This is a comprehensive project manual and bid document for a Junior/Senior High School Athletic Restroom Building project issued by Escanaba Area Public Schools located in Escanaba, Michigan. The project involves constructing a 22ft x 16ft restroom building, including new utilities and concrete sidewalks. The bid documents were released on March 31, 2024, with bids due on Monday, April 14, 2024, at 10:00 A.M. Eastern Standard Time. A mandatory pre-bid meeting for Prime Contractors will be held on two dates: Monday, April 7, 2024, at 10:00 A.M. and Tuesday, April 8, 2024, at 2:00 P.M. The project has a desired completion date of Monday, April 1, 2026, with on-site work potentially beginning on or after Monday, June 9, 2024.

The bid requires a bid security deposit of not less than 5% of the total bid amount, which can be submitted as a certified check or bid bond. The contract will be a lump sum fixed price, and bidders must submit completed Familial Disclosure and Iran Economic Sanctions Act Affidavits. The project includes two potential alternates: one for constructing a sidewalk to a proposed tennis pavilion and another for additional buried conduit and water supply pipe modifications. Bidders are required to provide unit prices for specific items such as excavation, trenching, and fill, and must list their proposed subcontractors for various aspects of the work including excavation, concrete, building, electrical, plumbing, and roofing.

View the file

Other files

File Type Posted
224520Plans03312025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual including Specifications

Project title:

Junior/Senior High School Athletic Restroom Building Escanaba Area Public Schools Escanaba, Michigan

Owner:

Escanaba Area Public Schools 1500 Ludington Street Escanaba, Michigan 49829

Date: 0 - -202

DDGi Project No.: 22-4520

Designer:

Dynamic Design Group, inc.

900 1st Avenue South, Suite A Escanaba, MI 49829 Phone: 906-786-3300 Fax: 906-233-7391

22-4 20 unior Senior igh School Athletic estroom uilding

00 0102 - 1 P E I MA I

SE 00 0102

PR JE RMA

PAR 1 E ERAL

1 01 PR JE E A

A. Project ame

1. unior Senior igh Athletic estroom uilding

2. Escanaba Area Public Schools

3. Escanaba, MI

. Project umber 22-4 20.

. he ner, hereinafter referred to as ner Escanaba Area Public Schools

1. Address 1 00 udington St.

2. ity, State, ip Escanaba MI 49829

D. he ners representative Dynamic Design Group, Inc..

1 02 E PR SPE E B ERS

A. hese documents constitute an Invitation to id to General ontractors for the construction of the project described belo .

1 0 PR JE ES R P

A. Summary Project Description onstruction of a 22ft 16ft restroom building, including ne utilities and concrete side al s.

. ontract erms ump sum fi ed price, stipulated sum .

. Site E amination See Section 00 1113 Advertisement for ids.

1 04 PR JE S L A S

A. he Engineer, hereinafter referred to as Engineer Dynamic Design Group, inc.

1. Address 900 1st Ave. So., Suite A

2. ity, State, ip Escanaba, MI 49829

3. Phone a 906 786-3300 906 233-7391.

1 05 PR REME ME ABLE

A. ast e uest for Substitution Due 7 days prior to due date of bids.

. ast e uest for Information Due days prior to due date of bids.

. ids Due Monday, April 14, 202 at 10 00 A.M. E.S. .

D. onstruction Start See 00 4100 id orm.

E. Substantial ompletion Date See 00 4100 id orm.

. he ner reserves the right to change the schedule or terminate the entire procurement process at any time.

E SE

00 0110 - 1 A E E S

SE 00 0110

ABLE E S

PR REME A RA RE REME S

2 01 S 00 -- PR REME A RA RE REME S

A. 00 0102 - Project Information . 00 0110 - able of ontents . 00 1113 - Advertisement for ids

D. 00 2113 - Instructions to idders E. 00 4100 - id orm

. amilial Disclosure Affidavit G. Iran Economic Sanction Act Affidavit

. 00 000 - ontracting orms and Supplements I. 00 7200 - General onditions . General onditions for onstruction Document . 00 7300 - Supplementary onditions

SPE A S

01 S 01 -- E ERAL RE REME S

A. 01 2200 - nit Prices . 01 2 00 - Substitution Procedures . Substitution e uest orm During Procurement

D. Substitution e uest orm During onstruction E. 01 3000 - Administrative e uirements

. 01 4000 - uality e uirements G. 01 000 - emporary acilities and ontrols

. 01 713 - emporary Erosion and Sediment ontrol I. 01 6000 - Product e uirements . 01 7000 - E ecution and loseout e uirements . 01 7800 - loseout Submittals

02 S 02 -- E S S A. 02 4100 - Demolition

0 S 0 -- RE E

A. 03 3000 - ast-in-Place oncrete

04 S 0 -- , PLAS S, A MP S ES

A. 06 1000 - ough arpentry

. 06 17 3 - Shop- abricated ood russes

05 S 0 -- HERMAL A M S RE PR E

A. 07 3113 - Asphalt Shingles . 07 4213 - Metal all Panels

0 S 08 -- PE S

A. 08 1113 - ollo Metal Doors and rames

00 0110 - 2 A E E S

. 08 7100 - Door ard are

0 S 09 -- SHES

A. 09 2116 - Gypsum oard Assemblies . 09 9123 - Interior Painting

08 S 10 -- SPE AL ES

A. 10 2113.19 - Plastic oilet ompartments

. 10 2800 - oilet, ath, and aundry Accessories

09 S 1 -- EAR H R

A. 31 1000 - Site learing . 31 2200 - Grading . 31 2316 - E cavation

D. 31 2323 - ill

10 S 2 -- E ER R MPR EME S

A. 32 1623 - Side al s . 32 9219 - Seeding

11 S -- L ES

A. 33 3113 - Site Sanitary Se erage Gravity Piping

00 1113 - 1 AD E ISEME IDS

SE 00 111

A ER SEME R B S

S LE PR ME B S LL BE RE E E R

he Pro ect unior Senior igh Athletic estroom uilding Escanaba Area Public Schools Escanaba, MI he ner Escanaba Area Public Schools 1 00 udington St.

Escanaba MI 49829 he Engineer Dynamic Design Group, inc., 900 1st Ave., So., Escanaba, MI 49829 o Potential Bidders ids ill be accepted by the ner and are to be delivered to Dynamic Design Group, inc., 900 1st

Ave. So., Suite A, Escanaba, MI 49829 on or before, Monday, April 14, 202 at 10 00 A.M. E.S. . .

ate bids ill not be accepted.

he School oard ill not consider or accept a bid received after the date and time specified for bid submission. ids shall be accompanied by a completed amilial Disclosure Affidavit and Iran Economic Sanctions Act Affidavit.

ids ill be publicly opened and read aloud in the office of Dynamic Design Group on Monday, April 14, 202 at 10 1 A.M. E.S. . . ids ill be revie ed by the School and presented to the School oard on Monday, April 14, 202 . he oard ill ma e a decision on Monday, April 21, 202 .

Pro ect escri tion onstruction of a 22ft 16ft restroom building, including ne utilities and concrete side al s.

Plans and S eci ications

Plans and Specifications ill be available on or after Monday, March 31, 202 .

erms of btaining Plans and Specifications ard opies Printed paper documents can be purchased from the ffice of the Engineer upon a payment of 1 0.00 nonrefundable fee plus 2 .00 if mailed.

Electronic opies PD copies on D can be purchased from the ffice of the Engineer upon a payment of 2 .00 nonrefundable fee plus 1 .00 if mailed.

Plans ill be posted at the Delta ounty and Mar uette ounty builder s e changes.

Prebid Meeting

A mandatory prebid meeting for Prime ontractors ill be held at the project site on Monday, April 7, 202 at 10am e.s.t. or uesday, April 8, 202 at 2pm e.s.t. . ontractors must attend one of these scheduled meetings.

he site is also available for additional contractor visits prior to their bid, on ee days, after 4pm or on ee ends at any time. o ever, the ner ould appreciate that ontractors contact Dynamic

Design Group to let them no of dates and time hen they intend to visit the site.

uestions

Direct all uestions to the office of the Engineer Dynamic Design Group, inc., telephone number 906 786-3300.

00 1113 - 2 AD E ISEME IDS

Bid Securit idders ill be re uired to provide id Security in the form of a ertified hec or id ond payable to the ner for not less than of their total bid amount.

he project ill re uire the Prime contractor to obtain a performance and payment bond in the amount to cover the total contract.

he ner reserves the right to accept or reject any or all bids.

00 2113 - 1 I S I S IDDE S

SE 00 211

S R S B ERS

S MMAR

1 01 RELA E ME S

A. Document 00 7300 - Supplementary onditions A

2 01 B S BM SS

A. ids signed, e ecuted, and dated ill be received at the office of the Engineer at the date time listed in on the bid form.

. ffers submitted after the above time shall be returned to the bidder unopened.

. Amendments to the submitted offer ill be permitted if received in riting prior to bid closing and if endorsed by the same party or parties ho signed and sealed the offer.

2 02 E

A. he intent of this bid re uest is to obtain an offer to perform and complete the or as outlined in the onstruction Docuement.

2 0 R E E HE RA ME S

A. or of this proposed ontract comprises building construction, site development, and demolition, including concrete side al or .

2 04 RA ME

A. Identify ontract ime in the id orm.

B ME S A RA ME S

01 A A LAB L

A. id Documents may be obtained from See Section 00 1113 Advertisement for ids.

02 E AM A

A. id Documents may be vie ed at the office of Engineer.

. id Documents are on display at the offices of the follo ing construction plan rooms

1. Mar uette ounty.

2. Delta ounty.

. pon receipt of id Documents verify that documents are complete. otify Engineer should the documents be incomplete.

D. Immediately notify Engineer upon finding discrepancies or omissions in the id Documents.

0 R ES/A E A

A. Direct all uestions to the ffice of the Engineer.

. Addenda may be issued during the bidding period. All Addenda become part of the ontract

Documents. Include resultant costs in the id Amount. A E A LL BE SE

H SE HA B A PLA S R M HE E HE E EER A ARE L S E

HE RRE PLA H L ERS L S

. erbal ans ers are not binding on any party.

D. larifications re uested by bidders must be in riting not less than 7 days before date set for receipt of bids. he reply ill be in the form of an Addendum, a copy of hich ill be for arded to no n recipients.

04 PR /ASSEMBL /S S EM S BS S

A. here the id Documents stipulate a particular product, substitutions ill be considered up to 7 days before receipt of bids.

00 2113 - 2 I S I S IDDE S

. hen a re uest to substitute a product is made, Engineer may approve the substitution and ill issue an Addendum to no n bidders.

. he submission shall provide sufficient information to determine acceptability of such products.

D. Provide complete information on re uired revisions to other or to accommodate each proposed substitution.

E. Provide products as specified unless substitutions are submitted in this manner and accepted.

. See Section 01 6000 - Product e uirements for additional re uirements.

S E ASSESSME

4 01 S E E AM A

A. E amine the project site before submitting a bid. Site availability is defined in the Advertisment for ids. ailure to e amine the project site ill not arrant additional charges to the ner for items that could have been noted during a site e amination.

4 02 PREB ERE E

A. See 00 1113 - Advertisement for ids

AL A S

5 01 S B RA RS/S PPL ERS/ HERS

A. ner reserves the right to reject a proposed subcontractor for reasonable cause.

B S BM SS

01 S BM SS PR E RE

A. idders shall be solely responsible for the delivery of their bids in the manner and time prescribed.

. Submit one copy of the e ecuted offer on the id orms provided, signed and sealed in a closed opa ue envelope, clearly identified ith bidder s name, project name and ner s name on the outside.

. ids shall be accompanied by a completed amilial Disclosure Affidavit and Iran Economic Sanctions Act Affidavit.

D. ids and accompanied paper or ill be accepted in person and via e-mail and can be e-mailed to dan ddgi-ddm.com. ard copies ill be re uired to be mailed prior to being a arded a contract ith the ner. DDGi ill not be responsible for any technical problems ith e-mail submission of bids associated ith computers, internet, services, etc. neither internally or e ternally. It is the ontractors responsibility to verify that electronically submitted bids are received in their entirety. DDGi strongly recommends that ontractors phyically deliver their bid in person at the office of DDGi.

02 B EL B L

A. ids that are unsigned, improperly signed or sealed, conditional, illegible, obscure, contain arithmetical errors, erasures, alterations, or irregularities of any ind, may at the discretion of the ner, be declared unacceptable.

. id orms, Appendices, and enclosures that are improperly prepared may, at the discretion of ner, be declared unacceptable.

B E L S RES/RE REME S

01 SE R EP S

A. ids shall be accompanied by a security deposit as follo s

1. id ond of a sum no less than percent of the id Amount on AIA A310 id ond orm.

2. ertified chec in the amount of of the total ma imum bid amount.

. Endorse the id ond in the name of the ner as obligee, signed and sealed by the principal ontractor and surety.

00 2113 - 3 I S I S IDDE S

. Endorse the certified chec in the name of the ner.

D. he security deposit ill be returned after delivery to the ner of the re uired Performance and Payment ond s by the accepted bidder.

E. Include the cost of bid security in the id Amount.

. After a bid has been accepted, all securities ill be returned to the respective bidders and other re uested enclosures.

G. If no contract is a arded, all security deposits ill be returned.

02 PER RMA E ASS RA E

A. Accepted idder Provide a Performance bond as described in 00 7300 - Supplementary onditions.

. Include the cost of performance assurance bonds in the id Amount.

0 B RM RE REME S

A. omplete all re uested information in the id orm and Appendices.

04 EES R HA ES HE R

A. Include the fees for overhead and profit on o n or and or by subcontractors, identified in Document 00 7300 - Supplementary onditions .

. Include in the id orm, the overhead and profit fees on o n or and or by subcontractors, applicable for hanges in the or , hether additions to or deductions from the or on hich the id Amount is based.

05 B RM S A RE

A. he id orm shall be signed by the bidder, as follo s

1. y one of the ners of the ompany submitting a bid or the principal incharge.

2. Sole Proprietorship Signature of sole proprietor in the presence of a itness ho ill also sign. Insert the ords Sole Proprietor under the signature. Affi seal.

3. Partnership Signature of all partners in the presence of a itness ho ill also sign.

Insert the ord Partner under each signature. Affi seal to each signature.

4. orporation Signature of a duly authori ed signing officer s in their normal signatures.

Insert the officer s capacity in hich the signing officer acts, under each signature. Affi the corporate seal. If the bid is signed by officials other than the president and secretary of the company, or the president secretary treasurer of the company, a copy of the by-la resolution of their board of directors authori ing them to do so, must also be submitted ith the id orm in the bid envelope.

ER A EP A E/REJE

8 01 RA ER

A. ids shall remain open to acceptance and shall be irrevocable for a period of si ty 60 days after the bid closing date.

8 02 A EP A E ER

A. ner reserves the right to accept or reject any or all offers.

00 4100 - 1 ID M

SE 00 4100

B RM

PR JE

unior Senior igh Athletic estroom uilding

Escanaba Area Public Schools Escanaba, MI

S BM B

Dynamic Design Group, inc.

900 1st Ave. So., Suite A Escanaba, MI 49829

H S B S A RESSE

Escanaba Area Public Schools 1 00 udington St.

Escanaba MI MI

B L SES

Monday, April 14, 202 at 10 00 A.M. E.S. .

ER

he undersigned IDDE proposes and agrees, if this id is accepted, to enter into an agreement ith E and agrees to perform and furnish all or as specified or indicated in the onstruction

Documents and idding Documents for the id Price and ithin the id imes indicated in this id and in accordance ith the other terms and conditions of the idding documents.

IDDE accepts all of the terms and conditions of the Advertisement or Invitation to id and Instructions to IDDE s, including ithout limitation those dealing ith the disposition of id security.

IDDE ill sign and deliver the re uired number of counterparts of the Agreement ith the onds and other documents re uired by the idding e uirements ithin fifteen 1 days after the date of

E S s otice of Intent.

S BM H S B , B ER REPRESE S, AS M RE LL SE R H HE

A REEME , HA

onstruction Documents - IDDE has obtained and carefully studied or accepts the conse uences for not doing so the entire set of ontract Documents including dra ings, specifications, invitation to bid, supporting documents if issued and addenda if issued .

It is the Engineers intent for all parties involved in the preparation of this bid to have in their possession the entire set of ontract Documents from hich to prepare their bids s . IDDE ac no ledges that at no time, as the dra ing set and or specifications separated and issued in parts to parties associated ith the preparation of this bid, hether in hard copy or digital format. IDDE further ac no ledges that all parties involved in the preparation of this bid have obtained and carefully studied the entire set of ontract Documents. It is the responsibility of IDDE to verify that all parties have revie ed the entire set of ontract Documents.

Addenda IDDE has e amined and carefully studied any Addenda that has been issued.

00 4100 - 2 ID M

Investigations and E aminations - IDDE - does not consider that any further e aminations, investigations, e plorations, tests, studies, or data are necessary for the determination of this id for performance of the or at the price s bid and ithin the times and in accordance ith the other terms and conditions of the idding Documents.

IDDE has given Engineer and ner ritten notice of all conflicts, errors, ambiguities or discrepancies that IDDE has discovered in the idding Documents and the ritten resolution thereof by Engineer and ner is acceptance to IDDE .

he idding Documents are generally sufficient to indicate and convey understanding of all terms conditions for performing and furnishing the or for hich this id is submitted.

idders bligations - IDDE has correlated the information no n to IDDE , information and observations obtained from visits to the site, dra ings, any conflicts identified in the onstruction Documents and idding Documents and all additional e aminations, and data ith the onstruction Documents and idding Documents that ill affect his bid.

aving e amined the Place of he or and all matters referred to in the Instructions to idders and the ontract Documents prepared by Dynamic Design Group, inc., of Escanaba for the above mentioned project, e, the undersigned, hereby offer to enter into a ontract to perform the or for the Sum of E A S A ID P I E.

BASE B

A S A ID P I E

ost to furnish all labor and materials.

dollars e ha e included the re uired bid securit de osit as re uired in Section 00 211 nstruction to Bidders e ha e included our com leted AM L AL S L S RE A A orm e ha e included our com leted S R A AR E A A MPL A E RA

E M SA S A orm e ha e included the re uired er ormance assurance bonds in the Bid Amount as re uired b the Section 00 211 nstruction to Bidders

AL ER A E B S

idder shall state the amount to add to, or deduct from, his ase id for the follo ing alternates.

Additions and deductions shall include any modifications of or or additional or that the undersigned may be re uired to perform by reason of acceptance of the alternate. See applicable sections of the specifications and the dra ings for detailed information.

Alternate Bid 1 t side al to the Pro osed ennis Pa ilion State the amount to adjust the base bid to construct the 6ft side al to the Proposed ennis Pavilion.

rite in ADD or DED ost to furnish all labor and materials and the cost of the performance and payment bond associated ith the above described alternate.

dollars

00 4100 - 3 ID M

Alternate Bid 2 Additional buried conduit and u si e o ater su l i e State the amount to adjust the base bid to include an additional 2 buried conduit and pull ire from the e isting high school building to the ne restroom building and upsi e the 1 ater supply pipe to a 2 ater supply pipe.

rite in ADD or DED ost to furnish all labor and materials and the cost of the performance and payment bond associated ith the above described alternate.

dollars

All a licable ederal ta es are included and State ta es are included in the Bid Sums

A EP A E

his offer shall be open to acceptance and is irrevocable for si ty days from the bid closing date.

If this bid is accepted by ner ithin the time period stated above, e ill

E ecute the Agreement ithin seven days of receipt of otice of Intent.

ommence or ithin seven days after ritten agreement is e ecuted. nless an alternate start date is mutually agreed apon.

If this bid is accepted ithin the time stated, and e fail to commence the or or e fail to provide the re uired ond s , the security deposit shall be forfeited as damages to ner by reason of our failure, limited in amount to the lesser of the face value of the security deposit or the difference bet een this bid and the bid upon hich a ontract is signed.

In the event our bid is not accepted ithin the time stated above, the re uired security deposit shall be returned to the undersigned, in accordance ith the provisions of the Instructions to idders unless a mutually satisfactory arrangement is made for its retention and validity for an e tended period of time.

RA ME

he project has a desired completion date of Monday, April 1, 2026. n-site or may begin on or after Monday, une 9, 202 . State the proposed construction start date and construction completion date.

If this id is accepted, and an ner ontractor contract agreement is e ecuted on riday, April 2 , 202 e ill egin on-site construction on idder to enter day, month, year .

omplete construction on idder to enter day, month, year .

HA ES HE R

hen Engineer establishes that the method of valuation for hanges in the or ill be net cost plus a percentage fee in accordance ith General onditions, our percentage fee ill be percent overhead and profit on the net cost of our o n or percent on the cost of or done by any Subcontractor.

n or deleted from the ontract, our credit to ner shall be Engineer-approved net cost plus percentage noted above.

00 4100 - 4 ID M

A E A he follo ing Addenda have been received. he modifications noted in the Addendums belo have been considered and all costs are included in the id Sum.

Addendum Dated .

Addendum Dated .

Addendum Dated .

Addendum Dated .

Addendum Dated .

PR ES

he follo ing are nit Prices for specific portions of the or as listed. he follo ing is the list of nit

Prices

I EM DES IP I -

E cavation and disposal of une pected debris or unsuitable soils.

renching to re-route utilities that are une pectedly encountered, including bac filling of the open trench ith properly compacted material per the specifications. -

Provide and install appropriate compacted fill in une pected e cavation or over-e cavation areas.

RA RS

ist your appointed Project oordinator

Prime ontractor ill be re uired to designate an on-site Project oordinator that ill represent the Prime ontractor on-site. ist the individual

Project oordinator

AM L AL S L S RE A A A RA E M SA S

es o - Ac no ledge the amilial Disclosure affidavit has been completed and submitted ith the ontractor s id orm.

es o - Ac no ledge the Iran Economic Sanctions compliance affidavit has been completed and submitted ith the ontractor s id orm.

S B- RA RS

E cavation subcontractor oncrete subcontractor uilding subcontractor

Electrical sucontractor Plumbing subcontractor oofing subcontractor

00 4100 - ID M

B RM S A RE S

Signature and certification I hereby certify that all statements herein are made on behalf of

Insert orporation, Partnership or Individual Submitting id above.

y presenting this bid and signing belo , I ac no ledge that at no time, did I separate the ontract

Documents and or issue parts of the ontract Documents to any parties involved in the preparation of this bid, either in hard copy or digital format. I further ac no ledge that all parties involved in the preparation of this bid have completely revie ed and studied the entire set of ontract Documents.

I have full authority to ma e such statement and to submit this proposal.

Signature

Printed ame ompany ame

Address State ip

Phone o.

Email itnessed by, Printed ame itnessed by, Signature

FAMILIAL DISCLOSURE AFFIDAVIT

All Bids shall be accompanied by a sworn statement disclosing any familial relationship that exists between the owner(s) or any employee of the bidder and any member of the Board of Education of the District, the Superintendent of the District and/or any Escanaba Public Schools Administrator.

The undersigned, owner or authorized officer of _____________________ (the bidder/contractor), pursuant to the familial disclosure requirement provided in the Escanaba Public Schools Request for Proposals, hereby represent and warrant, except as provided below, that no familial relationships exist between the bidder/contractor or any employee of the bidder/contractor, and any member of the Escanaba Public Schools Board of Education, the Superintendent and/or any Escanaba Public Schools Administrator.

The following are the bidder’s familial relationship(s) with the Escanaba Public Schools:

Bidder/Contractor Employee Name Related to: Relationship

1 ____________________________________________

(Attach additional pages if necessary to disclose all familial relationships)

There is no familial relationship that exists between the bidder/contractor and/or any employee of the bidder and any member of the Escanaba Public Schools Board of Education, Superintendent, and/or any Escanaba Public Schools Administrator.

Bidder:

(Company Name)

By:

(Signature) (Title)

This instrument was acknowledged before me, a Notary Public, in and for ___

County, _____________ on this day of __________________ , 2021

SS:

(Notary Public Signature)

My Commission expires: ________________

Acting in the County of: __________________

SWORN AND NOTARIZED AFFIDAVIT OF COMPLIANCE

IRAN ECONOMIC SANCTIONS ACT

Michigan Public Act No. 517 of 2012

All bidders must submit the following certification statement in compliance with Public Act No. 517 of 2012 (the “Iran Economic Sanctions Act”) and attach this form to the bid.

Escanaba Public Schools shall not accept a bid that does not include this sworn and notarized certification statement. This form must be completed in its entirety.

The undersigned, the owner or authorized officer of (the

“Bidder”), pursuant to the compliance certification requirement provided in the Escanaba Public Schools Request for Proposal, hereby certifies, represents and warrants that the Bidder (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, and that in the event the Bidder is awarded a contract as a result of the aforementioned Request for Proposal, the Bidder will not become an “Iran linked business” at any time during the course of performing the work or any services under the contract.

The Bidder further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification is made, whichever is greater, the cost of the Escanaba Public Schools investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date it is determined that the person has submitted the false certification.

BIDDER:

STATE OF )

)ss.

COUNTY OF )

Name of Bidder By:

Its:

Date:

This instrument was acknowledged before me on the day of , 2021, by .

, Notary Public County, Michigan

My Commission Expires:

Acting in the County of:

00 000 - 1 A I G MS A D

S PP EME S

SE 00 5000

RA RMS A S PPLEME S

PAR 1 E ERAL

1 01 A REEME A S HE RA

A. See General onditions.

. he Agreement is based on AIA A101. opies ill be made available upon re uest.

. he General onditions are based on AIA A201. Supplementary onditions are included.

1 02 RMS

A. se the follo ing forms for the specified purposes unless other ise indicated else here in ontract Documents.

. ond orms

1. id ond orm AIA A310.

. Post-A ard ertificates and ther orms

1. Schedule of alues orm AIA G703.

2. Application for Payment orms AIA G702 ith AIA G703 for ontractors .

1 0 RE ERE E S A AR S

A. AIA A310 - id ond 2010.

. AIA G702 - Application and ertificate for Payment 1992.

. AIA G703 - ontinuation Sheet 1992.

00 7200 - 1 GE E A DI I S

SE 00 200

E ERAL S

RM E ERAL S

1 01 HE E ERAL S APPL ABLE H S RA S A A HE LL

H S PA E

Contract Type: General Conditions for Construction Page 1 of 44 Document No. GCC201 for the following PROJECT:

Junior/Senior High School Athletic Restroom Building Escanaba Area Public Schools Escanaba, Michigan

THE OWNER:

Escanaba Area Public Schools 1500 Ludington Street Escanaba, Michigan

THE ARCHITECT/ENGINEER:

Dynamic Design Group, inc.

900 1st Avenue South, Suite A Escanaba, MI 49829

TABLE OF ARTICLES

1 GENERAL PROVISIONS

2 OWNER

3 CONTRACTOR

4 ARCHITECT/ENGINEER

5 SUBCONTRACTORS

6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS

7 CHANGES IN THE WORK

8 TIME

9 PAYMENTS AND COMPLETION

10 PROTECTION OF PERSONS AND PROPERTY

11 INSURANCE AND BONDS

12 UNCOVERING AND CORRECTION OF WORK

13 MISCELLANEOUS PROVISIONS

14 TERMINATION OR SUSPENSION OF THE CONTRACT

15 CLAIMS AND DISPUTES

Contract Type: General Conditions for Construction Page 2 of 44

INDEX

(Numbers and Topics preceded with '*' are Section Headings)

Acceptance of Nonconforming Work:

9.6.6, 9.9.3, 12.3 Acceptance of Work:

9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 Access to Work:

3.16, 6.2.1, 12.1 Accident Prevention:

Acts and Omissions:

3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.4.2, 13.7.1, 14.1,15.2 Addenda:

1.1.1, 3.11.1 Additional Costs, Claims for:

3.7.4, 3.7.5, 6.1.1, 7.3.7.5, 10.3,15.1.4 Additional Inspections and Testing:

9.4.2, 9.8.3, 12.2.1, 13.5 Additional Insured 11.1.4 Additional Time, Claims for:

3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2,15.1.5 Administration of the Contract:

3.1.3, 4.2, 9.4, 9.5 Advertisement or Invitation to Bid:

1.1.1 Aesthetic Effect:

4.2.13 Allowances:

3.8, 7.3.8 All-risk Insurance:

11.3.1, 11.3.1.1 Applications for Payment:

4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.6.3, 9.7.1, 9.10, 11.1.3 Approvals:

2.1.1, 2.2.2, 2.4, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10, 4.2.7, 9.3.2, 13.5.1 Arbitration:

8.3.1, 11.3.10, 13.1.1, 15.3.2, 15.4

ARCHITECT/ENGINEER:

Architect/Engineer, Definition of:

4.1.1 Architect/Engineer, Extent of Authority:

2.4.1, 3.12.7, 4.1, 4.2, 5.2, 6.3.1, 7.1.2, 7.3.7, 7.4, 9.2.1, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.5.1, 13.5.2, 14.2.2, 14.2.4, 15.1.3, 15.2.1 Architect/Engineer, Limitations of Authority and Responsibility: 2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4.1, 9.4.2, 9.5.3, 9.6.4,15.1.3, 15.2 Architect/Engineer's Additional Services and Expenses:

Architect/Engineer's Administration of the Contract:

3.1.3, 4.2, 3.7.4,15.2, 9.4.1, 9.5 Architect/Engineer's Approvals:

2.4.1, 3.1.3, 3.5.1, 3.10.2, 4.2.7 Architect/Engineer's Authority to Reject Work:

3.5.1, 4.2.6, 12.1.2, 12.2.1 Architect/Engineer's Copyright:

1.1.7,1.5 Architect/Engineer's Decisions:

3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.2.14, 6.3.1,7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2.1, 9.4.1, 9.5, 9.8.4, 9.9.1, 13.5.2, 15.2,15.3 Architect/Engineer's Inspections:

3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1,13.5 Architect/Engineer's Instructions:

3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.5.2 Architect/Engineer's Interpretations:

4.2.11,4.2.12 Architect/Engineer's Project Representative:

4.2.10 Architect/Engineer's Relationship with Contractor:

1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4,3.3.1,3.4.2, 3.5.1, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3.7, 12, 13.4.2, 13.5, 15.2 Architect/Engineer's Relationship with Subcontractors:

1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3.7 Architect/Engineer's Representations:

9.4.2, 9.5.1, 9.10.1 Architect/Engineer’s Site Visits:

3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1,13.5 Asbestos:

10.3.1 Attorneys' Fees:

3.18.1, 9.10.2, 10.3.3 Award of Separate Contracts:

6.1.1, 6.1.2 Award of Subcontracts and Other Contracts for Portions of the Work:

5.2 Basic Definitions:

1.1 Bidding Requirements:

1.1.1, 5.2.1, 11.4.1 Binding Dispute Resolution:

9.7.1, 11.3.9, 11.3.10, 13.1.1, 15.2.5, 15.2.6.1, 15.3.1, 15.3.2, 15.4.1 Boiler and Machinery Insurance:

11.3.2 Bonds, Lien:

7.3.7.4, 9.10.2, 9.10.3 Bonds, Performance, and Payment:

7.3.6.4, 9.6.7, 9.10.3, 11.3.9, 11.4 Building Permit:

Contract Type: General Conditions for Construction Page 3 of 44

2.4.1, 11.3.1.1, 12.2.1, 13.5.2, 13.5.3, 14.2.4 3.7.1 Capitalization 1.3

Certificate of Substantial Completion:

9.8.3, 9.8.4, 9.8.5 Certificates for Payment:

4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7.1, 9.10.1, 9.10.3, 14.1.1.3. 14.2.4, 15.1.3 Certificates of Inspection, Testing or Approval:

13.5.4 Certificates of Insurance:

9.10.2, 11.1.3 Change Orders:

1.1.1, 2.4.1, 3.4.2, 3.7.4, 3.8.2.3, 3.11.1, 3.12.8, 4.2.8, 5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.6, 7.3.9, 7.3.10, 8.3.1, 9.3.1.1, 9.10.3, 10.3.2, 11.3.1.2,11.3.4, 11.3.9, 12.1.2, 15.1.3 Change Orders, Definition of:

7.2.1

CHANGES IN THE WORK:

2.2.1, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 7.4.1, 8.3.1, 9.3.1.1, 11.3.9 Claims, Definition of:

15.1.1

CLAIMS AND DISPUTES:

3.2.4, 6.1.1, 6.3.1, 7.3.9, 9.3.3, 9.10.4, 10.3.3, 15, 15.4 Claims and Timely Assertion of Claims:

15.4.1 Claims for Additional Cost:

3.2.4, 3.7.4, 6.1.1, 7.3.9, 10.3.2, 15.1.4 Claims for Additional Time:

3.2.4, 3.7.46.1.1, 8.3.2, 10.3.2, 15.1.5 Concealed or Unknown Conditions, Claims for:

3.7.4 Claims for Damages:

3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1, 11.3.5, 11.3.7, 14.1.3, 14.2.4,15.1.6 Claims Subject to Arbitration:

15.3.1. 15.4.1 Cleaning Up:

3.15, 6.3 Commencement of the Work, Conditions Relating to:

2.2.1, 3.2.2, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 5.2.1, 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.3.1, 11.3.6, 11.4.1 15.1.4 Commencement of the Work, Definition of:

8.1.2 Communications Facilitating Contract Administration:

3.9.1, 4.2.4 Completion, Conditions Relating to:

3.4.1, 3.11, 3.15, 4.2.2, 4.2.9. 8.2, 9.4.2, 9.8, 9.9.1, 9.10, 12.2, 13.7, 14.1.2

COMPLETION, PAYMENTS AND:

Completion, Substantial:

Compliance with Laws:

1.6.1, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 9.6.4, 10.2.2, 11.1, 11.3, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14.1.1, 14.2.1.3, 15.2.8, 15.4.2, 15.4.3 Concealed or Unknown Conditions:

3.7.4, 4.2.8. 8.3.1, 10.3 Conditions of the Contract:

1.1.1, 6.1.1, 6.1.4 Consent, Written:

3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2., 9.3.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 11.3.1, 13.2, 13.4.2, 15.4.4.2 Consolidation or Joinder 15.4.4

CONSTRUCTION BY OWNER OR BY SEPARATE

CONTRACTORS:

1.1.4, 6 Construction Change Directive, Definition of:

7.3.1 Construction Change Directives:

1.1.1, 3.4.2, 3.12.8, 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3, 9.3.1.1 Construction Schedules. Contractor's:

3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Contingent Assignment of Subcontracts:

5.4, 14.2.2.2 Continuing Contract Performance:

15.1.3 Contract, Definition of:

1.1.2

CONTRACT, TERMINATION OR SUSPENSION OF

THE:

5.4.1.1, 11.3.9, 14 Contract Administration:

3.1.3, 4, 9.4, 9.5 Contract Award and Execution, Conditions Relating to:

3.7.1, 3.10, 5.2, 6.1, 11.1.3, 11.3.6, 11.4.1 Contract Documents, The:

1.1.1 Contract Documents, Copies Furnished and Use of:

1.5.2, 2.2.5, 5.3 Contract Documents, Definition of:

1.1.1 Contract Sum:

3.7.4, 3.8, 5.2.3, 7.2, 7.3, 7.4, 9.1, 9.4.2, 9.5.1.4.

9.6.7, 9.7, 10.3.2, 11.3.1, 14.2.4, 14.3.2, 15.1.4, 15.2.5 Contract Sum, Definition of:

9.1 Contract Time:

3.7.4, 3.7.5, 3.10.2, 5.2.3, 7.2.1.3, 7.3.1, 7.3.5, 7.4, 8.1.1, 8.2.1, 8.3.1, 9.5.1, 9.7.1, 10.3.2, 12.1.1, 14.3.2, 15.1.5.1, 15.2.5 Contract Time, Definition of:

Contract Type: General Conditions for Construction Page 4 of 44

4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 13.7

8.1.1

CONTRACTOR:

Contractor, Definition of:

3.1, 6.1.2

Contractor's Construction Schedules:

3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Contractor's Employees:

3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6. 10.2, 10.3, 11.1.1, 11.3.7, 14.1, 14.2.1.1, Contractor's Liability Insurance:

11.1 Contractor's Relationship with Separate Contractors and Owner's Forces:

3.12.5, 3.14.2, 4.2.4, 6, 11.3.7, 12.1.2, 12.2.4 Contractor's Relationship with Subcontractors:

1.2.2, 3.3.2, 3.18.1, 3.18.2, 5, 9.6.2, 9.6.7, 9.10.2, 11.3.1.2, 11.3.7, 11.3.8 Contractor's Relationship with the Architect/Engineer:

1.1.2, 1.5, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5.1, 3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.3, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9.

10.2.6, 10.3, 11.3.7, 12, 13.5, 15.1.2, 15.2.1 Contractor's Representations:

3.2.1, 3.2.2, 3.5.1, 3.12.6, 6.2.2, 8.2.1. 9.3.3, 9.8.2 Contractor's Responsibility for Those Performing the Work:

3.3.2, 3.18, 5.3.1, 6.1.3, 6.2, 9.5.1,10.2.8 Contractor's Review of Contract Documents:

3.2 Contractor's Right to Stop the Work:

9.7 Contractor's Right to Terminate the Contract:

14.1, 15.1.6 Contractor's Submittals:

3.10, 3.11, 3.12.4, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2, 9.8.3, 9.9.1, 9.10.2, 9.10.3, 11.1.3, 11.4.2 Contractor's Superintendent:

3.9, 10.2.6 Contractor's Supervision and Construction Procedures:

1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.5, 7.3.7, 8.2, 10, 12, 14, 15.1.3 Contractual Liability Insurance:

11.1.1.8, 11.2 Coordination and Correlation:

1.2, 3.2.1, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1 Copies Furnished of Drawings and Specifications:

1.5, 2.2.5, 3.11 Copyrights:

1.5, 3.17 Correction of Work:

2.3, 2.4, 3.7.3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2, Correlation and Intent of the Contract Documents:

1.2

Damage to Construction of Owner or Separate Contractors:

3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 11.1.1, 11.3, 12.2.4 Damage to the Work:

3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.4.1, 11.3.1, 12.2.4 Damages. Claims for:

3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.1.1,

11.3.5. 11.3.7, 14.1.3, 14.2.4, 15.1.6 Damages for Delay:

6.1.1, 8.3.3, 9.5.1.6, 9.7, 10.3.2 Date of Commencement of the Work, Definition of:

8.1.2 Date of Substantial Completion, Definition of:

8.1.3 Day, Definition of:

8.1.4 Decisions of the Architect/Engineer:

3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 15.2, 6.3, 7.3.7, 7.3.9, 8.1.3, 8.3.1, 9.2.1, 9.4, 9.5.1, 9.8.4, 9.9.1,13.5.2, 14.2.2, 14.2.4, 15.1, 15.2 Decisions to Withhold Certification:

9.4.1, 9.5, 9.7, 14.1.1.3 Defective or Nonconforming Work, Acceptance, Rejection and Correction of:

2.3.1, 2.4.1, 3.5.1, 4.2.6. 6.2.5, 9.5.1, 9.5.2, 9.6.6, 9.8.2, 9.9.3, 9.10.4, 12.2.1 Defective Work, Definition of:

3.5.1 Definitions:

1.1, 2.1.1, 3.1.1, 3.5.1, 3.12.1, 3.12.2, 3.12.3, 4.1.1, 15.1.1, 5.1, 6.1.2, 7.2.1, 7.3.1. 8.1, 9.1. 9.8.1 Delays and Extensions of Time:

3.2, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4.1, 8.3, 9.5.1, 9.7.1, 10.3.2, 10.4.1, 14.3.2, 15.1.5, 15.2.5 Disputes:

6.3.1, 7.3.9, 15.1, 15.2 Documents and Samples at the Site:

3.11 Drawings, Definition of:

1.1.5 Drawings and Specifications, Use and Ownership of:

3.11 Effective Date of Insurance:

8.2.2, 11.1.2 Emergencies:

10.6, 14.1.1.2, 15.1.4 Employees, Contractor’s:

3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3.3, 11.1.1, 11.3.7, 14.1, 14.2.1.1 Equipment, Labor, Materials or:

1.1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13.1, Contract Type: General Conditions for Construction Page 5 of 44

Cost, Definition of:

7.3.7 Costs:

2.4.1, 3.2.4, 3.7.3, 3.8.2, 3.15.2, 5.4.2, 6.1.1. 6.2.3, 7.3.3.3, 7.3.7, 7.3.8,7.3.9, 9.10.2, 10.3.2, 10.3.6, 11.3, 12.1.2, 12.2.1, 12.2.4, 13.5, 14 Cutting and Patching:

3.14, 6.2.5

3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7. 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Execution and Progress of the Work:

1.1.3, 1.2.1, I.2.2, 2.2.3, 2.2.5, 3.1, 3.3.1,3.4.1, 3.5.1, 3.7.1, 3.10.1, 3.12, 3.14, 4.2, 6.2.2, 7.1.3, 7.3.5, 8.2, 9.5.1, 9.9.1, 10.2, 10.3, 12.2, 14.2, 14.3.1, 15.1.3

Extensions of Time:

3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3, 7.4.1, 9.5.1, 9.7.1, 10.3.2, 10.4.1. 14.3, 15.1.5, 15.2.5 Failure of Payment:

9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2, Faulty Work:

(See Defective or Nonconforming Work) Final Completion and Final Payment:

4.2.1, 4.2.9, 9.10, 11.1.2, 11.1.3, 11.3.1, 11.3.5, 12.3.1, 14.2.4, 14.4.3 Financial Arrangements, Owner's:

2.2.1, 13.2.2, 14.1.1.4 Fire and Extended Coverage Insurance:

11.4

GENERAL PROVISIONS:

Governing Law:

13.1 Guarantees (See Warranty) Hazardous Materials:

10.2.4, 10.3 Identification of Subcontractors and Suppliers:

5.2.1 Indemnification:

3.17.1, 3.18, 9.10.2, 10.3.3,10.3.5, 10.3.6, 11.3.1.2, 11.3.7 Information and Services Required of the Owner:

2.1.2, 2.2, 3.2.2, 3.12.4, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2.1, 11.4, 13.5.1, 13.5.2, 14.1.1.4, 14.1.4, 15.1.3 Initial Decision:

15.2 Initial Decision Maker, Definition of :

1.1.8 Initial Decision Maker, Decisions:

14.2.2, 14.2.4, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5 Initial Decision Maker, Extent of Authority:

14.2.2, 14.2.4, 15.1.3, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5 Injury or Damage to Person or Property:

10.2.8, 10.4.1 Inspections:

3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 12.2.1, 13.5 Instructions to Bidders:

1.1.1 Instructions to the Contractor:

3.2.4, 3.3.1, 3.8.1, 5.2.1, 7, 8.2.2, 12, 13.5.2 Instruments of Service, Definition of:

Insurance, Loss of Use:

11.3.3 Insurance, Owner’s Liability:

11.2 Insurance, Property:

10.2.5, 11.3 Insurance, Stored Materials:

9.3.2, 11.4.1.4

INSURANCE AND BONDS

Insurance Companies, Consent to Partial Occupancy:

9.9.1, 11.4.1.5 Insurance Companies, Settlement with:

11.4.10 Intent of the Contract Documents:

1.2.1, 4.2.7, 4.2.12, 4.2.13, 7.4 Interest:

13.6 Interpretation:

1.2.3, 1.4, 4.1.1, 5.1, 6.1.2, 15.1.1 Interpretations, Written:

4.2.11, 4.2.12, 15.1.4 Judgment on Final Award:

15.4.2 Labor and Materials, Equipment:

1.1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 Labor Disputes:

8.3.1 Laws and Regulations:

1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13.1, 4.1.1, 9.6.4, 9.9.1, 10.2.2, 11.1.1, 11.3, 13.1.1, 13.4, 13.5.1, 13.5.2, 13.6.1, 14, 15.2.8, 15.4 Liens:

2.1.2, 9.3.3, 9.10.2, 9.10.4, 15.2.8 Limitations, Statutes of:

12.2.5, 13.7, 15.4.1.1 Limitations of Liability:

2.3.1, 3.2.2, 3.5.1, 3.12.10, 3.17.1, 3.18.1, 4.2.6, 4.2.7, 4.2.12, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 10.2.5, 10.3.3, 11.1.2, 11.2.1, 11.3.7, 12.2.5, 13.4.2 Limitations of Time:

2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, 3.12.5,3.15.1, 4.2.7, 5.2, 5.3.1, 5.4.1, 6.2.4, 7.3, 7.4, 8.2, 9.2.1, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.71, 9.8, 9.9, 9.10, 11.1.3, 11.3.1.5,11.3.6,11.3.10,12.2,13.5,13.7,14,15 Loss of Use Insurance:

Contract Type: General Conditions for Construction Page 6 of 44

1.1.7 Insurance:

3.18.1, 6.1.1, 7.3.7, 9.3.2, 9.8.4, 9.9.1, 9.10.2, 11 Insurance, Boiler and Machinery:

11.3.2 Insurance, Contractor’s Liability:

11.1 Insurance Effective Date of 8.2.2, 11.1.2

11.4.3 Material Suppliers:

1.5, 3.12.1, 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.6, 9.10.5 Materials, Hazardous:

10.2.4, 10.3 Materials, Labor, Equipment and:

1.1.3, 1.1.6, 1.5.1, 3.4.1, 3.5.1. 3.8.2, 3.8.3, 3.12, 3.13.1, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.7, 9.3.2,

9.3.3. 9.5.1.3, 9.10.2, 10.2.1.2, 10.2.4, 14.2.1.1, 14.2.1.2

Means, Methods. Techniques, Sequences and Procedures of Construction:

3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2 Mechanic's Lien:

2.1.2, 15.2.8 Mediation:

8.3.1, 10.3.5, 10.3.6, 15.2.1, 15.2.5, 15.2.6, 15.3, 15.4.1 Minor Changes in the Work:

1.1.1, 3.12.8, 4.2.8, 7.1, 7.4

MISCELLANEOUS PROVISIONS:

Modifications, Definition of:

1.1.1 Modifications to the Contract:

1.1.1, 1.1.2, 3.11, 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, 9.7.1, 10.3.2, 11.3.1 Mutual Responsibility:

6.2 Nonconforming Work, Acceptance of:

9.6.6, 9.9.3, 12.3 Nonconforming Work, Rejection and Correction of:

2.3.1, 2.4.1, 3.5.1, 4.2.6, 6.2.4, 9.5.1, 9.8.2, 9.9.3, 9.10.4, 12.2.1 Notice:

2.2.1, 2.3.1, 2.4.1, 3.2.4, 3.3.1, 3.7.2, 3.12.9, 5.2.1, 9.7.1, 9.10, 10.2.2, 11.1.3, 11.4.6, 12.2.2.1, 13.3.

13.5.1, 13.5.2, 14.1, 14.2, 15.2.8, 15.4.1 Notice, Written:

2.3.1, 2.4.1, 3.3.1, 3.9.2, 3.12.9. 3.12.10, 5.2.1, 9.7.1, 9.10, 10.2.2, 10.3, 11.1.3, 11.3.6, 12.2.2.1, 13.3, 14, 15.2.8, 15.4.1 Notice of Claims 3.7.4, 4.5, 10.2.8, 15.1.2, 15.4 Notice of Testing and Inspections:

13.5.1, 13.5.2 Observations, Contractor's:

3.2, 3.7.4 Occupancy:

2.2.2, 9.6.6, 9.8, 11.3.1.5 Orders, Written:

1.1.1, 2.3, 3.9.2, 7, 8.2.2, 11.3.9, 12.1, 12.2.2.1, 13.5.2, 14.3.1

OWNER:

Owner, Definition of:

2.1.1

Owner's Financial Capability:

2.2.1, 13.2.2, 14.1.1.4 Owner's Liability Insurance:

11.2 Owner's Loss of Use Insurance:

11.3.3 Owner's Relationship with Subcontractors:

1.1.2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2 Owner's Right to Carry Out the Work:

2.4, 14.2.2 Owner's Right to Clean Up:

6.3 Owner's Right to Perform Construction and to Award Separate Contracts:

6.1 Owner's Right to Stop the Work:

2.3 Owner's Right to Suspend the Work:

14.3 Owner's Right to Terminate the Contract:

14.2 Ownership and Use of Drawings, Specifications and Other Instruments of Service:

1.1.1, 1.1.6, 1.1.7, 1.5, 2.2.5, .3.2.2, 3.11.1, 3.17.1, 4.2.12, 5.3.1 Partial Occupancy or Use:

9.6.6, 9.9, 11.3.1.5 Patching, Cutting and:

3.14, 6.2.5 Patents:

3.17 Payment, Applications for:

4.2.5, 7.3.9, 9.2.1, 9.3, 9.4, 9.5, 9.6.3, 9.7.1, 9.8.5.

9.10.1, 14.2.3, 14.2.4, 14.4.3 Payment, Certificates for:

4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7.1, 9.10.1, 9.10.3, 13.7, 14.1.1.3, 14.2.4 Payment, Failure of:

9.5.1.3, 9.7, 9.10.2, 13.6, 14.1.1.3, 14.2.1.2, Payment, Final:

4.2.1, 4.2.9, 9.8.2, 9.10, 11.1.2, 11.1.3. 11.4.1, 11.4.5, 12.3.1, 13.7, 14.2.4. 14.4.3 Payment Bond, Performance Bond and:

7.3.7.4, 9.6.7, 9.10.3, 11.4.9, 11.4 Payments, Progress:

9.3. 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3

PAYMENTS AND COMPLETION:

Contract Type: General Conditions for Construction Page 7 of 44

Owner, Information and Services Required of the 2.1.2, 2.2, 3.2.2, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 9.3.2, 9.6.1,9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2.1, 11.3,13.5.1, 13.5.2, 14.1.1.4, 14.1.4, 15.1.3 Owner's Authority:

1.5, 2.1.1, 2.3.1, 2.4.1, 3.4.2, 3.8.1, 3.12.10, 3.14.2, 4.1.2, 4.1.3, 4.2.4, 4.2.9, 5.2.1, 5.2.4, 5.4.1, 6.1, 6.3.1, 7.2.1, 7.3.1, 8.2.2, 8.3.1, 9.3.1, 9.3.2, 9.5.1, 9.6.4, 9.9.1, 9.10.2, 10.3.2, 11.1.3, 11.3.3, 11.3.10, 12.2.2, 12.3.1, 13.2.2, 14.3, 14.4, 15.2.7

Payments to Subcontractors:

5.4.2, 9.5.1.3, 9.6.2, 9.6.3, 9.6.4, 9.6.7, 11.4.8, 14.2.1.2

PCB:

10.3.1 Performance Bond and Payment Bond:

7.3.6.4, 9.6.7, 9.10.3, 11.4.9, 11.4 Permits, Fees and Notices and Compliance with Laws:

2.2.2, 3.7, 3.13, 7.3.7.4, 10.2.2

PERSONS AND PROPERTY, PROTECTION OF:

Polychlorinated Biphenyl:

10.3.1 Product Data, Definition of:

3.12.2 Product Data and Samples, Shop Drawings:

3.1 1 , 3.12, 4.2.7 Progress and Completion:

4.2.2, 8.2, 9.8, 9.9.1, 14.1.4,15.1.3 Progress Payments:

9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3, 15.1.3 Project, Definition of the:

1.1.4 Project Representatives:

4.2.10 Property Insurance:

10.2.5, 11.3

PROTECTION OF PERSONS AND PROPERTY:

Regulations and Laws:

1.5, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 4.4.1, 9.6.4, 9.9.1, 10.2.2, 11.1,11.4, 13.1, 13.4, 13.5.1, 13.5.2, 13.6, 14, 15.2.8, 15.4 Rejection of Work:

3.5.1, 4.2.6, 12.2.1 Releases and Waivers of Liens:

9.10.2 Representations:

3.2.1, 3.5.1, 3.12.6, 6.2.2. 8.2.1, 9.3.3, 9.4.2, 9.5.1.

9.8.2, 9.10.1 Representatives:

2.1.1, 3.1.1,3.9, 4.1.1, 4.2.1, 4.2.2, 4.2.10, 5.1.1, 5.1.2, 13.2.1 Responsibility for Those Performing the Work:

3.3.2, 3.18, 4.2.3, 5.3.1, 6.1.3, 6.2, 6.3, 9.5.1, 10 Retainage:

9.3.1, 9.6.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3 Review of Contract Documents and Field Conditions by Contractor 3.2, 3.12.7, 6.1.3 Review of Contractor’s Submittals by Owner and Architect/Engineer:

3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2, Review of Shop Drawings, Product Data and

Safety Precautions and Programs:

3.3.1, 4.2.2, 4.2.7, 5.3.1, 10.1, 10.2, 10.4 Samples, Definition of:

3.12.3 Samples, Shop Drawings, Product Data and:

3.11, 3.12, 4.2.7 Samples at the Site, Documents and:

3.11 Schedule of Values:

9.2, 9.3.1 Schedules, Construction:

1.4.1.2, 3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.5.2 Separate Contracts and Contractors:

1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 6, 8.3.1, 11.4.7, 12.1.2 Shop Drawings, Definition of:

3.12.1 Shop Drawings, Product Data and Samples:

3.11, 3.12, 4.2.7 Site, Use of:

3.13, 6.1.1, 6.2.1 Site Inspections:

3.2.2, 3.3.3, 3.7.1, 4.2, 9.4.2, 9.10.1,13.5 Site Visits, Architect/Engineer's:

3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.5 Special Inspections and Testing:

4.2.6, 12.2.1, 13.5 Specifications, Definition of the:

1.1.6 Specifications, The:

1.1.1, 1.1.6, 1.2.2, 1.5, 3.11, 3.12.10, 3.17, 4.2.14 Statute of Limitations:

13.7, 15.4.1.1 Stopping the Work:

2.3, 9.7, 10.3, 14.1 Stored Materials:

6.2.1, 9.3.2, 10.2.1.2, 10.2.4, 11.4.1.4 Subcontractor, Definition of:

5.1.1

SUBCONTRACTORS:

Subcontractors, Work by:

1.2.2, 3.3.2, 3.12.1, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2, 9.6.7 Sub contractual Relations:

Contract Type: General Conditions for Construction Page 8 of 44

Samples by Contractor 3.12 Rights and Remedies:

1.1.2, 2.3, 2.4, 3.5.1, 3.7.4, 3.15.2, 4.2.6, 4.5, 5.3, 5.4, 6.1, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 12.2.2, 12.2.4. 13.4, 14, 15.4 Royalties, Patents and Copyrights:

3.17 Rules and Notices for Arbitration:

15.4.1 Safety of Persons and Property:

10.2, 10.4

5.3, 5.4, 9.3.1.2, 9.6, 9.10, 10.2.1, 11.4.7, 11.4.8, 14.1, 14.2.1 Submittals:

3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.7, 9.2, 9.3, 9.8, 9.9.1, 9.10.2, 9.10.3, 11.1.3 Submittals Schedule:

3.10.2, 3.12.5, 4.2.7 Subrogation, Waivers of:

6.1.1, 11.4.5, 11.3.7 Substantial Completion:

4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3,

12.2. 13.7

Substantial Completion, Definition of:

9.8.1 Substitution of Subcontractors:

5.2.3, 5.2.4 Substitution of Architect/Engineer:

4.1.3 Substitutions of Materials:

3.4.2, 3.5.1, 7.3.8 Sub-subcontractor, Definition of:

5.1.2 Subsurface Conditions:

3.7.4 Successors and Assigns:

13.2 Superintendent:

3.9, 10.2.6 Supervision and Construction Procedures:

1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.7, 8.2, 8.3.1, 9.4.2, 10, 12, 14, 15.1.3 Surety:

5.4.1.2, 9.8.5, 9.10.2, 9.10.3, 14.2.2,15.2.7 Surety, Consent of:

9.10.2, 9.10.3 Surveys:

2.2.3 Suspension by the Owner for Convenience:

14.3 Suspension of the Work:

5.4.2, 14.3 Suspension or Termination of the Contract:

5.4.1.1, 11.4.9, 14 Taxes:

3.6, 3.8.2.1, 7.3.6.4 Termination by the Contractor:

14.1, 15.1.6 Termination by the Owner for Cause:

5.4.1.1, 14.2, 15.1.6 Termination by Owner for Convenience:

14.4 Termination of the Architect/Engineer:

4.1.3 Termination of the Contractor:

14.2.2

Time Limits:

2.1.2, 2.2, 2.4, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2, 4.4, 4.5, 5.2, 5.3, 5.4, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 11.1.3, 11.4.1.5, 11.4.6, 11.4.10, 12.2, 13.5, 13.7, 14, 15.1.2, 15.4 Time Limits on Claims:

3.7.4, 10.2.8, 13.7, 15.1.2 Title to Work:

9.3.2, 9.3.3 Transmission of Data in Digital Form:

1.6

UNCOVERING AND CORRECTION OF WORK:

Uncovering of Work:

12.1 Unforeseen Conditions, Concealed or Unknown:

3.7.4, 8.3.1, 10.3 Unit Prices:

7.3.3.2, 7.3.4 Use of Documents:

1.1.1, 1.5, 2.2.5, 3.12.6, 5.3 Use of Site:

3.13, 6.1.1. 6.2.1 Values, Schedule of:

9.2, 9.3.1 Waiver of Claims by the Architect/Engineer:

13.4.2 Waiver of Claims by the Contractor:

9.10.5, 11.4.7, 13.4.2, 15.1.6 Waiver of Claims by the Owner:

9.9.3, 9.10.3, 9.10.4, 11.4.3. 11.4.5, 11.4.7, 12.2.2.1, 13.4.2, 14.2.4, 15.1.6 Waiver of Consequential Damages:

14.2.4, 15.1.6 Waiver of Liens:

9.10.2, 9.10.4 Waivers of Subrogation:

6.1.1. 11.4.5, 11.3.7 Warranty:

3.5, 4.2.9, 9.3.3, 9.8.4, 9.9.1, 9.10.4, 12.2.2,13.7.1 Weather Delays:

15.1.5.2

Contract Type: General Conditions for Construction Page 9 of 44

TERMINATION OR SUSPENSION OF THE

CONTRACT:

Tests and Inspections:

3.1.3, 3.3.3, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 10.3.2, 11.4.1.1,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .