This document is Addendum No. 2 to the Construction Bid for the Newberry Correctional Facility - Pavement Repair / Replacement Phase 1 project in Luce County, Michigan, issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division. The addendum provides clarification and responses to bidder questions, including the lack of detail on the existing HVAC system and controls, and that the scope is limited to the removal and replacement of piping within the sidewalk. The bid opening date is January 11, 2023.
The related state and local contract opportunity indicates that all questions should be emailed to the project contact, Kristofer Enlow of Beckett & Raeder, Inc., and that bid attachments must be uploaded to the SIGMA VSS system, with no hard copies accepted. Bidders are advised to contact the SIGMA help desk if they experience any issues with the electronic submission process, and to notify the Office of Design and Construction if they are having SIGMA VSS issues. Emailed submissions may be accepted on a case-by-case basis if approved by the DCD prior to the 2:00 p.m. deadline.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
1/10/2023
PROJECT NAME
Newberry Correctional Facility - Pavement Repair / Replacement Phase 1
FILE NUMBER
472/22271.ABG
PROFESSIONAL
Beckett & Raeder, Inc.
PROJECT DIRECTOR
Alan Goschka
BID OPENING DATE:
1/11/2023
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Addendum No. 1 Clarification, Bidder Questions:
1. The heated concrete does not provide enough detail on the prints of the existing conditions and controls for any of the HVAC contractors I have contacted. A mechanical sheet with more detail would be extremely helpful. Or at least some detail of the existing mechanical set up for which they are to connect to. The project does not include any work to the existing controls or the control system. The scope is the removal and replacement of the piping within the sidewalk. Pictures of the pipe penetrations from the inside:
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Kristofer Enlow, P.E., Beckett & Raeder, Inc. DATE: 1/10/2023
APPROVED BY:
PROJECT DIRECTOR: DATE: 1/10/2023