This document provides details on a federal contract opportunity from the Department of Energy Western Area Power Administration to replace breakers at two substations. The solicitation number is 89503222BWA000048 and seeks to replace breakers at the Beaver Creek and Cheyenne substations. The opportunity type is a solicitation. The attached file is a set of drawings for the Beaver Creek substation. No other details are provided on products or services required, response dates, pricing terms, or whether there are any set asides.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B
Beaver Creek Drawings
89503222BWA000048
02 September 2021
PROJECT DRAWINGS
BEAVER CREEK SUBSTATION
115KV BREAKER REPLACEMENT
SECTION C
DESCRIPTION/SPECIFICATIONS
Spec. No. 1028
COLORADO
BEAVER CREEK
BREAKER REPLACEMENT
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise WAPA of any errors or omissions.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. BC 0015 Rev. C – Location and Vicinity Map
ELECTRICAL:
2. BC 0001 Rev. N EI – Switching Diagram (Existing Installation)
3. BC 0001 Rev. O – Switching Diagram
4. BC 1003 Rev. E EI – 115kV Electrical Installation Bays Y2 to Y9, Grounding and Bus Plan (Existing Installation)
5. BC 1003 Rev. F – 115kV Electrical Installation Bays Y2 to Y9 Lower Bus Plan
6. BC 1004 Rev. D EI – Bay Y2 Section A-A (Existing Installation)
7. BC 1004 Rev. E – Bay Y2 Section A-A
8. BC 1005 Rev. C EI – 115kV Electrical Installation Bay Y3 Section E-E (Existing Installation)
9. BC 1005 Rev. D – 115kV Electrical Installation Bay Y3 Section E-E
10. BC 1006 Rev. B EI – 115kV Electrical Installation Bay Y5 Section C-C (Existing Installation)
11. BC 1006 Rev. C – 115kV Electrical Installation Bay Y5 Section C-C
12. BC 1007-1 Rev. A EI – 115kV Electrical Installation Bay Y6 Section D-D (Sheet 1 of 2) (Existing Installation)
13. BC 1007-1 Rev. B – 115kV Electrical Installation Bay Y6 Section D-D, Assemblies B, C (Sheet 1 of 2)
14. BC 1010 Rev. E EI – Bays Y2 to Y9 Bus Plan (Existing Installation)
15. BC 1010 Rev. F – Bays Y2 to Y9 Bus Plan
16. BC 1100 – Equipment and Material Index
17. BC 1101 – Substation Signs
18. BC 1106 EI – 115kV Area Bay Y4 Section B-B (Existing Installation)
19. BC 1106 Rev. A – 115kV Area Bay Y4 Section B-B
20. BC 1107 EI – 115kV Area Bay Y7 Section F-F (Existing Installation)
21. BC 1107 Rev. A – 115kV Area Bay Y7 Section F-F
22. BC 1113 – 115kV Bus Structure Section O-O
23. BC 1513 – Electrical Installation 115kV Area Grounding Plan
24. BC 1610 EI – Distribution Panel DWB, Transformer KWA and KWB Wiring Diagram (Existing Installation)
25. BC 1610 Rev. A – Distribution Panel DWB, Transformer KWA and KWB Wiring Diagram
26. BC 1611 – 115kV Yard Panel DWC Wiring Diagram
27. BC 1620 – 115kV Yard 240/120V Wiring Diagram
28. BC 1700 Rev. D EI – Electrical Installation Cable Trench and Conduit Key Plan and Details (Existing Installation)
29. BC 1700 Rev. E – Electrical Installation Cable Trench and Conduit Key Plan
30. BC 1701 – Electrical Installation Cable Trench and Conduit Plan 115kV Area
31. BC 1702 FIO – Electrical Installation Cable Trench and Conduit Details (For Information Only)
FOUNDATION AND STRUCTURAL DRAWING INDEX:
32. BC 2001 Rev. D – Foundation/Structural Data and Drawing Index (SH 1 of 2)
33. BC 2001-1 – Foundation/Structural Data and Drawing Index (SH 2 of 2)
CONCRETE:
34. BC 2000-1 Rev. B (EI) – Foundation General Plan (Existing Installation)
35. BC 2000-1 Rev. C – Foundation General Plan (SH 1 of 3)
36. BC 2000-2 Rev. B (EI) – Foundation Plan West Area (Existing Installation)
37. BC 2000-2 Rev. C – Foundation Plan West Area (SH 2 of 3)
BEAVER CREEK
BREAKER REPLACEMENT
PROJECT DRAWINGS
38. BC 2000-3 Rev. B (EI) – Foundation Plan East Area (Existing Installation)
39. BC 2000-3 Rev. C – Foundation Plan East Area (SH 3 of 3)
40. BC 2003 Rev B. (EI) – Concrete Structures Foundations (Existing Installation)
41. BC 2016 Rev B. (EI) – Concrete Structures Foundations (Existing Installation)
42. BC 2300 – Foundations Outlines and Reinforcement
STEEL STRUCTURES:
43. BC 2007 Rev B – 115 KV. Bus Structure General Plans
44. BC 2008 Rev A (FIO) – 115 KV. Bus Structure Column Assemblies and Connections (For Information Only)
45. BC 2009 Rev B– 115 KV. Bus Structure Beam Assemblies and Connections
46. BC 2010 Rev A (FIO) – 115 KV. Bus Structure Modification (For Information Only)
47. BC 2550 – Anchor Bolts
48. BC 2600 – 115 KV. Steel Structures Bus Structure Beam Assemblies
49. 31 2012 Rev A (EI) – Standard Design Substations Tie-Downs (Existing Installation)
50. 31 2013 Rev B (EI) – Standard Design Switchyards – Steel Structures Capacitor Tie-Down Frames (Existing Installation)
51. 31 2044 Rev F – Equipment Cabinet Platforms and Steel Design and Details
CONTROLS:
52. BC T600 – Control Cable List
GEOLOGY:
53. BC 8000 – Subsurface Exploration – Penetration Resistance and Log
54. BC 8001 – Subsurface Exploration – Penetration Resistance and Log
55. BC 8002 – Subsurface Exploration – Penetration Resistance and Log
56. BC 8003 – Subsurface Exploration – Penetration Resistance and Log
57. BC 8004 – Subsurface Exploration – Penetration Resistance and Log
58. BC 8005 – Subsurface Exploration – Penetration Resistance and Log
59. BC 8006 – Subsurface Exploration – Penetration Resistance and Log
60. BC 8007 – Subsurface Exploration – Penetration Resistance and Log
61. BC 8008 – Subsurface Exploration – Penetration Resistance and Log
62. BC 8009 – Subsurface Exploration – Penetration Resistance and Log
SUITABLE FOR CONSTRUCTION AS OF:
Sep 02, 2021- 6:43am
Sep 16, 2021- 6:42am
Sep 16, 2021- 7:12am
Sep 16, 2021- 7:38am
Sep 02, 2021- 6:46am
Sep 02, 2021- 6:48am
Sep 02, 2021- 6:51am
Sep 02, 2021- 6:54am
Sep 02, 2021- 6:56am
Sep 02, 2021- 6:58am
Sep 02, 2021- 7:01am
Sep 02, 2021- 7:03am
Sep 02, 2021- 9:01am
Sep 16, 2021- 6:46am
Sep 16, 2021- 6:48am
Sep 02, 2021- 7:11am
Sep 16, 2021- 6:50am
Sep 16, 2021- 6:52am
Sep 02, 2021- 7:16am
FORT MORGAN WEST LINE
BC 262
PCB JY2M 115KV
BIG SANDY LINE
BC 462
PCB JY4M 115KV
STERLING LINE
BC 562
PCB JY5M 115KV
HOYT LINE
BC 662
PCB JY6M 115KV
FORT MORGAN WEST LINE
VY2A2
CCVT 115KV
FORT MORGAN WEST LINE
EY2A2
VY2A2 SECONDARY FUSES
DEERING LAKE LINE
BC 762
PCB JY7M 115KV
BIG SANDY LINE
VY4A2
CCVT 115KV
BIG SANDY LINE CCVT
EY4A2
VY4A2 SECONDARY FUSES
STERLING LINE
VY5A2
CCVT 115KV
STERLING LINE CCVT
EY5A2
VY5A2 SECONDARY FUSES
HOYT LINE
VY6A2
CCVT 115KV
HOYT LINE CCVT
EY6A2
VY6A2 SECONDARY FUSES
DEERING LAKE LINE
VY7A2
CCVT 115KV
DEERING LAKE LINE CCVT
EY7A2
VY7A2 SECONDARY FUSES
Sep 02, 2021- 7:18am
Sep 02, 2021- 7:23am
Sep 02, 2021- 7:21am
Sep 02, 2021- 7:28am
Sep 02, 2021- 7:26am
Sep 02, 2021- 7:31am
Sep 03, 2021- 6:08am
Sep 02, 2021- 7:34am
Sep 02, 2021- 9:05am
Sep 02, 2021- 9:03am
Sep 02, 2021- 7:47am
Sep 02, 2021- 7:49am
Sep 02, 2021- 10:04am
Sep 02, 2021- 7:54am
Sep 02, 2021- 7:56am
Sep 02, 2021- 7:58am
Sep 03, 2021- 6:10am
Sep 02, 2021- 9:16am
Sep 02, 2021- 8:36am
Sep 02, 2021- 8:01am
Sep 02, 2021- 9:07am
Sep 02, 2021- 9:09am
Sep 02, 2021- 9:12am
Sep 02, 2021- 8:14am
Sep 02, 2021- 9:14am
Sep 02, 2021- 8:40am
Sep 02, 2021- 8:47am
Sep 02, 2021- 8:43am
Denton For Information Only
Denton For Information Only
Sep 02, 2021- 8:49am
Sep 02, 2021- 8:52am
Sep 02, 2021- 9:41am
Sep 02, 2021- 6:36am
Sep 02, 2021- 8:54am
| Cover Page |
| Project Drawings |
| bc_0015c |
| bc_0001n_ei |
| bc_0001o |
| bc_1003e_ei |
| bc_1003f |
| bc_1004d_ei |
| bc_1004e |
| bc_1005c_ei |
| bc_1005d |
| bc_1006b_ei |
| bc_1006c |
| bc_1007_1a_ei |
| bc_1007_1b |
| bc_1010e_ei |
| bc_1010f |
| bc_1100 |
| bc_1101 |
| bc_1106_ei |
| bc_1106a |
| bc_1107_ei |
| bc_1107a |
| bc_1113 |
| bc_1513 |
| bc_1610_ei |
| bc_1610a |
| bc_1611 |
| bc_1620 |
| bc_1700d_ei |
| bc_1700e |
| bc_1701 |
| bc_1702_fio |
| bc_2001d |
| bc_2001_1 |
| bc_2000_1b_ei |
| bc_2000_1c |
| bc_2000_2b_ei |
| bc_2000_2c |
| bc_2000_3b_ei |
| bc_2000_3c |
| bc_2003b_ei |
| bc_2016b_ei |
| bc_2300 |
| bc_2007b |
| bc_2008a_fio |
| bc_2009b |
| bc_2010a_fio |
| bc_2550 |
| bc_2600 |
| 31_2012a_ei |
| 31_2013b_ei |
| 31_2044f |
| bc_t600 |
| bc_8000 |
| bc_8001 |
| bc_8002 |
| bc_8003 |
| bc_8004 |
| bc_8005 |
| bc_8006 |
| bc_8007 |
| bc_8008 |
| bc_8009 |
File details come from the government source that posted it. Updated .