system. (50 SM or less / per location) 1,000 SM ¥ ¥ 0
B089 Provide and remove temporary framing system as separation barrier for enclosure. 300 SM ¥ ¥ 0
B090 Provide PCM area air and personal sampling test. 500 EA ¥ ¥ 0
B091 Provide aggressive PCM air sampling test for clearance. 100 EA ¥ ¥ 0
B092 Provide TEM area air and personal sampling test. 50 EA ¥ ¥ 0
B093 Provide aggressive TEM air sampling test for clearance. 10 EA ¥ ¥ 0
B094 Provide negative pressure system, large type. 20 EA ¥ ¥ 0
B095 Provide negative pressure system, small type. 20 EA ¥ ¥ 0
B096 Provide glovebag system. 100 EA ¥ ¥ 0
B097 Provide Decon-unit with water shower system. 5 EA ¥ ¥ 0
B098 Provide Single Stage Decon-unit. 30 EA ¥ ¥ 0
B099 Provide double-pole scaffolding and/or prefabricated scaffolding. (More than 20 SM / per location) 100 SM ¥ ¥ 0
B100 Provide double-pole scaffolding and/or prefabricated scaffolding. (20 SM or less / per location) 50 SM ¥ ¥ 0
B101 Provide step-ladder scaffolding. (More than 20 SM / per location) 300 SM ¥ ¥ 0
B102 Provide step-ladder scaffolding. (20 SM or less / per location) 150 SM ¥ ¥ 0
B103 Provide transfer scaffolding “Rolling Tower”. 10 EA ¥ ¥ 0
B104 Remove and reinstall heavy weight office equipment. 10 EA ¥ ¥ 0
B105 Transport friable asbestos contaminated material. 50 CM ¥ ¥ 0
B106 Dispose friable asbestos contaminated material. 50 CM ¥ ¥ 0
B107 Transport non-friable asbestos contaminated material. 50 CM ¥ ¥ 0
B108 Dispose non-friable asbestos contaminated material. 50 CM ¥ ¥ 0
B109 Transport non-asbestos material. 20 CM ¥ ¥ 0
B110 Dispose non-asbestos material. 20 CM ¥ ¥ 0
B111 Provide Qualified Person service. 400 HR ¥ ¥ 0
B112 Provide Construction special worker service. 400 HR ¥ ¥ 0
| B113 | Other related miscelaneous work. | 1 | LS | ¥ | - | ¥ | 10,000,000 |
| (Not-to-exceed) |
TOTAL (B001 through B113) Not-To-Exceed ¥ 10,000,000
| Abbreviations: |
| EST AMT = Estimated Amount |
| EST QTY = Estimated Quantity |
| SM = Square Meter |
| LM = Linear Meter |
| CM = Cubic Meter |
| EA = Each |
| HR = Hour |
| LS = Lump Sum |
| PCM = Phase Contrast Microscopy |
| TEM = Transmission Electron Microscopy |
| SCHEDULE OF INDEFINITE QUANTITY WORK - "C" | ||||||||
| EXHIBIT C Second Option Period | ||||||||
| ITEM NO | DESCRIPTION | EST QTY | UT | 0 | UNIT PRICE | 0 | 0 | EST AMT TOTAL |
C001 Remove existing asbestos ceiling / wall board / tile. (More than 5 SM / per location) 200 SM ¥ ¥ 0
C002 Remove existing asbestos ceiling / wall board / tile. (5 SM or less / per location) 50 SM ¥ ¥ 0
C003 Remove existing asbestos ceiling / wall board / tile with underlayer. (More than 5 SM / per location) 100 SM ¥ ¥ 0
C004 Remove existing asbestos ceiling / wall board / tile with underlayer. (5 SM or less / per location) 30 SM ¥ ¥ 0
C005 Remove existing non-asbestos wall board / ceiling board. 50 SM ¥ ¥ 0
C006 Provide non-asbestos gypsum wall / ceiling board. 200 SM ¥ ¥ 0
C007 Provide non-asbestos cement wall / ceiling board. 200 SM ¥ ¥ 0
C008 Provide non-asbestos acoustic ceiling / wall tile. 200 SM ¥ ¥ 0
C009 Remove existing metal / wood ceiling frame. 100 SM ¥ ¥ 0
C010 Provide metal ceiling frame including hanger rod. 100 SM ¥ ¥ 0
C011 Provide wood ceiling frame including hanger frame. 50 SM ¥ ¥ 0
C012 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (More than 5 SM / per location) 100 SM ¥ ¥ 0
C013 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (5 SM or less / per location) 30 SM ¥ ¥ 0
C014 Provide metal wall stud system, any size, and pitch is 300 mm ~ 455 mm. 100 SM ¥ ¥ 0
C015 Provide wood wall stud, any size, any pitch. 50 SM ¥ ¥ 0
C016 Remove existing asbestos floor tile / sheet / carpet with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
C017 Remove existing asbestos floor tile / sheet / carpet with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
C018 Remove existing asbestos underlayer or sub-flooring with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
C019 Remove existing asbestos underlayer or sub-flooring with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
C020 Provide non-asbestos vinyl floor tile / vinyl sheet with adhesive. 50 SM ¥ ¥ 0
C021 Provide non-asbestos carpet floor tile with adhesive. 30 SM ¥ ¥ 0
C022 Provide underlayer or sub-flooring with fastener / adhesive. 50 SM ¥ ¥ 0
C023 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (More than 5 LM / per location) 100 LM ¥ ¥ 0
C024 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (5 LM or less / per location) 50 LM ¥ ¥ 0
C025 Remove non-asbestos wood base board / vinyl base board / molding / casing on asbestos wall / ceiling board. 50 LM ¥ ¥ 0
C026 Provide non-asbestos base board / molding / casing on wall / ceiling board. 100 LM ¥ ¥ 0
C027 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (More than 5 SM / per location) 30 SM ¥ ¥ 0
C028 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (5 SM or less / per location) 30 SM ¥ ¥ 0
C029 Provide non-asbestos cementitious material (board, mortar, plaster, or etc.), with metal reinforcing. 10 SM ¥ ¥ 0
C030 Remove existing asbestos contaminated soil including material handling. 10 CM ¥ ¥ 0
C031 Remove existing asbestos containing roofing / siding board. (More than 5 SM / per location) 50 SM ¥ ¥ 0
C032 Remove existing asbestos containing roofing / siding board. (5 SM or less / per location) 50 SM ¥ ¥ 0
C033 Provide non-asbestos pre-coated steel sheet or fiber reinforced plastic sheet roofing or siding. 100 SM ¥ ¥ 0
C034 Provide non-asbestos cement roofing or siding board. 100 SM ¥ ¥ 0
C035 Provide pre-coated galvanized steel sheet flashing up to 300 mm width. 50 LM ¥ ¥ 0
C036 Patch and repair hole of asbestos siding. Unit of measurement shall be by up to 0.5 SM hole/each. 50 EA ¥ ¥ 0
C037 Prepare and paint interior wall / ceiling board / base board / molding / casing. 300 SM ¥ ¥ 0
C038 Prepare and paint galvanized iron steel siding. 100 SM ¥ ¥ 0
C039 Prepare and paint cementitious wall. 50 SM ¥ ¥ 0
C040 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (More than 20 SM / per location) 50 SM ¥ ¥ 0
C041 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (20 SM or less / per location) 50 SM ¥ ¥ 0
C042 Provide non-asbestos sprayed insulation on metal roofing, steel structure and tank. 50 SM ¥ ¥ 0
C043 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (More than 5 SM / per location) 50 SM ¥ ¥ 0
C044 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (5 SM or less / per location) 50 SM ¥ ¥ 0
C045 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (More than 5 SM / per location) 30 SM ¥ ¥ 0
C046 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (5 SM or less / per location) 30 SM ¥ ¥ 0
C047 Provide non-asbestos, non-sprayed insulation on ceiling or wall. 50 SM ¥ ¥ 0
C048 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller. 30 SM ¥ ¥ 0
C049 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller, including metal jacket. 30 SM ¥ ¥ 0
C050 Remove existing asbestos containing up to 300 mm outside diameter pipe insulation and covering by glovebag method. 20 LM ¥ ¥ 0
C051 Remove existing asbestos containing over 300 mm outside diameter pipe insulation and covering by glovebag method. 20 LM ¥ ¥ 0
C052 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (More than 5 LM / per location) 50 LM ¥ ¥ 0
C053 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (5 LM or less / per location) 50 LM ¥ ¥ 0
C054 Remove asbestos duct flange gasket and provide non-asbestos duct flange gasket. 10 EA ¥ ¥ 0
C055 Remove asbestos pipe joint gasket and provide non-asbestos pipe joint gasket. 10 EA ¥ ¥ 0
C056 Dismantle and clean-up existing fastened cabinet / shelf / sink on asbestos containing material. 20 EA ¥ ¥ 0
C057 Reinstall cabinet / shelf / sink with fastener. 20 EA ¥ ¥ 0
C058 Dismantle of and clean-up existing sign board on asbestos containing material. 30 EA ¥ ¥ 0
C059 Reinstall sign board with fastener. 30 EA ¥ ¥ 0
C060 Provide new sign board with fastener. 10 EA ¥ ¥ 0
C061 Dismantle of and clean-up existing switch / outlet on asbestos containing material. 30 EA ¥ ¥ 0
C062 Reinstall switch / outlet with fastener. 30 EA ¥ ¥ 0
C063 Provide new switch, switch cover and outlet cover with new fastener on non-asbestos wall board. 20 EA ¥ ¥ 0
C064 Dismantle of and clean-up existing light / exit light / emergency light / sensor / mortion sensor / speaker / electronics clock / fire detector / air conditioner equipment. 40 EA ¥ ¥ 0
C065 Dismantle and clean-up exist fire control panel. 10 EA ¥ ¥ 0
C066 Reinstall lighting (mounted) / exit light / emergency light with fastener. 20 EA ¥ ¥ 0
C067 Reinstall lighting (recessed) with fastener. 20 EA ¥ ¥ 0
C068 Reinstall sensor / motion sensor / speaker / electronics clock / fire detector with fastener. 40 EA ¥ ¥ 0
C069 Reinstall fire control panel with fastener. 10 EA ¥ ¥ 0
C070 Dismantle and clean-up exist A/C inside unit / diffuser / return air grille. 20 EA ¥ ¥ 0
C071 Reinstall diffuser / return air grille with fastener. 10 EA ¥ ¥ 0
C072 Reinstall A/C inside unit. 10 EA ¥ ¥ 0
C073 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (More than 5 LM / per location) 30 LM ¥ ¥ 0
C074 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (5 LM or less / per location) 30 LM ¥ ¥ 0
C075 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location) 30 LM ¥ ¥ 0
C076 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location) 30 LM ¥ ¥ 0
C077 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location) 30 LM ¥ ¥ 0
C078 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location) 30 LM ¥ ¥ 0
C079 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (More than 5 LM / per location) 100 LM ¥ ¥ 0
C080 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (5 LM or less / per location) 100 LM ¥ ¥ 0
C081 Dismantle of and clean-up existing sanitary ware on asbestos containing material. 10 EA ¥ ¥ 0
C082 Reinstall sanitary ware with fastener. 10 EA ¥ ¥ 0
C083 Stop and restore splinkler system. 5 LS ¥ ¥ 0
C084 Provide plug for sprinkler. 20 EA ¥ ¥ 0
C085 Remove and provide ceiling plate of concealed type sprinkler head. 100 EA ¥ ¥ 0
C086 Provide cleaning asbestos contaminated area and asbestos contaminated dust area. 1,000 SM ¥ ¥ 0
C087 Provide plastic sheet enclosure system. (More than 50 SM / per location) 1,000 SM ¥ ¥ 0
C088 Provide plastic sheet enclosure system. (50 SM or less / per location) 1,000 SM ¥ ¥ 0
C089 Provide and remove temporary framing system as separation barrier for enclosure. 300 SM ¥ ¥ 0
C090 Provide PCM area air and personal sampling test. 500 EA ¥ ¥ 0
C091 Provide aggressive PCM air sampling test for clearance. 100 EA ¥ ¥ 0
C092 Provide TEM area air and personal sampling test. 50 EA ¥ ¥ 0
C093 Provide aggressive TEM air sampling test for clearance. 10 EA ¥ ¥ 0
C094 Provide negative pressure system, large type. 20 EA ¥ ¥ 0
C095 Provide negative pressure system, small type. 20 EA ¥ ¥ 0
C096 Provide glovebag system. 100 EA ¥ ¥ 0
C097 Provide Decon-unit with water shower system. 5 EA ¥ ¥ 0
C098 Provide Single Stage Decon-unit. 30 EA ¥ ¥ 0
C099 Provide double-pole scaffolding and/or prefabricated scaffolding. (More than 20 SM / per location) 100 SM ¥ ¥ 0
C100 Provide double-pole scaffolding and/or prefabricated scaffolding. (20 SM or less / per location) 50 SM ¥ ¥ 0
C101 Provide step-ladder scaffolding. (More than 20 SM / per location) 300 SM ¥ ¥ 0
C102 Provide step-ladder scaffolding. (20 SM or less / per location) 150 SM ¥ ¥ 0
C103 Provide transfer scaffolding “Rolling Tower”. 10 EA ¥ ¥ 0
C104 Remove and reinstall heavy weight office equipment. 10 EA ¥ ¥ 0
C105 Transport friable asbestos contaminated material. 50 CM ¥ ¥ 0
C106 Dispose friable asbestos contaminated material. 50 CM ¥ ¥ 0
C107 Transport non-friable asbestos contaminated material. 50 CM ¥ ¥ 0
C108 Dispose non-friable asbestos contaminated material. 50 CM ¥ ¥ 0
C109 Transport non-asbestos material. 20 CM ¥ ¥ 0
C110 Dispose non-asbestos material. 20 CM ¥ ¥ 0
C111 Provide Qualified Person service. 400 HR ¥ ¥ 0
C112 Provide Construction special worker service. 400 HR ¥ ¥ 0
| C113 | Other related miscelaneous work. | 1 | LS | ¥ | - | ¥ | 10,000,000 |
| (Not-to-exceed) |
TOTAL (C001 through C113) Not-To-Exceed ¥ 10,000,000
| Abbreviations: | ||||||||
| EST AMT = Estimated Amount | ||||||||
| EST QTY = Estimated Quantity | ||||||||
| SM = Square Meter | ||||||||
| LM = Linear Meter | ||||||||
| CM = Cubic Meter | ||||||||
| EA = Each | ||||||||
| HR = Hour | ||||||||
| LS = Lump Sum | ||||||||
| PCM = Phase Contrast Microscopy | ||||||||
| TEM = Transmission Electron Microscopy | ||||||||
| SCHEDULE OF INDEFINITE QUANTITY WORK - "D" | ||||||||
| EXHIBIT D Third Option Period | ||||||||
| ITEM NO | DESCRIPTION | EST QTY | UT | 0 | UNIT PRICE | 0 | 0 | EST AMT TOTAL |
D001 Remove existing asbestos ceiling / wall board / tile. (More than 5 SM / per location) 200 SM ¥ ¥ 0
D002 Remove existing asbestos ceiling / wall board / tile. (5 SM or less / per location) 50 SM ¥ ¥ 0
D003 Remove existing asbestos ceiling / wall board / tile with underlayer. (More than 5 SM / per location) 100 SM ¥ ¥ 0
D004 Remove existing asbestos ceiling / wall board / tile with underlayer. (5 SM or less / per location) 30 SM ¥ ¥ 0
D005 Remove existing non-asbestos wall board / ceiling board. 50 SM ¥ ¥ 0
D006 Provide non-asbestos gypsum wall / ceiling board. 200 SM ¥ ¥ 0
D007 Provide non-asbestos cement wall / ceiling board. 200 SM ¥ ¥ 0
D008 Provide non-asbestos acoustic ceiling / wall tile. 200 SM ¥ ¥ 0
D009 Remove existing metal / wood ceiling frame. 100 SM ¥ ¥ 0
D010 Provide metal ceiling frame including hanger rod. 100 SM ¥ ¥ 0
D011 Provide wood ceiling frame including hanger frame. 50 SM ¥ ¥ 0
D012 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (More than 5 SM / per location) 100 SM ¥ ¥ 0
D013 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (5 SM or less / per location) 30 SM ¥ ¥ 0
D014 Provide metal wall stud system, any size, and pitch is 300 mm ~ 455 mm. 100 SM ¥ ¥ 0
D015 Provide wood wall stud, any size, any pitch. 50 SM ¥ ¥ 0
D016 Remove existing asbestos floor tile / sheet / carpet with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
D017 Remove existing asbestos floor tile / sheet / carpet with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
D018 Remove existing asbestos underlayer or sub-flooring with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
D019 Remove existing asbestos underlayer or sub-flooring with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
D020 Provide non-asbestos vinyl floor tile / vinyl sheet with adhesive. 50 SM ¥ ¥ 0
D021 Provide non-asbestos carpet floor tile with adhesive. 30 SM ¥ ¥ 0
D022 Provide underlayer or sub-flooring with fastener / adhesive. 50 SM ¥ ¥ 0
D023 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (More than 5 LM / per location) 100 LM ¥ ¥ 0
D024 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (5 LM or less / per location) 50 LM ¥ ¥ 0
D025 Remove non-asbestos wood base board / vinyl base board / molding / casing on asbestos wall / ceiling board. 50 LM ¥ ¥ 0
D026 Provide non-asbestos base board / molding / casing on wall / ceiling board. 100 LM ¥ ¥ 0
D027 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (More than 5 SM / per location) 30 SM ¥ ¥ 0
D028 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (5 SM or less / per location) 30 SM ¥ ¥ 0
D029 Provide non-asbestos cementitious material (board, mortar, plaster, or etc.), with metal reinforcing. 10 SM ¥ ¥ 0
D030 Remove existing asbestos contaminated soil including material handling. 10 CM ¥ ¥ 0
D031 Remove existing asbestos containing roofing / siding board. (More than 5 SM / per location) 50 SM ¥ ¥ 0
D032 Remove existing asbestos containing roofing / siding board. (5 SM or less / per location) 50 SM ¥ ¥ 0
D033 Provide non-asbestos pre-coated steel sheet or fiber reinforced plastic sheet roofing or siding. 100 SM ¥ ¥ 0
D034 Provide non-asbestos cement roofing or siding board. 100 SM ¥ ¥ 0
D035 Provide pre-coated galvanized steel sheet flashing up to 300 mm width. 50 LM ¥ ¥ 0
D036 Patch and repair hole of asbestos siding. Unit of measurement shall be by up to 0.5 SM hole/each. 50 EA ¥ ¥ 0
D037 Prepare and paint interior wall / ceiling board / base board / molding / casing. 300 SM ¥ ¥ 0
D038 Prepare and paint galvanized iron steel siding. 100 SM ¥ ¥ 0
D039 Prepare and paint cementitious wall. 50 SM ¥ ¥ 0
D040 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (More than 20 SM / per location) 50 SM ¥ ¥ 0
D041 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (20 SM or less / per location) 50 SM ¥ ¥ 0
D042 Provide non-asbestos sprayed insulation on metal roofing, steel structure and tank. 50 SM ¥ ¥ 0
D043 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (More than 5 SM / per location) 50 SM ¥ ¥ 0
D044 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (5 SM or less / per location) 50 SM ¥ ¥ 0
D045 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (More than 5 SM / per location) 30 SM ¥ ¥ 0
D046 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (5 SM or less / per location) 30 SM ¥ ¥ 0
D047 Provide non-asbestos, non-sprayed insulation on ceiling or wall. 50 SM ¥ ¥ 0
D048 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller. 30 SM ¥ ¥ 0
D049 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller, including metal jacket. 30 SM ¥ ¥ 0
D050 Remove existing asbestos containing up to 300 mm outside diameter pipe insulation and covering by glovebag method. 20 LM ¥ ¥ 0
D051 Remove existing asbestos containing over 300 mm outside diameter pipe insulation and covering by glovebag method. 20 LM ¥ ¥ 0
D052 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (More than 5 LM / per location) 50 LM ¥ ¥ 0
D053 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (5 LM or less / per location) 50 LM ¥ ¥ 0
D054 Remove asbestos duct flange gasket and provide non-asbestos duct flange gasket. 10 EA ¥ ¥ 0
D055 Remove asbestos pipe joint gasket and provide non-asbestos pipe joint gasket. 10 EA ¥ ¥ 0
D056 Dismantle and clean-up existing fastened cabinet / shelf / sink on asbestos containing material. 20 EA ¥ ¥ 0
D057 Reinstall cabinet / shelf / sink with fastener. 20 EA ¥ ¥ 0
D058 Dismantle of and clean-up existing sign board on asbestos containing material. 30 EA ¥ ¥ 0
D059 Reinstall sign board with fastener. 30 EA ¥ ¥ 0
D060 Provide new sign board with fastener. 10 EA ¥ ¥ 0
D061 Dismantle of and clean-up existing switch / outlet on asbestos containing material. 30 EA ¥ ¥ 0
D062 Reinstall switch / outlet with fastener. 30 EA ¥ ¥ 0
D063 Provide new switch, switch cover and outlet cover with new fastener on non-asbestos wall board. 20 EA ¥ ¥ 0
D064 Dismantle of and clean-up existing light / exit light / emergency light / sensor / mortion sensor / speaker / electronics clock / fire detector / air conditioner equipment. 40 EA ¥ ¥ 0
D065 Dismantle and clean-up exist fire control panel. 10 EA ¥ ¥ 0
D066 Reinstall lighting (mounted) / exit light / emergency light with fastener. 20 EA ¥ ¥ 0
D067 Reinstall lighting (recessed) with fastener. 20 EA ¥ ¥ 0
D068 Reinstall sensor / motion sensor / speaker / electronics clock / fire detector with fastener. 40 EA ¥ ¥ 0
D069 Reinstall fire control panel with fastener. 10 EA ¥ ¥ 0
D070 Dismantle and clean-up exist A/C inside unit / diffuser / return air grille. 20 EA ¥ ¥ 0
D071 Reinstall diffuser / return air grille with fastener. 10 EA ¥ ¥ 0
D072 Reinstall A/C inside unit. 10 EA ¥ ¥ 0
D073 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (More than 5 LM / per location) 30 LM ¥ ¥ 0
D074 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (5 LM or less / per location) 30 LM ¥ ¥ 0
D075 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location) 30 LM ¥ ¥ 0
D076 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location) 30 LM ¥ ¥ 0
D077 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location) 30 LM ¥ ¥ 0
D078 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location) 30 LM ¥ ¥ 0
D079 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (More than 5 LM / per location) 100 LM ¥ ¥ 0
D080 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (5 LM or less / per location) 100 LM ¥ ¥ 0
D081 Dismantle of and clean-up existing sanitary ware on asbestos containing material. 10 EA ¥ ¥ 0
D082 Reinstall sanitary ware with fastener. 10 EA ¥ ¥ 0
D083 Stop and restore splinkler system. 5 LS ¥ ¥ 0
D084 Provide plug for sprinkler. 20 EA ¥ ¥ 0
D085 Remove and provide ceiling plate of concealed type sprinkler head. 100 EA ¥ ¥ 0
D086 Provide cleaning asbestos contaminated area and asbestos contaminated dust area. 1,000 SM ¥ ¥ 0
D087 Provide plastic sheet enclosure system. (More than 50 SM / per location) 1,000 SM ¥ ¥ 0
D088 Provide plastic sheet enclosure system. (50 SM or less / per location) 1,000 SM ¥ ¥ 0
D089 Provide and remove temporary framing system as separation barrier for enclosure. 300 SM ¥ ¥ 0
D090 Provide PCM area air and personal sampling test. 500 EA ¥ ¥ 0
D091 Provide aggressive PCM air sampling test for clearance. 100 EA ¥ ¥ 0
D092 Provide TEM area air and personal sampling test. 50 EA ¥ ¥ 0
D093 Provide aggressive TEM air sampling test for clearance. 10 EA ¥ ¥ 0
D094 Provide negative pressure system, large type. 20 EA ¥ ¥ 0
D095 Provide negative pressure system, small type. 20 EA ¥ ¥ 0
D096 Provide glovebag system. 100 EA ¥ ¥ 0
D097 Provide Decon-unit with water shower system. 5 EA ¥ ¥ 0
D098 Provide Single Stage Decon-unit. 30 EA ¥ ¥ 0
D099 Provide double-pole scaffolding and/or prefabricated scaffolding. (More than 20 SM / per location) 100 SM ¥ ¥ 0
D100 Provide double-pole scaffolding and/or prefabricated scaffolding. (20 SM or less / per location) 50 SM ¥ ¥ 0
D101 Provide step-ladder scaffolding. (More than 20 SM / per location) 300 SM ¥ ¥ 0
D102 Provide step-ladder scaffolding. (20 SM or less / per location) 150 SM ¥ ¥ 0
D103 Provide transfer scaffolding “Rolling Tower”. 10 EA ¥ ¥ 0
D104 Remove and reinstall heavy weight office equipment. 10 EA ¥ ¥ 0
D105 Transport friable asbestos contaminated material. 50 CM ¥ ¥ 0
D106 Dispose friable asbestos contaminated material. 50 CM ¥ ¥ 0
D107 Transport non-friable asbestos contaminated material. 50 CM ¥ ¥ 0
D108 Dispose non-friable asbestos contaminated material. 50 CM ¥ ¥ 0
D109 Transport non-asbestos material. 20 CM ¥ ¥ 0
D110 Dispose non-asbestos material. 20 CM ¥ ¥ 0
D111 Provide Qualified Person service. 400 HR ¥ ¥ 0
D112 Provide Construction special worker service. 400 HR ¥ ¥ 0
| D113 | Other related miscelaneous work. | 1 | LS | ¥ | - | ¥ | 10,000,000 |
| (Not-to-exceed) |
TOTAL (D001 through D113) Not-To-Exceed ¥ 10,000,000
| Abbreviations: | ||||||||
| EST AMT = Estimated Amount | ||||||||
| EST QTY = Estimated Quantity | ||||||||
| SM = Square Meter | ||||||||
| LM = Linear Meter | ||||||||
| CM = Cubic Meter | ||||||||
| EA = Each | ||||||||
| HR = Hour | ||||||||
| LS = Lump Sum | ||||||||
| PCM = Phase Contrast Microscopy | ||||||||
| TEM = Transmission Electron Microscopy | ||||||||
| SCHEDULE OF INDEFINITE QUANTITY WORK - "E" | ||||||||
| EXHIBIT E Fourth Option Period | ||||||||
| ITEM NO | DESCRIPTION | EST QTY | UT | 0 | UNIT PRICE | 0 | 0 | EST AMT TOTAL |
E001 Remove existing asbestos ceiling / wall board / tile. (More than 5 SM / per location) 200 SM ¥ ¥ 0
E002 Remove existing asbestos ceiling / wall board / tile. (5 SM or less / per location) 50 SM ¥ ¥ 0
E003 Remove existing asbestos ceiling / wall board / tile with underlayer. (More than 5 SM / per location) 100 SM ¥ ¥ 0
E004 Remove existing asbestos ceiling / wall board / tile with underlayer. (5 SM or less / per location) 30 SM ¥ ¥ 0
E005 Remove existing non-asbestos wall board / ceiling board. 50 SM ¥ ¥ 0
E006 Provide non-asbestos gypsum wall / ceiling board. 200 SM ¥ ¥ 0
E007 Provide non-asbestos cement wall / ceiling board. 200 SM ¥ ¥ 0
E008 Provide non-asbestos acoustic ceiling / wall tile. 200 SM ¥ ¥ 0
E009 Remove existing metal / wood ceiling frame. 100 SM ¥ ¥ 0
E010 Provide metal ceiling frame including hanger rod. 100 SM ¥ ¥ 0
E011 Provide wood ceiling frame including hanger frame. 50 SM ¥ ¥ 0
E012 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (More than 5 SM / per location) 100 SM ¥ ¥ 0
E013 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (5 SM or less / per location) 30 SM ¥ ¥ 0
E014 Provide metal wall stud system, any size, and pitch is 300 mm ~ 455 mm. 100 SM ¥ ¥ 0
E015 Provide wood wall stud, any size, any pitch. 50 SM ¥ ¥ 0
E016 Remove existing asbestos floor tile / sheet / carpet with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
E017 Remove existing asbestos floor tile / sheet / carpet with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
E018 Remove existing asbestos underlayer or sub-flooring with adhesive. (More than 5 SM / per location) 100 SM ¥ ¥ 0
E019 Remove existing asbestos underlayer or sub-flooring with adhesive. (5 SM or less / per location) 30 SM ¥ ¥ 0
E020 Provide non-asbestos vinyl floor tile / vinyl sheet with adhesive. 50 SM ¥ ¥ 0
E021 Provide non-asbestos carpet floor tile with adhesive. 30 SM ¥ ¥ 0
E022 Provide underlayer or sub-flooring with fastener / adhesive. 50 SM ¥ ¥ 0
E023 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (More than 5 LM / per location) 100 LM ¥ ¥ 0
E024 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (5 LM or less / per location) 50 LM ¥ ¥ 0
E025 Remove non-asbestos wood base board / vinyl base board / molding / casing on asbestos wall / ceiling board. 50 LM ¥ ¥ 0
E026 Provide non-asbestos base board / molding / casing on wall / ceiling board. 100 LM ¥ ¥ 0
E027 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (More than 5 SM / per location) 30 SM ¥ ¥ 0
E028 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (5 SM or less / per location) 30 SM ¥ ¥ 0
E029 Provide non-asbestos cementitious material (board, mortar, plaster, or etc.), with metal reinforcing. 10 SM ¥ ¥ 0
E030 Remove existing asbestos contaminated soil including material handling. 10 CM ¥ ¥ 0
E031 Remove existing asbestos containing roofing / siding board. (More than 5 SM / per location) 50 SM ¥ ¥ 0
E032 Remove existing asbestos containing roofing / siding…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .