221010 - FNG5085.docx

DOCX document 42 KB Posted

Attached to
221010 Hangar Door Repairs/Upgrades
Solicitation number
ITB-09782
Issued by
Duval County, Florida

About this file

This document provides instructions for prequalifications related to the award of a state and local contract opportunity for Levels Four and Five contracts. The project involves repairs and upgrades to the maintenance hangar doors, including alignment and structural integrity inspections, replacements of various door components, and upgrades to the electrical and control systems. The project is located in Duval County, Florida, and additional qualification requirements are specified, such as the contractor having an active office within 300 road miles of the project, successfully completing at least two similar projects within the last five years, and meeting specific experience requirements for the project manager and superintendent. The contractor must also agree to perform a minimum of 15% of the construction work using its own employees.

The document outlines the information that must be submitted for prequalification, including details about the contractor's past projects, any differences between original and final contract prices or completion dates, and any liquidated damages, penalties, liens, defaults, or cancellations. The contractor must also provide proof of their Florida state contractor license, corporate charter number, vendor registration in MyFloridaMarketplace, and a letter of confirmation from their bonding company.

View the file

Other files

File Type Posted
221010 Hangar Doors SOW-Specs.pdf PDF
221010 Invitation To Bid .pdf PDF
221010 Proposal Form-SubList.docx DOCX document
221010 PART 1-Supplemental Conditions.pdf PDF
221010 - ADDENDUM #1.pdf PDF
221010 - ADDENDUM #2.pdf PDF
221010 PART 1-Supplemental Conditions.pdf PDF
221010 Part 2- General Terms & Conditions.pdf PDF
221010 PART 1-Supplemental Conditions.pdf PDF
221010 Part 2- General Terms & Conditions.pdf PDF
221010 - ADDENDUM #1.pdf PDF
221010 Proposal Form-SubList.docx DOCX document
221010 Part 2- General Terms & Conditions.pdf PDF
221010 Invitation To Bid .pdf PDF
221010 PART 1-Supplemental Conditions.pdf PDF
221010 - ADDENDUM #1.pdf PDF
221010 Drive Train Fab Drawings.pdf PDF
221010 Invitation To Bid .pdf PDF
221010 Hangar Doors SOW-Specs.pdf PDF
221010 Invitation To Bid .pdf PDF
221010 - ADDENDUM #2.pdf PDF
221010 - FNG5085.docx DOCX document
221010 - FNG5085.docx DOCX document
221010 Drive Train Fab Drawings.pdf PDF
221010 - FNG5085.docx DOCX document
221010 Drive Train Fab Drawings.pdf PDF
221010 Drive Train Fab Drawings.pdf PDF
221010 Hangar Doors SOW-Specs.pdf PDF
221010 Proposal Form-SubList.docx DOCX document
221010 Part 2- General Terms & Conditions.pdf PDF
221010 Hangar Doors SOW-Specs.pdf PDF
221010 Proposal Form-SubList.docx DOCX document
221010 bid tabulation.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OWNER'S INSTRUCTIONS FOR

PREQUALIFICATIONS FOR AWARD OF THE CONTRACT ON LEVELS FOUR AND FIVE CONTRACTS

The information listed in this Exhibit is required to be filed with soliciting agencies prior to award of any contract. In order to expedite the processing of contracts, please complete the enclosed forms or attach required documentation in accordance with these instructions.

Heading

Project Title Indicate title of project as shown in the solicitation/specifications.
Project Number – State/Federal project number assigned see original solicitation/specifications.
Location Project location as shown in the solicitation/specifications.

Item 1 List projects of comparable size, scope and complexity to subject project.

Item 2-3 Complete in accordance with form.

If additional space is required, please attach supplementary pages.

ADDITIONAL QUALIFICATION REQUIREMENTS/INSTRUCTIONS

The following must be included with packet-use as check list

1. Copy of Florida State Contractor License (If Applicable).

2. Corporate Charter Number.

3. Proof of Contractor's active office within 300 road miles of project. (Attach Map Quest or like) (see 60D-5.004(2)(b)1.f.)

4. Contractor agreement to perform no less than 15% of the construction work utilizing its own employees, on company letterhead (required for Bids in excess of $500,000.00 (Level Five).

5. Resumes of experience for Project Manager and Project Superintendent meeting the requirements at 60D-5.003(2)(b)i, F.A.C. (required for Bids in excess of $500,000.00 (Level Five)

6. List of projects and their status for a period of thirty-six months prior to solicitation.

7. Proof Contractor has successfully completed no less than two (2) projects of similar scope, size and complexity within the last five (5) years, see item 1. Complete as instructed, do not use other forms or alter our format. Additional information may be included with pictures. Do not submit projects that were performed as a subcontractor or not yet completed. Specify if the project was new construction or renovation. Do not reuse this form from previous project submittals as the form could have changed to meet specific requirements (required for Bids in excess of $500,000.00 (Level Five).

8. Proof of vendor registration in MyFloridaMarketplace at www.dms.myflorida.com.

9. Letter of Confirmation from your bonding company stating that you can bond or have bonded with this company.

March 2013 FNG 5085

FNG 5085

EXHIBIT 3 Continued

1.List all projects of similar size, scope and complexity successfully completed by your organization in the previous five years (must be no less than two (2)).
Projects MUST be listed in spaces below for Level Five. Additional information may be attached if desired. (Required for Bids in excess of $500,000.00 (Level Five)
A
B

C. Original Contract Price/

Completion Dates:

Name of Owner (Include POC & phone numbers) Name, Location & Description of Project

Type of Work (Renovation or New Construction) Name of Design Architect and/or Design Engineer (Include POC & phone numbers)

D. Final Contract Price
E.

Original

F. Revised
G. Actual

FNG5085

March 2013 FNG5085

EXHIBIT 3 CONTINUED

With reference to all contracts completed by your organization in the previous fiscal years, as listed on item 1, answer the following questions:

2. Explain differences in original and final contract price, and original and actual completion dates, if any. (Required for Bids in excess of $500,000.00 (Level Five)

3. Were there any liquidated damages, penalties, liens, defaults or cancellations imposed or filed against your organization?

If so, list the name and location of the project, as shown in Column A, explain. (Required for Bids in excess of $500,000.00 (Level Five)

March 2013 FNG5085

FNG 5085

File details come from the government source that posted it. Updated .