About this file

This document is a Scope of Work for a state and local contract opportunity for the Florida Army National Guard, Construction & Facility Management Office. The Base Bid requires the construction of a 40' x 60' enclosed lightweight metal storage building with a vertical roof for lodging cart storage at the Camp Blanding Joint Training Center in Starke, Florida. The building is to have a divider wall separating cart storage from supply storage, with three roll-up doors and electrical service to power cart chargers, lighting, HVAC, and other miscellaneous requirements. Alternate Bid Item #1 includes site preparation, grading, and a concrete pad, while Alternate Bid Item #2 provides for sloped concrete ramps at each door. The project must comply with the Florida Building Code, State Fire Marshall, local authorities, and obtain all necessary permits. The estimated construction cost is $150,000.

The contract opportunity requires the submission of appropriate licenses and certifications from the bidders. Contractors are subject to debarment and suspension regulations, and the Department of Military Affairs will verify the status of potential contractors. The contract award will be made to the lowest responsive and responsible bidder.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CBJTC Lodging Cart Building

• Base Bid.

• Provide 60’ x 40’ enclosed light weight metal structure with a vertical roof and 12’ eaves. Per attached Building layout.

• Basis of design is a Handi-House light steel storage building.

• Building is to meet state minimum wind rating for its intended location.

• Building legs are be minimum 4' on center.

• 24 Gauge minimum on building panels.

• Roll up door are to be 10’ x 10’ Laundry storage side insulated door.

• Provide 4" steel Sch 40 painted bollards with caps on both sides of each roll up doors.

• Provide motorized continues duty exhaust fan on cart side of building.

• Provide 208/120-volt, single phase 200-amp service, 36-circuit service rated Square D panel (or equal) with Main Breaker and all required breakers.

• Provide underground service conduit and conductors from panel up to weather head on utility pole approximately 85’ from building location. Underground conduit to be PVC and exterior conduit above ground to be GRC.

(sized per NEC). Provide and install electrical meter can on utility pole.

• All conduit entering the building shall be through the slab, no penetration through the metal skin of the building except for exterior light fixtures mounted on the building.

• Provide all required conduit, wire, boxes, electrical devices, LED light fixtures and misc.

material for a complete turnkey electrical system per attached drawing. All interior conduit above grade shall be EMT, all boxes to be 4” square boxes with industrial covers. (sized per NEC)

• Interior light fixtures are to be round UFO low bay style fixtures. 5000 kelvins in color.

Mount high as possible.

• Exterior light fixture to be LED (lithonia tws led p1 50k mvolt pe ddb m4 or equal)

Project

Scope of Work Base Bid

This work will consist of supplying and installing a 40’ x 60’ enclosed light weight metal storage building with a vertical roof for lodging cart storage. Building is to have a divider wall from floor to ceiling to separate the cart storage side from the supply storage with two roll up doors. Building is to have electrical service panel to provide power for cart chargers, lighting, HVAC system and misc. power requirements.

Scope of work to include but not be limited to the following:

#223102

• Exterior light fixtures to be LED (lithonia tws led p1 50k mvolt pe ddb m4 or equal)

• Provide electric auto door openers for the two roll up doors.

• Provide two 120-volt 20-amp cord reel and associated hardware to attach overhead in cart bays. (Reel Craft Model H-7121 or equal)

• Every Receptacle on the cart side of building shall be a dedicated circuit. (9)

• Ceiling and interior walls to be spray foamed with closed cell insulations minimum of 2” thick on one side and just the ceiling sprayed on the other (cart side).

• Install ½ plywood up to 4’ from floor on all walls on the cart storage side of building.

Provide 1-1/2" 12 gauge angle metal support between up rights top and bottom for support of plywood attachment. Plywood joints are to have vertical support.

• Provide and install a turnkey air conditioning system for the laundry storage side of the building. (Mitsubishi MSZ-HM24NA/MSZ-MUZ-HM24NA or equal). Line set and condensate piping are to be run inside to the lowest point then turned outside at floor height.

• Provide all required electrical grounding and bonding per NEC.

• Contractor is to provide all required shop drawing, calculations, and necessary information to meet state and local code to obtain all necessary permits for this project. All material and installation are to be per state and local code and per CBJTC standards (attached).

• ALT Bid Item #1:

• Grade, fill and compact building pad location to proper compaction and elevation.

• Provide concrete pad with vapor barrier for building per manufacture requirements.

• Termite Treatment under slab.

• ALT Bid Item #2:

• Provide slopped concrete ramps at each door the entire width of the opening for cart and pedestrian entrance.