222029 CBJTC Counterdrug HQ New Bldg Ex_4_5.docx

DOCX document 31 KB Posted

Attached to
222029 Counterdrug HQ New Building rebid
Solicitation number
ITB-05155
Issued by
Clay County, Florida

About this file

This document is an Exhibit 4 Proposal Form and List of Subcontractors from the State of Florida, Department of Military Affairs for the construction of the CBJTC Counterdrug HQ New Building project at Camp Blanding Joint Training Center in Starke, Florida. The project entails the construction of a new 6,746 SF, single-story commercial office building utilizing a pre-engineered metal building system on a cast-in-place concrete slab. The scope includes exterior finishes, interior build-out, mechanical/electrical/plumbing, and site work. The solicitation includes a base bid and 14 alternate bid items related to flooring, millwork, HVAC, doors, kitchen equipment, tile, and site features. Bids are due by a specific date and time, and the winning bidder will be required to provide performance and payment bonds, complete a bid breakout form, and adhere to insurance requirements.

The estimated construction cost range is $1,750,000 to $2,300,000. The construction contractor is responsible for obtaining and paying for the building permit, except for the Fire Marshal permit which is handled by the State. The winning contractor must meet Florida Building Code, State Fire Marshal, local jurisdiction, and water management requirements. No specific set-asides or incumbent information is provided, but the contractor must have the appropriate Florida construction industry licenses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 4

PROPOSAL FORM

SUBMIT ORIGINAL PROPOSAL FORM IN DUPLICATE ON CONTRACTOR'S LETTERHEAD AND INCLUDE BUSINESS NAME, ADDRESS, FEDERAL ID NUMBER, TELEPHONE, FACSIMILE AND SIGNATURE

Note: NO conditional, incomplete, unsigned, undated, ambiguous, or improper bids/proposals will be accepted.

DATE:
TIME:
TO:State of Florida, Department of Military Affairs
Attention: Construction & Facility Management Office (Contract Management Branch)
2305 State Road 207
Saint Augustine, Florida 32086

To Whom It May Concern:

The undersigned, hereinafter called "Bidder", having for the proposed project familiarized himself with the local conditions, nature, and extent of the work, and having examined carefully any drawings or specifications, the Form of Agreement, and other Contract Documents with the Bond Requirements, therein, proposes to furnish all labor, materials, equipment, and other items, facilities, and services for the proper execution and completion of Project Number: 222029 – CBJTC Counterdrug HQ New Building, in full accordance with any drawings and specifications prepared by Ebert Norman Brady Architects, in full accordance with the advertisement for bids, Instruction to Bidders, Agreement, and all other documents relating thereto on file in the Construction & Facility Management Office (CFMO) and if awarded the contract, to complete the said work within the time limit specified for the following bid price:

Base Bid: $
_______________________
Alternate Bid Item #1 (Flooring): $
_______________________
Alternate Bid Item #2 (Millwork): $
_______________________
Alternate Bid Item #3 (HVAC 5 zones): $
_______________________
Alternate Bid Item #4 (Wood doors): $
_______________________
Alternate Bid Item #5 (Denlar Kitchen hood): $
_______________________
Alternate Bid Item #6 (Ceramic tile): $
_______________________
Alternate Bid Item #7 (Generator wiring): $
_______________________
Alternate Bid Item #8 (Canopy/Front): $
_______________________
Alternate Bid Item #9 (Canopy/Staff): $
_______________________
Alternate Bid Item #10 (Split-face watertable): $
_______________________
Alternate Bid Item #11 (Asphalt parking lot): $
_______________________
Alternate Bid Item #12 (Site lighting): $
_______________________
Alternate Bid Item #13 (Fill dirt DEDUCT): $
_______________________
Alternate Bid Item #14 (GC on-site office DEDUCT): $
_______________________

Enclosed is certified check, cashier's check, treasurer's check, bank draft, or Bid Bond in the amount of not less than five percent of the Bid, payable to the Owner as a guarantee for the purpose set out in Instructions to Bidders.

MARK ENVELOPES: ATTN: SEALED BID for Project Number: 222029 – CBJTC Counterdrug HQ New Building.

ADDRESSED TO: Department of Military Affairs, ATTN: CFMO-Contract Management Branch, 2305 State Road 207, St. Augustine, Florida 32086

The Bidder hereby agrees that:

a. The above proposal shall remain in full force and effect for a period of 40 calendar days after the time of the opening of this proposal and that the Bidder will not revoke or cancel this proposal or withdraw from the competition within the said 40 calendar days.

b. In the event the contract is awarded to this Bidder, he will abide by and fulfill all requirements as specified in the Non-Technical Specifications provided with the Invitation to Bid.

c. In the event the contract is awarded to this Bidder, he will enter into a formal written Agreement with the Owner in accordance with the accepted bid within 10 calendar days after said contract is submitted to him and, (if requirement is not deleted per Section C2 of the Conditions of the Contract), will furnish to the Owner a Contract Performance Bond and a Labor and Material Payment Bond with good and sufficient sureties, satisfactory to the Owner, in the amount of 100% of the accepted bid, the form of which is shown by Exhibits 7 and 8 of the Conditions of the Contract and terms of which shall fully comply with Section 255.05, Florida Statutes. The Bidder further agrees that in the event of the Bidder's default or breach of any of the agreements of this proposal, the said bid deposit shall be forfeited as liquidated damages.

d. In the event the contract is awarded to this Bidder, he will not commence any work in connection with the contract until he has obtained all insurance as specified in the Non-Technical Specifications, and such insurance has been approved by the Owner, nor shall the contractor allow any subcontractor to commence work on his subcontract until all similar insurance required of the subcontractor has been so obtained and approved by Owner. All insurance policies shall be with insurers qualified to do business in Florida through an authorized licensed Florida Resident Agent. The insurance requirements shall be completed in a timely manner in order not to delay the construction schedule.

e. In the event the contract is awarded to this Bidder, he will (if requested by Owner) complete and submit a preliminary and final Bid Breakout Form supplied by the Department of Military Affairs, Construction & Facility Management Office.

Acknowledgement is hereby made that this proposal includes required permit fees as directed in the Non-Technical Specifications.

Acknowledgement is hereby made of receipt of the following addenda issued during the bidding period.

Addendum No.
Dated
Addendum No.
Dated

Florida Construction Industries Licensing Board Certification.

(Name of Holder) (Certificate No.)

In witness whereof, the Bidder has hereunto set his signature and affixed his seal this
day of
(Month)
(Year)

(SEAL)

By:

Address:

Title:

Company:

E-mail

Telephone No.:

Tax ID No.:

Unique Entity ID (UEID):

EXHIBIT 5

LIST OF SUBCONTRACTORS

(To be submitted in duplicate on the Bidder's letterhead and attached to Contractor's proposal.)

DATE:

THIS LIST IS ATTACHED TO, AND IS AN INTEGRAL PART OF THE BID SUBMITTED BY:

FOR THE CONSTRUCTION OF: PROJECT NUMBER: 222029

PROJECT NAME & LOCATION: CBJTC Counterdrug HQ New Building.

THE UNDERSIGNED, HEREINAFTER CALLED "BIDDER", LISTS BELOW THE NAME OF EACH SUBCONTRACTOR WHO WILL PERFORM THE PHASES OF THE WORK INDICATED. FAILURE OF THE BIDDER TO SUPPLY SUFFICIENT INFORMATION TO ALLOW VERIFICATION OF THE CORPORATE AND DISCIPLINE LICENSE STATUS OF THE SUBCONTRACTOR MAY DEEM THE BID AS BEING NONRESPONSIVE. Only one (1) copy of this list is required with your bid. You may also just list the names of subcontractors, the additional information (license #, telephone number) need not be listed until after the bid and only from the contractor awarded the project.

SUBCONTRACTOR
DISCIPLINESNAME OF SUBCONTRACTOR
1.___________________________________________________
(Name)
_______________________________________________
(Telephone No.)(Sub License #.)
2.___________________________________________________
(Name)
__________________________________________
(Telephone No.)(Sub License #.).)
3.___________________________________________________
(Name)
___________________________________________
(Telephone No.)(Sub License #.).)
4.___________________________________________________
(Name)
__________________________________________
(Telephone No.)(Sub License #.).)
5.___________________________________________________
(Name)
__________________________________________
(Telephone No.)(Sub License #.)

By (Signature)

FNG 4004