About this file
This is a Scope of Work memorandum issued by the Directorate of Public Works at Camp Blanding Joint Training Center, a Florida Army National Guard facility located in Starke, Florida. The project involves the repaving of four streets—Pensacola, Westerly, Rutland, and Eustis—at the training center. Work includes removing grass from roadway edges and driveways, milling existing asphalt to remove deficient areas, and applying a two-lift asphalt overlay system consisting of a leveling course of approximately 1.25 inches of SP-12.5 hot mix asphalt (maximum 30% RAP) followed by a final paving lift of 1.5 inches of 12.5 mix in accordance with FDOT standards. The project requires replacement of all culverts crossed by new paving with like-for-like concrete culverts and mitered concrete ends, as well as cleaning and maintenance of roadside ditches. A mandatory pre-bid site visit is required for all bidders prior to submission.
The contractor is responsible for all inspections, testing, and density verification, which must reach a minimum of 98 percent compaction on base and sub-base materials. An FDOT-approved tack product must be applied using a heated distributor truck at a rate of 0.10 gallons per square yard. Damaged concrete ditch linings must be repaired by the contractor, and any grass-stripped or damaged areas require new sod installation with contractor-provided watering until establishment. All milling debris, dirt, and recyclable materials must remain on Camp Blanding. Paving must maintain a 2 percent fall from the centerline to each roadway edge to ensure proper drainage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 220017 4800 STREETS Pt 2 GTC.pdf | ||
| 220017 STREETS MAP.pdf | ||
| 220017 CB 4800 STREETS Prop & Sub List.docx | DOCX document | |
| 220017 4800 STREETS Pt 1 Supp Cond.pdf | ||
| 220017 CB 4800 Paving STREETS ITB.pdf | ||
| 220017 FNG 5085.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIRECTORATE OF PUBLIC WORKS
CAMP BLANDING JOINT TRAINING CENTER
FLORIDA ARMY NATIONAL GUARD
5629 STATE ROAD 16 WEST, BUILDING 2300
STARKE, FLORIDA 32091-9703
29 April 2026CBJTC-DPW
MEMORANDUM FOR: Bidders Pre-Bid SITE VISIT IS MANDATORY.
SUBJECT: 220017 4800 Paving Pensacola, Westerly, Rutland and Eustis STREETS Scope of Work
Repave the Streets identified in the attached map, at the Camp Blanding Joint Training Center.
Prior to paving, remove all grass from roadway edges and driveways.
All Streets will be milled of existing asphalt to remove all deficient areas.
All inspections and testing are the responsibility of the contractor and cost must be included in your bid.
Following clean-up an FDOT approved tack product will be applied by use of a heated distributor truck at a rate of 0.10 gallons per square yard.
Following the application of the FDOT approved tack product, a leveling course (1st lift, approximately 1 ½ inches) of SP-12.5 hot mix asphalt (maximum 30% RAP) will be placed by spreader and compacted prior to further work. 2nd lift, final paving to consist of 1 1/2" of 12.5 mix per FDOT Standards. There shall be a 2% fall from the centerline of the road to each edge of road.
Anywhere the new paving crosses a culvert, the culvert is to be replaced (with like for like), and concrete mitered ends added. (See Project Notes (2.) below)
Project Notes:
All new culverts shall be concrete. The shape and size must remain as original. All culverts must be replaced to their original inverts and maintain a positive flow from culvert to culvert.
All roadside ditches along newly paved roads must be cleaned from culvert to culvert and maintain a natural flow from culvert to culvert. Some ditches are concrete lined. The contractor shall repair any of the concrete lining which is damaged by their equipment.
All Avenues that have existing utility cuts will require testing for densities of base and sub-base compaction. All testing must reach 98% compaction or higher prior to paving.
Any areas that have grass stripped or damaged will require new sod. No seeding allowed. Contractor must water until sod is established.
ALL millings, dirt or other recyclable materials shall remain on Camp Blanding and will be
| 220024 - 3600 Paving _ Ludlow, Bristol, Greenwich, Winter Haven Streets_7JUL26_Procurement Request.pdf |
| 220024 - 3600 Paving - Ludlow, Bristol, Greenwich, Winterhaven Streets_SOW and Bidding Sheet.pdf |
| 12220024_420 3600 Paved Streets.pdf |
File details come from the government source that posted it. Updated .