- ASBESTOS REMOVAL IDIQ AT VARIOUS AREA, JAPAN
- Solicitation number
- N4008422B0105
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22B0105D PPI Form.docx | DOCX document | |
| 22B0105E Schedule of Price.xlsx | XLSX spreadsheet | |
| 22B0105A.pdf | ||
| 22B0105C Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI//FEDCON
eProject No. 1702673
SPECIFICATIONS
FOR
IDIQ ASBESTOS REMOVAL CONTRACT FOR VARIOUS AREAS
PREPARED BY:
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, FAR EAST
PUBLIC WORKS DEPARTMENT (PWD) YOKOSUKA
FACILITIES ENGINEERING AND ACQUISITION DIVISION (FEAD)
Architectural: Y. WRIGHT / K. TANAKA Mechanical: N/A Civil: N/A Electrical: N/A Structural: N/A Fire Protection: N/A Geotechnical: N/A Safety: N/A
Submitted By: Date:
M. KOBAYASHI (NAVFAC FE PRY233)
Approved By: Date:
M. ISHIBASHI (FSCM, NAVFAC FE PRY23)
Controlled by: PWD Yokosuka CUI Category: DCRIT Limited Dissemination Control: FEDCON POC: Mr. M. ISHIBASHI, NAVFAC FE PRY23
IDIQ Asbestos Removal Contract for Various Areas
TABLE OF CONTENTS Page 1
TABLE OF CONTENTS
NOTICE TO BIDDERS
ORDER LIMITATION
SCHEDULE OF PRICE
SCHEDULE OF INDEFINITE QUANTITY WORK
SUPPLEMENTARY EXPLANATION OF WORK
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 33 SUMMARY OF WORK
01 14 00.00 33 WORK RESTRICTIONS
01 20 00.00 33 PRICE & PAYMENT PROCEDURES
01 30 00.00 33 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 33 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT
CONTRACT MANAGEMENT SYSTEM
01 32 16.00 33 CONSTRUCTION PROGRESS SCHEDULE
01 33 00.00 33 SUBMITTAL PROCEDURES
01 35 26.00 33 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 01.00 33 QUALITY CONTROL (QC) – MINOR CONSTRUCTION
01 50 00.00 33 TEMPORARY FACILITIES AND CONTROLS
01 57 19.00 33 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 33 SUPPLMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00.00 33 PROJECT IDENTIFICATION
01 74 19.00 33 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00.00 33 CLOSEOUT SUBMITTALS
01 78 23.00 33 OPERATION AND MAINTENANCE DATA
DIVISION 02 – EXISTING CONDITIONS
02 41 00.00 33 DEMOLITION
02 82 00.00 33 ASBESTOS REMEDIATION
02 83 00.00 33 LEAD REMEDIATION
DIVISION 03 – CONCRETE
03 30 00.00 33 CAST-IN PLACE CONCRETE
DIVISION 05 – METALS
05 50 13.00 33 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00.00 33 ROUGH CARPENTRY
06 20 00.00 33 FINISH CARPENTRY
TABLE OF CONTENTS Page 2
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 21 16.00 33 MINERAL FIBER BLANKET INSULATION
07 41 13.00 33 METAL ROOF PANELS
07 42 13.00 33 METAL WALL PANELS
07 92 00.00 33 SEALANTS
DIVISION 09 – FINISHES
09 22 00.00 33 METAL SUPPORT ASSEMBLIES
09 24 23.00 33 CEMENT MORTAR
09 29 00.00 33 GYPSUM BOARD AND CEMENT BOARD
09 51 00.00 33 ACOUSTICAL CEILINGS
09 65 00.00 33 VINYL FLOOR TILE SHEET
09 68 00.00 33 CARPET AND CARPET TILE
09 69 00.00 33 ACCESS FLOORING
09 90 00.00 33 PAINTS AND COATINGS
DIVISION 21 – FIRE SUPPRESSION
21 13 13.00 33 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 – PLUMBING
22 00 00.00 33 PLUMBING, GENERAL PURPOSE
22 07 19.00 33 PLUMBING PIPING INSULATION
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00.00 33 HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 03 00.00 33 BASIC MECHANICAL MATERIALS AND METHODS
23 07 00.00 33 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 31 13.00 33 METAL DUCTS
DIVISION 26 – ELECTRICAL
26 00 00.00 33 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00.00 33 INTERIOR DISTRIBUTION SYSTEM
26 51 00.00 33 INTERIOR LIGHTING
26 56 00.00 33 EXTERIOR LIGHTING
DIVISION 31 – EARTHWORK
31 23 00.00 33 EXCAVATION AND FILL
DIVISION 33 – UTILITIES
33 71 02.00 33 UNDERGROUND ELECTRICAL DISTRIBUTION
NOTICE TO BIDDERS Page 1
NOTICE TO BIDDERS
1. CONTRACT LINE ITEMS AND CONTRACT SUBLINE ITEMS
a. Bidders/Offerors shall enter unit prices and amounts for contract line item numbers(CLINs), and exhibit line item numbers(ELINs) as indicated in the schedules.
b. In the event that there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid/offer and the total of the CLINs, or ELINs will be recomputed accordingly. The CLIN which includes recomputed contract ELINs will also be recomputed to take into account the change in the contract Sub-line item number (SLIN) or ELIN. If the bidder/offeror provides a total amount for a CLIN, or ELIN but fails to enter the unit price, the total amount divided by the CLIN, or ELIN will be held to be the intended unit price.
2. SUPPLEMENTAL PRICING INFORMATION
a. Bidders/Offerors shall also enter the supplemental pricing information on the Exhibits. The offered price for CLINs in the schedule must be broken down by the ELINs listed on the Exhibits.
b. The supplemental pricing information that the Bidders/Offerors shall provide is composed of unit price, extended amounts and its total.
c. Include all necessary costs in the Unit Price to accomplish exhibit line item work. The costs shall be composed of direct and indirect labor, material, equipment, tools, overhead, transportation, profits, taxes, insurance, estimates and all other associated costs.
3. INDEFINITE QUANTITY INDIVIDUAL CONTRACT LINE ITEM QUANTITIES
Once the estimated quantities for individual line items shown in the schedule and any accompanying exhibits have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.
ORDER LIMITATION Page 1
ORDER LIMITATION (FAR 52.216-19)
a. Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than ¥300,000, the
Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
b. Maximum order. The Contractor is not obligated to honor.
(1) Any order for single item in excess of ¥ 10,000,000.
(2) Any order for a combination of items in excess of ¥ 25,000,000.
(3) A series of orders from the same ordering office within seven working days that together call for quantities exceeding the limitation in subparagraphs (1) or (2) above.
c. Minimum and Maximum Quantities.
As referred to in paragraph (b) of FAR 52.216-22, INDEFINITE QUANTITY”
CLAUSE, THE CONTRACT MINIMUM QUANTITY IS A TOTAL OF ¥ 300,000 for five years.
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
NAME OF OFFEROR OR CONTRACTOR:
ITEM NO. ITEM Q'TY UNIT AMOUNT
CLIN 0001 Base Period 1 LS ¥ 1 year from the date of award or when the NOT-TO- EXCEED (NTE) amount is met whichever comes first.
CLIN 0001 is the summation of the total prices for exhibit line item number ELINs A001 through A113.
CLIN 0002 First Option Period 1 LS ¥ 1 year from the completion date of the Base Period or when the NOT-TO-EXCEED (NTE) amount is met whichever comes first. CLIN 0002 is the summation of the total prices for exhibit line item number ELINs B001 through B113.
CLIN 0003 Second Option Period 1 LS ¥ 1 year from the completion date of the First Option Period or when the NOT-TO-EXCEED (NTE) amount is met whichever comes first. CLIN 0003 is the summation of the total prices for exhibit line item number ELINs C001 through C113.
CLIN 0004 Third Option Period 1 LS ¥ 1 year from the completion date of the Second Option Period or when the NOT-TO-EXCEED (NTE) amount is met whichever comes first. CLIN 0004 is the summation of the total prices for exhibit line item number ELINs D001 through D113.
CLIN 0005 Fourth Option Period 1 LS ¥ 1 year from the completion date of the Third Option Period or when the NOT-TO-EXCEED (NTE) amount is met whichever comes first. CLIN 0005 is the summation of the total prices for exhibit line item number ELINs E001 through E113.
GRAND TOTAL, NTE AMOUNT ¥
(CLIN 0001 THROUGHT CLIN 0005)
Abbreviations:
CLIN = Contract Line Item Number ELIN = Exhibit Line Item Number LS = Lump Sum
SCHEDULE OF PRICE
SCHEDULE Page 1
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in]
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
EXHIBIT A Base Period 1
ITEM
NO
DESCRIPTION EST
QTY
UT UNIT
PRICE
EST AMT
TOTAL
A001 Remove existing asbestos ceiling / wall board / tile. (More than 5 SM / per location)
200 SM ¥ ¥
A002 Remove existing asbestos ceiling / wall board / tile. (5 SM or less / per location)
50 SM ¥ ¥
A003 Remove existing asbestos ceiling / wall board / tile with underlayer. (More than 5 SM / per location)
100 SM ¥ ¥
A004 Remove existing asbestos ceiling / wall board / tile with underlayer. (5 SM or less / per location)
30 SM ¥ ¥
A005 Remove existing non-asbestos wall board / ceiling board.
50 SM ¥ ¥
A006 Provide non-asbestos gypsum wall / ceiling board.
200 SM ¥ ¥
A007 Provide non-asbestos cement wall / ceiling board.
200 SM ¥ ¥
A008 Provide non-asbestos acoustic ceiling / wall tile.
200 SM ¥ ¥
A009 Remove existing metal / wood ceiling frame.
100 SM ¥ ¥
A010 Provide metal ceiling frame including hanger rod.
100 SM ¥ ¥
SCHEDULE OF INDEFINITE QUANTITY WORK - "A"
DETAILED SCHEDULE Page 1 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A011 Provide wood ceiling frame including hanger frame.
50 SM ¥ ¥
A012 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (More than 5 SM / per location)
100 SM ¥ ¥
A013 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (5 SM or less / per location)
30 SM ¥ ¥
A014 Provide metal wall stud system, any size, and pitch is 300 mm ~ 455 mm.
100 SM ¥ ¥
A015 Provide wood wall stud, any size, any pitch.
50 SM ¥ ¥
A016 Remove existing asbestos floor tile / sheet / carpet with adhesive. (More than 5 SM / per location)
100 SM ¥ ¥
A017 Remove existing asbestos floor tile / sheet / carpet with adhesive. (5 SM or less / per location)
30 SM ¥ ¥
A018 Remove existing asbestos underlayer or sub-flooring with adhesive. (More than 5 SM / per location)
100 SM ¥ ¥
A019 Remove existing asbestos underlayer or sub-flooring with adhesive. (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 2 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A020 Provide non-asbestos vinyl floor tile / vinyl sheet with adhesive.
50 SM ¥ ¥
A021 Provide non-asbestos carpet floor tile with adhesive.
30 SM ¥ ¥
A022 Provide underlayer or sub-flooring with fastener / adhesive.
50 SM ¥ ¥
A023 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (More than 5 LM / per location)
100 LM ¥ ¥
A024 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (5 LM or less / per location)
50 LM ¥ ¥
A025 Remove non-asbestos wood base board / vinyl base board / molding / casing on asbestos wall / ceiling board.
50 LM ¥ ¥
A026 Provide non-asbestos base board / molding / casing on wall / ceiling board.
100 LM ¥ ¥
A027 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (More than 5 SM / per location)
30 SM ¥ ¥
A028 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 3 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A029 Provide non-asbestos cementitious material (board, mortar, plaster, or etc.), with metal reinforcing.
10 SM ¥ ¥
A030 Remove existing asbestos contaminated soil including material handling.
10 CM ¥ ¥
A031 Remove existing asbestos containing roofing / siding board. (More than 5 SM / per location)
50 SM ¥ ¥
A032 Remove existing asbestos containing roofing / siding board. (5 SM or less / per location)
50 SM ¥ ¥
A033 Provide non-asbestos pre-coated steel sheet or fiber reinforced plastic sheet roofing or siding.
100 SM ¥ ¥
A034 Provide non-asbestos cement roofing or siding board.
100 SM ¥ ¥
A035 Provide pre-coated galvanized steel sheet flashing up to 300 mm width.
50 LM ¥ ¥
A036 Patch and repair hole of asbestos siding. Unit of measurement shall be by up to
0.5 SM hole/each.
50 EA ¥ ¥
A037 Prepare and paint interior wall / ceiling board / base board / molding / casing.
300 SM ¥ ¥
A038 Prepare and paint galvanized iron steel siding.
100 SM ¥ ¥
DETAILED SCHEDULE Page 4 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A039 Prepare and paint cementitious wall.
50 SM ¥ ¥
A040 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (More than 20 SM / per location)
50 SM ¥ ¥
A041 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (20 SM or less / per location)
50 SM ¥ ¥
A042 Provide non-asbestos sprayed insulation on metal roofing, steel structure and tank.
50 SM ¥ ¥
A043 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (More than 5 SM / per location)
50 SM ¥ ¥
A044 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (5 SM or less / per location)
50 SM ¥ ¥
A045 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (More than 5 SM / per location)
30 SM ¥ ¥
A046 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 5 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A047 Provide non-asbestos, non-sprayed insulation on ceiling or wall.
50 SM ¥ ¥
A048 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller.
30 SM ¥ ¥
A049 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller, including metal jacket.
30 SM ¥ ¥
A050 Remove existing asbestos containing up to 300 mm outside diameter pipe insulation and covering by glovebag method.
20 LM ¥ ¥
A051 Remove existing asbestos containing over 300 mm outside diameter pipe insulation and covering by glovebag method.
20 LM ¥ ¥
A052 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (More than 5 LM / per location)
50 LM ¥ ¥
A053 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (5 LM or less / per location)
50 LM ¥ ¥
A054 Remove asbestos duct flange gasket and provide non-asbestos duct flange gasket.
10 EA ¥ ¥
A055 Remove asbestos pipe joint gasket and provide non-asbestos pipe joint gasket.
10 EA ¥ ¥
DETAILED SCHEDULE Page 6 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A056 Dismantle and clean-up existing fastened cabinet / shelf / sink on asbestos containing material.
20 EA ¥ ¥
A057 Reinstall cabinet / shelf / sink with fastener.
20 EA ¥ ¥
A058 Dismantle of and clean-up existing sign board on asbestos containing material.
30 EA ¥ ¥
A059 Reinstall sign board with fastener.
30 EA ¥ ¥
A060 Provide new sign board with fastener.
10 EA ¥ ¥
A061 Dismantle of and clean-up existing switch / outlet on asbestos containing material.
30 EA ¥ ¥
A062 Reinstall switch / outlet with fastener.
30 EA ¥ ¥
A063 Provide new switch, switch cover and outlet cover with new fastener on non-asbestos wall board.
20 EA ¥ ¥
A064 Dismantle of and clean-up existing light / exit light / emergency light / sensor / mortion sensor / speaker / electronics clock / fire detector / air conditioner equipment.
40 EA ¥ ¥
A065 Dismantle and clean-up exist fire control panel.
10 EA ¥ ¥
A066 Reinstall lighting (mounted) / exit light / emergency light with fastener.
20 EA ¥ ¥
DETAILED SCHEDULE Page 7 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A067 Reinstall lighting (recessed) with fastener.
20 EA ¥ ¥
A068 Reinstall sensor / motion sensor / speaker / electronics clock / fire detector with fastener.
40 EA ¥ ¥
A069 Reinstall fire control panel with fastener.
10 EA ¥ ¥
A070 Dismantle and clean-up exist A/C inside unit / diffuser / return air grille.
20 EA ¥ ¥
A071 Reinstall diffuser / return air grille with fastener.
10 EA ¥ ¥
A072 Reinstall A/C inside unit. 10 EA ¥ ¥
A073 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (More than 5 LM / per location)
30 LM ¥ ¥
A074 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (5 LM or less / per location)
30 LM ¥ ¥
A075 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener.
(More than 5 LM / per location)
30 LM ¥ ¥
A076 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location)
30 LM ¥ ¥
DETAILED SCHEDULE Page 8 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A077 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location)
30 LM ¥ ¥
A078 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location)
30 LM ¥ ¥
A079 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (More than 5 LM / per location)
100 LM ¥ ¥
A080 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (5 LM or less / per location)
100 LM ¥ ¥
A081 Dismantle of and clean-up existing sanitary ware on asbestos containing material.
10 EA ¥ ¥
A082 Reinstall sanitary ware with fastener.
10 EA ¥ ¥
A083 Stop and restore splinkler system.
5 LS ¥ ¥
A084 Provide plug for sprinkler. 20 EA ¥ ¥
A085 Remove and provide ceiling plate of concealed type sprinkler head.
100 EA ¥ ¥
A086 Provide cleaning asbestos contaminated area and asbestos contaminated dust area.
1,000 SM ¥ ¥
DETAILED SCHEDULE Page 9 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A087 Provide plastic sheet enclosure system. (More than 50 SM / per location)
1,000 SM ¥ ¥
A088 Provide plastic sheet enclosure system. (50 SM or less / per location)
1,000 SM ¥ ¥
A089 Provide and remove temporary framing system as separation barrier for enclosure.
300 SM ¥ ¥
A090 Provide PCM area air and personal sampling test.
500 EA ¥ ¥
A091 Provide aggressive PCM air sampling test for clearance.
100 EA ¥ ¥
A092 Provide TEM area air and personal sampling test.
50 EA ¥ ¥
A093 Provide aggressive TEM air sampling test for clearance.
10 EA ¥ ¥
A094 Provide negative pressure system, large type.
20 EA ¥ ¥
A095 Provide negative pressure system, small type.
20 EA ¥ ¥
A096 Provide glovebag system. 100 EA ¥ ¥
A097 Provide Decon-unit with water shower system.
5 EA ¥ ¥
A098 Provide Single Stage Decon-unit. 30 EA ¥ ¥
A099 Provide double-pole scaffolding and/or prefabricated scaffolding. (More than 20 SM / per location)
100 SM ¥ ¥
DETAILED SCHEDULE Page 10 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A100 Provide double-pole scaffolding and/or prefabricated scaffolding. (20 SM or less / per location)
50 SM ¥ ¥
A101 Provide step-ladder scaffolding.
(More than 20 SM / per location)
300 SM ¥ ¥
A102 Provide step-ladder scaffolding.
(20 SM or less / per location)
150 SM ¥ ¥
A103 Provide transfer scaffolding “Rolling Tower”.
10 EA ¥ ¥
A104 Remove and reinstall heavy weight office equipment.
10 EA ¥ ¥
A105 Transport friable asbestos contaminated material.
50 CM ¥ ¥
A106 Dispose friable asbestos contaminated material.
50 CM ¥ ¥
A107 Transport non-friable asbestos contaminated material.
50 CM ¥ ¥
A108 Dispose non-friable asbestos contaminated material.
50 CM ¥ ¥
A109 Transport non-asbestos material. 20 CM ¥ ¥
A110 Dispose non-asbestos material. 20 CM ¥ ¥
A111 Provide Qualified Person service.
400 HR ¥ ¥
A112 Provide Construction special worker service.
400 HR ¥ ¥
DETAILED SCHEDULE Page 11 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
A113 Other related miscelaneous work. 1 LS ¥ - ¥ 10,000,000
TOTAL (A001 through A113) Not-To-Exceed ¥
Abbreviations:
EST AMT = Estimated Amount EST QTY = Estimated Quantity SM = Square Meter LM = Linear Meter CM = Cubic Meter EA = Each HR = Hour LS = Lump Sum PCM = Phase Contrast Microscopy TEM = Transmission Electron Microscopy
(Not-to-exceed)
DETAILED SCHEDULE Page 12 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
EXHIBIT B First Option Period
ITEM
NO
DESCRIPTION EST
QTY
UT UNIT
PRICE
EST AMT
TOTAL
B001 Remove existing asbestos ceiling / wall board / tile. (More than 5 SM / per location)
200 SM ¥ ¥
B002 Remove existing asbestos ceiling / wall board / tile. (5 SM or less / per location)
50 SM ¥ ¥
B003 Remove existing asbestos ceiling / wall board / tile with underlayer. (More than 5 SM / per location)
100 SM ¥ ¥
B004 Remove existing asbestos ceiling / wall board / tile with underlayer. (5 SM or less / per location)
30 SM ¥ ¥
B005 Remove existing non-asbestos wall board / ceiling board.
50 SM ¥ ¥
B006 Provide non-asbestos gypsum wall / ceiling board.
200 SM ¥ ¥
B007 Provide non-asbestos cement wall / ceiling board.
200 SM ¥ ¥
B008 Provide non-asbestos acoustic ceiling / wall tile.
200 SM ¥ ¥
B009 Remove existing metal / wood ceiling frame.
100 SM ¥ ¥
B010 Provide metal ceiling frame including hanger rod.
100 SM ¥ ¥
SCHEDULE OF INDEFINITE QUANTITY WORK - "B"
DETAILED SCHEDULE Page 13 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B011 Provide wood ceiling frame including hanger frame.
50 SM ¥ ¥
B012 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (More than 5 SM / per location)
100 SM ¥ ¥
B013 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (5 SM or less / per location)
30 SM ¥ ¥
B014 Provide metal wall stud system, any size, and pitch is 300 mm ~ 455 mm.
100 SM ¥ ¥
B015 Provide wood wall stud, any size, any pitch.
50 SM ¥ ¥
B016 Remove existing asbestos floor tile / sheet / carpet with adhesive. (More than 5 SM / per location)
100 SM ¥ ¥
B017 Remove existing asbestos floor tile / sheet / carpet with adhesive. (5 SM or less / per location)
30 SM ¥ ¥
B018 Remove existing asbestos underlayer or sub-flooring with adhesive. (More than 5 SM / per location)
100 SM ¥ ¥
B019 Remove existing asbestos underlayer or sub-flooring with adhesive. (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 14 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B020 Provide non-asbestos vinyl floor tile / vinyl sheet with adhesive.
50 SM ¥ ¥
B021 Provide non-asbestos carpet floor tile with adhesive.
30 SM ¥ ¥
B022 Provide underlayer or sub-flooring with fastener / adhesive.
50 SM ¥ ¥
B023 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (More than 5 LM / per location)
100 LM ¥ ¥
B024 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (5 LM or less / per location)
50 LM ¥ ¥
B025 Remove non-asbestos wood base board / vinyl base board / molding / casing on asbestos wall / ceiling board.
50 LM ¥ ¥
B026 Provide non-asbestos base board / molding / casing on wall / ceiling board.
100 LM ¥ ¥
B027 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (More than 5 SM / per location)
30 SM ¥ ¥
B028 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 15 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B029 Provide non-asbestos cementitious material (board, mortar, plaster, or etc.), with metal reinforcing.
10 SM ¥ ¥
B030 Remove existing asbestos contaminated soil including material handling.
10 CM ¥ ¥
B031 Remove existing asbestos containing roofing / siding board. (More than 5 SM / per location)
50 SM ¥ ¥
B032 Remove existing asbestos containing roofing / siding board. (5 SM or less / per location)
50 SM ¥ ¥
B033 Provide non-asbestos pre-coated steel sheet or fiber reinforced plastic sheet roofing or siding.
100 SM ¥ ¥
B034 Provide non-asbestos cement roofing or siding board.
100 SM ¥ ¥
B035 Provide pre-coated galvanized steel sheet flashing up to 300 mm width.
50 LM ¥ ¥
B036 Patch and repair hole of asbestos siding. Unit of measurement shall be by up to
0.5 SM hole/each.
50 EA ¥ ¥
B037 Prepare and paint interior wall / ceiling board / base board / molding / casing.
300 SM ¥ ¥
B038 Prepare and paint galvanized iron steel siding.
100 SM ¥ ¥
DETAILED SCHEDULE Page 16 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B039 Prepare and paint cementitious wall.
50 SM ¥ ¥
B040 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (More than 20 SM / per location)
50 SM ¥ ¥
B041 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (20 SM or less / per location)
50 SM ¥ ¥
B042 Provide non-asbestos sprayed insulation on metal roofing, steel structure and tank.
50 SM ¥ ¥
B043 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (More than 5 SM / per location)
50 SM ¥ ¥
B044 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (5 SM or less / per location)
50 SM ¥ ¥
B045 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (More than 5 SM / per location)
30 SM ¥ ¥
B046 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 17 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B047 Provide non-asbestos, non-sprayed insulation on ceiling or wall.
50 SM ¥ ¥
B048 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller.
30 SM ¥ ¥
B049 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller, including metal jacket.
30 SM ¥ ¥
B050 Remove existing asbestos containing up to 300 mm outside diameter pipe insulation and covering by glovebag method.
20 LM ¥ ¥
B051 Remove existing asbestos containing over 300 mm outside diameter pipe insulation and covering by glovebag method.
20 LM ¥ ¥
B052 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (More than 5 LM / per location)
50 LM ¥ ¥
B053 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (5 LM or less / per location)
50 LM ¥ ¥
B054 Remove asbestos duct flange gasket and provide non-asbestos duct flange gasket.
10 EA ¥ ¥
B055 Remove asbestos pipe joint gasket and provide non-asbestos pipe joint gasket.
10 EA ¥ ¥
DETAILED SCHEDULE Page 18 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B056 Dismantle and clean-up existing fastened cabinet / shelf / sink on asbestos containing material.
20 EA ¥ ¥
B057 Reinstall cabinet / shelf / sink with fastener.
20 EA ¥ ¥
B058 Dismantle of and clean-up existing sign board on asbestos containing material.
30 EA ¥ ¥
B059 Reinstall sign board with fastener.
30 EA ¥ ¥
B060 Provide new sign board with fastener.
10 EA ¥ ¥
B061 Dismantle of and clean-up existing switch / outlet on asbestos containing material.
30 EA ¥ ¥
B062 Reinstall switch / outlet with fastener.
30 EA ¥ ¥
B063 Provide new switch, switch cover and outlet cover with new fastener on non-asbestos wall board.
20 EA ¥ ¥
B064 Dismantle of and clean-up existing light / exit light / emergency light / sensor / mortion sensor / speaker / electronics clock / fire detector / air conditioner equipment.
40 EA ¥ ¥
B065 Dismantle and clean-up exist fire control panel.
10 EA ¥ ¥
B066 Reinstall lighting (mounted) / exit light / emergency light with fastener.
20 EA ¥ ¥
DETAILED SCHEDULE Page 19 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B067 Reinstall lighting (recessed) with fastener.
20 EA ¥ ¥
B068 Reinstall sensor / motion sensor / speaker / electronics clock / fire detector with fastener.
40 EA ¥ ¥
B069 Reinstall fire control panel with fastener.
10 EA ¥ ¥
B070 Dismantle and clean-up exist A/C inside unit / diffuser / return air grille.
20 EA ¥ ¥
B071 Reinstall diffuser / return air grille with fastener.
10 EA ¥ ¥
B072 Reinstall A/C inside unit. 10 EA ¥ ¥
B073 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (More than 5 LM / per location)
30 LM ¥ ¥
B074 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (5 LM or less / per location)
30 LM ¥ ¥
B075 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener.
(More than 5 LM / per location)
30 LM ¥ ¥
B076 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location)
30 LM ¥ ¥
DETAILED SCHEDULE Page 20 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B077 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location)
30 LM ¥ ¥
B078 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location)
30 LM ¥ ¥
B079 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (More than 5 LM / per location)
100 LM ¥ ¥
B080 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (5 LM or less / per location)
100 LM ¥ ¥
B081 Dismantle of and clean-up existing sanitary ware on asbestos containing material.
10 EA ¥ ¥
B082 Reinstall sanitary ware with fastener.
10 EA ¥ ¥
B083 Stop and restore splinkler system.
5 LS ¥ ¥
B084 Provide plug for sprinkler. 20 EA ¥ ¥
B085 Remove and provide ceiling plate of concealed type sprinkler head.
100 EA ¥ ¥
B086 Provide cleaning asbestos contaminated area and asbestos contaminated dust area.
1,000 SM ¥ ¥
DETAILED SCHEDULE Page 21 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B087 Provide plastic sheet enclosure system. (More than 50 SM / per location)
1,000 SM ¥ ¥
B088 Provide plastic sheet enclosure system. (50 SM or less / per location)
1,000 SM ¥ ¥
B089 Provide and remove temporary framing system as separation barrier for enclosure.
300 SM ¥ ¥
B090 Provide PCM area air and personal sampling test.
500 EA ¥ ¥
B091 Provide aggressive PCM air sampling test for clearance.
100 EA ¥ ¥
B092 Provide TEM area air and personal sampling test.
50 EA ¥ ¥
B093 Provide aggressive TEM air sampling test for clearance.
10 EA ¥ ¥
B094 Provide negative pressure system, large type.
20 EA ¥ ¥
B095 Provide negative pressure system, small type.
20 EA ¥ ¥
B096 Provide glovebag system. 100 EA ¥ ¥
B097 Provide Decon-unit with water shower system.
5 EA ¥ ¥
B098 Provide Single Stage Decon-unit. 30 EA ¥ ¥
B099 Provide double-pole scaffolding and/or prefabricated scaffolding. (More than 20 SM / per location)
100 SM ¥ ¥
DETAILED SCHEDULE Page 22 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B100 Provide double-pole scaffolding and/or prefabricated scaffolding. (20 SM or less / per location)
50 SM ¥ ¥
B101 Provide step-ladder scaffolding.
(More than 20 SM / per location)
300 SM ¥ ¥
B102 Provide step-ladder scaffolding.
(20 SM or less / per location)
150 SM ¥ ¥
B103 Provide transfer scaffolding “Rolling Tower”.
10 EA ¥ ¥
B104 Remove and reinstall heavy weight office equipment.
10 EA ¥ ¥
B105 Transport friable asbestos contaminated material.
50 CM ¥ ¥
B106 Dispose friable asbestos contaminated material.
50 CM ¥ ¥
B107 Transport non-friable asbestos contaminated material.
50 CM ¥ ¥
B108 Dispose non-friable asbestos contaminated material.
50 CM ¥ ¥
B109 Transport non-asbestos material. 20 CM ¥ ¥
B110 Dispose non-asbestos material. 20 CM ¥ ¥
B111 Provide Qualified Person service.
400 HR ¥ ¥
B112 Provide Construction special worker service.
400 HR ¥ ¥
DETAILED SCHEDULE Page 23 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
B113 Other related miscelaneous work. 1 LS ¥ - ¥ 10,000,000
TOTAL (B001 through B113) Not-To-Exceed ¥
Abbreviations:
EST AMT = Estimated Amount EST QTY = Estimated Quantity SM = Square Meter LM = Linear Meter CM = Cubic Meter EA = Each HR = Hour LS = Lump Sum PCM = Phase Contrast Microscopy TEM = Transmission Electron Microscopy
(Not-to-exceed)
DETAILED SCHEDULE Page 24 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
EXHIBIT C Second Option Period
ITEM
NO
DESCRIPTION EST
QTY
UT UNIT
PRICE
EST AMT
TOTAL
C001 Remove existing asbestos ceiling / wall board / tile. (More than 5 SM / per location)
200 SM ¥ ¥
C002 Remove existing asbestos ceiling / wall board / tile. (5 SM or less / per location)
50 SM ¥ ¥
C003 Remove existing asbestos ceiling / wall board / tile with underlayer. (More than 5 SM / per location)
100 SM ¥ ¥
C004 Remove existing asbestos ceiling / wall board / tile with underlayer. (5 SM or less / per location)
30 SM ¥ ¥
C005 Remove existing non-asbestos wall board / ceiling board.
50 SM ¥ ¥
C006 Provide non-asbestos gypsum wall / ceiling board.
200 SM ¥ ¥
C007 Provide non-asbestos cement wall / ceiling board.
200 SM ¥ ¥
C008 Provide non-asbestos acoustic ceiling / wall tile.
200 SM ¥ ¥
C009 Remove existing metal / wood ceiling frame.
100 SM ¥ ¥
C010 Provide metal ceiling frame including hanger rod.
100 SM ¥ ¥
SCHEDULE OF INDEFINITE QUANTITY WORK - "C"
DETAILED SCHEDULE Page 25 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C011 Provide wood ceiling frame including hanger frame.
50 SM ¥ ¥
C012 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (More than 5 SM / per location)
100 SM ¥ ¥
C013 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (5 SM or less / per location)
30 SM ¥ ¥
C014 Provide metal wall stud system, any size, and pitch is 300 mm ~ 455 mm.
100 SM ¥ ¥
C015 Provide wood wall stud, any size, any pitch.
50 SM ¥ ¥
C016 Remove existing asbestos floor tile / sheet / carpet with adhesive. (More than 5 SM / per location)
100 SM ¥ ¥
C017 Remove existing asbestos floor tile / sheet / carpet with adhesive. (5 SM or less / per location)
30 SM ¥ ¥
C018 Remove existing asbestos underlayer or sub-flooring with adhesive. (More than 5 SM / per location)
100 SM ¥ ¥
C019 Remove existing asbestos underlayer or sub-flooring with adhesive. (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 26 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C020 Provide non-asbestos vinyl floor tile / vinyl sheet with adhesive.
50 SM ¥ ¥
C021 Provide non-asbestos carpet floor tile with adhesive.
30 SM ¥ ¥
C022 Provide underlayer or sub-flooring with fastener / adhesive.
50 SM ¥ ¥
C023 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (More than 5 LM / per location)
100 LM ¥ ¥
C024 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (5 LM or less / per location)
50 LM ¥ ¥
C025 Remove non-asbestos wood base board / vinyl base board / molding / casing on asbestos wall / ceiling board.
50 LM ¥ ¥
C026 Provide non-asbestos base board / molding / casing on wall / ceiling board.
100 LM ¥ ¥
C027 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (More than 5 SM / per location)
30 SM ¥ ¥
C028 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 27 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C029 Provide non-asbestos cementitious material (board, mortar, plaster, or etc.), with metal reinforcing.
10 SM ¥ ¥
C030 Remove existing asbestos contaminated soil including material handling.
10 CM ¥ ¥
C031 Remove existing asbestos containing roofing / siding board. (More than 5 SM / per location)
50 SM ¥ ¥
C032 Remove existing asbestos containing roofing / siding board. (5 SM or less / per location)
50 SM ¥ ¥
C033 Provide non-asbestos pre-coated steel sheet or fiber reinforced plastic sheet roofing or siding.
100 SM ¥ ¥
C034 Provide non-asbestos cement roofing or siding board.
100 SM ¥ ¥
C035 Provide pre-coated galvanized steel sheet flashing up to 300 mm width.
50 LM ¥ ¥
C036 Patch and repair hole of asbestos siding. Unit of measurement shall be by up to
0.5 SM hole/each.
50 EA ¥ ¥
C037 Prepare and paint interior wall / ceiling board / base board / molding / casing.
300 SM ¥ ¥
C038 Prepare and paint galvanized iron steel siding.
100 SM ¥ ¥
DETAILED SCHEDULE Page 28 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C039 Prepare and paint cementitious wall.
50 SM ¥ ¥
C040 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (More than 20 SM / per location)
50 SM ¥ ¥
C041 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (20 SM or less / per location)
50 SM ¥ ¥
C042 Provide non-asbestos sprayed insulation on metal roofing, steel structure and tank.
50 SM ¥ ¥
C043 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (More than 5 SM / per location)
50 SM ¥ ¥
C044 Remove existing asbestos containing non-sprayed insulation on ceiling, wall, duct, chiller and tank. (5 SM or less / per location)
50 SM ¥ ¥
C045 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (More than 5 SM / per location)
30 SM ¥ ¥
C046 Remove existing asbestos containing non-sprayed insulation and metal jacket on duct, chiller and tank. (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 29 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C047 Provide non-asbestos, non-sprayed insulation on ceiling or wall.
50 SM ¥ ¥
C048 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller.
30 SM ¥ ¥
C049 Provide non-asbestos, non-sprayed insulation on duct, tank and chiller, including metal jacket.
30 SM ¥ ¥
C050 Remove existing asbestos containing up to 300 mm outside diameter pipe insulation and covering by glovebag method.
20 LM ¥ ¥
C051 Remove existing asbestos containing over 300 mm outside diameter pipe insulation and covering by glovebag method.
20 LM ¥ ¥
C052 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (More than 5 LM / per location)
50 LM ¥ ¥
C053 Remove existing asbestos containing up to 300 mm outside diameter cement pipe. (5 LM or less / per location)
50 LM ¥ ¥
C054 Remove asbestos duct flange gasket and provide non-asbestos duct flange gasket.
10 EA ¥ ¥
C055 Remove asbestos pipe joint gasket and provide non-asbestos pipe joint gasket.
10 EA ¥ ¥
DETAILED SCHEDULE Page 30 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C056 Dismantle and clean-up existing fastened cabinet / shelf / sink on asbestos containing material.
20 EA ¥ ¥
C057 Reinstall cabinet / shelf / sink with fastener.
20 EA ¥ ¥
C058 Dismantle of and clean-up existing sign board on asbestos containing material.
30 EA ¥ ¥
C059 Reinstall sign board with fastener.
30 EA ¥ ¥
C060 Provide new sign board with fastener.
10 EA ¥ ¥
C061 Dismantle of and clean-up existing switch / outlet on asbestos containing material.
30 EA ¥ ¥
C062 Reinstall switch / outlet with fastener.
30 EA ¥ ¥
C063 Provide new switch, switch cover and outlet cover with new fastener on non-asbestos wall board.
20 EA ¥ ¥
C064 Dismantle of and clean-up existing light / exit light / emergency light / sensor / mortion sensor / speaker / electronics clock / fire detector / air conditioner equipment.
40 EA ¥ ¥
C065 Dismantle and clean-up exist fire control panel.
10 EA ¥ ¥
C066 Reinstall lighting (mounted) / exit light / emergency light with fastener.
20 EA ¥ ¥
DETAILED SCHEDULE Page 31 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C067 Reinstall lighting (recessed) with fastener.
20 EA ¥ ¥
C068 Reinstall sensor / motion sensor / speaker / electronics clock / fire detector with fastener.
40 EA ¥ ¥
C069 Reinstall fire control panel with fastener.
10 EA ¥ ¥
C070 Dismantle and clean-up exist A/C inside unit / diffuser / return air grille.
20 EA ¥ ¥
C071 Reinstall diffuser / return air grille with fastener.
10 EA ¥ ¥
C072 Reinstall A/C inside unit. 10 EA ¥ ¥
C073 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (More than 5 LM / per location)
30 LM ¥ ¥
C074 Dismantle and clean-up existing wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. (5 LM or less / per location)
30 LM ¥ ¥
C075 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener.
(More than 5 LM / per location)
30 LM ¥ ¥
C076 Reinstall wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location)
30 LM ¥ ¥
DETAILED SCHEDULE Page 32 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C077 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (More than 5 LM / per location)
30 LM ¥ ¥
C078 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener. (5 LM or less / per location)
30 LM ¥ ¥
C079 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (More than 5 LM / per location)
100 LM ¥ ¥
C080 Provide new wiring, conduit pipe, ducting, pull wire, raceway, rack and etc. with fastener on ACM. (5 LM or less / per location)
100 LM ¥ ¥
C081 Dismantle of and clean-up existing sanitary ware on asbestos containing material.
10 EA ¥ ¥
C082 Reinstall sanitary ware with fastener.
10 EA ¥ ¥
C083 Stop and restore splinkler system.
5 LS ¥ ¥
C084 Provide plug for sprinkler. 20 EA ¥ ¥
C085 Remove and provide ceiling plate of concealed type sprinkler head.
100 EA ¥ ¥
C086 Provide cleaning asbestos contaminated area and asbestos contaminated dust area.
1,000 SM ¥ ¥
DETAILED SCHEDULE Page 33 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C087 Provide plastic sheet enclosure system. (More than 50 SM / per location)
1,000 SM ¥ ¥
C088 Provide plastic sheet enclosure system. (50 SM or less / per location)
1,000 SM ¥ ¥
C089 Provide and remove temporary framing system as separation barrier for enclosure.
300 SM ¥ ¥
C090 Provide PCM area air and personal sampling test.
500 EA ¥ ¥
C091 Provide aggressive PCM air sampling test for clearance.
100 EA ¥ ¥
C092 Provide TEM area air and personal sampling test.
50 EA ¥ ¥
C093 Provide aggressive TEM air sampling test for clearance.
10 EA ¥ ¥
C094 Provide negative pressure system, large type.
20 EA ¥ ¥
C095 Provide negative pressure system, small type.
20 EA ¥ ¥
C096 Provide glovebag system. 100 EA ¥ ¥
C097 Provide Decon-unit with water shower system.
5 EA ¥ ¥
C098 Provide Single Stage Decon-unit. 30 EA ¥ ¥
C099 Provide double-pole scaffolding and/or prefabricated scaffolding. (More than 20 SM / per location)
100 SM ¥ ¥
DETAILED SCHEDULE Page 34 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C100 Provide double-pole scaffolding and/or prefabricated scaffolding. (20 SM or less / per location)
50 SM ¥ ¥
C101 Provide step-ladder scaffolding.
(More than 20 SM / per location)
300 SM ¥ ¥
C102 Provide step-ladder scaffolding.
(20 SM or less / per location)
150 SM ¥ ¥
C103 Provide transfer scaffolding “Rolling Tower”.
10 EA ¥ ¥
C104 Remove and reinstall heavy weight office equipment.
10 EA ¥ ¥
C105 Transport friable asbestos contaminated material.
50 CM ¥ ¥
C106 Dispose friable asbestos contaminated material.
50 CM ¥ ¥
C107 Transport non-friable asbestos contaminated material.
50 CM ¥ ¥
C108 Dispose non-friable asbestos contaminated material.
50 CM ¥ ¥
C109 Transport non-asbestos material. 20 CM ¥ ¥
C110 Dispose non-asbestos material. 20 CM ¥ ¥
C111 Provide Qualified Person service.
400 HR ¥ ¥
C112 Provide Construction special worker service.
400 HR ¥ ¥
DETAILED SCHEDULE Page 35 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
C113 Other related miscelaneous work. 1 LS ¥ - ¥ 10,000,000
TOTAL (C001 through C113) Not-To-Exceed ¥
Abbreviations:
EST AMT = Estimated Amount EST QTY = Estimated Quantity SM = Square Meter LM = Linear Meter CM = Cubic Meter EA = Each HR = Hour LS = Lump Sum PCM = Phase Contrast Microscopy TEM = Transmission Electron Microscopy
(Not-to-exceed)
DETAILED SCHEDULE Page 36 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
EXHIBIT D Third Option Period
ITEM
NO
DESCRIPTION EST
QTY
UT UNIT
PRICE
EST AMT
TOTAL
D001 Remove existing asbestos ceiling / wall board / tile. (More than 5 SM / per location)
200 SM ¥ ¥
D002 Remove existing asbestos ceiling / wall board / tile. (5 SM or less / per location)
50 SM ¥ ¥
D003 Remove existing asbestos ceiling / wall board / tile with underlayer. (More than 5 SM / per location)
100 SM ¥ ¥
D004 Remove existing asbestos ceiling / wall board / tile with underlayer. (5 SM or less / per location)
30 SM ¥ ¥
D005 Remove existing non-asbestos wall board / ceiling board.
50 SM ¥ ¥
D006 Provide non-asbestos gypsum wall / ceiling board.
200 SM ¥ ¥
D007 Provide non-asbestos cement wall / ceiling board.
200 SM ¥ ¥
D008 Provide non-asbestos acoustic ceiling / wall tile.
200 SM ¥ ¥
D009 Remove existing metal / wood ceiling frame.
100 SM ¥ ¥
D010 Provide metal ceiling frame including hanger rod.
100 SM ¥ ¥
SCHEDULE OF INDEFINITE QUANTITY WORK - "D"
DETAILED SCHEDULE Page 37 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
D011 Provide wood ceiling frame including hanger frame.
50 SM ¥ ¥
D012 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (More than 5 SM / per location)
100 SM ¥ ¥
D013 Remove existing asbestos contaminated stud with wall board and base board on asbestos floor. (5 SM or less / per location)
30 SM ¥ ¥
D014 Provide metal wall stud system, any size, and pitch is 300 mm ~ 455 mm.
100 SM ¥ ¥
D015 Provide wood wall stud, any size, any pitch.
50 SM ¥ ¥
D016 Remove existing asbestos floor tile / sheet / carpet with adhesive. (More than 5 SM / per location)
100 SM ¥ ¥
D017 Remove existing asbestos floor tile / sheet / carpet with adhesive. (5 SM or less / per location)
30 SM ¥ ¥
D018 Remove existing asbestos underlayer or sub-flooring with adhesive. (More than 5 SM / per location)
100 SM ¥ ¥
D019 Remove existing asbestos underlayer or sub-flooring with adhesive. (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 38 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
D020 Provide non-asbestos vinyl floor tile / vinyl sheet with adhesive.
50 SM ¥ ¥
D021 Provide non-asbestos carpet floor tile with adhesive.
30 SM ¥ ¥
D022 Provide underlayer or sub-flooring with fastener / adhesive.
50 SM ¥ ¥
D023 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (More than 5 LM / per location)
100 LM ¥ ¥
D024 Remove existing asbestos containing vinyl base board and adhesive on non-asbestos wall board. (5 LM or less / per location)
50 LM ¥ ¥
D025 Remove non-asbestos wood base board / vinyl base board / molding / casing on asbestos wall / ceiling board.
50 LM ¥ ¥
D026 Provide non-asbestos base board / molding / casing on wall / ceiling board.
100 LM ¥ ¥
D027 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (More than 5 SM / per location)
30 SM ¥ ¥
D028 Remove existing asbestos containing cementitious material (board, mortar, plaster, or etc.). (5 SM or less / per location)
30 SM ¥ ¥
DETAILED SCHEDULE Page 39 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
D029 Provide non-asbestos cementitious material (board, mortar, plaster, or etc.), with metal reinforcing.
10 SM ¥ ¥
D030 Remove existing asbestos contaminated soil including material handling.
10 CM ¥ ¥
D031 Remove existing asbestos containing roofing / siding board. (More than 5 SM / per location)
50 SM ¥ ¥
D032 Remove existing asbestos containing roofing / siding board. (5 SM or less / per location)
50 SM ¥ ¥
D033 Provide non-asbestos pre-coated steel sheet or fiber reinforced plastic sheet roofing or siding.
100 SM ¥ ¥
D034 Provide non-asbestos cement roofing or siding board.
100 SM ¥ ¥
D035 Provide pre-coated galvanized steel sheet flashing up to 300 mm width.
50 LM ¥ ¥
D036 Patch and repair hole of asbestos siding. Unit of measurement shall be by up to
0.5 SM hole/each.
50 EA ¥ ¥
D037 Prepare and paint interior wall / ceiling board / base board / molding / casing.
300 SM ¥ ¥
D038 Prepare and paint galvanized iron steel siding.
100 SM ¥ ¥
DETAILED SCHEDULE Page 40 of 60
CUI//FEDCON[when filled in] Source Selection Information--See FAR 2.101 and 3.104[when filled in] eProject No. 1702673
D039 Prepare and paint cementitious wall.
50 SM ¥ ¥
D040 Remove existing asbestos containing sprayed insulation on metal roofing, steel structure and tank. (More than 20 SM / per location)
50 SM ¥ ¥
D041 Remove existing asbestos containing…