221010 PART 1-Supplemental Conditions.pdf

PDF 201 KB Posted

Attached to
221010 Hangar Door Repairs/Upgrades
Solicitation number
ITB-09782
Issued by
Duval County, Florida

About this file

This document is a Construction Contract Project Manual for the NON-TECHNICAL SPECIFICATION SECTIONS OF DIVISION ONE LEVELS 4 & 5 (Level 4 - $200,000 - $500,000) (Level 5 - Over $500,000) Revised FEBRUARY 2023 for a project titled "221010 AASF #1 HANGAR DOOR REPAIR/UPGRADE" to be constructed for the Department of Military Affairs in Florida. The project involves repairs and upgrades to maintenance hangar doors, including alignment and structural integrity inspection, drive component replacement, and electrical/electronic control system work. The project is to be substantially complete within 90 calendar days after the Notice to Proceed, with liquidated damages assessed at $133.00 per calendar day if the project is not completed on time. The Contractor is required to provide and maintain an Architect/Engineer's field office, as well as provide water, electricity, and site security for the duration of the project.

The document also includes standard terms and conditions, such as requirements for bid bonds, criminal history background checks, and insurance and bonding. Samples of required forms are provided, and the bidding process and contract award details are outlined. The overall project is located in the state of Florida, with the work to be performed in St. Johns County and St. Petersburg City.

View the file

Other files

File Type Posted
221010 Hangar Doors SOW-Specs.pdf PDF
221010 Invitation To Bid .pdf PDF
221010 Proposal Form-SubList.docx DOCX document
221010 PART 1-Supplemental Conditions.pdf PDF
221010 - ADDENDUM #1.pdf PDF
221010 - ADDENDUM #2.pdf PDF
221010 PART 1-Supplemental Conditions.pdf PDF
221010 Part 2- General Terms & Conditions.pdf PDF
221010 Part 2- General Terms & Conditions.pdf PDF
221010 - ADDENDUM #1.pdf PDF
221010 Proposal Form-SubList.docx DOCX document
221010 Part 2- General Terms & Conditions.pdf PDF
221010 - FNG5085.docx DOCX document
221010 Invitation To Bid .pdf PDF
221010 PART 1-Supplemental Conditions.pdf PDF
221010 - ADDENDUM #1.pdf PDF
221010 Drive Train Fab Drawings.pdf PDF
221010 Invitation To Bid .pdf PDF
221010 Hangar Doors SOW-Specs.pdf PDF
221010 Invitation To Bid .pdf PDF
221010 - ADDENDUM #2.pdf PDF
221010 - FNG5085.docx DOCX document
221010 - FNG5085.docx DOCX document
221010 Drive Train Fab Drawings.pdf PDF
221010 - FNG5085.docx DOCX document
221010 Drive Train Fab Drawings.pdf PDF
221010 Drive Train Fab Drawings.pdf PDF
221010 Hangar Doors SOW-Specs.pdf PDF
221010 Proposal Form-SubList.docx DOCX document
221010 Part 2- General Terms & Conditions.pdf PDF
221010 Hangar Doors SOW-Specs.pdf PDF
221010 Proposal Form-SubList.docx DOCX document
221010 bid tabulation.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Contract Project Manual for the

NON-TECHNICAL SPECIFICATION

SECTIONS OF DIVISION ONE

LEVELS 4 & 5

(Level 4 - $200,000 - $500,000) (Level 5 – Over $500,000)

Revised FEBRUARY 2023 (All previous revisions are obsolete)

STATE OF FLORIDA

DEPARTMENT OF MILITARY AFFAIRS

2305 STATE ROAD 207

St. Augustine, Florida 32086

(USE COVER SHEET)

221010

AASF #1 HANGAR DOOR REPAIR/UPGRADE

13650 AEROSPACE WAY, BLDG. 860

JACKSONVILLE, FLORIDA

TO BE CONSTRUCTED FOR:

Department of Military Affairs

82 Marine Street

St. Augustine, FL 32084

CONTRACT ADMINISTERED BY

Department of Military Affairs

Construction and Facility Management Office

2305 State Road 207

St. Augustine, Florida, 32033

ARCHITECT / ENGINEER

SIMES & ROSCH

7411 Fullerton Street, STE: 250

Jacksonville, FL 32256

SUPPLEMENTARY TERMS AND CONDITIONS

07/24/2024

221010

AASF #1 Hangar Door Repair/Upgrade, Jacksonville, Florida.

OWNER: Department of Military Affairs

ARCHITECT/ENGINEER: SIMES & ROSCH

This document forms an integral part of the Request for Proposal Documents and the Contract Documents. The receipt of this document must be acknowledged in the space provided on your Proposal. This General Terms and Conditions are hereby modified as follows: (modify below as it applies to the project requirements; remove or strike through unnecessary items)

1. SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES: Section C-7 is amended in part as follows: This Project is to be substantially complete within 90 calendar days after the date of the Notice to Proceed. This date may be extended only in accordance with the Contract Documents. If the project is not substantially completed by the required date, liquidated damages shall be assessed at the rate of $133.00 per calendar day. (PM determines the daily rate in coordination with A/E, Contracting, and Deputy CFMO, or use $0)

2. ARCHITECT/ENGINEER'S FIELD OFFICE. The Contractor shall provide and maintain a watertight office at the Project for the exclusive use of the Architect/Engineer and his representatives, not less than 12' x 12' in size, one room with at least one window in each exterior wall and an independent outside entrance door fitted with hardware and lock, artificial light, a bench with one drawer, a blueprint rack, a heater and a window air conditioner. This office and equipment shall become the property of the Contractor upon completion of the contract.

3. TELEPHONE. A telephone shall be installed in the Architect/Engineer's office and it shall remain until the full completion of the project. Charges for long distance calls shall be paid by the person making the calls. All other telephone charges shall be paid by the Contractor.

4. WATER. Water necessary for construction of the building and testing its plumbing and mechanical systems shall be furnished by the Contractor. He shall make all connections, install a meter, take out and pay for all permits necessary, do all piping and clear away all evidence of same after the job is completed.

5. ELECTRICITY. All electricity for light and power necessary for the construction of the building and testing of its electrical and mechanical systems shall be paid for by the Contractor. The Contractor shall make all necessary arrangements for this service and perform the work required.

6. PROJECT SIGN. A sign shall be erected at the site by the Contractor and shall be 3/4"- 4' X 8' exterior grade plywood mounted on 4 x 4 wood posts (p.t.), located in a prominent location approved by the Architect/Engineer and Owner. Sign shall conform to the size, colors and design specifications provided by Architect/Engineer or owner.

7. INITIAL CONSTRUCTION CONFERENCE. Immediately prior to starting construction or as soon as possible after the construction has started, the Owner will arrange a meeting with the project stakeholders. The purpose of this meeting shall be to discuss requirements and responsibilities of the various parties involved with the objective of expeditious handling of the construction contract. The Owner's Contract Manager and Project Manager will chair this meeting.

8. SITE SECURITY. The Contractor shall pay for and be responsible to secure the site and the project against theft, vandalism, fire and for public safety at all times (24 hours per day) from Notice to Proceed until Substantial Completion.

9. DAVIS-BACON REQUIREMENTS. If Davis-Bacon and related laws apply, they will be addressed in Section D of the General Terms and Conditions. If applicable, then all applicable federal labor standards clauses are incorporated into the Contract Documents. The Contractor agrees to familiarize itself with “Making Davis-Bacon Work – A Contractor’s Guide to Prevailing Wage Requirements for Federally-Assisted Construction Projects” and to comply with all applicable regulations.

EXCEPT AS SPECIFICALLY PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS OF THE BIDDING

DOCUMENTS AND CONTRACT DOCUMENTS REMAIN UNCHANGED.

[END]

Date Issued:

A/I Initials:

NOTICE TO BIDDERS

The following General Terms and Conditions and the Supplemental Terms and Conditions are part of the bidding and contract process for construction projects in excess of $200,000. These non-technical documents are designed to (i) ensure compliance with applicable laws, (ii) protect the State’s interests, and (iii) make the contracting process easier for all parties. Please carefully review all sections in the non-technical specifications including the following items:

1. All Bidders must submit a bid bond with their bid proposal if the bid exceeds $100,000.00. For details please refer to Section B-11 of the General Terms and Conditions.

2. All Bidders must submit bids in accordance with the publicized Invitation to Bid (ITB). If prequalification to bid is required, it will be stated within the ITB along with instructions.

3. Criminal History Background Checks, if included in the General Terms and Conditions, must be obtained for all employees and agents of the Contractor and its subcontractors, their agents and employees, and all other persons performing any of the work under a contract to the Contractor working within buildings or facilities either owned or managed by the Department of Military Affairs.

Details of this responsibility are outlined in Article C-38 of the General Terms and Conditions.

4. All Bidders are responsible for the cost of insurance and bonds. Please refer to Sections C-1 through

C-3 of the General Terms and Conditions for required types of insurance and Exhibits 2 and 3 to review the requirements on the bond forms.

5. Proposal Form may be obtained with the ITB or as instructed in the ITB.

6. Samples of some Forms required by the Department of Military Affairs (DMA) are shown in the

General Terms and Conditions. Forms for use during contract performance will be provided by DMA after contract award.

File details come from the government source that posted it. Updated .