22. Attachment B - Drawings.pdf
PDF 17 MB Posted
- Attached to
- Lovell Control Building and Breaker Replacement
- Solicitation number
- 89503222BWA000051
About this file
This file is an attachment to a federal contract solicitation issued by the Department of Energy Western Area Power Administration. The solicitation seeks proposals to replace the control building and breakers at the Lovell substation. Interested parties should refer to solicitation number 89503222BWA000051 for full details on response requirements and evaluation criteria. Proposals are due based on the timeline outlined in the solicitation. The selected contractor will be responsible for replacing critical infrastructure to ensure continued operations at the Lovell substation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B
Drawings
89503222BWA000051
17 May 2022
PROJECT DRAWINGS
LOVELL SUBSTATION
SERVICE BUILDING AND BREAKER REPLACEMENT
STATE
SECTION C
DESCRIPTION/SPECIFICATIONS
Spec. No. 1048
WYOMING
SERVICE BUILDING and BREAKER REPLACEMENT
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise WAPA of any errors or omissions.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. LV 0016 Rev D – Location and Vicinity Map
ELECTRICAL:
2. LV 0001 Rev R (EI) – Switching Diagram (Existing Installation)
3. LV 0001 Rev S – Switching Diagram
4. LV 0010 Rev J (EI) – General Plot Plan (Existing Installation)
5. LV 0010 Rev K – General Plot Plan
6. LV 1000 E (FIO) – 12.47kV Bus Structures Sections G-G & J-J (For Information Only)
7. LV 1001 G (EI) – 115/34.5kV Transformer KY4A Area Plan (Existing Installation)
8. LV 1001 H – 115/34.5kV Transformer KY4A Area Plan
9. LV 1002 G (EI) – 69kV Bus Structure Sections B-B, C-C, & D-D (Existing Installation)
10. LV 1002 H – 69kV Bus Structure Sections B-B, C-C, & D-D
11. LV 1003 G (EI) – 115-34.5kV Transformer Sections A-A, B-B, E-E, & I-I (Existing Installation)
12. LV 1003 H – 115-34.5kV Transformer Sections A-A, B-B, E-E, & I-I
13. LV 1004 E (EI) – 115kV Bus Structure Section D-D (Existing Installation)
14. LV 1004 F – 115kV Bus Structure Section D-D
15. LV 1005 M (EI) – 115kV Bus Structure Equipment and Bus Plan (Existing Installation)
16. LV 1005 N – 115kV Bus Structure Equipment and Bus Plan
17. LV 1006 I (EI) – 115kV Bus Structure Sections A-A & PP (Existing Installation)
18. LV 1006 J – 115kV Bus Structure Sections A-A & PP
19. LV 1007 G (EI) – 115kV Bus Structure Section B-B (Existing Installation)
20. LV 1007 H – 115kV Bus Structure Section B-B
21. LV 1008 G (EI) – 115kV Bus Structure Section C-C (Existing Installation)
22. LV 1008 H – 115kV Bus Structure Section C-C
23. LV 1009 D (EI) – 115kV Bus Structure Section E-E (Existing Installation)
24. LV 1009 E – 115kV Bus Structure Section E-E
25. LV 1010 J (EI) – 115kV Bus Structure Sections H-H & R-R (Existing Installation)
26. LV 1010 K – 115kV Bus Structure Sections H-H & R-R
27. LV 1012 E (EI) – 115kV Sections Section M-M (Existing Installation)
28. LV 1012 F – 115kV Sections Section M-M
29. LV 1015 C (EI) – 34.5kV & 12.47kV Bus Structures Sections C-C and F-F (Existing Installation)
30. LV 1015 D – 34.5kV & 12.47kV Bus Structures Sections C-C and F-F
31. LV 1017 C (EI) – 69/115kV XFMR Structure Sections A-A, E-E, F-F & G-G (Existing Installation)
32. LV 1017 D – 69/115kV XFMR Structure Sections A-A, E-E, F-F & G-G
33. LV 1018 E (EI) – 115kV Bus Structures Sections S-S & T-T (Existing Installation)
34. LV 1018 F – 115kV Bus Structures Sections S-S & T-T
35. LV 1019 (EI) – 115kV Transformer KY1A Area Plan (Existing Installation)
36. LV 1019 A – 115kV Transformer KY1A Area Plan
37. LV 1100 G – Equipment and Material Index
38. LV 1101 C – Equipment and Material Index
39. LV 1102 – Substation Signs
40. LV 1500 Rev B (EI) – 69kV Bus Structure Conduit and Grounding Plan (Existing Installation)
41. LV 1500 Rev C – 69kv Bus Structure Conduit and Grounding Plan
42. LV 1501 Rev C (EI) – 34.5kV Grounding and Conduit Plan (Existing Installation)
43. LV 1501 Rev D – 34.5kV Grounding and Conduit Plan
44. LV 1502 Rev F (EI) – 115kV Bus Structure Conduit and Grounding Plan (Existing Installation)
45. LV 1502 Rev G – 115kV Bus Structure Conduit and Grounding Plan
46. LV 1503 – Communications Grounding Details
47. 31 1502 – Communication Site Grounding – Typical Plan
48. 31 1503 – Communication Tower Grounding – Details
49. 31 1504 Rev. B – Building Growing Substation Details
50. LV 1610 Rev. C (EI) – Unit Substation DWA Wiring Diagram (Existing Installation)
51. LV 1610 Rev. D – Unit Substation DWA Wiring Diagram
CIVIL & SITE DRAWINGS:
52. LV 2017 Rev B (FIO) – Grading and Drainage Plan (For Information Only)
53. LV 2018 Rev B (FIO) – Grading & Drainage Facility (For Information Only)
FOUNDATION and STRUCTURAL DRAWING INDEX:
54. LV 2001-1 – Foundation/Structural Data and Drawings Index (Sh 1 of 2)
55. LV 2001-2 – Foundation/Structural Data and Drawings Index (Sh 2 of 2)
FOUNDATION PLANS:
56. LV 2000 Rev J (EI) – Foundation General Plan (Existing Installation)
57. LV 2000-1 – General Foundation Plan (Sh 1 of 4)
58. LV 2000-2 – 115/34.5kV Transformer KY4A Area Foundation Plan (Sh 2 of 4)
59. LV 2000-3 – 115kV Bus Structure Foundation Plan (Sh 3 of 4)
60. LV 2000-4 – 115kV Transformer Foundation Plan (Sh 4 of 4)
CONCRETE:
61. LV 2004 Rev D – Foundations Outline and Reinforcement
62. LV 2012 Rev E – Foundations Outline and Reinforcement
63. LV 2025 Rev E – Foundations Outline and Reinforcement
64. LV 2048 (EI) – Foundations Outline and Reinforcement (Existing Installation)
65. LV 2048 Rev A – Foundations Outline and Reinforcement
66. LV 2300 Rev A – Foundations Outline and Reinforcement
67. LV 2301 – Foundations Outline and Reinforcement
68. LV 2550 – Anchor Bolts & Embeds
69. LV 2877 – 30-Foot Monopole Drilled Auger Type
70. LV 2878 – 30-Foot Monopole Foundation Layout
CABLE TRENCH:
71. LV 2026-1 Rev A (FIO) – Cable Trench Plan, Sections and Details (For Information Only)
72. LV 2026-2 Rev A (FIO) – Cable Trench Plan, Sections and Details (For Information Only)
73. LV 2026-3 Rev A (EI) – Cable Trench Plan, Sections and Details (Existing Installation)
74. LV 2026-3 Rev B – Cable Trench Plan, Sections and Details
75. LV 2501 – Cable Trench Plan
STEEL STRUCTURES:
76. LV 2052 (FIO) – Equipment Supports (For Information Only)
77. LV 2054 (FIO) – 34.5 kV SW & Fuse Support Type I (For Information Only)
78. LV 2600 – Bus and Equipment Support Type I
79. LV 2925 – Equipment Cabinet Platform Type VII Details
80. LV 2876 – 30-Foot Monopole Outline
CONTROL BUILDING:
81. 01 2004-1 Rev. D – Concrete Standards – General Outline & Reinforcement Notes
82. 01 2004-2 Rev. D – Concrete Standards – General Outline & Reinforcement Notes
83. 01 2006-1 – Concrete Standards – Building Slabs-On-Ground Specifications, Notes, Plans & Details (Sheet 1 Of 3)
84. 01 2006-2 – Concrete Standards – Building Slabs-On-Ground Specifications, Notes, Plans & Details (Sheet 2 Of 3)
85. 01 2006-3 – Concrete Standards – Building Slabs-On-Ground Specifications, Notes, Plans & Details (Sheet 3 Of 3)
86. 31 2049-1 Rev. B – Control Switchboard Equipment & Communication Rack – Base Anchorage Details (Sheet 1 Of 2)
87. 31 2051 Rev. B – Structural Building Entry Platforms
88. LV 3010 – Architectural Floor Plan
89. LV 3011 – Battery Room Bridge Crane
90. LV 3012 – Reflected Ceiling Plan
91. LV 3014 – Elevations
92. LV 3016 – Building Sections
93. LV 3018 – Architectural Detailed Wall Sections
94. LV 3020 – Architectural Details
95. LV 3022 – Architectural Detailed Sections
96. LV 3024 – Door Schedules & Details
97. LV 3200 – General Structural Notes, Abbreviations & Reference Drawings
98. LV 3201 – Structural Foundation Plan
99. LV 3202 – Structural Roof Framing Plan
100. LV 3203-1 – Structural Foundation Sections & Details (Sh 1 Of 2)
101. LV 3203-2 – Structural Foundation Sections & Details (Sh 2 Of 2)
102. LV 3204-1 – Structural Foundation/Cable Entry Details (Sh 1 Of 2)
103. LV 3204-2 – Structural Foundation/Cable Entry Details (Sh 2 Of 2)
104. LV 3205-1 – Structural Typical Wood-Framed Wall (Sh 1 Of 2)
105. LV 3205-2 – Structural Typical Wood-Framed Wall (Sh 2 Of 2)
106. LV 3206 – Structural Equipment Mounting Details
107. LV 3400 – Electrical Power Plan
108. LV 3401 – Electrical Lighting Plan
109. LV 3402 – Electrical Security Plan
110. LV 3403 – Electrical Panelboards DHA, DHB
111. LV 3404 – Electrical Wiring Devices Schematic
112. LV 3405 – Electrical Luminaire and Equipment Schedules
CONTROLS:
113. LV T600-1 – Control Cable List (SH 1 OF 2)
114. LV T600-2 – Control Cable List (SH 2 OF 2)
115. LV 1611D – Outdoor Lighting Wiring Diagram
116. LV 4000 Rev I – Service Building Conduit, Arrangement, & Grounding
117. LV 6000 Rev I – 125VDC Distribution Panel BHA1 & BHA2 WD
118. LV 6021-1 Rev B – 115kV PT VY1A Wiring Diagram
119. LV 6021-2 Rev A – 115kV CCVT VY2A1 Wiring Diagram
120. LV 6021-3 Rev B – 115kV CCVT VY3A1 Wiring Diagram
121. LV 6021-4 Rev B – 115kV CCVT VY4A1 Wiring Diagram
122. LV 6021-5 Rev B – 115kV CCVT VY5A1 Wiring Diagram
123. LV 6021-6 Rev A – 115kV CCVT VY6A1 Wiring Diagram
124. LV 6021-7 Rev A – 115kV CCVT VY7A1 Wiring Diagram
125. LV 6022-1 – 69kV CCVT VZ1B Wiring Diagram
126. LV 6022-2 – 69kV CCVT VZ1A1 Wiring Diagram
127. LV 6023 Rev E – 34.5kV VX1A & VX2A & CT'S QX1A & QX2A WD
128. LV 6024 Rev D – 12.47kV CT QW1A & PT VW1A WD
129. LV 6146 – 12.47kV VW1B and RW1B Wiring Diagram
130. LV 6147 – 12.47kV VW4A and RW4A Wiring Diagram
GEOLOGY:
131. LV 0015 Rev C – Topographic Map and Location of Exploration
132. LV 8000 Rev B – Logs of Exploration
133. LV 8001 Rev B – Logs of Exploration
134. LV 8002 Rev B – Logs of Exploration
135. LV 8003 Rev B – Logs of Exploration
136. LV 8004 Rev B – Logs of Exploration
137. LV 8005 Rev B – Logs of Exploration
SUITABLE FOR CONSTRUCTION AS OF:
May 16, 2022- 4:32pm
May 16, 2022- 4:25pm
May 16, 2022- 4:27pm
May 16, 2022- 4:28pm
May 16, 2022- 4:31pm
May 16, 2022- 4:30pm
May 17, 2022- 6:56am
May 17, 2022- 6:59am
May 16, 2022- 5:10pm
POLE A POLE B POLE C
OPENOPENOPENOPEN
8D 8M
125VDC
MOTOR
May 16, 2022- 5:11pm
May 16, 2022- 5:13pm
May 17, 2022- 7:02am
May 16, 2022- 5:19pm
May 17, 2022- 7:04am
May 16, 2022- 5:29pm
May 17, 2022- 7:06am
May 16, 2022- 5:32pm
May 17, 2022- 7:32am
May 16, 2022- 5:33pm
SU
IT
AB
LE
F O
R C
O N
ST
R
U C
TI
O
N A
S O
F:
J ul
6, 3-
0:
am
May 17, 2022- 7:34am
May 16, 2022- 5:35pm
May 17, 2022- 7:36am
May 16, 2022- 5:37pm
May 17, 2022- 7:40am
May 16, 2022- 5:39pm
May 17, 2022- 7:43am
May 16, 2022- 5:40pm
May 17, 2022- 7:51am
May 16, 2022- 5:42pm
May 17, 2022- 7:54am
May 16, 2022- 5:44pm
May 17, 2022- 7:58am
May 16, 2022- 5:45pm
May 17, 2022- 8:02am
May 16, 2022- 5:47pm
May 17, 2022- 8:03am
May 16, 2022- 5:49pm
May 16, 2022- 5:50pm
May 16, 2022- 5:52pm
TRANSFORMER KY4A
LV 462
PCB JY4A 115KV
TRANSFORMER KY1A
LV 162
PCB JY1A 115KV
YELLOWTAIL NO. 1
LV 662
PCB JY2A 115KV
HILLTOP-THERMOPOLIS
LV 762
PCB JY3A 115KV
YELLOWTAIL NO. 2
LV 862
PCB JY6A 115KV
BIG HORN REA
VX1B1
INSTR XFMR 34.5KV
BIG HORN REA
VX1B2
INSTR XFMR 34.5KV
BIG HORN REA
VX1B3
INSTR XFMR 34.5KV
YELLOWTAIL NO. 1
VY2A1
INSTR XFMR 115KV
YELLOWTAIL NO. 1
EY2A
SECONDARY FUSE
TRANSFER BUS
VY4A1
INSTR XFMR 115KV
TRANSFER BUS
EY4A
SECONDARY FUSE
HILLTOP-THERMOPOLIS
VY3A1
INSTR XFMR 115KV
HILLTOP-THERMOPOLIS
EY3A
SECONDARY FUSE
YELLOWTAIL NO. 2
VY6A1
INSTR XFMR 115KV
YELLOWTAIL NO. 2
EY6A
SECONDARY FUSE
BIG GEORGE
VY7A1
INSTR XFMR 115KV
BIG GEORGE
EY7A
SECONDARY FUSE
GROUND FAULT CIRCUIT
VW4A1
VT 12.47KV
GROUND FAULT CIRCUIT
VW4A2
VT 12.47KV
GROUND FAULT CIRCUIT
VW4A3
VT 12.47KV
GROUND FAULT CIRCUIT
RW4A
RESISTOR 208V
GROUND FAULT CIRCUIT
EW4A
TERMINAL BLOCKS
GROUND FAULT CIRCUIT
VW1B1
VT 12.47KV
GROUND FAULT CIRCUIT
VW1B2
VT 12.47KV
GROUND FAULT CIRCUIT
VW1B3
VT 12.47KV
GROUND FAULT CIRCUIT
RW1B
RESISTOR 208V
GROUND FAULT CIRCUIT
EW1B
TERMINAL BLOCKS
NORTH CODY
EZ1A
SECONDARY FUSE
TRANSFORMER KY1A
EZ1B
SECONDARY FUSE
May 16, 2022- 5:53pm
May 17, 2022- 8:07am
May 16, 2022- 5:55pm
May 17, 2022- 8:09am
May 16, 2022- 5:57pm
May 17, 2022- 8:11am
May 16, 2022- 6:00pm
AS OF: May 16, 2022- 6:01pm
NOT TO BE USED FOR REVIEW SETINTERNAL ENGINEERING REVIEW
May 16, 2022- 6:01pm
May 17, 2022- 8:13am
May 16, 2022- 6:02pm
May 17, 2022- 8:19am
May 17, 2022- 8:24am
May 16, 2022- 6:16pm
May 16, 2022- 6:17pm
May 17, 2022- 8:15am
May 16, 2022- 6:05pm
May 16, 2022- 6:07pm
May 16, 2022- 6:07pm
May 16, 2022- 6:10pm
May 16, 2022- 6:12pm
May 16, 2022- 6:14pm
May 17, 2022- 8:17am
May 16, 2022- 6:52pm
May 16, 2022- 6:53pm
May 17, 2022- 8:42am
May 17, 2022- 8:38am
May 16, 2022- 7:03pm
May 17, 2022- 8:49am
May 16, 2022- 7:08pm
May 16, 2022- 7:13pm
May 16, 2022- 7:14pm
May 17, 2022- 8:26am
May 17, 2022- 8:30am
May 17, 2022- 8:32am
May 16, 2022- 6:55pm
May 16, 2022- 7:07pm
May 17, 2022- 8:45am
May 17, 2022- 8:47am
May 16, 2022- 7:10pm
May 16, 2022- 7:16pm
May 16, 2022- 7:11pm
Ψ
Ψ
Ψ
Ψ
AutoCAD SHX Text
4'-0" BASE
AutoCAD SHX Text
4'-0" BASE
AutoCAD SHX Text
4'-0" BASE
AutoCAD SHX Text
4'-0" BASE
AutoCAD SHX Text
PLAN - BASE FRAME RELATIONSHIP TO FLOOR PANELS &
AutoCAD SHX Text
ALLOWABLE FLOOR PANEL CUT-OUTS, SEE NOTES 4 & 9
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text
4'-0" BASE
AutoCAD SHX Text
4'-0" BASE
AutoCAD SHX Text
4'-0" BASE
AutoCAD SHX Text
4'-0" BASE
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text
FRONT
AutoCAD SHX Text
FRONT
AutoCAD SHX Text
FRONT
AutoCAD SHX Text
WESTERN AREA POWER ADMINISTRATION
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF ENERGY
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
SUBSTATION STANDARDS
AutoCAD SHX Text
CONTROL SWITCHBOARD EQUIPMENT &
AutoCAD SHX Text
COMMUNICATION RACK
AutoCAD SHX Text
BASE ANCHORAGE DETAILS (SHEET 1 OF 2)
AutoCAD SHX Text
J. SCHREIBER
AutoCAD SHX Text
D. HANSON
AutoCAD SHX Text
AutoCAD SHX Text 2049-1
AutoCAD SHX Text
CIVIL ENGINEERING MANAGER
AutoCAD SHX Text
HEADQUARTERS - LAKEWOOD, COLORADO
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
FRONT ELEVATION
AutoCAD SHX Text
ISOMETRIC VIEW
AutoCAD SHX Text
OPTION A NOTES
AutoCAD SHX Text
DETAIL A
AutoCAD SHX Text
DETAIL B
AutoCAD SHX Text
%%UOPTION A:%%U THREADED ROD & CHANNEL SYSTEM
AutoCAD SHX Text
SUPERSEDES DWG NO. 31_2049A (IN PART)
AutoCAD SHX Text S:\projects\Misc\StandardDrawings\Drawings\DesignDrawings\xDwgsReadyForFinal\Scripts\31_2049_1b.dwg Last Saved By: Denton, Debra on 10/5/2020 3:10 PM Last Saved By: Denton, Debra on 10/5/2020 3:10 PMDenton, Debra on 10/5/2020 3:10 PM on 10/5/2020 3:10 PM10/5/2020 3:10 PM
AutoCAD SHX Text
STRINGERS BETWEEN TOPS OF FLOOR PEDESTALS NOT
AutoCAD SHX Text
SHOWN FOR CLARITY.
AutoCAD SHX Text
UNISTRUT SYSTEM (OR EQUAL):
AutoCAD SHX Text
P1000T, 12 GAUGE, 1 5/8" GALVANIZED STEEL
AutoCAD SHX Text
CHANNEL; P1010 CHANNEL NUT WITH SPRING THREADED
AutoCAD SHX Text FOR 1/2"o ROD.
AutoCAD SHX Text
ANCHOR OPTIONS:
AutoCAD SHX Text
HILTI (OR EQUAL) HIT-RE 500-SD EPOXY
AutoCAD SHX Text ANCHORING SYSTEM: 1/2"o HILTI HAS THREADED
AutoCAD SHX Text
RODS WITH 4 1/2" MIN EMBEDMENT INTO
AutoCAD SHX Text
CONCRETE SLAB.
AutoCAD SHX Text
HILTI (OR EQUAL) KWIK BOLT TZ-SS 304
AutoCAD SHX Text EXPANSION ANCHORS: 1/2"o WITH 3 1/4" MIN
AutoCAD SHX Text
EMBEDMENT INTO CONCRETE SLAB.
AutoCAD SHX Text
1. BASE ANCHORAGE DETAILS SHOWN ON THIS SHEET ARE BASE ANCHORAGE DETAILS SHOWN ON THIS SHEET ARE MINIMUM REQUIREMENTS APPLICABLE FOR ALL IBC SEISMIC DESIGN CATEGORIES (SDC), ALL IEEE 693 SEISMIC QUALIFICATION LEVELS (SQL), AND ALL NON-SPECIFIED LOCATIONS. 2. FOR CONTROL SWITCHBOARD EQUIPMENT OR FOR CONTROL SWITCHBOARD EQUIPMENT OR COMMUNICATION RACK LOCATIONS, SEE ARCHITECTURAL FLOOR PLAN AND BUILDING ARRANGEMENT, CONDUIT & GROUNDING DRAWING. 3. REFER TO SPECIFICATIONS FOR IEEE 693 SEISMIC REFER TO SPECIFICATIONS FOR IEEE 693 SEISMIC QUALIFICATION LEVEL (SQL) AND/OR BUILDING GENERAL STRUCTURAL NOTES (GSN) FOR IBC SEISMIC DESIGN CATEGORY (SDC). 4. REGARDING CABLE CUTOUTS FOR INSTALLATION OF REGARDING CABLE CUTOUTS FOR INSTALLATION OF CONTROL SWITCHBOARD EQUIPMENT OR COMMUNICATION RACKS: DO NOT CUT STRUCTURAL STRINGERS SPANNING BETWEEN TOPS OF FLOOR PEDESTALS; DO NOT CUT STIFFENED PERIMETER SECTIONS OF FLOOR PANELS; AND DO NOT CUT WITHIN 3" OF FLOOR PANEL EDGES IN ANY DIRECTION. 5. CONTROL SWITCHBOARD EQUIPMENT OR COMMUNICATION CONTROL SWITCHBOARD EQUIPMENT OR COMMUNICATION RACK BASE FRAME IS SHOWN IN CONCEPT ONLY; REFER TO MANUFACTURER FOR ACTUAL CONFIGURATION AND DETAILS (TO BE COMPATIBLE WITH ANCHORAGE REQUIREMENTS SHOWN). 6. FOR APPROVAL PRIOR TO INSTALLATION, SUBMIT FOR APPROVAL PRIOR TO INSTALLATION, SUBMIT SEISMIC OUTLINE DRAWING (PER IEEE 693) AND SHOP DETAIL DRAWINGS OF BASE SHOWING COMPONENTS AND ANCHOR LOCATIONS. 7. REFER TO 53 7051, ELECTRICAL STANDARDS & REFER TO 53 7051, ELECTRICAL STANDARDS & SPECIFICATIONS FOR EQUIPMENT REQUIRING ELECTRICAL ISOLATION BETWEEN ANCHOR & BASE; AND BETWEEN ANCHOR, THROUGH RAISED FLOOR INTO CONCRETE SLAB. 8. CONTROL SWITCHBOARD EQUIPMENT OR COMMUNICATIONS CONTROL SWITCHBOARD EQUIPMENT OR COMMUNICATIONS RACK SIDE WALL FRAMES NOT SHOWN FOR CLARITY. 9. COORDINATE W/ ARCHITECTURAL FLOOR PLAN REGARDING COORDINATE W/ ARCHITECTURAL FLOOR PLAN REGARDING FLOOR PANEL LAYOUT.
AutoCAD SHX Text A.
AutoCAD SHX Text B.
AutoCAD SHX Text
INTERIOR
AutoCAD SHX Text
DIRECTION, TYP
AutoCAD SHX Text
ANCHORAGE DIRECTLY INTO FLOOR SLAB
AutoCAD SHX Text
DETAIL C
AutoCAD SHX Text
ANCHORAGE THROUGH RAISED FLOOR INTO FLOOR SLAB BELOW
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text A1.
AutoCAD SHX Text A2.
AutoCAD SHX Text A3.
AutoCAD SHX Text
OCTOBER 13, 2016
AutoCAD SHX Text A
AutoCAD SHX Text
A7-JAS
AutoCAD SHX Text
UPDATED FOR NEW BASE ASSEMBLY CONFIGURATION;
AutoCAD SHX Text
ADDED PLAN - BASE FRAME RELATIONSHIP TO FLOOR
AutoCAD SHX Text
PANELS & ALLOWABLE FLOOR PANEL CUT-OUTS.
AutoCAD SHX Text c
AutoCAD SHX Text c
AutoCAD SHX Text c
AutoCAD SHX Text c
AutoCAD SHX Text
BACK
AutoCAD SHX Text
FRONT
AutoCAD SHX Text c
AutoCAD SHX Text
ISOMETRIC VIEW
AutoCAD SHX Text c
AutoCAD SHX Text c
AutoCAD SHX Text c
AutoCAD SHX Text c
AutoCAD SHX Text c
AutoCAD SHX Text c
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text c
AutoCAD SHX Text
FRONT
AutoCAD SHX Text 3-23-18
AutoCAD SHX Text B
AutoCAD SHX Text
A7-JAS
AutoCAD SHX Text
REMOVED A3.C.
AutoCAD SHX Text 10-5-20
May 16, 2022- 7:18pm
May 16, 2022- 7:19pm
May 16, 2022- 7:22pm
May 16, 2022- 7:23pm
May 16, 2022- 7:25pm
May 16, 2022- 7:27pm
May 16, 2022- 7:28pm
May 16, 2022- 7:30pm
May 16, 2022- 7:31pm
May 16, 2022- 7:33pm
May 16, 2022- 7:35pm
May 16, 2022- 7:38pm
May 16, 2022- 7:39pm
May 16, 2022- 7:41pm
May 16, 2022- 7:43pm
May 16, 2022- 7:44pm
May 16, 2022- 7:46pm
May 16, 2022- 7:48pm
May 16, 2022- 7:49pm
May 16, 2022- 7:52pm
May 16, 2022- 7:54pm
May 16, 2022- 7:56pm
May 16, 2022- 7:58pm
May 16, 2022- 8:00pm
May 16, 2022- 8:01pm
May 16, 2022- 8:27pm
May 16, 2022- 8:29pm
May 16, 2022- 6:04pm
May 16, 2022- 8:03pm
May 16, 2022- 8:05pm
May 16, 2022- 8:07pm
May 16, 2022- 8:08pm
May 16, 2022- 8:10pm
May 16, 2022- 8:11pm
May 16, 2022- 8:13pm
May 16, 2022- 8:15pm
May 16, 2022- 8:16pm
May 16, 2022- 8:18pm
May 16, 2022- 8:19pm
May 16, 2022- 8:21pm
May 16, 2022- 8:22pm
May 16, 2022- 8:24pm
May 16, 2022- 8:26pm
| Lovell Breaker Replacement |
| Drawing List |
| lv_0016d |
| lv_0001r_ei |
| lv_0001s |
| lv_0010j_ei |
| lv_0010k |
| lv_1000e_fio |
| lv_1001g_ei |
| lv_1001h |
| lv_1002g_ei |
| lv_1002h |
| lv_1003g_ei |
| lv_1003h |
| lv_1004e_ei |
| lv_1004f |
| lv_1005m_ei |
| lv_1005n |
| lv_1006i_ei |
| lv_1006j |
| lv_1007g_ei |
| lv_1007h |
| lv_1008g_ei |
| lv_1008h |
| lv_1009d_ei |
| lv_1009e |
| lv_1010j_ei |
| lv_1010k |
| lv_1012e_ei |
| lv_1012f |
| lv_1015c_ei |
| lv_1015d |
| lv_1017c_ei |
| lv_1017d |
| lv_1018e_ei |
| lv_1018f |
| lv_1019_ei |
| lv_1019a |
| lv_1100g |
| lv_1101c |
| lv_1102 |
| lv_1500b_ei |
| lv_1500c |
| lv_1501c_ei |
| lv_1501d |
| lv_1502f_ei |
| lv_1502g |
| lv_1503 |
| 31_1502 |
| 31_1503 |
| 31_1504b |
| lv_1610c_ei |
| lv_1610d |
| lv_2017b_fio |
| lv_2018b_fio |
| lv_2001_1 |
| lv_2001_2 |
| lv_2000j_ei |
| lv_2000_1 |
| lv_2000_2 |
| lv_2000_3 |
| lv_2000_4 |
| lv_2004d |
| lv_2012e |
| lv_2025e |
| lv_2048_ei |
| lv_2048a |
| lv_2300a |
| lv_2301 |
| lv_2550 |
| lv_2877 |
| lv_2878 |
| lv_2026_1a_fio |
| lv_2026a_fio |
| lv_2026_3a_ei |
| lv_2026_3b |
| lv_2501 |
| lv_2052_fio |
| lv_2054_fio |
| lv_2600 |
| lv_2925 |
| lv_2876 |
| 01_2004_1d |
| 01_2004_2d |
| 01_2006_1 |
| 01_2006_2 |
| 01_2006_3 |
| 31_2049_1b |
| 31_2051b |
| lv_3010 |
| lv_3011 |
| lv_3012 |
| lv_3014 |
| lv_3016 |
| lv_3018 |
| lv_3020 |
| lv_3022 |
| lv_3024 |
| lv_3200 |
| lv_3201 |
| lv_3202 |
| lv_3203_1 |
| lv_3203_2 |
| lv_3204_1 |
| lv_3204_2 |
| lv_3205_1 |
| lv_3205_2 |
| lv_3206 |
| lv_3400 |
| lv_3401 |
| lv_3402 |
| lv_3403 |
| lv_3404 |
| lv_3405 |
| lv_t600_1 |
| lv_t600_2 |
| lv_1611d |
| lv_4000i |
| lv_6000i |
| lv_6021_1b |
| lv_6021_2a |
| lv_6021_3b |
| lv_6021_4b |
| lv_6021_5b |
| lv_6021_6a |
| lv_6021_7a |
| lv_6022_1 |
| lv_6022_2 |
| lv_6023e |
| lv_6024d |
| lv_6146 |
| lv_6147 |
| lv_0015c |
| lv_8000b |
| lv_8001b |
| lv_8002b |
| lv_8003b |
| lv_8004b |
| lv_8005b |
File details come from the government source that posted it. Updated .