This document provides details on a federal contract opportunity from the Department of Energy Western Area Power Administration to replace breakers at two substations. The solicitation number is 89503222BWA000048 and seeks to replace breakers at the Beaver Creek and Cheyenne substations. The opportunity type is a solicitation. The attached file is a set of drawings related to the Cheyenne substation. The agency listed is the Department of Energy Western Area Power Administration. The document provides key information on the federal contract opportunity to replace electrical infrastructure at two substations, including the solicitation number, names of the substations involved, issuing agency, and an attached drawing file specifically for one of the substations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment D
Cheyenne Drawings
89503222BWA000048
03 September 2021
PROJECT DRAWINGS
CHEYENNE SUBSTATION
115KV BREAKER REPLACEMENT
SECTION C
DESCRIPTION/SPECIFICATIONS
Spec No. 1028
WYOMING
115kV BREAKER REPLACEMENT
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.
Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise WAPA of any errors or omissions.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. CH 0015 Rev. D – Location and Vicinity Map
ELECTRICAL
2. CH 0001 Rev. Q EI – Switching Diagram (Existing Installation)
3. CH 0001 Rev. R – Switching Diagram
4. CH 0010 Rev. G EI – General Plot Plan (Existing Installation)
5. CH 0010 Rev. H – General Plot Plan
6. CH 1001 Rev. L EI – 115kV Area Arrangement Plan (Existing Installation)
7. CH 1001 Rev. M – 115kV Area Arrangement Plan
8. CH 1012 Rev. F EI – 120/240V AC Station Service Panels DWA and LY11 Wiring Diagram (Existing Installation)
9. CH 1012 Rev. G – 120/240V AC Station Service Panels DWA and LY11 Wiring Diagram
10. CH 1100 Rev. E – Equipment and Material Index
11. CH 1101 – Substation Signs
12. CH 1117 Rev. F EI – 115kV Yard Sections L-L, M-M, N-N. P-P and Q-Q (Existing Installation)
13. CH 1117 Rev. G – 115kV Yard Sections L-L, M-M, N-N. P-P and Q-Q
14. CH 1118 Rev. H EI – 115kV Yard Sections C-C, D-D, E-E, F-F, H-H and J-J (Existing Installation)
15. CH 1118 Rev. I – 115kV Yard Sections C-C, D-D, E-E, F-F, H-H and J-J
16. CH 1510 Rev. G EI – 115kV Area Grounding Plan (Existing Installation)
17. CH 1510 Rev. H – 115kV Area Grounding Plan
18. CH 1610 Rev. E EI – 115kV Yard 120/240V AC Station Service Wiring Diagram (Existing Installation)
19. CH 1610 Rev. F – 115kV Yard 120/240V AC Station Service Wiring Diagram
20. CH 1705 Rev. D EI – 115kV Area Conduit Plan (Existing Installation)
21. CH 1705 Rev. E – 115kV Area Conduit Plan
FOUNDATION AND STRUCTURAL DRAWING INDEX:
22. CH 2081-1 Rev. A – Foundation/Structural Data and Drawing Sheets (SH 1 of 2)
23. CH 2081-2 Rev. A – Foundation/Structural Data and Drawing Sheet (SH 1of 2)
CONCRETE:
24. CH 2000 Rev. I EI– Foundation Plan (Existing Installation)
25. CH 2000 Rev. J – Foundation Plan
26. CH 2010 Rev. J EI – General Foundation Plan (Existing Installation)
27. CH 2010 Rev. J EI – General Foundation Plan (Existing Installation)
28. CH 2024 Rev. D EI – Foundations Outline and Reinforcement (Existing Installation)
29. CH 2025 Rev. D EI – Foundations Outline and Reinforcement (Existing Installation)
30. CH 2310 Rev. A – Foundations Outline and Reinforcement
STEEL STRUCTURES:
31. CH 2550 Rev. H – Anchor Bolts
32. CH 2927 – Equipment Cabinet Platforms
CONTROLS:
33. CH T600 – Control Cable List
34. CH 4001 FIO – Service Building Arrangement, Conduit and Grounding
35. CH 6072 Rev. F FIO – 115kV Bus Differential CT Circuit Summation Cabinet ET11A Wiring Diagram (For Information Only)
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.
Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise WAPA of any errors or omissions.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. CH 0015 Rev. D – Location and Vicinity Map
ELECTRICAL
2. CH 0001 Rev. Q EI – Switching Diagram (Existing Installation)
3. CH 0001 Rev. R – Switching Diagram
4. CH 0010 Rev. G EI – General Plot Plan (Existing Installation)
5. CH 0010 Rev. H – General Plot Plan
6. CH 1001 Rev. L EI – 115kV Area Arrangement Plan (Existing Installation)
7. CH 1001 Rev. M – 115kV Area Arrangement Plan
8. CH 1012 Rev. F EI – 120/240V AC Station Service Panels DWA and LY11 Wiring Diagram (Existing Installation)
9. CH 1012 Rev. G – 120/240V AC Station Service Panels DWA and LY11 Wiring Diagram
10. CH 1100 Rev. E – Equipment and Material Index
11. CH 1101 – Substation Signs
12. CH 1117 Rev. F EI – 115kV Yard Sections L-L, M-M, N-N. P-P and Q-Q (Existing Installation)
13. CH 1117 Rev. G – 115kV Yard Sections L-L, M-M, N-N. P-P and Q-Q
14. CH 1118 Rev. H EI – 115kV Yard Sections C-C, D-D, E-E, F-F, H-H and J-J (Existing Installation)
15. CH 1118 Rev. I – 115kV Yard Sections C-C, D-D, E-E, F-F, H-H and J-J
16. CH 1510 Rev. G EI – 115kV Area Grounding Plan (Existing Installation)
17. CH 1510 Rev. H – 115kV Area Grounding Plan
18. CH 1610 Rev. E EI – 115kV Yard 120/240V AC Station Service Wiring Diagram (Existing Installation)
19. CH 1610 Rev. F – 115kV Yard 120/240V AC Station Service Wiring Diagram
20. CH 1705 Rev. D EI – 115kV Area Conduit Plan (Existing Installation)
21. CH 1705 Rev. E – 115kV Area Conduit Plan
FOUNDATION AND STRUCTURAL DRAWING INDEX:
22. CH 2081-1 Rev. A – Foundation/Structural Data and Drawing Sheets (SH 1 of 2)
23. CH 2081-2 Rev. A – Foundation/Structural Data and Drawing Sheet (SH 1of 2)
CONCRETE:
24. CH 2000 Rev. I EI– Foundation Plan (Existing Installation)
25. CH 2000 Rev. J – Foundation Plan
26. CH 2010 Rev. J EI – General Foundation Plan (Existing Installation)
27. CH 2010 Rev. J EI – General Foundation Plan (Existing Installation)
28. CH 2024 Rev. D EI – Foundations Outline and Reinforcement (Existing Installation)
29. CH 2025 Rev. D EI – Foundations Outline and Reinforcement (Existing Installation)
30. CH 2310 Rev. A – Foundations Outline and Reinforcement
STEEL STRUCTURES:
31. CH 2550 Rev. H – Anchor Bolts
32. CH 2927 – Equipment Cabinet Platforms
CONTROLS:
33. CH T600 – Control Cable List
34. CH 4001 FIO – Service Building Arrangement, Conduit and Grounding
35. CH 6072 Rev. F FIO – 115kV Bus Differential CT Circuit Summation Cabinet ET11A Wiring Diagram (For Information Only)
PROJECT DRAWINGS
GEOLOGY:
36. CH 8000 Rev. A – Logs of Exploration
SUITABLE FOR CONSTRUCTION AS OF:
Sep 01, 2021- 7:20am
Sep 01, 2021- 7:16am
Sep 01, 2021- 7:17am
Sep 01, 2021- 7:18am
Sep 01, 2021- 7:19am
Sep 01, 2021- 7:20am
Sep 01, 2021- 7:21am
Sep 01, 2021- 7:22am
Sep 01, 2021- 7:23am
Sep 01, 2021- 7:23am
OWL CREEK LINE
CH 762
PCB JY13A 115KV
TRANSFORMER KV2A
CH 562
PCB JY14A 115KV
ARCHER NORTH LINE
CH 862
PCB JY15A 115KV
ARCHER SOUTH LINE
CH 262
PCB JY16A 115KV
ARCHER SOUTH LINE
VY16A3
CCVT 115KV
ARCHER SOUTH LINE CCVT
EY16A3
VY16A3 SECONDARY FUSES
Sep 01, 2021- 7:24am
Sep 01, 2021- 7:24am
Sep 01, 2021- 7:25am
Sep 01, 2021- 7:26am
Sep 01, 2021- 7:26am
Sep 01, 2021- 7:27am
Sep 01, 2021- 7:27am
Sep 01, 2021- 7:28am
Sep 01, 2021- 7:29am
Sep 01, 2021- 7:29am
Sep 01, 2021- 7:30am
Sep 01, 2021- 7:36am
Sep 01, 2021- 7:36am
Sep 01, 2021- 7:31am
Sep 01, 2021- 7:31am
Sep 01, 2021- 7:32am
Sep 01, 2021- 7:33am
Sep 01, 2021- 7:37am
Sep 01, 2021- 7:38am
Sep 01, 2021- 7:38am
Sep 01, 2021- 7:40am
Sep 01, 2021- 7:39am
Sep 01, 2021- 7:39am
| DrawingsCoverPage |
| ProjectDrawings |
| ch_0015d |
| ch_0001q_ei |
| ch_0001r |
| ch_0010g_ei |
| ch_0010h |
| ch_1001l_ei |
| ch_1001m |
| ch_1012f_ei |
| ch_1012g |
| ch_1100e |
| ch_1101 |
| ch_1117f_ei |
| ch_1117g |
| ch_1118h_ei |
| ch_1118i |
| ch_1510g_ei |
| ch_1510h |
| ch_1610e_ei |
| ch_1610f |
| ch_1705d_ei |
| ch_1705e |
| ch_2081_1a |
| ch_2081_2a |
| ch_2000i_ei |
| ch_2000j |
| ch_2010j_ei |
| ch_2010k |
| ch_2024d_ei |
| ch_2025d_ei |
| ch_2310a |
| ch_2550h |
| ch_2927 |
| ch_t600 |
| ch_4001_fio |
| ch_6072f_fio |
| ch_8000a |
File details come from the government source that posted it. Updated .